CN106088151A - Complete prefabricated piecemeal assembled pipe gallery - Google Patents

Complete prefabricated piecemeal assembled pipe gallery Download PDF

Info

Publication number
CN106088151A
CN106088151A CN201610648427.1A CN201610648427A CN106088151A CN 106088151 A CN106088151 A CN 106088151A CN 201610648427 A CN201610648427 A CN 201610648427A CN 106088151 A CN106088151 A CN 106088151A
Authority
CN
China
Prior art keywords
pipe gallery
side plate
top board
cabin
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610648427.1A
Other languages
Chinese (zh)
Other versions
CN106088151B (en
Inventor
翟世鸿
张世奎
彭强
杨钊
蒋道东
李鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Wuhan Zhixing International Engineering Consulting Co ltd
CCCC Second Harbor Engineering Co
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd, CCCC Second Harbor Engineering Co filed Critical Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
Priority to CN201610648427.1A priority Critical patent/CN106088151B/en
Publication of CN106088151A publication Critical patent/CN106088151A/en
Application granted granted Critical
Publication of CN106088151B publication Critical patent/CN106088151B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Supports For Pipes And Cables (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The invention discloses a kind of complete prefabricated piecemeal assembled pipe gallery, piping lane is had arc top, arc wall and flat cube by what multiple prefabricated components formed, and described prefabricated component includes top board, and it is arcuate structure;The side plate of two arcs, it is separately positioned on the both sides of described top board, and the top of described side plate is connected with the smooth-going of described top board;And base plate, its lower flat with described side plate is along being connected;Longitudinal edge joint position moment of flexure between described top board, side plate and base plate levels off to 0.Present configuration is reasonable, has outstanding resistance to compression shear behavior.

