CN107905384A - The bow formula dowel embedded part of assembly concrete superstructure plate face - Google Patents
The bow formula dowel embedded part of assembly concrete superstructure plate face Download PDFInfo
- Publication number
- CN107905384A CN107905384A CN201711183021.1A CN201711183021A CN107905384A CN 107905384 A CN107905384 A CN 107905384A CN 201711183021 A CN201711183021 A CN 201711183021A CN 107905384 A CN107905384 A CN 107905384A
- Authority
- CN
- China
- Prior art keywords
- dowel
- plate
- pin key
- reinforcing bar
- embedded part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 28
- 210000000245 forearm Anatomy 0.000 claims abstract description 4
- 210000003205 muscle Anatomy 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 6
- 238000003466 welding Methods 0.000 abstract description 5
- 230000002787 reinforcement Effects 0.000 abstract description 2
- 239000000203 mixture Substances 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 3
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 238000009491 slugging Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
Abstract
The bow formula dowel embedded part of assembly concrete superstructure plate face, it is related to a kind of bow formula dowel embedded part.The present invention solves the problems, such as that existing superstructure plate face connection method superstructure under severe earthquake action may occur in larger plane and deformity out of plane or cause because of prefabricated components and its bearing dockingundocking.The dowel is arched, it is welded in the middle part of dowel on connection end plate and connection end plate is located on the forearm of dowel, pin key plate is welded on the middle part of connection end plate and the two is vertically arranged, pin key reinforcement welding is vertically arranged at the middle part of pin key plate and pin key reinforcing bar with being connected end plate, dowel, pin key plate and pin key reinforcing bar are on the same side for connect end plate, after the bow formula dowel embedded part is bound with precast floor slab plate face reinforcing bar, cast forms precast floor slab, is welded to connect between two neighboring precast floor slab by two connection end plates.The present invention is used in assembly concrete superstructure plate face.
Description
Technical field
The present invention relates to a kind of dowel embedded part, and in particular to a kind of bow formula dowel of assembly concrete superstructure plate face buries
Part, belongs to technical field of civil engineering.
Background technology
The assembly concrete superstructure that prefabricated components are formed is used, it is necessary to take connection measure to protect between each prefabricated components
Building cover structure rigidity is demonstrate,proved, makes its overall work.At present, frequently with plate face connection method mainly have two kinds, one kind is in component
After assembly between each component preset slot, reinforcing bar is targetedly arranged using direct perfusion pea gravel concreten or high-intensity earthquake fortification zone
And the method for pouring coincidence surface plate;Another kind is to arrange built-in fitting to edge in each prefabricated components length, and in component assembly rear cover
Plate is welded to connect.Though the problem of this two classes measure alleviates assembly concrete superstructure globality poor to a certain extent, superstructure
Flat in-plane stiffness is still relatively low, and under severe earthquake action, superstructure may occur in larger plane and deformity out of plane, causes building cover structure
Seismic Damage, be also easy to cause because of prefabricated components and its bearing dockingundocking, so as to cause structural system to be destroyed, it is difficult to ensure
Structure safety.
To sum up, existing superstructure plate face connection method superstructure under severe earthquake action may occur in larger plane and plane
Outer deformation causes because of prefabricated components and its bearing dockingundocking.
The content of the invention
To solve existing superstructure plate face connection method superstructure under severe earthquake action larger plane may occur for the present invention
Interior and deformity out of plane causes because of prefabricated components and the problem of its bearing dockingundocking, and then provides a kind of assembly concrete
The bow formula dowel embedded part of superstructure plate face.
The present invention adopts the technical scheme that to solve above-mentioned technical problem:
The bow formula dowel embedded part of the assembly concrete superstructure plate face of the present invention includes dowel 1-1, connection end plate 1-2, pin
Keypad 1-3 and pin key reinforcing bar 1-4, the dowel 1-1 is arched, is welded on connection end plate 1-2 and connects in the middle part of dowel 1-1
End plate 1-2 is located on the forearm of dowel 1-1, and pin key plate 1-3 is welded on the middle part of connection end plate 1-2 and the two is vertically arranged, and sells
Key reinforcing bar 1-4 is welded on the middle part of pin key plate 1-3 and pin key reinforcing bar 1-4 is vertically arranged with being connected end plate 1-2, dowel 1-1, pin key
Plate 1-3 and pin key reinforcing bar 1-4 is the bow formula dowel embedded part and 3 plate face of precast floor slab on the same side for connect end plate 1-2
After reinforcing bar is bound, cast forms precast floor slab, is connected between two neighboring precast floor slab by two connection end plate 1-2 welding
Connect.
