CN107905256A - The underground pipe gallery and its construction method of three cabin structures - Google Patents

The underground pipe gallery and its construction method of three cabin structures Download PDF

Info

Publication number
CN107905256A
CN107905256A CN201711181901.5A CN201711181901A CN107905256A CN 107905256 A CN107905256 A CN 107905256A CN 201711181901 A CN201711181901 A CN 201711181901A CN 107905256 A CN107905256 A CN 107905256A
Authority
CN
China
Prior art keywords
cabin
heat supply
piping
feedwater piping
supply pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711181901.5A
Other languages
Chinese (zh)
Inventor
杨春英
油新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China State Construction Engineering Research Institute Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201711181901.5A priority Critical patent/CN107905256A/en
Publication of CN107905256A publication Critical patent/CN107905256A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to the underground pipe gallery of three cabin structures, discloses a kind of underground pipe gallery and its construction method of three cabin structures.The present invention is three cabin structures being set up in parallel including prefabricated piping lane body, and the vertical section in heat supply pipeline cabin and combustion gas cabin is semicircle, and the vertical section in feedwater piping cabin is rectangle;Between heat supply pipeline cabin and feedwater piping cabin, and load-bearing dividing wall is provided between combustion gas cabin and feedwater piping cabin, prefabricated piping lane body is separated into three relatively independent chambers;Heat supply pipeline is arranged in heat supply pipeline cabin, gas pipeline is arranged in combustion gas cabin, feedwater piping and sewage conduct are arranged in feedwater piping cabin, communication cable packet is positioned close on the load-bearing dividing wall of heat supply pipeline cabin side, and power cable packet is positioned close on the load-bearing dividing wall of combustion gas cabin side.Space availability ratio of the present invention is high, and structure tension performance is good, and prefabricated rate of constructing is high, and construction cost is low, and difficulty is small, and internal pipeline crossing-over rate is low.

