CN107893531A - A kind of construction package for early-dismantling - Google Patents

A kind of construction package for early-dismantling Download PDF

Info

Publication number
CN107893531A
CN107893531A CN201711216122.4A CN201711216122A CN107893531A CN 107893531 A CN107893531 A CN 107893531A CN 201711216122 A CN201711216122 A CN 201711216122A CN 107893531 A CN107893531 A CN 107893531A
Authority
CN
China
Prior art keywords
adjusting rod
regulation ring
top plate
early
construction package
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711216122.4A
Other languages
Chinese (zh)
Inventor
付志红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Kuaiyi Template Engineering Co ltd
Original Assignee
Guangzhou Kuaiyi Template Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Kuaiyi Template Engineering Co ltd filed Critical Guangzhou Kuaiyi Template Engineering Co ltd
Priority to CN201711216122.4A priority Critical patent/CN107893531A/en
Publication of CN107893531A publication Critical patent/CN107893531A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/483Supporting heads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of construction package for early-dismantling, and it includes adjusting rod, rubber sleeve, regulating part, supporting plate and top plate;Rubber sleeve is detachably arranged in the lower end of adjusting rod;Top plate is detachably arranged in the upper end end of adjusting rod;Regulating part includes upper regulation ring and lower regulation ring;Upper regulation ring and lower regulation ring are rotatably arranged on adjusting rod, and upper regulation ring and lower regulation ring are between rubber sleeve and top plate;Supporting plate is slidably arranged on adjusting rod, and supporting plate is between upper regulation ring and top plate;Supporting plate is enabled to adjust height with the rotation of upper regulation ring.It is i.e. dismountable can make it that concrete strength reaches 50% by using technical scheme, and now setting time needed for concrete at 35 days or so, therefore need to be equipped with template and reinforce the materials such as steel pipe only to need 1.1 1.2 sets, greatly reduce the input of material, improve material week transfer efficient, overall cost is lower, and the usage amount of material reduces the policy for also more meeting national low-carbon environment-friendly.