Further, dowel 1-1 and pin key reinforcing bar 1-4 are in the same plane.
Further, it is vertically arranged between dowel 1-1 and pin key plate 1-3.
Further, the consistency of thickness of the width of connection end plate 1-2 and the width of pin key plate 1-3 with precast floor slab 3 is set
Put.
Further, it is welded as a whole between two neighboring connection end plate 1-2 by connecting reinforcing bar 2.
The present invention has the advantages that compared with prior art:
The bow formula dowel embedded part of the assembly concrete superstructure plate face of the present invention is embedded in precast floor slab, contiguous prefabricated building
Plate connects to form Assembled Building cover board by bending formula dowel embedded part and connection reinforcement welding, and the present invention effectively increases assembled and mixes
The globality peace in-plane stiffness of solidifying Tulou cover board, greatly reduces under geological process in the plane of assembly concrete building cover board
Deformation, improves Assembled Building Strap joint ultimate bearing capacity more than 50%, effectively alleviates welding temperature stress to assembled
The influence of building cover board joint behavior.
Brief description of the drawings
Fig. 1 is the front view of the bow formula dowel embedded part of the assembly concrete superstructure plate face of the present invention;
Fig. 2 is the schematic perspective view of the bow formula dowel embedded part of the assembly concrete superstructure plate face of the present invention;
Fig. 3 is that assembly concrete building cover board part plate face of the present invention is welded to connect schematic diagram;
Fig. 4 is that assembly concrete superstructure plate face is welded to connect main sectional view.
Embodiment
Embodiment one:As shown in Figs 1-4, the bow formula dowel of the assembly concrete superstructure plate face of present embodiment
Embedded part includes dowel 1-1, connection end plate 1-2, pin key plate 1-3 and pin key reinforcing bar 1-4, and the dowel 1-1 is arched, dowel 1-1
Middle part be welded on that connection end plate 1-2 is upper and connect end plate 1-2 and be located on the forearm of dowel 1-1, and pin key plate 1-3 is welded on connection
The middle part of end plate 1-2 and the two be vertically arranged, pin key reinforcing bar 1-4 is welded on the middle part of pin key plate 1-3 and pin key reinforcing bar 1-4 and company
End plate 1-2 is met to be vertically arranged, dowel 1-1, pin key plate 1-3 and pin key reinforcing bar 1-4 be on the same side for connect end plate 1-2,
After the bow formula dowel embedded part is bound with 3 plate face reinforcing bar of precast floor slab, cast forms precast floor slab, two neighboring prefabricated building
It is welded to connect between plate by two connection end plate 1-2.
Assembly concrete building cover board facebow formula dowel slugging connects specific construction method:Precast floor slab 3 pours
Before building, bow formula dowel embedded part is placed on design position and is bound dowel 1-1 and 3 plate face reinforcing bar of precast floor slab, then
Carry out pouring and conserving for precast floor slab 3;
After the completion of precast floor slab 3 conserves, interspace contiguous prefabricated floor 3 of mating formation in advance according to design requirement, in adjacent bow
Place connection reinforcing bar 2 and end plate 1-2 is connected with both sides according to design requirement in gap between the connection end plate 1-2 of formula dowel embedded part
Welded.
Embodiment two:As depicted in figs. 1 and 2, present embodiment dowel 1-1 and pin key reinforcing bar 1-4 is positioned at same
In plane.It is so designed that, improves the anchoring strength more than 50% of connecting elements.Other compositions and connection relation and specific implementation
Mode one is identical.
Embodiment three:As shown in Figure 1, Figure 2 and Figure 3, hang down between present embodiment dowel 1-1 and pin key plate 1-3
It is straight to set.It is so designed that, improves connecting elements anchoring strength 25%, reduces welding temperature stress influence 40%.It is other composition and
Connection relation is the same as one or two specific embodiments.
Embodiment four:As shown in Figure 3 and Figure 4, the width and pin key plate 1-3 of present embodiment connection end plate 1-2
Width set with the consistency of thickness of precast floor slab 3.Other compositions and connection relation are identical with embodiment three.
Embodiment five:As shown in Figure 3 and Figure 4, company is passed through between the two neighboring connection end plate 1-2 of present embodiment
Reinforcing bar 2 is connect to be welded as a whole.It is so designed that, connection end plate 1-2 improves 1/3rd of anchoring strength, improves connection end plate and company
Connect weld strength between reinforcing bar.Other compositions and connection relation are identical with embodiment one, two or four.