Description

The underground pipe gallery and its construction method of three cabin structures
Technical field
The present invention relates to the underground pipe gallery of three cabin structures, more particularly to a kind of underground pipe gallery of three cabin structures And its construction method.
Background technology
Civilian infrastructure is the embodiment of city bearing function, can show the integrated countermeasures system and ability in a city, It is current world's prosperity city public administration and pipe gallery becomes one of the idealized model in modern metropolitan cities infrastructure field Important component.Pipe gallery construction is to improve urban environment, solve the problems, such as the effective way of road slide fastener, and is easy to run Management.
It is various to include the utilities pipeline species of piping lane, including power cable, communication cable, burning line, water-supply line, confession Hot pipeline and flowing line etc., not only need the pipeline with intersecting roads or plot access port to be connected, but also are related to each , if setting position unreasonable, easily there is the intersection of various pipelines in piping lane, intricately in arrangement of the kind pipeline in piping lane Under the influence of shape, it is chaotic that circuit easily occurs.
Existing precast assembly piping lane section configuration generally compares fixation, is mostly arch, rectangle or circle, rectangular cross section Space availability ratio is high, but structure tension performance is poor, it usually needs sets underground support and reinforcement system, while adds and apply Work workload and construction cost;Circular cross section structure tension performance is preferable, but space availability ratio is poor;The structure in arch section Stress performance is preferable, but prefabricated construction difficulty is big, be mostly it is cast-in-place be combined or all cast-in-place constructions with prefabricated, construction is dirty Dye is serious, and long construction period is of high cost.
The content of the invention
The present invention provides a kind of space availability ratio height, and structure tension performance is good, and prefabricated rate of constructing is high, and construction cost is low, difficult Spend small, the underground pipe gallery and its construction method of three low cabin structures of internal pipeline crossing-over rate.
The technical problem of solution is:The space availability ratio of existing prefabricated piping lane and the stress performance compatibility of structure compared with Difference, construction cost is high, and difficulty of construction is big;It is mostly cast-in-place with prefabricated phase knot and the piping lane prefabricated construction difficulty of crowned section is big Conjunction or all cast-in-place constructions, construction pollution is serious, long construction period, of high cost.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
The underground pipe gallery of three cabin structures of the invention, prefabricated piping lane body, load-bearing dividing wall and the electromechanics being arranged in piping lane Pipeline;
Prefabricated piping lane body is three cabin structures being set up in parallel, including is located at the heat supply pipeline cabin and combustion gas cabin of both sides respectively, with And positioned at the feedwater piping cabin at middle part, the vertical section in heat supply pipeline cabin and combustion gas cabin is semicircle, heat supply pipeline cabin and combustion gas Cabin is opposite, is symmetrical arranged, and the vertical section in feedwater piping cabin is rectangle;Between heat supply pipeline cabin and feedwater piping cabin, and combustion gas Vertically axis direction is respectively arranged with load-bearing dividing wall between cabin and feedwater piping cabin, and prefabricated piping lane body is separated into three Relatively independent chamber;
Piping lane length direction, uniform intervals are provided with access door on load-bearing dividing wall;
Electromechanical pipeline includes heat supply pipeline, gas pipeline, feedwater piping, sewage conduct, power cable and communication cable, heating tube Road is arranged in heat supply pipeline cabin, and gas pipeline is arranged in combustion gas cabin, and feedwater piping and sewage conduct are arranged on feedwater piping In cabin, communication cable packet is positioned close on the load-bearing dividing wall of heat supply pipeline cabin side, and power cable packet, which is arranged on, leans on On the load-bearing dividing wall of nearly combustion gas cabin side.