Description

A kind of construction package for early-dismantling
Technical field
The present invention relates to architectural engineering correlative technology field, concretely relates to a kind of structure group for early-dismantling Part.
Background technology
At present, in construction, when casting the concrete components such as floor or beam body at the scene, more using template, steel pipe Support etc. assembles.But due to the technology restriction of support system, template needs concrete strength to reach more than 75% ability Remove, at least more than 20 days the time required to concrete coagulating time, it is therefore desirable to which being equipped with template and reinforcing the materials such as steel pipe needs 3 Set and more than, cause live material usage to waste huge, fund input is big and the remaining value of surplus material is few more.
The content of the invention
For the deficiency of prior art, the invention provides a kind of construction package for early-dismantling.
The concrete technical scheme of the construction package for early-dismantling of the present invention is as follows:
A kind of construction package for early-dismantling, it includes adjusting rod, rubber sleeve, regulating part, supporting plate and top plate;It is described Rubber sleeve is detachably arranged in the lower end of the adjusting rod;The top plate is detachably arranged in the upper end end of the adjusting rod Portion;The regulating part includes upper regulation ring and lower regulation ring;The upper regulation ring and the lower regulation ring are rotatably set In on the adjusting rod, and the upper regulation ring and the lower regulation ring are between the rubber sleeve and the top plate;Institute State supporting plate to be slidably arranged on the adjusting rod, and the supporting plate is between the upper regulation ring and the top plate; The supporting plate is enabled to adjust height with the rotation of the upper regulation ring.
The construction package for early-dismantling of the present invention is a kind of construction package early torn open with beam forms available for floor, Applied to the beam-slab template reinforcement system used in architectural engineering.It can cause coagulation by using above-mentioned technical proposal of the present invention Native intensity reaches 50% i.e. dismountable, and now setting time needed for concrete at 3-5 days or so, it is therefore desirable to the template of outfit And reinforcing the materials such as steel pipe, beam slab support be stupefied only needs 1.1-1.2 to cover, and greatly reduces the input of material, improves material week transfer efficient, Overall cost is lower, and the usage amount of material reduces the policy for also more meeting national low-carbon environment-friendly.
According to a preferred embodiment, the adjusting rod includes smooth department and threaded portion, is formed as a top The screw rod of non-threaded;And the end set in described smooth department one end has a screwed hole.
According to a preferred embodiment, the upper regulation ring is identical with the lower regulation ring structure, and it includes one Tapped annulus and the first regulation support arm being symmetricly set on the annulus lateral wall and the second regulation support arm;Installing Under state, the internal thread on the annulus is connected with the external screw thread on the threaded portion in the adjusting rod so that the up-regulation Section ring and the lower regulation ring are rotatably arranged on the adjusting rod.
By setting the upper regulation ring with being threadedly coupled on adjusting rod, it can play a part of holding supporting plate, and can Lifted by screw thread, and then adjust the height of supporting plate, convenient handling;Lower regulation with being threadedly coupled is set on adjusting rod Ring, lower regulation ring are spindle rotationally arranged on adjusting rod by screw thread, are inserted into when entirely early tearing construction package open in supporting steel pipe During face, you can adjust the early height for tearing construction package open by rotating lower regulation ring.
According to a preferred embodiment, supporting plate includes poppet body and is respectively arranged at the poppet body both sides Baffle plate;And through hole is provided with the middle part of the poppet body, one is provided with the poppet body bottom surface and is connected with the through hole Logical body;In the mounted state, smooth department one end of the adjusting rod passes through the body and the through hole so that the support Plate is slidably arranged on the adjusting rod and held by the upper regulation ring.
Baffle plate is set respectively in poppet body both sides, position-limiting action can be played to the position of the stupefied placement of master, prevents from leading stupefied Come off.
According to a preferred embodiment, also it is evenly arranged with the junction of the body and the poppet body more Individual ribs.
Ribs is set to can be used for the intensity for strengthening supporting plate in supporting plate bottom, to bear to lead stupefied load.
