CN107905551A - 墙体的加固结构施工方法 - Google Patents

墙体的加固结构施工方法 Download PDF

Info

Publication number
CN107905551A
CN107905551A CN201711245741.6A CN201711245741A CN107905551A CN 107905551 A CN107905551 A CN 107905551A CN 201711245741 A CN201711245741 A CN 201711245741A CN 107905551 A CN107905551 A CN 107905551A
Authority
CN
China
Prior art keywords
deformed bar
wall
reinforcing rib
grouting pipe
slurries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711245741.6A
Other languages
English (en)
Other versions
CN107905551B (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Tianli Huaneng Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711245741.6A priority Critical patent/CN107905551B/zh
Publication of CN107905551A publication Critical patent/CN107905551A/zh
Application granted granted Critical
Publication of CN107905551B publication Critical patent/CN107905551B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties

Abstract

本发明公开了一种墙体的加固结构施工方法,其特征是墙体加固施工步骤采用如下:(1)剥离粉刷层,预钻注浆管的埋设孔;(2)挂设预应力钢筋;(3)在预应力钢筋上面挂设加强筋;(4)对预应力钢筋进行预应力张拉;(5)预应力张拉完毕后用固定筋将预应力钢筋进行焊接锚定,将预应力钢筋与加强筋进行焊接固定;(6)埋设注浆管,注浆管与埋设孔的空隙采用结构胶进行封闭;(7)对墙体进行注浆。