Description

Complete prefabricated piecemeal assembled pipe gallery
Technical field
The present invention relates to city integrated piping lane.It is more particularly related to a kind of complete prefabricated piecemeal assembled is comprehensive Piping lane.
Background technology
Urban Underground pipe gallery refers to that building a municipal administration below urban road shares tunnel, by electric power, communicates, supplies The multiple municipal pipeline such as water, combustion gas concentrates on one, carries out " same planning, unified construction, unified management ", to accomplish that underground is empty Between comprehensive utilization and resource share, the most just can avoid user along the line without planning abuse the underground space so that variously Underground pipelines is concentrated and is laid in the comprehensive gallery in underground.
The existing prefabricated assembled city integrated piping lane integral prefabricated pin-connected panel of many employings, i.e. piping lane segmentation tunneling boring are overall pre- Carrying out on-site consolidation after system, the prefabricated piping lane of this sectional type generally uses rectangular configuration, and this version is often limited to fortune Defeated with lifting so that physical dimension is less, it is impossible to for Main Corridor road construct.The many employings in Main Corridor road at present are cast-in-place, build slowly, work The problems such as the phase is very long.
Summary of the invention
It is an object of the invention to solve at least the above, and the advantage that at least will be described later is provided.
It is a still further object of the present invention to provide the most prefabricated, easy to assembly a kind of, the pipe gallery of reasonable stress.
In order to realize according to object of the present invention and further advantage, it is provided that a kind of complete prefabricated piecemeal assembled is comprehensive Piping lane, pipe gallery is assembled by multiple prefabricated components, has arc top, arc wall and flat cube.
Preferably, described pipe gallery includes single cabin formula pipe gallery, and described single cabin formula pipe gallery includes following prefabricated Part:
Top board, it is arcuate structure;
The side plate of two arcs, it is separately positioned on the both sides of described top board, the top of described side plate and described top board and puts down Along connecting;And
Base plate, its lower flat with described side plate is along being connected;
Longitudinal edge joint position moment of flexure between described top board, side plate and base plate levels off to 0.
Preferably, the distribution of described pipe gallery inner homogeneous together or twice mid-board with constitute double-cabin type pipe gallery or Three cabin formula pipe galleries;
The top board of described three cabin formula pipe galleries include being positioned at both sides the curved portions being connected with the smooth-going of described side plate and Flat part between said two curved portions, the described curved portions that described twice mid-board is respectively provided at both sides is with described The position that flat part connects;
The top board both sides of described double-cabin type pipe gallery and the curved portions structure one of the top board of described three cabin formula pipe galleries Cause.
Preferably, described single cabin formula pipe gallery, double-cabin type pipe gallery and the lateral plate structure of three cabin formula pipe galleries Unanimously;
Described double-cabin type pipe gallery is consistent with the middle partition wall structure of described three cabin formula pipe galleries.
Preferably, described base plate neutral straight and two ends arc are turned up to be connected with the smooth-going of described side plate;
The two ends of the base plate of described single cabin formula pipe gallery, described double-cabin type pipe gallery and described three cabin formula pipe galleries Arc is consistent.
Preferably, described base plate is that the lower curved of flat construction and described side plate is turned up to horizontal direction to put down with base plate Along connecting.
Preferably, the width in longitudinal piece face of described prefabricated component both sides.
The present invention at least includes following beneficial effect:
1, use arc top with the pipe gallery of arc wall construction under identical external condition, the pipe gallery of relatively slab construction Desired thickness is little, and arrangement of reinforcement is few, more economical, and the moment of flexure of the edge joint position of adjacent preforms is approximately 0, and stress is minimum, affixed at bolt Time can guarantee that bolt will not rupture because stress is excessive.
2, demand is laid by what pipe gallery arranged median septum can adapt to different utilities pipelines.
3, single cabin formula, double-cabin type, three cabin formula pipe galleries lateral plate structure consistent, the arch section structure one at base plate two ends Causing, the arch section structure of Shuan Cang and three storehouse curved roofs is consistent.It is prefabricated that the concordance of structure can realize quick industrialization, Scene is specially joined, and increases economic efficiency.
Part is embodied by the further advantage of the present invention, target and feature by description below, and part also will be by this Invention research and practice and be understood by the person skilled in the art.
Accompanying drawing explanation
Fig. 1 is single cabin formula comprehensive pipe gallery structure schematic diagram of the present invention;
Fig. 2 is the double-cabin type comprehensive pipe gallery structure schematic diagram of the present invention;
Fig. 3 is the three cabin formula comprehensive pipe gallery structure schematic diagrams of the present invention;
Fig. 4 is another form of single cabin formula comprehensive pipe gallery structure schematic diagram of the present invention;
Fig. 5 is the another form of double-cabin type comprehensive pipe gallery structure schematic diagram of the present invention;
Fig. 6 is the another form of three cabin formula comprehensive pipe gallery structure schematic diagrams of the present invention;
Fig. 7 is the detailed structure schematic diagram of the double-cabin type pipe gallery of the present invention;
Fig. 8 is the structural representation drawing fastening assembly in the present invention.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to description literary composition Word can be implemented according to this.
It should be noted that experimental technique described in following embodiment, if no special instructions, it is conventional method, institute State reagent and material, if no special instructions, the most commercially obtain;In describing the invention, term " laterally ", " vertical To ", " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", the side of the instruction such as " outward " Position or position relationship are based on orientation shown in the drawings or position relationship, are for only for ease of the description present invention and simplify description, Be not instruction or the hint device of indication or element must have specific orientation, with specific azimuth configuration and operation, because of This is not considered as limiting the invention.
The present invention provides a kind of complete prefabricated piecemeal assembled pipe gallery, as it is shown in figure 1, present embodiments provide a kind of complete Prefabricated piecemeal assembled pipe gallery, pipe gallery is assembled by multiple prefabricated components, have arc top, arc wall and flat Cube.