According to a preferred embodiment, the top plate includes top plate body and is vertically installed in the top plate body bottom The connecting screw of Middle face position;In the mounted state, the connecting screw and the screw thread of described adjusting rod one end end Hole is threadedly coupled so that the top plate is detachably arranged in adjusting rod upper end end.
The top plate of different size is threadedly coupled by connecting screw with adjusting rod, and convenient dismounting, versatile.
According to a preferred embodiment, multiple circular holes are additionally provided with the top plate body;In a state of use, The top plate by multiple circular holes with beam slab support is stupefied is connected, make beam slab and the integral structure of support body.
It is cylindrical according to a preferred embodiment, the rubber sleeve;The rubber sleeve is sheathed on the adjusting rod On;Or the internal thread being engaged with the threaded portion on the adjusting rod is provided with the rubber sleeve inwall;Pacifying Under dress state, the internal thread is connected with the threaded portion so that the rubber sleeve is detachably arranged in the regulation On bar.
By setting rubber sleeve on adjusting rod, it is ensured that it is early to tear open after construction package is inserted into inside supporting steel pipe, subtract Few early gap torn open between construction package and supporting steel pipe, prevent that early tearing construction package open rocks, ensure that and entirely early tear construction package open Resistance to overturning.
According to a preferred embodiment, the quantity of the rubber sleeve is two.
According to a preferred embodiment, the adjusting rod, the rubber sleeve, the regulating part, the supporting plate and institute The edges and corners stated in top plate use fillet structure.
It is suitable by will be possible to take fillet with the part of worker exposure in the construction package for early-dismantling Sliding processing, the injury such as scratch, the safe design of this hommization, ensures worker caused by avoiding the corner angle of parts possible to worker Use the security of process.
Compared with prior art, the construction package for early-dismantling of the invention has the advantages that:
The construction package for early-dismantling of the present invention is a kind of construction package early torn open with beam forms available for floor, Applied to the beam-slab template reinforcement system used in architectural engineering.It can cause coagulation by using above-mentioned technical proposal of the present invention Native intensity reaches 50% i.e. dismountable, and now setting time needed for concrete at 3-5 days or so, it is therefore desirable to the template of outfit And reinforcing the materials such as steel pipe, beam slab support be stupefied only needs 1.1-1.2 to cover, and greatly reduces the input of material, improves material week transfer efficient, Overall cost is lower, and the usage amount of material reduces the policy for also more meeting national low-carbon environment-friendly.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in patent Example of the present invention The accompanying drawing to be used is briefly described.Obviously, described accompanying drawing is the part of the embodiment of patent of the present invention, rather than entirely Portion's embodiment, those skilled in the art on the premise of not paying creative work, can also obtain it according to these accompanying drawings His design and accompanying drawing.
Fig. 1 is the structural representation for the construction package that the present invention is used for early-dismantling;
Fig. 2 is the structural representation that the present invention is used for adjusting rod in the construction package of early-dismantling;
Fig. 3 is the structural representation that the present invention is used for rubber sleeve in the construction package of early-dismantling;
Fig. 4 is that the present invention is used for the structural representation of upper regulation ring and lower regulation ring in the construction package of early-dismantling;
Fig. 5 is the structural representation that the present invention is used for supporting plate in the construction package of early-dismantling;
Fig. 6 is the structural representation that the present invention is used for top plate in the construction package of early-dismantling;
Fig. 7 is the structural representation that the present invention is used for another adjusting rod in the construction package of early-dismantling;
Fig. 8 is the structural representation that the present invention is used for another supporting plate in the construction package of early-dismantling;
Fig. 9 is the structural representation that the present invention is used for another top plate in the construction package of early-dismantling;
Figure 10 is the structural representation of another construction package for being used for early-dismantling of the invention.
Reference numerals list
