CN205421938U - Concrete placement device based on tower crane concrete hopper - Google Patents

Concrete placement device based on tower crane concrete hopper Download PDF

Info

Publication number
CN205421938U
CN205421938U CN201620201204.6U CN201620201204U CN205421938U CN 205421938 U CN205421938 U CN 205421938U CN 201620201204 U CN201620201204 U CN 201620201204U CN 205421938 U CN205421938 U CN 205421938U
Authority
CN
China
Prior art keywords
hopper
tapered sleeve
concrete
tower crane
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620201204.6U
Other languages
Chinese (zh)
Inventor
程圣国
覃茂森
陈勇
赖坡
陈晓虎
林姗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201620201204.6U priority Critical patent/CN205421938U/en
Application granted granted Critical
Publication of CN205421938U publication Critical patent/CN205421938U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The utility model provides a concrete placement device based on tower crane concrete hopper, includes the frame and installs the hopper in the frame, is equipped with a feed inlet and discharge gate on the hopper, still include detachable connection the spout of frame below, be located hopper discharge gate below the sleeve pipe, in proper order with connecting leg, passage and the blowing pipe of sleeve pipe intercommunication, be equipped with the spout in the channel -section steel, the utility model discloses the concrete placement construction is carried out in the space of pouring to narrow and small that can be very convenient to be applicable to and pour the mouth and be located pouring of template side.