Claims (5)
1. a kind of bow formula dowel embedded part of assembly concrete superstructure plate face, the bow formula dowel embedded part includes dowel (1-1), connects
Connect end plate (1-2), pin key plate (1-3) and pin key reinforcing bar (1-4), it is characterised in that:The dowel (1-1) is arched, dowel (1-
1) it is welded in the middle part of on connection end plate (1-2) and connection end plate (1-2) is located on the forearm of dowel (1-1), pin key plate (1-3)
It is welded on the middle part of connection end plate (1-2) and the two is vertically arranged, pin key reinforcing bar (1-4) is welded on the middle part of pin key plate (1-3)
And pin key reinforcing bar (1-4) is vertically arranged with being connected end plate (1-2), dowel (1-1), pin key plate (1-3) and pin key reinforcing bar (1-4) are equal
On same side for connection end plate (1-2), after the bow formula dowel embedded part is bound with precast floor slab (3) plate face reinforcing bar,
Cast forms precast floor slab, is welded to connect between two neighboring precast floor slab by two connection end plates (1-2).
2. the bow formula dowel embedded part of assembly concrete superstructure plate face according to claim 1, it is characterised in that:Dowel
(1-1) and pin key reinforcing bar (1-4) are in the same plane.
3. the bow formula dowel embedded part of assembly concrete superstructure plate face according to claim 1 or 2, it is characterised in that:Anchor
It is vertically arranged between muscle (1-1) and pin key plate (1-3).
4. the bow formula dowel embedded part of assembly concrete superstructure plate face according to claim 3, it is characterised in that:Connecting pin
The consistency of thickness of the width of plate (1-2) and the width of pin key plate (1-3) with precast floor slab (3) is set.
5. the bow formula dowel embedded part of the assembly concrete superstructure plate face according to claim 1,2 or 4, it is characterised in that:
It is welded as a whole between two neighboring connection end plate (1-2) by connecting reinforcing bar (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711183021.1A CN107905384A (en) | 2017-11-23 | 2017-11-23 | The bow formula dowel embedded part of assembly concrete superstructure plate face |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711183021.1A CN107905384A (en) | 2017-11-23 | 2017-11-23 | The bow formula dowel embedded part of assembly concrete superstructure plate face |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107905384A true CN107905384A (en) | 2018-04-13 |
Family
ID=61847579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711183021.1A Pending CN107905384A (en) | 2017-11-23 | 2017-11-23 | The bow formula dowel embedded part of assembly concrete superstructure plate face |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107905384A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184054A (en) * | 2018-09-29 | 2019-01-11 | 中国建筑股份有限公司 | Connecting node and its construction method outside the face of cross-layer cladding panel and floor |
CN111877621A (en) * | 2020-07-06 | 2020-11-03 | 东南大学 | Precast concrete superstructure slab joint H shaped steel connected node |
CN111877622A (en) * | 2020-07-06 | 2020-11-03 | 东南大学 | Full-assembly type concrete floor slab seam butterfly type connecting node |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DD255960A1 (en) * | 1986-11-07 | 1988-04-20 | Bauakademie Ddr | UPPER BELT CONNECTION FOR TRAY ELEMENTS ASSOCIATED WITH INDIVIDUAL ELEMENTS WITH NEGATIVE CONNECTION |
DE20217678U1 (en) * | 2002-11-15 | 2003-02-27 | Peikko Gmbh | Steel support for prefabricated reinforced concrete parts has interconnected flat steel bars extending parallel to one another with at least one steel anchor provided on each steel bar on at least one side face |
CN101736841A (en) * | 2009-12-18 | 2010-06-16 | 东南大学 | Welding type slab crack joint for precast concrete floor system |
CN202430876U (en) * | 2011-11-28 | 2012-09-12 | 美建建筑系统(中国)有限公司 | Floor system with structure of steel and concrete precast slabs |
CN203808285U (en) * | 2014-05-07 | 2014-09-03 | 中国核工业第二二建设有限公司 | Mounting limit device for reinforced concrete shear wall embedded part |
KR20150006626A (en) * | 2013-07-09 | 2015-01-19 | 주식회사 포스코 | Embedded structure |
CN104895197A (en) * | 2015-05-29 | 2015-09-09 | 重庆大学 | Sectional steel concrete column-steel bar concrete beam joint connection method |
-
2017
- 2017-11-23 CN CN201711183021.1A patent/CN107905384A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DD255960A1 (en) * | 1986-11-07 | 1988-04-20 | Bauakademie Ddr | UPPER BELT CONNECTION FOR TRAY ELEMENTS ASSOCIATED WITH INDIVIDUAL ELEMENTS WITH NEGATIVE CONNECTION |