100- adjusting rods, 110- smooth departments, 120- threaded portions, 130- screwed holes, 200- rubber sleeves, the upper regulation rings of 310-, Regulation ring under 320-, 301- annulus, 302- first adjust support arm, and 303- second adjusts support arm, 304- anticreep lanyard holes, 400- supports Plate, 410- poppet bodies, 411- through holes, 420- baffle plates, 430- bodys, 440- ribs, 500- top plates, 510- top plate bodies, 511- circular holes, 520- connecting screws, 530- screw shells, the ribs of 540- second.
Embodiment
The construction package for early-dismantling of the present invention is described in detail below in conjunction with the accompanying drawings.
Embodiment 1
As shown in Figures 1 to 6, a kind of construction package for early-dismantling, it include adjusting rod 100, rubber sleeve 200, Regulating part, supporting plate 400 and top plate 500.
Preferably, adjusting rod 100 includes smooth department 110 and threaded portion 120, is formed as the spiral shell of a top non-threaded Bar;And the end set in the one end of smooth department 110 has a screwed hole 130.
Preferably, rubber sleeve 200 is cylindrical.Rubber sleeve 200 is detachably arranged in the lower end of adjusting rod 100.Specifically , rubber sleeve 200 can be directly sleeved on adjusting rod 100.Or it is provided with the inwall of rubber sleeve 200 and adjusting rod 100 On the internal thread that is engaged of threaded portion 120.In the mounted state, internal thread is threadedly coupled with threaded portion 120 so that rubber sleeve 200 are detachably arranged on adjusting rod 100.Preferably, the quantity of rubber sleeve 200 is two.
By setting rubber sleeve on adjusting rod, it is ensured that it is early to tear open after construction package is inserted into inside supporting steel pipe, subtract Few early gap torn open between construction package and supporting steel pipe, prevent that early tearing construction package open rocks, ensure that and entirely early tear construction package open Resistance to overturning.
Top plate 500 is detachably arranged in the upper end end of adjusting rod 100.Top plate 500 is including top plate body 510 and vertically It is arranged at the connecting screw 520 of the bottom surface medium position of top plate body 510.
In the mounted state, connecting screw 520 is threadedly coupled with the screwed hole 130 of one end end of adjusting rod 100 so that top Plate 500 is detachably arranged in the upper end end of adjusting rod 100.Top plate is threadedly coupled by connecting screw with adjusting rod, and Convenient dismounting, it is versatile.
Further, multiple circular holes 511 are additionally provided with top plate body 510.In a state of use, top plate 500 passes through Multiple circular holes 511 with beam slab support is stupefied is connected, make beam slab and the integral structure of support body.
Regulating part includes upper regulation ring 310 and lower regulation ring 320.Upper regulation ring 310 and lower regulation ring 320 are rotatable It is arranged on adjusting rod 100, and upper regulation ring 310 and lower regulation ring 320 are between rubber sleeve 200 and top plate 500.
Upper regulation ring 310 is identical with the lower structure of regulation ring 320, and it includes a tapped annulus 301 and symmetrically set The first regulation support arm 302 and second being placed on the lateral wall of annulus 301 adjusts support arm 303.
In the mounted state, the internal thread on annulus 301 is connected with the external screw thread on the threaded portion 120 in adjusting rod 100 Connect so that upper regulation ring 310 and lower regulation ring 320 are rotatably arranged on adjusting rod 100.
Preferably, adjusted in the first regulation support arm 302 and second and be respectively arranged with anticreep lanyard hole 304 on support arm 303.
Anticreep lanyard hole 304 is set respectively on support arm 303 by being adjusted in the first regulation support arm 302 and second, during use Total component can be connected by the anticreep lanyard hole 304 by materials such as rope or iron chains with steel pipe support, facilitate worker to enter Row is overall to be carried.
By setting the upper regulation ring with being threadedly coupled on adjusting rod, it can play a part of holding supporting plate, and can Lifted by screw thread, and then adjust the height of supporting plate, convenient handling;Lower regulation with being threadedly coupled is set on adjusting rod Ring, lower regulation ring are spindle rotationally arranged on adjusting rod by screw thread, are inserted into when entirely early tearing construction package open in supporting steel pipe During face, you can adjust the early height for tearing construction package open by rotating lower regulation ring.
First regulation support arm 302 and second, which adjusts support arm 303, to be used as handle, convenient to rotate the upper He of regulation ring 310 Lower regulation ring 320.
Supporting plate 400 is slidably arranged on adjusting rod 100, and supporting plate 400 is located at upper regulation ring 310 and top plate 500 Between;Supporting plate 400 is enabled to adjust height with the rotation of upper regulation ring 310.