The underground pipe gallery of three cabin structures of the invention, further, the heat supply pipeline cabin, combustion gas cabin and feedwater piping Highly consistent, the two ends tangent setting of two long sides up and down with feedwater piping cabin respectively in heat supply pipeline cabin and combustion gas cabin in cabin.
The underground pipe gallery of three cabin structures of the invention, further, the feedwater piping bilge portion stage casing, along feed pipe The vertical axis direction of road cabin vertical section, be provided with elongated short partition wall.
The underground pipe gallery of three cabin structures of the invention, further, the height of the short partition wall is no more than feedwater piping The 1/3 of cabin internal height, the thickness of short partition wall are not less than the 1/12 of short partition wall height.
The underground pipe gallery of three cabin structures of the invention, further, the feedwater piping and sewage conduct are set respectively In short partition wall both sides, short partition wall both sides, along piping lane length direction, uniform intervals be provided with pressure pipe platform, feedwater piping and sewage Pipeline is separately positioned on pressure pipe platform.
The underground pipe gallery of three cabin structures of the invention, further, the height of the pressure pipe platform below the feedwater piping Degree is not less than 1.3 times of feedwater piping outside diameter, 3.5 times of interval between adjacent pressure pipe platform no more than feedwater piping outside diameter; The height of pressure pipe platform below sewage conduct is not less than 1.5 times of sewage conduct outside diameter, the interval between adjacent pressure pipe platform No more than 4 times of sewage conduct outside diameter;The pressure pipe platform is up-narrow and down-wide cone table.
The underground pipe gallery of three cabin structures of the invention, further, in the heat supply pipeline cabin, along piping lane length side , uniform intervals are provided with pressure pipe platform, the interval between adjacent pressure pipe platform is no more than 5 times of heat supply pipeline outside diameter, pressure The height of pipe platform is no more than the 1/5 of feedwater piping cabin internal height, and heat supply pipeline is arranged on pressure pipe platform.
The underground pipe gallery of three cabin structures of the invention, further, along piping lane length direction, equal in the combustion gas cabin in It is even to be arranged at intervals with pressure pipe platform, interval between adjacent pressure pipe platform no more than 4 times of gas pipeline outside diameter, pressure pipe platform Highly it is no more than the 1/7 of feedwater piping cabin internal height, gas pipeline is arranged on pressure pipe platform.
The underground pipe gallery of three cabin structures of the invention, further, be provided with the load-bearing dividing wall one group it is elongated Cable support, cable support is set along to load-bearing dividing wall short transverse uniform intervals, between neighbouring cable support Distance is not less than 300mm.
The construction method of the underground pipe gallery of three cabin structures of the invention, comprises the following steps:
Step 1: piping lane body is prefabricated:Be prefabricated in the factory piping lane frame, and prefabricated longitudinal section is semicircular heat supply pipeline cabin respectively With combustion gas cabin, and the feedwater piping cabin that longitudinal section is rectangle;
Step 2: load-bearing dividing wall is prefabricated:According to detail design demand, be prefabricated in the factory load-bearing dividing wall;
Step 3: pressure pipe platform is prefabricated:According to detail design demand, the pressure pipe platform for the different height that is prefabricated in the factory;
Step 4: the on-site consolidation of piping lane body:Prefabricated components are subjected to on-site consolidation, assembled seam crossing carries out encapsulation process; Then load-bearing dividing wall is set, and carry out splicing fixation;