Description

A kind of concrete casting device based on tower crane concrete hopper
Technical field
This utility model relates to a kind of concrete casting device, and feature relates to a kind of concrete casting device based on tower crane concrete hopper.
Background technology
At present, tower crane concrete hopper is mainly used in building construction, ground concreting, transports in the middle of the constructions such as mix.Tower crane concrete hopper can contain the materials such as cement, concrete, soil ash, mortar in construction, reasonable employment tower crane concrete hopper not only can the reduction of erection time, accelerating construction progress, but also can be cost-effective, tradition hopper is improved, form multifunctional hopper device, there is the features such as saving time, work safety, labor and material saving, strong adaptability.nullThe discharging opening of existing tower crane concrete hopper is fixing,And a valve controlling discharge hole for discharge is installed on hopper,In hopper periphery, framework is installed,After Open valve,In hopper, concrete will flow out from discharging opening,But discharging opening is normally at the underface of hopper,Therefore the direction that concrete flows out is perpendicular to ground,Adding the block of upper frame,So when casting concrete in template,Need to pour mouth bigger,And the narrow and small casting space for pouring mouth less can not directly pour,Conventional solution is to insert funnel on mouth and expand pouring of narrow and small casting space and pour mouth,Then the discharging opening of hopper is poured facing to funnel,This casting method is because controlling valve and being positioned on framework,It is not easy to pull,Therefore inlet amount can not be accurately controlled,And the mouth that pours of the narrow and small casting space having is positioned at the side of formwork for placing,When inserting funnel,Can only insert sideling,Cause operation inconvenience.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of concrete casting device based on tower crane concrete hopper, and narrow and small casting space can carry out concrete pouring construction very easily, and is applicable to pour mouth and is positioned at pouring of formwork sides.
In order to solve the problems referred to above, the technical solution of the utility model is: a kind of concrete casting device based on tower crane concrete hopper, including framework and the hopper being arranged in framework, hopper is provided with a charging aperture and discharging opening, also include detachable be connected to below framework chute, be positioned at the sleeve pipe below hopper discharging opening, the connecting leg connected successively, passage and vomit pipe with sleeve pipe, be provided with chute in channel-section steel;
Described sleeve pipe includes tapered sleeve and lower tapered sleeve, connected by spring between upper tapered sleeve and lower tapered sleeve, it is enclosed with a circle flexible layer at spring peripheral, the two ends of this flexible layer are connected on tapered sleeve and lower tapered sleeve, a connecting shaft it has been respectively fixedly connected with in the both sides of lower tapered sleeve, connecting at the two ends of connecting shaft axle respectively and have a roller, described roller is positioned at described chute
Described connecting leg connects on described lower tapered sleeve, is installed with a ring annular groove plate at connecting leg away from one end of lower tapered sleeve, is provided with a plane bearing in annular frid,
One end of described passage is positioned at described connecting leg, and is positioned on the end of connecting leg at passage and is installed with an outward extending shirt rim of circle, and the lower surface of shirt rim is resisted against on the upper surface of plane bearing,
Vomit pipe connection away from one end of shirt rim, is provided with a dispensing valve at passage on vomit pipe.
Further, described passage has a thicker front end and a rear end from the coarse to fine, and rear end from the coarse to fine during to curving, described shirt rim is installed on described front end, on described vomit pipe connection end in the rear.
Further, framework is connected with chute by polylith connecting plate, is provided with multiple through hole on connecting plate, framework and chute are provided with multiple screwed hole, described through hole and described screwed hole relative to, at through hole and screwed hole, screw is installed.
Further, described flexible layer is non-woven fabrics or canvas.
The beneficial effects of the utility model are: can drill through multiple screwed hole in the both sides of the framework of existing tower crane concrete hopper, then by connecting plate, channel-section steel is arranged on the lower section of framework, again roller is rolled in chute, after roller rolls in chute, upper tapered sleeve is being nested on the discharging opening of concrete hopper, and then can need not buy funnel or the less tower crane concrete hopper of discharging opening, reduce production cost;When needs casting concrete, passage can be rotated, what vomit pipe was directed at narrow and small casting space pours mouth, Open valve, just can accurately narrow and small casting space be poured, when needs rotate vomit pipe direction, it is not necessary to whole tower crane concrete hopper is rotated, only need to rotate the passage of lower section, improve safety when device uses;Owing to vomit pipe is relatively thin, and valve is installed on vomit pipe, therefore can be accurately controlled load;Due to rear end from the coarse to fine during to curving, the axis making vomit pipe has a certain degree with ground shape, make vomit pipe be inserted into the pouring in mouth of formwork sides, and then just can be positioned at formwork sides carry out concreting with pouring to pouring mouth in the case of not using funnel.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings this utility model is described further:
Fig. 1 is that master of the present utility model regards part section structural representation,
Fig. 2 is side-looking part section structural representation of the present utility model,
Fig. 3 is generalized section at A-A in Fig. 1,
Fig. 4 is the close-up schematic view in Fig. 1 at B,
Fig. 5 is the close-up schematic view in Fig. 1 at C,
Fig. 6 is the close-up schematic view in Fig. 1 at D.
Detailed description of the invention
If Fig. 1 is to shown in 6, a kind of concrete casting device based on tower crane concrete hopper, including framework 1 and the hopper 2 being arranged in framework 1, hopper 2 is provided with a charging aperture 22 and discharging opening 21, also include the detachable chute 81 being connected to below framework 1, it is positioned at the sleeve pipe 3 below hopper 2 discharging opening 21, the connecting leg 4 connected with sleeve pipe 3 successively, passage 5 and vomit pipe 6, chute 81 it is provided with in channel-section steel 8, channel-section steel 8 is the means of production being very easy to buy, after buying meeting channel-section steel 8, internal groove can be polished flat slightly, groove after smooth can serve as chute 81 and uses.
Described sleeve pipe 3 includes tapered sleeve 31 and lower tapered sleeve 32, connected by spring 34 between upper tapered sleeve 31 and lower tapered sleeve 32, it is enclosed with a circle flexible layer 33 in spring 34 periphery, the two ends of this flexible layer 33 are connected on tapered sleeve 31 and lower tapered sleeve 32, it is respectively welded a connecting shaft 10 in the both sides of lower tapered sleeve 32, two connecting shafts 10 are parallel to each other, connect at the two ends of connecting shaft 10 axle respectively and have a roller 11, described roller 11 is positioned at described chute 81, the two ends of spring 34 are respectively fixedly connected with on upper tapered sleeve 31 and lower tapered sleeve 32, after trip spring 34, upper tapered sleeve 31 can be enclosed within the periphery of discharging opening 21.
Described connecting leg 4 connects on described lower tapered sleeve 32, is installed with a ring annular groove plate 41 at connecting leg 4 away from one end of lower tapered sleeve 32, is provided with a plane bearing 42 in annular frid 41,
One end of described passage 5 is positioned at described connecting leg 4, and is installed with an outward extending shirt rim of circle 53 on the end that passage 5 is positioned at connecting leg 4, and the lower surface of shirt rim 53 is resisted against on the upper surface of plane bearing 42,
Vomit pipe 6 connects at passage 5 away from one end of shirt rim 53, is provided with a dispensing valve 7 on vomit pipe 6, and dispensing valve 7 can control the load of concrete so that device operates convenient.
Further, described passage 5 has a thicker front end 51 and a rear end 52 from the coarse to fine, and rear end 52 from the coarse to fine during to curving, described shirt rim 53 is installed on described front end 51, and described vomit pipe 6 connects in the rear on end 52.
Further, framework 1 is connected with chute 81 by polylith connecting plate 9, connecting plate 9 is provided with multiple through hole, framework 1 and chute 81 be provided with multiple screwed hole, described through hole and described screwed hole relative to, at through hole and screwed hole, screw is installed, can directly mount a device onto on existing tower crane concrete hopper 2, and then without additionally purchasing hopper 2 or the funnel of little discharging opening 21, economical and practical, reduce production cost.
Further, described flexible layer 33 is non-woven fabrics or canvas, non-woven fabrics or canvas is used to be sewn into the cloth cylinder of a tubulose, then it is set to outside spring, the two ends of cloth cylinder are bonding with upper vertebra set 31 and lower tapered sleeve 32 respectively, flexible layer 33 can play the effect of sealing, and can compress along with spring 34 or extend and fold.
Implementation of the present utility model: fetch use crane and sling concrete hopper 2, multiple screwed hole is drilled through in the bottom of hopper 2 framework 1, then channel-section steel 8 is fetched, by connecting plate 9, channel-section steel 8 is installed on hopper 2 framework 1, handle 24 on rotating frame 1, the discharge valve 23 of sealed discharging mouth 21 is opened, again roller 11 is inserted in the chute 81 in channel-section steel 8, now the spring 34 in sleeve pipe 3 can be compressed, when upper tapered sleeve 31 is moved to below hopper 2 discharging opening 21 by connecting shaft 10 and roller 11, can be with trip spring 34, upper tapered sleeve 31 can be socketed on discharging opening 21 the most permissible under the effect of spring 34.
When needing narrow and small casting space is poured, first concrete can be circulated in hopper 2, rotate passage 5, make vomit pipe 6 alignment pour mouth, open dispensing valve 7 on vomit pipe 6, it is possible to narrow and small casting space is poured.