In one embodiment, described pipe gallery includes single cabin formula pipe gallery, and described single cabin formula pipe gallery includes Following prefabricated component:
Top board 1, it is arcuate structure;
The side plate 2 of two arcs, it is separately positioned on the both sides of described top board 1, the top of described side plate 2 and described top board 1 smooth-going connects;And
Base plate 3, its lower flat with described side plate 2 is along being connected;
Longitudinal edge joint position moment of flexure between described top board 1, side plate 2 and base plate 3 levels off to 0.
In another embodiment, as in figure 2 it is shown, described piping lane inside center arranges one mid-board, septum wall 4 Vertical support between described base plate 3 and described top board 1 to constitute double-cabin type pipe gallery.
In another embodiment, as described in Figure 3, described piping lane inside center is uniformly arranged twice mid-board 4, described in Partition wall 4 vertical support between described base plate 3 and described top board 1 to constitute three cabin formula pipe galleries.
The top board 1 of described three cabin formula pipe galleries include being positioned at the curved portions being connected with the smooth-going of described side plate 2 of both sides with And the flat part between said two curved portions, the described curved portions that described twice mid-board 4 is respectively provided at both sides with The position that described flat part connects;
Top board 1 both sides of described double-cabin type pipe gallery and the curved portions structure of the top board 1 of described three cabin formula pipe galleries Unanimously.
In another embodiment, described single cabin formula pipe gallery, double-cabin type pipe gallery and three cabin formula pipe galleries Side plate 2 structure consistent;
Described double-cabin type pipe gallery is consistent with mid-board 4 structure of described three cabin formula pipe galleries.
As Figure 1-3, the bottom that described base plate 3 is flat construction and described side plate 2 of the pipe gallery of three kinds of cabin formulas Arc is turned up to horizontal direction to be connected with base plate 3 smooth-going.
The present invention also provides for another type of base plate, as Figure 4-Figure 6, described base plate 3 neutral straight and two ends arc Turn up to be connected with the smooth-going of described side plate 2;
The two of the base plate 3 of described single cabin formula pipe gallery, described double-cabin type pipe gallery and described three cabin formula pipe galleries End arc is consistent.
In another embodiment, the width in longitudinal piece face of described prefabricated component both sides, to adapt to piping lane assembling Become the requirement of plane curve.
In another embodiment, as it is shown in fig. 7, as a example by the pipe gallery of double cabin structures, adjacent two prefabricated components lead to Cross and draw that fastening assembly 7 is fixing to be connected, draw fastening assembly as shown in Figure 8, described in draw fastening assembly to include being separately positioned on adjacent two The bolt hand hole 71 of the edge joint position of individual prefabricated component, connect the bolt 72 of two described bolt hand holes and and be arranged on described bolt The nut 73 of end, bolt includes arch screw bolt, straight bolt etc..Base plate 3 has as described flat flat board 303, is arranged on The arc of described flat board both sides turns up 302 and for supporting the inverted T shape mounting seat 301 of septum wall.
In another embodiment, owing to mid-board 4 is primarily subjected to vertical pressure, thus top board 1 and mid-board 4, base plate 3 with Mid-board 4 uses tongue and groove 8 to connect, and described tongue and groove 8 is included in the groove in described inverted T shape mounting seat and septum wall 4 On the tongue with described matching grooves.
Longitudinal edge joint position of adjacent two prefabricated components is respectively equipped with shearing groove and the shearing rod mated with described shearing groove, cuts Power groove can be circle, rectangle, trapezoidal, and is not limited to this, improves the shear resistance of structure.
The horizontal edge joint position of any one of prefabricated component and longitudinal edge joint position are respectively provided with elastic sealing gasket groove and filleting groove, The material of described elastic sealing gasket groove can use ethylene propylene diene rubber, is provided with waterproof material in described elastic sealing gasket groove.
Needing based on piping lane piecemeal assembly, every piece of preform center is equipped with hole for hoist 9, it is considered to base plate 3 and substrate bed course There may be gap, therefore at base plate 3, hole for hoist doubles as injected hole.
The invention also discloses the installation method of a kind of complete prefabricated piecemeal assembled pipe gallery, dig to phase including by ground Answer designed elevation, pour handling base plate 3 to precalculated position after a layer concrete bed course on the ground, side plate 2 is hoisted to base plate 3 On corresponding position, put on arch screw bolt, tightening nuts by side plate 2 bolt hand hole corresponding with base plate 3 so that side plate 2 with Base plate 3 is connected firmly, and is then hoisted to top board 1 upper end of biside plate 2, be then connected by design requirement with top board 1 by side plate 2 It is fixed as an entirety.Double, three cabin piping lane sequences of construction are first sole piece, then abutment wall block and mid-board 4, and last jacking block, during installation Using longitudinal staggered joint erection mode, this construction method is very convenient.
The present invention at least includes following beneficial effect:
1, use arc top with the pipe gallery of arc wall construction under identical external condition, the pipe gallery of relatively slab construction Desired thickness is little, and arrangement of reinforcement is few, more economical, and the moment of flexure of edge joint position is approximately 0, and stress is minimum, can guarantee that bolt when bolt is affixed Will not rupture because stress is excessive.
2, pipe gallery will arrange median septum and demarcation strip can adapt to different utilities pipelines lays demand.
3, single cabin formula, double-cabin type, three cabin formula pipe galleries lateral plate structure consistent, the arch section structure one at base plate two ends Causing, the arch section structure of Shuan Cang and three storehouse curved roofs is consistent.It is prefabricated that the concordance of structure can realize quick industrialization, Scene is specially joined, and increases economic efficiency.
4, the edge joint position of adjacent two prefabricated components is respectively provided with shearing groove and shearing rod, improves the shear resistance of structure.
5, horizontal edge joint position and longitudinal edge joint position of prefabricated component is respectively provided with elastic sealing gasket groove and filleting groove, and described elasticity is close It is provided with waterproof material, it is possible to the most waterproof in packing groove.
Although embodiment of the present invention are disclosed as above, but it is not restricted in description and embodiment listed Using, it can be applied to various applicable the field of the invention completely, for those skilled in the art, and can be easily Realizing other amendment, therefore under the general concept limited without departing substantially from claim and equivalency range, the present invention does not limit In specific details with shown here as the legend with description.