Step 5: pipe installation:Heat supply pipeline, gas pipeline, feedwater piping, sewage pipe are set in each relatively independent cabin Road, power cable and communication cable.
The underground pipe gallery of three cabin structures of the invention compared with prior art, has the advantages that:
The underground pipe gallery stress performance of three cabin structures of the invention is good, and semicircle cabin and rectangular cabin linking are improved without corner The stress performance of overall Pipe rack, reduces the dosage of reinforcing bar, steel skeleton and concrete, reduces and be constructed into greatest extent This;Internal structure is compact, substantially increases the space availability ratio of structure;Two halves circle cabin causes combustion gas and heat supply pipeline independently to divide Cabin, substantially increases the security of underground piping;The piping lane of three cabin structures designs, can be by being arranged on load-bearing point between each cabin Access door on partition wall is walked, easy to managed operation;All kinds of pipeline arrangements rationally design, and avoid the friendship of pipeline to greatest extent Fork and overlapping, pipeline maintainance and construction of relocating using the later stage, reduction maintenance cost and maintenance difficulty.
The present invention uses element precast, the form of construction work of on-site consolidation, reduces the ratio of wet construction to greatest extent, So that whole work progress is safe and environment-friendly;Difficulty of construction is small, and construction efficiency is high, substantially reduces construction period.
The underground pipe gallery and its construction method of three cabin structures of the invention are described further below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the structure diagram of the underground pipe gallery of three cabin structures of the invention.
Reference numeral:
The prefabricated piping lane bodies of 1-;11- heat supply pipelines cabin;12- combustion gas cabin;13- feedwater pipings cabin;2- load-bearing dividing walls;3- it is short every Wall;4- pressure pipe platforms;51- heat supply pipelines;52- gas pipelines;53- feedwater pipings;54- sewage conducts;55- power cables;56- Communication cable;6- cable supports.
Embodiment
As shown in Figure 1, the underground pipe gallery of three cabin structures of the invention includes prefabricated piping lane body 1,2 and of load-bearing dividing wall The electromechanical pipeline being arranged in piping lane;
Prefabricated piping lane body 1 is three cabin structures being set up in parallel, including is located at the heat supply pipeline cabin 11 and combustion gas cabin of both sides respectively 12, and positioned at the feedwater piping cabin 13 at middle part, the vertical section in heat supply pipeline cabin 11 and combustion gas cabin 12 is semicircle, heating tube Road cabin 11 and combustion gas cabin 12 are opposite, are symmetrical arranged, and the vertical section in feedwater piping cabin 13 is rectangle, heat supply pipeline cabin 11, combustion gas cabin 12 and feedwater piping cabin 13 it is highly consistent, the two ends in heat supply pipeline cabin 11 and combustion gas cabin 12 respectively with feedwater piping cabin 13 The upper and lower tangent setting of two long sides;Between heat supply pipeline cabin 11 and feedwater piping cabin 13, and combustion gas cabin 12 and feedwater piping cabin 13 Between vertically axis direction be respectively arranged with load-bearing dividing wall 2, prefabricated piping lane body 1 is separated into three relatively independent chambers Room;13 bottom stage casing of feedwater piping cabin, along the vertical axis direction of 13 vertical section of feedwater piping cabin, be provided with elongated short partition wall 3, the height of short partition wall 3 is no more than the 1/3 of 13 internal height of feedwater piping cabin, and the thickness of short partition wall 3 is not less than the short height of partition wall 3 1/12;Piping lane length direction, uniform intervals are provided with the distance between access door, adjacency channel door on load-bearing dividing wall 2 No more than 200m;