Supporting plate 400 includes poppet body 410 and is respectively arranged at the baffle plate 420 of the both sides of poppet body 410.And in supporting plate The middle part of body 410 is provided with through hole 411, and a body 430 connected with through hole 411 is provided with the bottom surface of poppet body 410.
In the mounted state, one end of smooth department 110 of adjusting rod 100 passes through body 430 and through hole 411 so that supporting plate 400 It is slidably arranged on adjusting rod 100 and is held by upper regulation ring 310.
By setting baffle plate respectively in poppet body both sides, position-limiting action can be played to the position of the stupefied placement of master, prevented Master is stupefied to come off.
Further, multiple ribs 440 are also evenly arranged with the junction of body 430 and poppet body 410.Holding in the palm Plate bottom sets ribs to can be used for the intensity for strengthening supporting plate, to bear to lead stupefied load.
Further, the edges and corners in adjusting rod 100, rubber sleeve 200, regulating part, supporting plate 400 and top plate 500 use Fillet structure.
It is suitable by will be possible to take fillet with the part of worker exposure in the construction package for early-dismantling Sliding processing, the injury such as scratch, the safe design of this hommization, ensures worker caused by avoiding the corner angle of parts possible to worker Use the security of process.
The construction package for early-dismantling of the present invention is a kind of construction package early torn open with beam forms available for floor, Applied to the beam-slab template reinforcement system used in architectural engineering.It can cause coagulation by using above-mentioned technical proposal of the present invention Native intensity reaches 50% i.e. dismountable, and now setting time needed for concrete at 3-5 days or so, it is therefore desirable to the template of outfit And reinforcing the materials such as steel pipe, beam slab support be stupefied only needs 1.1-1.2 to cover, and greatly reduces the input of material, improves material week transfer efficient, Overall cost is lower, and the usage amount of material reduces the policy for also more meeting national low-carbon environment-friendly.
Embodiment 2
As shown in Figure 10, the another kind for present embodiments providing the construction package that the present invention is used for early-dismantling is preferable real Apply mode.
Compared with embodiment, its main distinction is that the structure of adjusting rod 100, supporting plate 400 and top plate is different.
Wherein, adjusting rod 100 is a screw rod, as shown in Figure 7.
As shown in figure 8, supporting plate 400 includes poppet body 410.In the present embodiment, poppet body 410 is a flat board.Holding in the palm The middle part of plate body 410 is provided with through hole 411, and a body 430 connected with through hole 411 is provided with the bottom surface of poppet body 410. Under installment state, one end of adjusting rod 100 passes through body 430 and through hole 411 so that supporting plate 400 is slidably arranged on regulation Held on bar 100 and by upper regulation ring 310.Further, also it is uniformly arranged in the junction of body 430 and poppet body 410 There are multiple ribs 440.Ribs is set to can be used for the intensity for strengthening supporting plate in supporting plate bottom, to bear to lead stupefied load.
Top plate 500 is detachably arranged in the upper end of adjusting rod 100.Top plate 500 includes top plate body 510 and is vertically arranged In the screw shell 530 of the bottom surface medium position of top plate body 510, as shown in Figure 9.
In the mounted state, screw shell 530 is connected with the threaded upper ends of adjusting rod 100 so that top plate 500 is removably set It is placed in the upper end of adjusting rod 100.Top plate is threadedly coupled by screw shell with adjusting rod, and convenient dismounting, versatile.And And the second ribs 540 is provided between screw shell 530 and top plate body 510.
Further, multiple circular holes 511 are additionally provided with top plate body 510.In a state of use, top plate 500 passes through Multiple circular holes 511 with beam slab support is stupefied is connected, make beam slab and the integral structure of support body.
Remaining structure of the present embodiment is same as Example 1.
It should be noted that all features disclosed in this specification, or disclosed all methods or during the step of, In addition to mutually exclusive feature and/or step, it can combine in any way.
In addition, above-mentioned specific embodiment is exemplary, those skilled in the art can opening in the disclosure of invention Give and find out various solutions, and these solutions also belong to disclosure of the invention scope and fall into the protection of the present invention Within the scope of.It will be understood by those skilled in the art that description of the invention and its accompanying drawing be it is illustrative and not form to power The limitation that profit requires.Protection scope of the present invention is limited by claim and its equivalent.