Claims (7)

1. a complete prefabricated piecemeal assembled pipe gallery, it is characterised in that pipe gallery is to be assembled by multiple prefabricated components , there is arc top, arc wall and flat cube.
Complete prefabricated piecemeal assembled pipe gallery the most as claimed in claim 1, it is characterised in that include single cabin formula integrated pipe Corridor, described single cabin formula pipe gallery includes following prefabricated component:
Top board, it is arcuate structure;
The side plate of two arcs, it is separately positioned on the both sides of described top board, the top of described side plate and the smooth-going of described top board even Connect;And
Base plate, its lower flat with described side plate is along being connected;
Longitudinal edge joint position moment of flexure between described top board, side plate and base plate levels off to 0.
Complete prefabricated piecemeal assembled pipe gallery the most as claimed in claim 2, it is characterised in that described pipe gallery is internal all Even distribution is together or twice mid-board is to constitute double-cabin type pipe gallery or three cabin formula pipe galleries;
The top board of described three cabin formula pipe galleries includes the curved portions being connected with the smooth-going of described side plate being positioned at both sides and is positioned at Flat part between said two curved portions, the described curved portions that described twice mid-board is respectively provided at both sides is straight with described The position that portion connects;
The top board both sides of described double-cabin type pipe gallery are consistent with the curved portions structure of the top board of described three cabin formula pipe galleries.
Complete prefabricated piecemeal assembled pipe gallery the most as claimed in claim 3, it is characterised in that described single cabin formula integrated pipe The lateral plate structure of corridor, double-cabin type pipe gallery and three cabin formula pipe galleries is consistent;
Described double-cabin type pipe gallery is consistent with the middle partition wall structure of described three cabin formula pipe galleries.
5. the complete prefabricated piecemeal assembled pipe gallery as described in claim 3-4 any one, it is characterised in that described base plate Neutral straight and two ends arc are turned up to be connected with the smooth-going of described side plate;
The two ends arc of the base plate of described single cabin formula pipe gallery, described double-cabin type pipe gallery and described three cabin formula pipe galleries Unanimously.
6. the complete prefabricated piecemeal assembled pipe gallery as described in claim 3-4 any one, it is characterised in that described base plate Lower curved for flat construction and described side plate is turned up to horizontal direction to be connected with base plate smooth-going.
Complete prefabricated piecemeal assembled pipe gallery the most as claimed in claim 1, it is characterised in that indulging of described prefabricated component both sides Width to piece face.
CN201610648427.1A 2016-08-09 2016-08-09 Complete prefabricated piecemeal assembled pipe gallery Active CN106088151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610648427.1A CN106088151B (en) 2016-08-09 2016-08-09 Complete prefabricated piecemeal assembled pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610648427.1A CN106088151B (en) 2016-08-09 2016-08-09 Complete prefabricated piecemeal assembled pipe gallery

Publications (2)

Publication Number Publication Date
CN106088151A true CN106088151A (en) 2016-11-09
CN106088151B CN106088151B (en) 2018-09-21