Electromechanical pipeline includes heat supply pipeline 51, gas pipeline 52, feedwater piping 53, sewage conduct 54, power cable 55 and telecommunications Cable 56, heat supply pipeline 51 are arranged in heat supply pipeline cabin 11, in heat supply pipeline cabin 11, along piping lane length direction, uniform intervals Be provided with pressure pipe platform 4, the interval between adjacent pressure pipe platform 4 no more than 5 times of 51 outside diameter of heat supply pipeline, pressure pipe platform 4 Highly it is no more than the 1/5 of 13 internal height of feedwater piping cabin, heat supply pipeline 51 is arranged on pressure pipe platform 4;Gas pipeline 52 is set Put in combustion gas cabin 12, in combustion gas cabin 12, pressure pipe platform 4, adjacent pressure pipe platform are provided with along piping lane length direction, uniform intervals No more than 4 times of 52 outside diameter of gas pipeline, the height of pressure pipe platform 4 is no more than the inside of feedwater piping cabin 13 height at interval between 4 The 1/7 of degree, gas pipeline 52 is arranged on pressure pipe platform 4;
Feedwater piping 53, sewage conduct 54, power cable 55 and communication cable 56 are arranged in feedwater piping cabin 13, feed pipe Road 53 and sewage conduct 54 are separately positioned on short 3 both sides of partition wall, and short 3 both sides of partition wall, set along piping lane length direction, uniform intervals There is pressure pipe platform 4, feedwater piping 53 and sewage conduct 54 are separately positioned on pressure pipe platform 4, the pressure of the lower section of feedwater piping 53 The height of pipe platform 4 is not less than 1.3 times of 53 outside diameter of feedwater piping, and the interval between adjacent pressure pipe platform 4 is no more than feedwater piping 3.5 times of 53 outside diameters;The height of the pressure pipe platform 4 of the lower section of sewage conduct 54 is not less than 1.5 times of 54 outside diameter of sewage conduct, adjacent No more than 4 times of 54 outside diameter of sewage conduct, all pressure pipe platforms 4 are up-narrow and down-wide frustum at interval between pressure pipe platform 4 Body;
Communication cable 56 and power cable 55 are separately positioned on the load-bearing dividing wall 2 of 13 both sides of feedwater piping cabin, and load-bearing separates One group of elongated cable support 6 is provided with wall 2, cable support 6 is set along to 2 short transverse uniform intervals of load-bearing dividing wall, The distance between neighbouring cable support 6 is not less than 300mm;The packet of communication cable 56 is positioned close to heat supply pipeline cabin 11 1 On cable support 6 on the load-bearing dividing wall 2 of side, power cable 55 is grouped the load-bearing separation for being positioned close to 12 side of combustion gas cabin On cable support 6 on wall 2.
The construction method of the underground pipe gallery of three cabin structures of the invention, comprises the following steps:
Step 1: piping lane body is prefabricated:Be prefabricated in the factory piping lane frame, and prefabricated longitudinal section is semicircular heat supply pipeline cabin respectively 11 and combustion gas cabin 12, and the feedwater piping cabin 13 that longitudinal section is rectangle;
Step 2: load-bearing dividing wall is prefabricated:According to detail design demand, be prefabricated in the factory load-bearing dividing wall 2 and short partition wall 3, and The reserved passageway door on load-bearing dividing wall 2;
Step 3: pressure pipe platform is prefabricated:According to detail design demand, the pressure pipe platform 4 for the different height that is prefabricated in the factory;
Step 4: the on-site consolidation of piping lane body:Prefabricated components are subjected to on-site consolidation, assembled seam crossing carries out encapsulation process; Then load-bearing dividing wall 2 and short partition wall 3 are set respectively, and carry out splicing fixation;
Step 5: pipe installation:Pressure pipe platform 4 is set in each relatively independent cabin, in the both sides side in feedwater piping cabin 13 Cable support 6 is set on wall, is then laid with heat supply pipeline 51, gas pipeline 52, feedwater piping 53, sewage conduct 54, electricity respectively Power cable 55 and communication cable 56, and build access door.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention The various modifications and improvement that case is made, should all fall into the protection domain that claims of the present invention determines.