Description

墙体的加固结构施工方法
技术领域
本发明涉及一种墙体施工方法,特别涉及一种墙体的加固结构施工方法。
背景技术
旧建筑物经长期使用后因各种原因会出现承载力下降的现象,主要表现在旧建筑物的墙体因沉降等原因出现裂缝,或者墙体承载力不能满足现有荷载的要求;旧建筑物的混凝土梁因混凝土碳化会出现承载力下降,或者因使用标准的提升而出现承载力不能达到要求。因此对于旧建筑物,要加强结构的整体承力效果,改善结构的力学性能。
发明内容
本发明是提供一种墙体的加固结构施工方法,解决墙体承载力的问题。
本发明针对墙体强度不够,采取以下加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋,预应力钢筋直径为12~14mm,预应力钢筋间距为150~300mm,预应力钢筋上面再布置非预应力加强筋,预应力钢筋与加强筋进行焊接连接,加强筋直径为12~14mm,加强筋钢筋间距为150~300mm。预应力钢筋初布置方向与水平夹角为45度,加强筋布置方向与预应力钢筋初布置方向垂直。预应力钢筋张拉完毕后将预应力钢筋通过固定筋进行固定,固定筋与预应力钢筋进行焊接固定,固定筋直径为14~16mm。固定筋间距为150~300mm,每个张拉单元长度为150~300mm,在张拉单元的两个端头设置加强筋。预应力钢筋与非预应力加强筋形成的张拉单元内布置注浆管,注浆管间距为350~450mm,注浆管为直径10mm的不锈钢钢管,注浆管埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管与储浆罐之间设置三通阀门。
还可以采用下列加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋,预应力钢筋直径为12~14mm,预应力钢筋间距为150~300mm,预应力钢筋上面再布置非预应力加强筋,预应力钢筋与加强筋进行焊接连接,加强筋直径为12~14mm,加强筋钢筋间距为150~300mm。预应力钢筋初布置方向为水平,加强筋布置方向为竖向布置。预应力钢筋张拉完毕后将预应力钢筋通过固定筋进行固定,固定筋与预应力钢筋进行焊接固定,固定筋直径为14~16mm。固定筋间距为300~600mm,每个张拉单元长度为300~600mm,在张拉单元的两个端头设置加强筋,在端头竖向加强筋和竖向固定筋之间布置一排加强筋。预应力钢筋与非预应力加强筋形成的张拉单元内布置注浆管,注浆管间距为350~450mm,注浆管为直径10mm的不锈钢钢管,注浆管埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管与储浆罐之间设置三通阀门。
墙体表面设置预应力钢筋后,墙体结构性能会有很大的提升,即使是结构的破坏形态也会很大的改善,会从塑性破坏过渡到弹性破坏,对结构安全会有显著的作用。
墙体加固施工步骤采用如下:
(1)剥离粉刷层,预钻注浆管的埋设孔,注浆管的埋设孔直径为12mm;预钻埋设孔使用电动旋转金刚石取芯钻,用水冷却钻头并带出砖屑;采用钢丝清理墙体表面的灰尘及浮渣或者松散部位并保持干燥;
(2)挂设预应力钢筋,通过U形铁扣将预应力钢筋固定在墙体,U形铁扣插入墙体灰缝;
(3)在预应力钢筋上面挂设加强筋,用钢丝将预应力钢筋与加强筋进行初步连接;
(4)对预应力钢筋进行预应力张拉,预应力钢筋张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。张拉工艺采用如下:将预应力钢筋初张拉张拉至10%的控制张拉应力,持荷3min建立初始应力,再张拉至控制张拉应力,持荷5min建立预应力。
(5)预应力张拉完毕后用固定筋将预应力钢筋进行焊接锚定,将预应力钢筋与加强筋进行焊接固定;
(6)埋设注浆管,注浆管与埋设孔的空隙采用结构胶进行封闭;
(7)对墙体进行注浆;用压力注浆机械浆液注入墙体,注浆从最下排位置开始,逐步向上和对称向两侧发展,在每一个注射点达到预期压力或者浆液在邻近注射点自由流出,注射方可终止,把注射孔堵塞。
如果浆液有渗漏,如找不到漏失通道,将浆液掺入速凝剂持续小量的注射使漏失通道逐渐沉淀堵塞。
浆液完全凝固后,拆除注浆管并进行封孔。