Family

ID=57455905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610648427.1A Active CN106088151B (en) 2016-08-09 2016-08-09 Complete prefabricated piecemeal assembled pipe gallery

Country Status (1)

Country Link
CN (1) CN106088151B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592631A (en) * 2017-01-12 2017-04-26 建华建材(江苏)有限公司 Precast assembling type underground comprehensive pipe gallery and construction method
CN106703077A (en) * 2017-01-17 2017-05-24 深圳市路桥建设集团有限公司 Prefabricated and assembled integral type underground pipe gallery structure
CN107313452A (en) * 2017-08-09 2017-11-03 中冶京诚工程技术有限公司 Prefabricated comprehensive pipe gallery
CN107653903A (en) * 2017-09-30 2018-02-02 沈阳建筑大学 Class rectangle pipe gallery section of jurisdiction attachment structure and assemble method
CN107905256A (en) * 2017-11-23 2018-04-13 中国建筑股份有限公司 The underground pipe gallery and its construction method of three cabin structures
CN109440819A (en) * 2018-12-25 2019-03-08 上海公路桥梁(集团)有限公司 Prefabricated pipe gallery
CN113006138A (en) * 2021-03-20 2021-06-22 恒亿集团有限公司 Assembled D-type comprehensive pipe gallery and construction method thereof
CN117738238A (en) * 2024-01-04 2024-03-22 中国瑞林工程技术股份有限公司东莞分公司 Prefabricated assembled utility tunnel
CN117738238B (en) * 2024-01-04 2024-10-01 中国瑞林工程技术股份有限公司东莞分公司 Prefabricated assembled utility tunnel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202469227U (en) * 2012-03-15 2012-10-03 孙成业 Prefabricated reinforced concrete fabricated pipe gallery
KR101457877B1 (en) * 2014-05-16 2014-11-07 고현 Assembled push pipe and underground structure construction method therewith
CN105064399A (en) * 2015-09-08 2015-11-18 浙江鑫宙竹基复合材料科技有限公司 Assembly type prefabricated bamboo composite pipe rack
CN105544605A (en) * 2016-01-29 2016-05-04 中铁第四勘察设计院集团有限公司 Modular assembly type comprehensive pipe gallery
CN105569076A (en) * 2016-02-20 2016-05-11 深圳华瀚城市综合管廊技术研究开发有限公司 Pipe gallery prefabricated parts and assembly type rectangular comprehensive pipe gallery
CN105625466A (en) * 2016-03-13 2016-06-01 青岛润国生态科技发展有限公司 Assembled prefabricated comprehensive pipe gallery
CN206157762U (en) * 2016-08-09 2017-05-10 中交第二航务工程局有限公司 Prefabricate piecemeal assembled utility tunnel entirely

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202469227U (en) * 2012-03-15 2012-10-03 孙成业 Prefabricated reinforced concrete fabricated pipe gallery
KR101457877B1 (en) * 2014-05-16 2014-11-07 고현 Assembled push pipe and underground structure construction method therewith
CN105064399A (en) * 2015-09-08 2015-11-18 浙江鑫宙竹基复合材料科技有限公司 Assembly type prefabricated bamboo composite pipe rack
CN105544605A (en) * 2016-01-29 2016-05-04 中铁第四勘察设计院集团有限公司 Modular assembly type comprehensive pipe gallery
CN105569076A (en) * 2016-02-20 2016-05-11 深圳华瀚城市综合管廊技术研究开发有限公司 Pipe gallery prefabricated parts and assembly type rectangular comprehensive pipe gallery
CN105625466A (en) * 2016-03-13 2016-06-01 青岛润国生态科技发展有限公司 Assembled prefabricated comprehensive pipe gallery
CN206157762U (en) * 2016-08-09 2017-05-10 中交第二航务工程局有限公司 Prefabricate piecemeal assembled utility tunnel entirely