Claims (10)

1. a kind of construction package for early-dismantling, it is characterised in that it includes adjusting rod (100), rubber sleeve (200), adjusted Save part, supporting plate (400) and top plate (500);
The rubber sleeve (200) is detachably arranged in the lower end of the adjusting rod (100);The top plate (500) is dismountable It is arranged at the upper end end of the adjusting rod (100);
The regulating part includes upper regulation ring (310) and lower regulation ring (320);The upper regulation ring (310) and the lower regulation Ring (320) is rotatably arranged on the adjusting rod (100), and the upper regulation ring (310) and the lower regulation ring (320) between the rubber sleeve (200) and the top plate (500);
The supporting plate (400) is slidably arranged on the adjusting rod (100), and the supporting plate (400) is located on described Between regulation ring (310) and the top plate (500);So that the supporting plate (400) can be with the rotation of the upper regulation ring (310) And adjust height.
A kind of 2. construction package for early-dismantling according to claim 1, it is characterised in that the adjusting rod (100) include smooth department (110) and threaded portion (120), be formed as the screw rod of a top non-threaded;
And the end set in the smooth department (110) one end has a screwed hole (130).
A kind of 3. construction package for early-dismantling according to claim 2, it is characterised in that the upper regulation ring (310) identical with lower regulation ring (320) structure, it includes a tapped annulus (301) and is symmetricly set in institute State the first regulation support arm (302) and the second regulation support arm (303) on annulus (301) lateral wall;In the mounted state, the circle Internal thread on ring (301) is connected with the external screw thread on the threaded portion (120) in the adjusting rod (100) so that on described Regulation ring (310) and the lower regulation ring (320) are rotatably arranged on the adjusting rod (100).
4. a kind of construction package for early-dismantling according to claim 3, it is characterised in that supporting plate (400) includes Poppet body (410) and the baffle plate (420) for being respectively arranged at the poppet body (410) both sides;
And through hole (411) is provided with the middle part of the poppet body (410), is provided with the poppet body (410) bottom surface One body (430) connected with the through hole (411);
In the mounted state, smooth department (110) one end of the adjusting rod (100) passes through the body (430) and the through hole (411) so that the supporting plate (400) is slidably arranged on the adjusting rod (100) and held in the palm by the upper regulation ring (310) Firmly.
5. a kind of construction package for early-dismantling according to claim 4, it is characterised in that in the body (430) and the junction of the poppet body (410) is also evenly arranged with multiple ribs (440).
A kind of 6. construction package for early-dismantling according to claim 4, it is characterised in that the top plate (500) Including top plate body (510) and it is vertically installed in the connecting screw (520) of top plate body (510) bottom surface medium position;
In the mounted state, the connecting screw (520) and the screwed hole (130) of the adjusting rod (100) one end end Threaded connection so that the top plate (500) is detachably arranged in the adjusting rod (100) upper end end.
7. a kind of construction package for early-dismantling according to claim 6, it is characterised in that in the top plate body (510) multiple circular holes (511) are additionally provided with;
In a state of use, the top plate (500) by multiple circular holes (511) with beam slab support is stupefied is connected.
A kind of 8. construction package for early-dismantling according to one of claim 2 to 7, it is characterised in that the rubber Gum cover (200) is cylindrical;
The rubber sleeve (200) is sheathed on the adjusting rod (100);
Or it is provided with the rubber sleeve (200) inwall and the threaded portion (120) phase on the adjusting rod (100) The internal thread of cooperation;
In the mounted state, the internal thread is threadedly coupled with the threaded portion (120) so that the rubber sleeve (200) is removable That unloads is arranged on the adjusting rod (100).
A kind of 9. construction package for early-dismantling according to claim 8, it is characterised in that the rubber sleeve (200) quantity is two.
A kind of 10. construction package for early-dismantling according to one of claim 1 to 7, it is characterised in that the tune Edges and corners in pole (100), the rubber sleeve (200), the regulating part, the supporting plate (400) and the top plate (500) are equal Using fillet structure.
CN201711216122.4A 2017-11-28 2017-11-28 A kind of construction package for early-dismantling Pending CN107893531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711216122.4A CN107893531A (en) 2017-11-28 2017-11-28 A kind of construction package for early-dismantling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711216122.4A CN107893531A (en) 2017-11-28 2017-11-28 A kind of construction package for early-dismantling

