CN105756345B - Building wall mould plate supporting device - Google Patents

Building wall mould plate supporting device Download PDF

Info

Publication number
CN105756345B
CN105756345B CN201610281762.2A CN201610281762A CN105756345B CN 105756345 B CN105756345 B CN 105756345B CN 201610281762 A CN201610281762 A CN 201610281762A CN 105756345 B CN105756345 B CN 105756345B
Authority
CN
China
Prior art keywords
secondary bar
mobile jib
bottom plate
pin
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610281762.2A
Other languages
Chinese (zh)
Other versions
CN105756345A (en
Inventor
谭赳
宁顺情
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Fast Construction Technology Co., Ltd.
Original Assignee
Suntown Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suntown Technology Group Co Ltd filed Critical Suntown Technology Group Co Ltd
Priority to CN201610281762.2A priority Critical patent/CN105756345B/en
Publication of CN105756345A publication Critical patent/CN105756345A/en
Application granted granted Critical
Publication of CN105756345B publication Critical patent/CN105756345B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Abstract

The present invention provides a kind of building wall mould plate supporting devices, including pedestal and supporting rod component, the pedestal includes bottom plate, the supporting rod component includes the first secondary bar, mobile jib, second secondary bar, lantern ring and pin, one end of first secondary bar is articulated on the bottom plate, the both ends of the mobile jib are respectively equipped with oppositely oriented screw thread, one end of the mobile jib is threadedly coupled with the other end of first secondary bar, one end of second secondary bar is threadedly coupled with the other end of the mobile jib, the other end of second secondary bar is fixed with the axial and second secondary bar axially vertical lantern ring, one end of the pin is fixed in second secondary bar, the other end of the pin is extended vertically towards the direction far from second secondary bar, the pin offers selling sheet slot in its radial direction.Compared with the relevant technologies, advantageous effect of the present invention is, installs and uses that efficiency is higher, carries that easy, cost is relatively low and security risk is low.