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
雷升祥等: "《综合管廊与管道盾构》", 31 July 2015 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592631A (en) * 2017-01-12 2017-04-26 建华建材(江苏)有限公司 Precast assembling type underground comprehensive pipe gallery and construction method
CN106703077A (en) * 2017-01-17 2017-05-24 深圳市路桥建设集团有限公司 Prefabricated and assembled integral type underground pipe gallery structure
CN106703077B (en) * 2017-01-17 2020-02-07 深圳市路桥建设集团有限公司 Integral underground comprehensive pipe gallery structure of prefabricated assembly
CN107313452A (en) * 2017-08-09 2017-11-03 中冶京诚工程技术有限公司 Prefabricated comprehensive pipe gallery
CN107313452B (en) * 2017-08-09 2023-08-04 中冶京诚工程技术有限公司 Prefabricated utility tunnel
CN107653903A (en) * 2017-09-30 2018-02-02 沈阳建筑大学 Class rectangle pipe gallery section of jurisdiction attachment structure and assemble method
CN107905256A (en) * 2017-11-23 2018-04-13 中国建筑股份有限公司 The underground pipe gallery and its construction method of three cabin structures
CN109440819A (en) * 2018-12-25 2019-03-08 上海公路桥梁(集团)有限公司 Prefabricated pipe gallery
CN113006138A (en) * 2021-03-20 2021-06-22 恒亿集团有限公司 Assembled D-type comprehensive pipe gallery and construction method thereof
CN117738238A (en) * 2024-01-04 2024-03-22 中国瑞林工程技术股份有限公司东莞分公司 Prefabricated assembled utility tunnel
CN117738238B (en) * 2024-01-04 2024-10-01 中国瑞林工程技术股份有限公司东莞分公司 Prefabricated assembled utility tunnel

Also Published As

Publication number Publication date
CN106088151B (en) 2018-09-21

Similar Documents

Publication Publication Date Title
CN106088151A (en) Complete prefabricated piecemeal assembled pipe gallery
CN206157762U (en) Prefabricate piecemeal assembled utility tunnel entirely
CN106049536A (en) Splitting method for assembled integral type waterproof comprehensive pipe rack
CN205276316U (en) Modular prefabricated piping lane
WO2017071113A1 (en) Cement-soil mixing pile protected underground pipe gallery
CN208280170U (en) Assembled steel structure piping lane
CN208386103U (en) A kind of quickly assembling sheet material assembly type cable slot
CN105756087A (en) Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack
CN105970976A (en) Vertical connection structure for supporting row piles and main underground structure
CN105735521A (en) T-shaped connecting brick and wall body structure
WO2017071111A1 (en) Underground pipe gallery protection structure
CN208201918U (en) Assembled corrugated steel Combined concrete list storehouse pipe gallery
CN207998861U (en) A kind of prefabricated assembled tube-in-tube waterproof pipe gallery
CN106193115A (en) A kind of concrete prefabricated groove
CN207160068U (en) A kind of disjunctor corrugated steel piping lane
CN220184085U (en) Utility tunnel
CN208136954U (en) Precast splice type Pipe rack
CN206956775U (en) A kind of cabin pipe gallery of plain type underground three
CN210684774U (en) Assembled concrete utility tunnel is connected to slot type
CN212177148U (en) Symmetrical horseshoe-shaped assembled concrete tunnel
CN204266666U (en) A kind of street lamp
CN210507525U (en) Strengthen waterproof type assembled many storehouses utility tunnel
KR20120021977A (en) Wave type steel plate tunnel
CN208088343U (en) A kind of assembled piping lane component and piping lane
CN208996077U (en) A kind of double cabin piping lane import and export mixes in underground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Di Shihong

Inventor after: Zhang Shikui

Inventor after: Peng Qiang

Inventor after: Yang Zhao

Inventor after: Jiang Daodong

Inventor after: Yu Cun

Inventor after: Yang Rui

Inventor after: Li Xin

Inventor before: Di Shihong

Inventor before: Zhang Shikui

Inventor before: Peng Qiang

Inventor before: Yang Zhao

Inventor before: Jiang Daodong

Inventor before: Li Xin

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210901

Address after: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Patentee after: The Second Harbor Engineering Co.

Patentee after: CCCC WUHAN ZHIXING INTERNATIONAL ENGINEERING CONSULTING Co.,Ltd.

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Patentee before: The Second Harbor Engineering Co.

Patentee before: CCCC WUHAN ZHIXING INTERNATIONAL ENGINEERING CONSULTING Co.,Ltd.