如果墙体有裂缝,在步骤(7)前要进行以下处理:
1)在裂缝中部埋设灌浆嘴,灌注点间距根据裂缝宽度和裂缝深度综合确定,间距为200~300mm;
2)封闭裂缝,灌浆嘴埋设后采用环氧胶泥封闭,形成一个密闭空间,预留浆液进出口,再用针筒将浆液压入缝隙,使其注满。
3)密封检查,沿裂缝涂一层肥皂,从灌浆嘴通入压缩空气,漏气部位予以修补密封至不漏为止。
4)灌浆,当裂缝宽度小于0.3mm时,采用环氧胶泥封闭裂缝后,再采用甲基丙烯酸脂类浆液灌注;当裂缝宽度大于或等于0.3mm且小于1mm时,采用环氧树脂类浆液灌注;当裂缝宽度大于或等于1mm时,采用水泥浆液灌注。
本发明结构性能好,安全可靠。
附图说明
图1为墙体加固结构示意图一,图2为墙体加固结构示意图二。
各附图中:1、预应力钢筋,2、加强筋,3、固定筋,4、注浆管,5、角钢,6、紧固螺杆,7、钢板,8、缀板。
具体实施方式
实施例一
本实施例针对墙体强度不够,采取以下加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋1,预应力钢筋1直径为12mm,预应力钢筋1间距为200mm,预应力钢筋1上面再布置非预应力加强筋2,预应力钢筋1与加强筋2进行焊接连接,加强筋2直径为12mm,加强筋2钢筋间距为200mm。预应力钢筋1初布置方向与水平夹角为45度,加强筋2布置方向与预应力钢筋1初布置方向垂直,预应力钢筋1初布置为图1虚线位置,预应力钢筋1经张拉后变成实线位置。预应力钢筋1张拉完毕后将预应力钢筋1通过固定筋3进行固定,固定筋3与预应力钢筋1进行焊接固定,固定筋3直径为14mm。固定筋3间距为200mm,每个张拉单元长度为200mm,在张拉单元的两个端头设置加强筋2。预应力钢筋1与非预应力加强筋2形成的张拉单元内布置注浆管4,注浆管4间距为400mm,注浆管4为直径10mm的不锈钢钢管,注浆管4埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管4与储浆罐之间设置三通阀门。
还可以采用下列加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋1,预应力钢筋1直径为12mm,预应力钢筋1间距为200mm,预应力钢筋1上面再布置非预应力加强筋2,预应力钢筋1与加强筋2进行焊接连接,加强筋2直径为12mm,加强筋2钢筋间距为200mm。预应力钢筋1初布置方向为水平,加强筋2布置方向为竖向布置,预应力钢筋1初布置为图2虚线位置,预应力钢筋1经张拉后变成实线位置。预应力钢筋1张拉完毕后将预应力钢筋1通过固定筋3进行固定,固定筋3与预应力钢筋1进行焊接固定,固定筋3直径为14~16mm。固定筋3间距为400mm,每个张拉单元长度为400mm,在张拉单元的两个端头设置加强筋2,在端头竖向加强筋2和竖向固定筋3之间布置一排加强筋2。预应力钢筋1与非预应力加强筋2形成的张拉单元内布置注浆管4,注浆管4间距为400mm,注浆管4为直径10mm的不锈钢钢管,注浆管4埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管4与储浆罐之间设置三通阀门。
墙体加固施工步骤采用如下:
(1)剥离粉刷层,预钻注浆管4的埋设孔,注浆管4的埋设孔直径为12mm;预钻埋设孔使用电动旋转金刚石取芯钻,用水冷却钻头并带出砖屑;采用钢丝清理墙体表面的灰尘及浮渣或者松散部位并保持干燥;
(2)挂设预应力钢筋1,通过U形铁扣将预应力钢筋1固定在墙体,U形铁扣插入墙体灰缝;
(3)在预应力钢筋1上面挂设加强筋2,用钢丝将预应力钢筋1与加强筋2进行初步连接;
(4)对预应力钢筋1进行预应力张拉,预应力钢筋1张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。张拉工艺采用如下:将预应力钢筋1初张拉张拉至10%的控制张拉应力,持荷3min建立初始应力,再张拉至控制张拉应力,持荷5min建立预应力。
(5)预应力张拉完毕后用固定筋3将预应力钢筋1进行焊接锚定,将预应力钢筋1与加强筋2进行焊接固定;
(6)埋设注浆管4,注浆管4与埋设孔的空隙采用结构胶进行封闭;