Claims (10)

1. the underground pipe gallery of three cabin structures, it is characterised in that:Including prefabricated piping lane body(1), load-bearing dividing wall(2)With set Put the electromechanical pipeline in piping lane;
Prefabricated piping lane body(1)For three cabin structures being set up in parallel, including it is located at the heat supply pipeline cabin of both sides respectively(11)And combustion Gas cabin(12), and positioned at the feedwater piping cabin at middle part(13), heat supply pipeline cabin(11)With combustion gas cabin(12)Vertical section be Semicircle, heat supply pipeline cabin(11)With combustion gas cabin(12)Relatively, it is symmetrical arranged, feedwater piping cabin(13)Vertical section be rectangle; Heat supply pipeline cabin(11)With feedwater piping cabin(13)Between, and combustion gas cabin(12)With feedwater piping cabin(13)Between vertically axis Line direction is respectively arranged with load-bearing dividing wall(2), by prefabricated piping lane body(1)It is separated into three relatively independent chambers;
Load-bearing dividing wall(2)On piping lane length direction, uniform intervals are provided with access door;
Electromechanical pipeline includes heat supply pipeline(51), gas pipeline(52), feedwater piping(53), sewage conduct(54), power cable (55)And communication cable(56), heat supply pipeline(51)It is arranged on heat supply pipeline cabin(11)It is interior, gas pipeline(52)It is arranged on combustion gas Cabin(12)It is interior, feedwater piping(53)And sewage conduct(54)It is arranged on feedwater piping cabin(13)It is interior, communication cable(56)Packet is set Put close to heat supply pipeline cabin(11)The load-bearing dividing wall of side(2)On, power cable(55)Packet is positioned close to combustion gas cabin (12)The load-bearing dividing wall of side(2)On.
2. the underground pipe gallery of three cabin structure according to claim 1, it is characterised in that:The heat supply pipeline cabin (11), combustion gas cabin(12)With feedwater piping cabin(13)Highly consistent, heat supply pipeline cabin(11)With combustion gas cabin(12)Two ends Respectively with feedwater piping cabin(13)The tangent setting of two long sides up and down.
3. the underground pipe gallery of three cabin structure according to claim 1, it is characterised in that:The feedwater piping cabin(13) Bottom stage casing, along feedwater piping cabin(13)The vertical axis direction of vertical section, be provided with elongated short partition wall(3).
4. the underground pipe gallery of three cabin structure according to claim 3, it is characterised in that:The short partition wall(3)Height Degree is no more than feedwater piping cabin(13)The 1/3 of internal height, short partition wall(3)Thickness be not less than short partition wall(3)The 1/12 of height.
5. the underground pipe gallery of three cabin structure according to claim 4, it is characterised in that:The feedwater piping(53)With Sewage conduct(54)It is separately positioned on short partition wall(3)Both sides, short partition wall(3)Both sides, along piping lane length direction, uniform intervals set There is pressure pipe platform(4), feedwater piping(53)And sewage conduct(54)It is separately positioned on pressure pipe platform(4)On.
6. the underground pipe gallery of three cabin structure according to claim 5, it is characterised in that:The feedwater piping(53)Under The pressure pipe platform of side(4)Height be not less than feedwater piping(53)1.3 times of outside diameter, adjacent pressure pipe platform(4)Between interval No more than feedwater piping(53)3.5 times of outside diameter;Sewage conduct(54)The pressure pipe platform of lower section(4)Height be not less than sewage pipe Road(54)1.5 times of outside diameter, adjacent pressure pipe platform(4)Between interval be no more than sewage conduct(54)4 times of outside diameter;The pressure Solenoid platform(4)For up-narrow and down-wide cone table.
7. the underground pipe gallery of three cabin structure according to claim 1, it is characterised in that:The heat supply pipeline cabin(11) It is interior, piping lane length direction, uniform intervals are provided with pressure pipe platform(4), adjacent pressure pipe platform(4)Between interval be no more than supply Hot channel(51)5 times of outside diameter, pressure pipe platform(4)Height be no more than feedwater piping cabin(13)The 1/5 of internal height, heating tube Road(51)It is arranged on pressure pipe platform(4)On.
8. the underground pipe gallery of three cabin structure according to claim 1, it is characterised in that:The combustion gas cabin(12)Interior, Piping lane length direction, uniform intervals are provided with pressure pipe platform(4), adjacent pressure pipe platform(4)Between interval be no more than combustion gas Pipeline(52)4 times of outside diameter, pressure pipe platform(4)Height be no more than feedwater piping cabin(13)The 1/7 of internal height, gas pipeline (52)It is arranged on pressure pipe platform(4)On.
9. the underground pipe gallery of three cabin structure according to claim 1, it is characterised in that:The load-bearing dividing wall(2) On be provided with one group of elongated cable support(6), cable support(6)Load-bearing dividing wall is given on edge(2)Short transverse uniform intervals are set Put, neighbouring cable support(6)The distance between be not less than 300mm.
10. the construction method of the underground pipe gallery of three cabin structures described in claim 1-9 any one, it is characterised in that: Comprise the following steps:
Step 1: piping lane body is prefabricated:Be prefabricated in the factory piping lane frame, and prefabricated longitudinal section is semicircular heat supply pipeline cabin respectively (11)With combustion gas cabin(12), and the feedwater piping cabin that longitudinal section is rectangle(13);
Step 2: load-bearing dividing wall is prefabricated:According to detail design demand, be prefabricated in the factory load-bearing dividing wall(2);
Step 3: pressure pipe platform is prefabricated:According to detail design demand, the pressure pipe platform for the different height that is prefabricated in the factory(4);
Step 4: the on-site consolidation of piping lane body:Prefabricated components are subjected to on-site consolidation, assembled seam crossing carries out encapsulation process; Then load-bearing dividing wall is set(2), and carry out splicing fixation;
Step 5: pipe installation:Heat supply pipeline is set in each relatively independent cabin(51), gas pipeline(52), feed pipe Road(53), sewage conduct(54), power cable(55)And communication cable(56).
CN201711181901.5A 2017-11-23 2017-11-23 The underground pipe gallery and its construction method of three cabin structures Withdrawn CN107905256A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711181901.5A CN107905256A (en) 2017-11-23 2017-11-23 The underground pipe gallery and its construction method of three cabin structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711181901.5A CN107905256A (en) 2017-11-23 2017-11-23 The underground pipe gallery and its construction method of three cabin structures