Publications (1)

Publication Number Publication Date
CN107893531A true CN107893531A (en) 2018-04-10

Family

ID=61806349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711216122.4A Pending CN107893531A (en) 2017-11-28 2017-11-28 A kind of construction package for early-dismantling

Country Status (1)

Country Link
CN (1) CN107893531A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196118A (en) * 2020-10-13 2021-01-08 邢台职业技术学院 Connecting piece for assembly type building
CN114737758A (en) * 2022-03-31 2022-07-12 重庆渝能建筑安装工程有限公司 Adjustable jacking and quick-release building template supporting structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3615997A1 (en) * 1986-05-13 1987-11-19 Gottlob Klein HEIGHT-ADJUSTABLE STEEL SUPPORT FOR CEILING SHEETS AND THE LIKE
US5083739A (en) * 1989-10-05 1992-01-28 Symons Corporation Concrete form support bracket for bridge overhang decks
CN203239814U (en) * 2013-04-24 2013-10-16 上海众力投资发展有限公司 Lining structure for increasing fatigue
CN107355073A (en) * 2017-08-30 2017-11-17 云南工程建设总承包公司 A kind of wooden model early tears support meanss and its construction and application method open
CN207513162U (en) * 2017-11-28 2018-06-19 广州市快易模板工程有限公司 A kind of construction package for early-dismantling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3615997A1 (en) * 1986-05-13 1987-11-19 Gottlob Klein HEIGHT-ADJUSTABLE STEEL SUPPORT FOR CEILING SHEETS AND THE LIKE
US5083739A (en) * 1989-10-05 1992-01-28 Symons Corporation Concrete form support bracket for bridge overhang decks
CN203239814U (en) * 2013-04-24 2013-10-16 上海众力投资发展有限公司 Lining structure for increasing fatigue
CN107355073A (en) * 2017-08-30 2017-11-17 云南工程建设总承包公司 A kind of wooden model early tears support meanss and its construction and application method open
CN207513162U (en) * 2017-11-28 2018-06-19 广州市快易模板工程有限公司 A kind of construction package for early-dismantling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196118A (en) * 2020-10-13 2021-01-08 邢台职业技术学院 Connecting piece for assembly type building
CN114737758A (en) * 2022-03-31 2022-07-12 重庆渝能建筑安装工程有限公司 Adjustable jacking and quick-release building template supporting structure

Similar Documents

Publication Publication Date Title
CN103422622B (en) The steel bar horse-shaped bench that height adjustable can reuse
CN207420057U (en) One kind can have enough to meet the need floor board thickness control apparatus
CN105756345B (en) Building wall mould plate supporting device
CN107893531A (en) A kind of construction package for early-dismantling
CN108035537A (en) A kind of strip breakfast practice for floor
CN107740573A (en) A kind of beam slab early tears supporting construction component open
CN107989364A (en) A kind of strip Quick Release support system for beam
CN106629485A (en) Novel lifting platform for electric power
CN208056624U (en) A kind of strip breakfast practice for floor
CN207513162U (en) A kind of construction package for early-dismantling
CN205684980U (en) Hang horse anti-state erecting device
CN103964166B (en) Compact form rotary type charging gear
CN105174080A (en) Multifunctional fishing and hoisting device
CN106522630A (en) Rotating type concrete distribution device applied to sliding formwork
CN206553146U (en) Novel electric power hoistable platform
CN203429899U (en) Height-adjustable and reusable steel bar horse stool
CN205526320U (en) Material loading screw mechanism
CN210414991U (en) Public road bridge roof beam construction is with mixing earth proportioning device
CN209703716U (en) A kind of architectural engineering hole mending machine
CN206781821U (en) A kind of architectural furniture
CN204850473U (en) Portable concrete placement speed controlling means
CN207633765U (en) A kind of quickly fragmentary concrete placings tool
CN205421938U (en) Concrete placement device based on tower crane concrete hopper
CN205328467U (en) Buffer when heavy object falls to ground
CN207776417U (en) Scaffold buckles discharge tube

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180410