(7)对墙体进行注浆;用压力注浆机械浆液注入墙体,注浆从最下排位置开始,逐步向上和对称向两侧发展,在每一个注射点达到预期压力或者浆液在邻近注射点自由流出,注射方可终止,把注射孔堵塞。
如果浆液有渗漏,如找不到漏失通道,将浆液掺入速凝剂持续小量的注射使漏失通道逐渐沉淀堵塞。
浆液完全凝固后,拆除注浆管4并进行封孔。
如果墙体有裂缝,在步骤(7)前要进行以下处理:
1)在裂缝中部埋设灌浆嘴,灌注点间距根据裂缝宽度和裂缝深度综合确定,间距为200~300mm;
2)封闭裂缝,灌浆嘴埋设后采用环氧胶泥封闭,形成一个密闭空间,预留浆液进出口,再用针筒将浆液压入缝隙,使其注满。
3)密封检查,沿裂缝涂一层肥皂,从灌浆嘴通入压缩空气,漏气部位予以修补密封至不漏为止。
4)灌浆,当裂缝宽度小于0.3mm时,采用环氧胶泥封闭裂缝后,再采用甲基丙烯酸脂类浆液灌注;当裂缝宽度大于或等于0.3mm且小于1mm时,采用环氧树脂类浆液灌注;当裂缝宽度大于或等于1mm时,采用水泥浆液灌注。
实施例二
本实施例采用下列加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋1,预应力钢筋1直径为12mm,预应力钢筋1间距为200mm,预应力钢筋1上面再布置非预应力加强筋2,预应力钢筋1与加强筋2进行焊接连接,加强筋2直径为12mm,加强筋2钢筋间距为200mm。预应力钢筋1初布置方向为水平,加强筋2布置方向为竖向布置,预应力钢筋1初布置为图2虚线位置,预应力钢筋1经张拉后变成实线位置。预应力钢筋1张拉完毕后将预应力钢筋1通过固定筋3进行固定,固定筋3与预应力钢筋1进行焊接固定,固定筋3直径为14~16mm。固定筋3间距为400mm,每个张拉单元长度为400mm,在张拉单元的两个端头设置加强筋2,在端头竖向加强筋2和竖向固定筋3之间布置一排加强筋2。预应力钢筋1与非预应力加强筋2形成的张拉单元内布置注浆管4,注浆管4间距为400mm,注浆管4为直径10mm的不锈钢钢管,注浆管4埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管4与储浆罐之间设置三通阀门。
墙体加固施工步骤采用如下:
(1)剥离粉刷层,预钻注浆管4的埋设孔,注浆管4的埋设孔直径为12mm;预钻埋设孔使用电动旋转金刚石取芯钻,用水冷却钻头并带出砖屑;采用钢丝清理墙体表面的灰尘及浮渣或者松散部位并保持干燥;
(2)挂设预应力钢筋1,通过U形铁扣将预应力钢筋1固定在墙体,U形铁扣插入墙体灰缝;
(3)在预应力钢筋1上面挂设加强筋2,用钢丝将预应力钢筋1与加强筋2进行初步连接;
(4)对预应力钢筋1进行预应力张拉,预应力钢筋1张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。张拉工艺采用如下:将预应力钢筋1初张拉张拉至10%的控制张拉应力,持荷3min建立初始应力,再张拉至控制张拉应力,持荷5min建立预应力。
(5)预应力张拉完毕后用固定筋3将预应力钢筋1进行焊接锚定,将预应力钢筋1与加强筋2进行焊接固定;
(6)埋设注浆管4,注浆管4与埋设孔的空隙采用结构胶进行封闭;
(7)对墙体进行注浆;用压力注浆机械浆液注入墙体,注浆从最下排位置开始,逐步向上和对称向两侧发展,在每一个注射点达到预期压力或者浆液在邻近注射点自由流出,注射方可终止,把注射孔堵塞。
如果浆液有渗漏,如找不到漏失通道,将浆液掺入速凝剂持续小量的注射使漏失通道逐渐沉淀堵塞。
浆液完全凝固后,拆除注浆管4并进行封孔。
如果墙体有裂缝,在步骤(7)前要进行以下处理:
1)在裂缝中部埋设灌浆嘴,灌注点间距根据裂缝宽度和裂缝深度综合确定,间距为200~300mm;
2)封闭裂缝,灌浆嘴埋设后采用环氧胶泥封闭,形成一个密闭空间,预留浆液进出口,再用针筒将浆液压入缝隙,使其注满。
3)密封检查,沿裂缝涂一层肥皂,从灌浆嘴通入压缩空气,漏气部位予以修补密封至不漏为止。
4)灌浆,当裂缝宽度小于0.3mm时,采用环氧胶泥封闭裂缝后,再采用甲基丙烯酸脂类浆液灌注;当裂缝宽度大于或等于0.3mm且小于1mm时,采用环氧树脂类浆液灌注;当裂缝宽度大于或等于1mm时,采用水泥浆液灌注。