Claims (4)

1. a concrete casting device based on tower crane concrete hopper, including framework (1) and the hopper (2) that is arranged in framework (1), hopper (2) is provided with a charging aperture (22) and discharging opening (21), it is characterized in that: also include detachable be connected to framework (1) lower section channel-section steel (8), be positioned at discharging opening (21) lower section sleeve pipe (3), the connecting leg (4) connected with sleeve pipe (3) successively, passage (5) and vomit pipe (6), in channel-section steel (8), be provided with chute (81);Described sleeve pipe (3) includes tapered sleeve (31) and lower tapered sleeve (32), connected by spring (34) between upper tapered sleeve (31) and lower tapered sleeve (32), a circle flexible layer (33) it is enclosed with in spring (34) periphery, the two ends of this flexible layer (33) are connected on tapered sleeve (31) and lower tapered sleeve (32), a connecting shaft (10) it has been respectively fixedly connected with in the both sides of lower tapered sleeve (32), two ends axle respectively in connecting shaft (10) connects a roller (11), described roller (11) is positioned at described chute (81)
Described connecting leg (4) connects on described lower tapered sleeve (32), is installed with a ring annular groove plate (41) at connecting leg (4) away from one end of lower tapered sleeve (32), is provided with a plane bearing (42) in annular frid (41),
One end of described passage (5) is positioned at described connecting leg (4), and it is positioned on the end of connecting leg (4) at passage (5) and is installed with an outward extending shirt rim of circle (53), the lower surface of shirt rim (53) is resisted against on the upper surface of plane bearing (42), vomit pipe (6) connection away from one end of shirt rim (53), is provided with a dispensing valve (7) at passage (5) on vomit pipe (6).
A kind of concrete casting device based on tower crane concrete hopper the most according to claim 1, it is characterized in that: described passage (5) has a thicker front end (51) and a rear end (52) from the coarse to fine, and rear end (52) from the coarse to fine during to curving, described shirt rim (53) is installed on described front end (51), on described vomit pipe (6) connection end (52) in the rear.
A kind of concrete casting device based on tower crane concrete hopper the most according to claim 1, it is characterized in that: framework (1) is connected with chute (81) by polylith connecting plate (9), connecting plate (9) is provided with multiple through hole, framework (1) and chute (81) are provided with multiple screwed hole, described through hole and described screwed hole relative to, at through hole and screwed hole, screw is installed.
A kind of concrete casting device based on tower crane concrete hopper the most according to claim 1, it is characterised in that: described flexible layer (33) is non-woven fabrics or canvas.
CN201620201204.6U 2016-03-16 2016-03-16 Concrete placement device based on tower crane concrete hopper Expired - Fee Related CN205421938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620201204.6U CN205421938U (en) 2016-03-16 2016-03-16 Concrete placement device based on tower crane concrete hopper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620201204.6U CN205421938U (en) 2016-03-16 2016-03-16 Concrete placement device based on tower crane concrete hopper