DE20217678U1 (en) * | 2002-11-15 | 2003-02-27 | Peikko Gmbh | Steel support for prefabricated reinforced concrete parts has interconnected flat steel bars extending parallel to one another with at least one steel anchor provided on each steel bar on at least one side face |
CN101736841A (en) * | 2009-12-18 | 2010-06-16 | 东南大学 | Welding type slab crack joint for precast concrete floor system |
CN202430876U (en) * | 2011-11-28 | 2012-09-12 | 美建建筑系统(中国)有限公司 | Floor system with structure of steel and concrete precast slabs |
KR20150006626A (en) * | 2013-07-09 | 2015-01-19 | 주식회사 포스코 | Embedded structure |
CN203808285U (en) * | 2014-05-07 | 2014-09-03 | 中国核工业第二二建设有限公司 | Mounting limit device for reinforced concrete shear wall embedded part |
CN104895197A (en) * | 2015-05-29 | 2015-09-09 | 重庆大学 | Sectional steel concrete column-steel bar concrete beam joint connection method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184054A (en) * | 2018-09-29 | 2019-01-11 | 中国建筑股份有限公司 | Connecting node and its construction method outside the face of cross-layer cladding panel and floor |
CN109184054B (en) * | 2018-09-29 | 2024-04-09 | 中国建筑股份有限公司 | Out-of-plane connection node of cross-layer outer hanging plate and floor slab and construction method thereof |
CN111877621A (en) * | 2020-07-06 | 2020-11-03 | 东南大学 | Precast concrete superstructure slab joint H shaped steel connected node |
CN111877622A (en) * | 2020-07-06 | 2020-11-03 | 东南大学 | Full-assembly type concrete floor slab seam butterfly type connecting node |
CN111877622B (en) * | 2020-07-06 | 2022-06-21 | 东南大学 | Full-assembly type concrete floor slab seam butterfly type connecting node |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107178163B (en) | Energy dissipation and shock absorption horizontal connecting device for fabricated shear wall and construction method of energy dissipation and shock absorption horizontal connecting device | |
CN107882232A (en) | A kind of assembly concrete is mated formation the node connector and attaching method thereof of building cover board in advance | |
CN106639037A (en) | Energy-dissipation and seismic-mitigation oblique prestress shear wall structural system suitable for prefabrication and assembly construction | |
CN107975176A (en) | Assembly concrete mat formation in advance building cover board H-shaped node connector and connection method | |
CN107905384A (en) | The bow formula dowel embedded part of assembly concrete superstructure plate face | |
CN109457801A (en) | A kind of connecting node and its construction method of prefabricated prestressed concrete beam | |
KR101098693B1 (en) | Reinforced Concrete Frame Structure having High Flexibility in Beam-Column Joint | |
KR101432087B1 (en) | Composite rahman bridge using preflex beam and horizontal shear connectors and construction method thereof | |
CN106760036B (en) | A kind of prefabricated steel-combined concrete shear wall | |
CN205712204U (en) | A kind of multiple waterstop and waterproof construction thereof | |
CN105821908A (en) | Multiple water stop belt, waterproof structure and construction method of waterproof structure | |
CN103205930B (en) | Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure | |
CN203440993U (en) | Connection joint of prefabricated reinforced concrete beam | |
CN210767353U (en) | Assembled shear force wall node connection structure | |
CN208152303U (en) | A kind of precast shear wall horizontal joint structure connected using groove profile steel plate | |
CN107859222A (en) | A kind of assembly concrete superstructure plate face node and joint connecting method | |
CN202831392U (en) | Connecting steel component for joint part of steel reinforced concrete laminated beams | |
CN113174798B (en) | Take assembled cement concrete shop front structure of prestressing force | |
CN108086528A (en) | The vertical steel sheet connection structure of precast shear wall, making and assembly method | |
CN210597793U (en) | Connection node for enhancing integrity of fabricated floor | |
KR20140140954A (en) | Steel concrete composite girder bridge and construction method thereof | |
CN217399384U (en) | High-strength prestressed concrete beam | |
CN217353012U (en) | Cast-in-place concrete heat-preservation integrated wall body adopting non-penetrating connecting piece | |
CN113175140B (en) | Precast concrete floor slab and mechanical slab joint connection node | |
CN217580826U (en) | Prefabricated constructional column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180413 |
|
RJ01 | Rejection of invention patent application after publication |