Claims (1)

1.一种墙体的加固结构施工方法,其特征是墙体加固采取如下:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋,预应力钢筋直径为12~14mm,预应力钢筋间距为150~300mm,预应力钢筋上面再布置非预应力加强筋,预应力钢筋与加强筋进行焊接连接,加强筋直径为12~14mm,加强筋钢筋间距为150~300mm;预应力钢筋张拉完毕后将预应力钢筋通过固定筋进行固定,固定筋与预应力钢筋进行焊接固定,固定筋直径为14~16mm;预应力钢筋与非预应力加强筋形成的张拉单元内布置注浆管,注浆管间距为350~450mm,注浆管为直径10mm的不锈钢钢管,注浆管埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定;注浆管与储浆罐之间设置三通阀门;
预应力钢筋初布置方向与水平夹角为45度,加强筋布置方向与预应力钢筋初布置方向垂直;固定筋间距为150~300mm,每个张拉单元长度为150~300mm,在张拉单元的两个端头设置加强筋;
墙体加固施工步骤采用如下:
(1)剥离粉刷层,预钻注浆管的埋设孔,注浆管的埋设孔直径为12mm;预钻埋设孔使用电动旋转金刚石取芯钻,用水冷却钻头并带出砖屑;采用钢丝清理墙体表面的灰尘及浮渣或者松散部位并保持干燥;
(2)挂设预应力钢筋,通过U形铁扣将预应力钢筋固定在墙体,U形铁扣插入墙体灰缝;
(3)在预应力钢筋上面挂设加强筋,用钢丝将预应力钢筋与加强筋进行初步连接;
(4)对预应力钢筋进行预应力张拉,预应力钢筋张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15;张拉工艺采用如下:将预应力钢筋初张拉张拉至10%的控制张拉应力,持荷3min建立初始应力,再张拉至控制张拉应力,持荷5min建立预应力;
(5)预应力张拉完毕后用固定筋将预应力钢筋进行焊接锚定,将预应力钢筋与加强筋进行焊接固定;
(6)埋设注浆管,注浆管与埋设孔的空隙采用结构胶进行封闭;
(7)对墙体进行注浆;用压力注浆机械浆液注入墙体,注浆从最下排位置开始,逐步向上和对称向两侧发展,在每一个注射点达到预期压力或者浆液在邻近注射点自由流出,注射方可终止,把注射孔堵塞;
如果浆液有渗漏,如找不到漏失通道,将浆液掺入速凝剂持续小量的注射使漏失通道逐渐沉淀堵塞;
浆液完全凝固后,拆除注浆管并进行封孔;
如果墙体有裂缝,在步骤(7)前要进行以下处理:
1)在裂缝中部埋设灌浆嘴,灌注点间距根据裂缝宽度和裂缝深度综合确定,间距为200~300mm;
2)封闭裂缝,灌浆嘴埋设后采用环氧胶泥封闭,形成一个密闭空间,预留浆液进出口,再用针筒将浆液压入缝隙,使其注满;
3)密封检查,沿裂缝涂一层肥皂,从灌浆嘴通入压缩空气,漏气部位予以修补密封至不漏为止;
4)灌浆,当裂缝宽度小于0.3mm时,采用环氧胶泥封闭裂缝后,再采用甲基丙烯酸脂类浆液灌注;当裂缝宽度大于或等于0.3mm且小于1mm时,采用环氧树脂类浆液灌注;当裂缝宽度大于或等于1mm时,采用水泥浆液灌注。
CN201711245741.6A 2016-05-21 2016-05-21 墙体的加固结构施工方法 Active CN107905551B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711245741.6A CN107905551B (zh) 2016-05-21 2016-05-21 墙体的加固结构施工方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711245741.6A CN107905551B (zh) 2016-05-21 2016-05-21 墙体的加固结构施工方法
CN201610442373.3A CN106088646B (zh) 2016-05-21 2016-05-21 旧建筑物的加固结构

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610442373.3A Division CN106088646B (zh) 2016-05-21 2016-05-21 旧建筑物的加固结构

Publications (2)

Publication Number Publication Date
CN107905551A true CN107905551A (zh) 2018-04-13
CN107905551B CN107905551B (zh) 2020-02-04