Publications (1)

Publication Number Publication Date
CN205421938U true CN205421938U (en) 2016-08-03

Family

ID=56547102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620201204.6U Expired - Fee Related CN205421938U (en) 2016-03-16 2016-03-16 Concrete placement device based on tower crane concrete hopper

Country Status (1)

Country Link
CN (1) CN205421938U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108908675A (en) * 2018-09-22 2018-11-30 湖北三丰机器人有限公司 One kind pouring type AGV
CN112196263A (en) * 2020-09-15 2021-01-08 河南省工建集团有限责任公司 Pouring device and method for beam slab column concrete engineering with different strength grades

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108908675A (en) * 2018-09-22 2018-11-30 湖北三丰机器人有限公司 One kind pouring type AGV
CN108908675B (en) * 2018-09-22 2024-06-04 湖北三丰机器人有限公司 Pouring type AGV
CN112196263A (en) * 2020-09-15 2021-01-08 河南省工建集团有限责任公司 Pouring device and method for beam slab column concrete engineering with different strength grades
CN112196263B (en) * 2020-09-15 2022-04-05 河南省工建集团有限责任公司 Pouring device and method for beam slab column concrete engineering with different strength grades

Similar Documents

Publication Publication Date Title
CN205421938U (en) Concrete placement device based on tower crane concrete hopper
CN106760503A (en) A kind of constructional column based on standard knot combination is poured uses template
CN205804771U (en) A kind of reinforcing bar grout sleeve
CN205476503U (en) Simple and easy concrete hopper device
CN207750651U (en) A kind of concrete pump pipe temporary blocking device
CN208152581U (en) A kind of concreting bucket device flexible and convenient to use
CN106370010A (en) Novel liner structure implementation scheme for cement kiln opening
TWI339236B (en)
CN205926103U (en) Power transmission line automatic spraying equipment
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN204826668U (en) Switch connects for concrete spreader
CN210032686U (en) Thickness control device for horizontal masonry mortar joint
CN207128076U (en) A kind of concrete-constituted pile of old foreign-style house reconstruction
CN210651316U (en) Concrete automatic gate discharge apparatus
CN207988515U (en) It is a kind of can Quantitative dosing mortar hopper
CN207988442U (en) A kind of mortar pulp shooting machine with choke preventing function
CN205238315U (en) High performance concrete mixer
CN208201872U (en) A kind of improved simple self-made concrete elephant trunk
CN211541776U (en) Engineering equipment for bridge construction
CN105064712B (en) A kind of environment-friendly type high intensity microdilatancy grouting material without mould construction technology
CN205818162U (en) Full-automatic foaming concrete grouting machine slip casting bucket
CN205475104U (en) Concrete placement chute
CN213837774U (en) Novel concrete hopper
CN206123912U (en) Pump sending concrete device and mould
CN205476514U (en) Ground pouring construction control device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20170316

CF01 Termination of patent right due to non-payment of annual fee