Publications (1)

Publication Number Publication Date
CN107905256A true CN107905256A (en) 2018-04-13

Family

ID=61847499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711181901.5A Withdrawn CN107905256A (en) 2017-11-23 2017-11-23 The underground pipe gallery and its construction method of three cabin structures

Country Status (1)

Country Link
CN (1) CN107905256A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924430A (en) * 2019-11-12 2020-03-27 中冶京诚工程技术有限公司 Utility tunnel
CN110965578A (en) * 2019-11-19 2020-04-07 重庆大学 Assembled type steel-concrete combined structure underground comprehensive pipe gallery component and construction method thereof
CN114017042A (en) * 2021-10-14 2022-02-08 广州地铁设计研究院股份有限公司 Shield constructs utility tunnel section

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685829A (en) * 1984-11-05 1987-08-11 Marcel Matiere Modular construction system for a covered structure
CN204151825U (en) * 2014-10-16 2015-02-11 张楸长 Super-section prestressing force Urban Underground pipe gallery
CN205576972U (en) * 2016-04-27 2016-09-14 西安建筑科技大学 Three storehouse formula utility tunnel structures
CN106088151A (en) * 2016-08-09 2016-11-09 中交第二航务工程局有限公司 Complete prefabricated piecemeal assembled pipe gallery
CN107313452A (en) * 2017-08-09 2017-11-03 中冶京诚工程技术有限公司 Prefabricated comprehensive pipe gallery
CN207567813U (en) * 2017-11-23 2018-07-03 中国建筑股份有限公司 The underground pipe gallery of three cabin structures

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685829A (en) * 1984-11-05 1987-08-11 Marcel Matiere Modular construction system for a covered structure
CN204151825U (en) * 2014-10-16 2015-02-11 张楸长 Super-section prestressing force Urban Underground pipe gallery
CN205576972U (en) * 2016-04-27 2016-09-14 西安建筑科技大学 Three storehouse formula utility tunnel structures
CN106088151A (en) * 2016-08-09 2016-11-09 中交第二航务工程局有限公司 Complete prefabricated piecemeal assembled pipe gallery
CN107313452A (en) * 2017-08-09 2017-11-03 中冶京诚工程技术有限公司 Prefabricated comprehensive pipe gallery
CN207567813U (en) * 2017-11-23 2018-07-03 中国建筑股份有限公司 The underground pipe gallery of three cabin structures

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924430A (en) * 2019-11-12 2020-03-27 中冶京诚工程技术有限公司 Utility tunnel
CN110965578A (en) * 2019-11-19 2020-04-07 重庆大学 Assembled type steel-concrete combined structure underground comprehensive pipe gallery component and construction method thereof
CN114017042A (en) * 2021-10-14 2022-02-08 广州地铁设计研究院股份有限公司 Shield constructs utility tunnel section

Similar Documents

Publication Publication Date Title
CN207348091U (en) A kind of assembled pipe gallery
CN107905256A (en) The underground pipe gallery and its construction method of three cabin structures
CN207567813U (en) The underground pipe gallery of three cabin structures
CN205954798U (en) Large -traffic, height falls poor drainage drop well
CN103603313B (en) Rectifier wall structure of making flow by deep water, and construction method thereof
CN105544605B (en) A kind of modular assembly formula pipe gallery
CN106013235A (en) City utility tunnel of arch cross section steel buckled plate
CN105971018A (en) Tubular cross section steel buckled plate city utility tunnel
CN106088296A (en) Big flow, height fall poor draining drop well and multilamellar energy dissipating construction method thereof
CN210529750U (en) Cable type utility tunnel system
CN105064612A (en) Steel-concrete combined special-shaped column with thermal insulating and load bearing integrated and preparation method thereof
CN109629602A (en) A kind of assembled underground pipe gallery with T-section point of changeable layout
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN109469099A (en) Assembled underground pipe gallery
CN208650912U (en) Heat distribution pipeline fixing force transfer bracket system in heating power shield tunnel
CN208309637U (en) A kind of assembled monolithic concrete structure pipe gallery standard paragraphs
CN206956775U (en) A kind of cabin pipe gallery of plain type underground three
CN108086523B (en) Light steel concrete block composite wall and construction method thereof
CN206721921U (en) Pipe gallery prefabricated panel is from load supporting structure
CN204919989U (en) Collect steel - concrete combination special -shaped post of heat preservation bearing in an organic whole
CN106930323A (en) Pipe gallery prefabricated panel is from load supporting structure
CN205445125U (en) Execute i -shaped assembled enclosure fast
CN212129233U (en) Utility tunnel
CN209368878U (en) Assembled underground pipe gallery
CN205917728U (en) City utility tunnel of arch cross section steel buckled plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180413

WW01 Invention patent application withdrawn after publication