Family

ID=57237314

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201711246564.3A Active CN107989398B (zh) 2016-05-21 2016-05-21 墙体的加固构造施工方法
CN201711245677.1A Active CN107916797B (zh) 2016-05-21 2016-05-21 一种提升旧建筑物承载性能的构造方法
CN201711245575.XA Active CN107916796B (zh) 2016-05-21 2016-05-21 一种提升旧建筑物承载性能的结构
CN201711245752.4A Active CN107989397B (zh) 2016-05-21 2016-05-21 旧建筑物的加固构造施工方法
CN201810184634.5A Active CN108360835B (zh) 2016-05-21 2016-05-21 旧建筑物的加固结构施工方法
CN201711245741.6A Active CN107905551B (zh) 2016-05-21 2016-05-21 墙体的加固结构施工方法
CN201610442373.3A Active CN106088646B (zh) 2016-05-21 2016-05-21 旧建筑物的加固结构

Family Applications Before (5)

Application Number Title Priority Date Filing Date
CN201711246564.3A Active CN107989398B (zh) 2016-05-21 2016-05-21 墙体的加固构造施工方法
CN201711245677.1A Active CN107916797B (zh) 2016-05-21 2016-05-21 一种提升旧建筑物承载性能的构造方法
CN201711245575.XA Active CN107916796B (zh) 2016-05-21 2016-05-21 一种提升旧建筑物承载性能的结构
CN201711245752.4A Active CN107989397B (zh) 2016-05-21 2016-05-21 旧建筑物的加固构造施工方法
CN201810184634.5A Active CN108360835B (zh) 2016-05-21 2016-05-21 旧建筑物的加固结构施工方法

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610442373.3A Active CN106088646B (zh) 2016-05-21 2016-05-21 旧建筑物的加固结构

Country Status (1)

Country Link
CN (7) CN107989398B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577500A (zh) * 2018-12-04 2019-04-05 富思特新材料科技发展股份有限公司 一种外墙外保温工程建筑疏松保温板基层处理工艺
CN110185277A (zh) * 2019-04-19 2019-08-30 上海市建筑装饰工程集团有限公司 既有建筑外墙渗水点的修复方法
CN112065000B (zh) * 2020-08-05 2021-08-06 业之峰诺华家居装饰集团股份有限公司 一种瓷砖薄贴法层结构及其施工工艺

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (fr) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Procédé pour conforter des arches ou des constructions analogues
JP2003193420A (ja) * 2001-12-28 2003-07-09 Kajima Corp 載荷金属管の補強工法
CN102041849A (zh) * 2010-12-03 2011-05-04 同济大学 双角钢拼接型屈曲约束支撑
CN202509792U (zh) * 2012-03-31 2012-10-31 西安工业大学 一种用于加固砖混结构墙体的水泥砂浆面层钢筋网
CN102900242A (zh) * 2012-11-16 2013-01-30 南京工业大学 一种钢桁架部分约束钢筋混凝土梁加固结构
CN103352581A (zh) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法
CN105421808A (zh) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 修补古建筑墙体中的裂缝的方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100564720C (zh) * 2006-03-10 2009-12-02 湖南高岭建设集团股份有限公司 钢筋混凝土抗裂墙
CN102704698B (zh) * 2012-05-04 2015-10-28 南京盛圆土木工程高科技有限公司 一种全预应力复合一体化加固钢筋混凝土结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0089861A1 (fr) * 1982-03-22 1983-09-28 CAMPENON BERNARD, Société Anonyme dite: Procédé pour conforter des arches ou des constructions analogues
JP2003193420A (ja) * 2001-12-28 2003-07-09 Kajima Corp 載荷金属管の補強工法
CN102041849A (zh) * 2010-12-03 2011-05-04 同济大学 双角钢拼接型屈曲约束支撑
CN202509792U (zh) * 2012-03-31 2012-10-31 西安工业大学 一种用于加固砖混结构墙体的水泥砂浆面层钢筋网
CN102900242A (zh) * 2012-11-16 2013-01-30 南京工业大学 一种钢桁架部分约束钢筋混凝土梁加固结构
CN103352581A (zh) * 2013-07-09 2013-10-16 北京筑福国际工程技术有限责任公司 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法
CN105421808A (zh) * 2015-12-03 2016-03-23 四川省大卫建筑设计有限公司 修补古建筑墙体中的裂缝的方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国建筑第七工程局: "《建设工程施工技术标准4》", 31 January 2008, 中国建筑工业出版社 *
杨永起: "《建筑防水施工技术》", 31 October 2015, 中国建筑工业出版社 *
肖翔等: "《病险水工程裂缝修补技术》", 31 May 2009, 中国水利水电出版社 *

Also Published As

Publication number Publication date
CN107916797B (zh) 2020-05-15
CN107989397B (zh) 2019-03-05
CN107989398B (zh) 2020-05-12
CN108360835B (zh) 2020-02-04
CN107989397A (zh) 2018-05-04
CN106088646B (zh) 2018-07-24
CN107905551B (zh) 2020-02-04
CN107916796B (zh) 2019-03-05
CN107989398A (zh) 2018-05-04
CN108360835A (zh) 2018-08-03
CN106088646A (zh) 2016-11-09
CN107916797A (zh) 2018-04-17
CN107916796A (zh) 2018-04-17

Similar Documents

Publication Publication Date Title
CN110468694B (zh) 承插式自复位多节段预制桥墩及其装配方法
CN101205724B (zh) 使用灌浆法和双向锚固系统的预制混凝土箱涵及其装配结构和方法
CN104976424B (zh) 一种矩形顶管管节连接加固的锚索施工方法
CN101139836A (zh) 钻孔灌注桩桩端后注浆施工方法
CN107905551A (zh) 墙体的加固结构施工方法
CN201883435U (zh) 一种预埋式管桩注浆装置
CN201770981U (zh) 一种随钻跟管桩的桩侧注浆装置
CN105625742B (zh) 砖墙加固结构
CN106838463B (zh) 提高矩形顶管工后纵向整体刚度的预埋组件及用法
CN105672205B (zh) 一种面板堆石坝防渗结构
CN106480880B (zh) 可回收式土钉及使用可回收土钉的施工方法
CN209603074U (zh) 一种土工膜与混凝土墙连接部位的加固结构
CN204781973U (zh) 对拉螺栓孔的防渗漏封堵装置
CN105926650A (zh) 坡面建筑混凝土层防滑坡固定装置
CN112324055B (zh) 一种预制竖向构件及其套筒灌浆施工方法
CN205777645U (zh) 一种墙体的加固结构
CN208072393U (zh) 一种带有接头装置的预埋注浆管的管桩
CN206941600U (zh) 一种预应力锚索搅拌桩基坑围护
KR20110029424A (ko) 마이크로파일 기초공법 및 이에 사용되는 파일 조립체
CN219973209U (zh) 一种注浆管加强装置
CN211646989U (zh) 一种用于防止压浆回流的出浆孔连接装置
CN210369424U (zh) 一种采用预应力钢绞线竖向连接的预制混凝土剪力墙板
CN208251149U (zh) 一种水利工程用挡土墙
CN211850330U (zh) 一种玻化微珠保温隔热建筑墙体
CN216892414U (zh) 新旧地下室混凝土结合处压力灌浆自防水结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 325000, No. 48, Jingshan Hill Road, Ouhai District, Wenzhou, Zhejiang

Applicant after: Ye Changqing

Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Applicant before: Ye Changqing

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201229

Address after: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee after: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

Address before: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221114

Address after: No. 986, Guanying Road, Economic Development Zone, Yingshang County, Fuyang City, Anhui Province 236000

Patentee after: Anhui Tianli Huaneng Construction Engineering Co.,Ltd.

Address before: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee before: Guangxi Xin Bin Cheng Machinery Co.,Ltd.