Description

Building wall mould plate supporting device
【Technical field】
The present invention relates to building template technical field more particularly to a kind of building wall mould plate supporting devices.
【Background technology】
When aluminum alloy mould plate is used for project installation, the installation for being uneven caused inconvenience is molded to evade mattess The problems such as with inconvenience is removed, can reserve interior wall aluminum alloy mould plate during design and installation aluminum alloy wall face die plate There should be gap between bottom end and molded mattess.The bottom end of interior wall aluminum alloy mould plate becomes free end as a result, It is easily shifted when pouring into a mould concrete.Therefore need to be supported interior wall aluminum alloy mould plate before concreting, ensure its position It is constant.Moreover, after the installation of interior wall aluminum alloy mould plate, it is difficult to ensure the verticality of metope, need to carry out interior wall aluminum alloy mould plate Subsequent verticality adjustment.
As shown in Figure 1, the metope mould plate supporting device of the relevant technologies includes the first hound 2, the second hound 3 and peace Pedestal 1 is filled, mounting seat 1 is fixed on concrete by bolt mode with being embedded in the built-in fitting cooperation of mattess or flooring in advance On ground or flooring (not shown), the first hound 2 is set there are two the first regulation handle 221, and the second hound 3 sets that there are two the Two regulation handles 321, one end of the first hound 2 is supported by the first connector 23 to be fixed on interior wall aluminum alloy mould plate and (does not scheme Show) on, one end of the second hound 3 is supported by the second connector 33 to be fixed on interior wall aluminum alloy mould plate.
The metope mould plate supporting device can be supported interior wall aluminum alloy mould plate, and also its verticality can be adjusted Section.But the metope mould plate supporting device, parts are more, install and use less efficient;Heavier-weight more than 20 kilograms, is removed Fortune is inconvenient and cost is higher;It is larger that occupied ground is installed, occupies operating space, operator's dealing is easily stumbled, and safety is hidden Suffer from more.So as to which the metope mould plate supporting device of the relevant technologies is higher in the presence of less efficient, difficult, cost is installed and used And the deficiency that security risk is more.
Therefore, it is really necessary to provide a kind of new building wall mould plate supporting device to overcome above-mentioned technical problem.
【Invention content】
The technical problem to be solved in the invention is to provide one kind and installs and uses that efficiency is higher, carries that easy, cost is relatively low And the building wall mould plate supporting device that security risk is low.
A kind of building wall mould plate supporting device of the present invention, including pedestal and supporting rod component, the pedestal includes bottom Plate, the supporting rod component include the first secondary bar, mobile jib, the second secondary bar, lantern ring and pin, and one end of first secondary bar is cut with scissors It is connected on the bottom plate, the both ends of the mobile jib are respectively equipped with oppositely oriented screw thread, one end of the mobile jib and described first The other end of secondary bar is threadedly coupled, and one end of second secondary bar is threadedly coupled with the other end of the mobile jib, the second secondary bar The other end is fixed with axial with the second secondary bar axially vertical lantern ring, and one end of the pin is fixed on described the In two secondary bars, the other end of the pin is extended vertically towards the direction far from second secondary bar, and the pin is opened in its radial direction Equipped with selling sheet slot.
Preferably, the pedestal further includes axis pin and the first sleeve being fixed on the bottom plate and the second casing, institute It states supporting rod component and further includes the axially vertical sleeve of axial direction Yu first secondary bar for being fixed on first secondary bar, it is described For sleeve between the first sleeve and second casing, the axis pin sequentially passes through the first sleeve, sleeve, second Casing is first secondary bar is articulated on the bottom plate.
Preferably, the mobile jib is in hollow form, and the mobile jib offers several circular holes in its peripheral wall.
Preferably, the number of the circular hole is 2, is located in the Different Plane axially vertical with the mobile jib respectively.
Preferably, the number of the circular hole is 4, symmetrical two-by-two along the axial direction of the mobile jib.
Preferably, the pedestal further includes the dismounting slot for being raised up and being formed by the bottom parts.
Preferably, the pedestal further includes the location hole being disposed through on the bottom plate, and the location hole is located at described Between sleeve and the dismounting slot.
Preferably, the angle between first secondary bar and the bottom plate is 30-40 °.
Preferably, the pedestal and supporting rod component are made of steel alloy.
Preferably, the pedestal, which further includes, is disposed through on the bottom plate and positioned at two groups of nails of the dismounting slot both sides Hole is plugged for cement steel nail with the fixation bottom plate.
Compared with the relevant technologies, the beneficial effects of the present invention are the building wall shuttering supporting dresses that the application provides Parts used in putting greatly reduce, and greatly improve the efficiency installed and used, can quickly realize installation and removal;Significantly The weight of building wall mould plate supporting device is alleviated, it can be by relative to the metope mould plate supporting device of the relevant technologies its weight Mitigate more than 20 kilograms to 2 kilograms, carrying is extremely simple, and cost significantly reduces;Occupied space is reduced, and operating personnel's contact is knocked The probability stumbled is substantially reduced, and effectively reduces the security risk in building site.
【Description of the drawings】
Fig. 1 is the metope mould plate supporting device structure diagram of the relevant technologies;
Fig. 2 is building wall mould plate supporting device structure diagram of the present invention;
Fig. 3 is building wall mould plate supporting device structural decomposition diagram of the present invention;
Fig. 4 is the use state diagram of building wall mould plate supporting device of the present invention.
【Specific embodiment】
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In attached drawing Give the preferred embodiment of the present invention.But the present invention can realize in many different forms, however it is not limited to herein Described embodiment.On the contrary, the purpose for providing these embodiments is to make the understanding to the disclosure more saturating It is thorough comprehensive.
With reference to shown in Fig. 2-Fig. 4, a kind of building wall mould plate supporting device 5 of the present invention, including pedestal 7 and support bar group Part 6.Pedestal 7 includes bottom plate 71, and supporting rod component 6 includes the first secondary bar 61, mobile jib 62, the second secondary bar 63, lantern ring 65 and pin Nail 66.One end of first secondary bar 61 is articulated on bottom plate 7, and the both ends of mobile jib 62 are respectively equipped with oppositely oriented screw thread and (do not scheme Show), one end of mobile jib 62 is threadedly coupled with the other end of the first secondary bar 61, one end of the second secondary bar 63 and the other end of mobile jib 62 It is threadedly coupled, the other end of the second secondary bar 63 is fixed with the axially vertical lantern ring 65 of axial direction and the second secondary bar 63, pin 66 One end is fixed in the second secondary bar 63, and the other end of pin 66 is extended vertically towards the direction far from the second secondary bar 63, pin 66 in Its radial direction offers selling sheet slot 661.
Bottom plate 71 is whole plate-like, is fixed on mattess 9.First secondary bar 61, mobile jib 62, the second secondary bar 63, set Ring 65 and the combination of pin 66 form an entirety-supporting rod component 6, and be articulated on bottom plate 71.Wherein, mobile jib 62 is by setting The screw thread for being placed in its both ends is connect, but with the first secondary bar 61 being threaded and the second secondary bar 63 not to the specific of screw thread respectively Setting form is defined.Such as, mobile jib 62 sets internal thread, then the first secondary bar 61 and the second secondary bar 63 are respectively provided with external screw thread;It is main Bar 62 sets external screw thread, then the first secondary bar 61 and the second secondary bar 63 are respectively provided with internal thread;62 one end of mobile jib sets internal thread, another End setting external screw thread, then the first secondary bar 61 and the second secondary bar 63 is arranged respectively to internal thread or external screw thread is coordinated.Pin 66 It is fixed on one end of the close lantern ring 65 of the second secondary bar 63 and is mutually parallel with lantern ring 65.
The thread rotary orientation of 62 both ends of mobile jib setting is on the contrary, can then pass through the length of the rotation adjustment supporting rod component 6 of mobile jib 62 Degree;One end of supporting rod component 6 is articulated with by the first secondary bar 61 on bottom plate 71, and the other end is fixed by lantern ring 65 or pin 66 In in metope template 8.The installation of monoblock wall form is mounted side by side fixation by several pieces of metope templates 8 and forms, metope template 8 Lateral opening 81 set on the side plate of lateral opening 81 metope templates 8 adjacent thereto set on side plate (not shown) are mutually aligned, from And pin 66 is passed through to two adjacent edge holes 81 on the adjacent both side plate of adjacent two metopes template 8, then worn with selling sheet (not shown) It crosses selling sheet slot 66 to be fixed, that is, realizes the support to metope template 8.Rotate the length that mobile jib 62 adjusts supporting rod component 6 The verticality adjustment to metope template 8 can be realized.And pressure is larger to be located in the middle part of wall at metope template 8 or not bearing It, can also be by supporting rod component 6 convenient for directly using at the wall corner metope template 8 of the building wall mould plate supporting device Be placed between the both side plate of a certain metope template 8, lantern ring 65 is aligned lateral opening 81, by pass through lateral opening 81 and lantern ring 65 steel pipe or Steel rod connects polylith metope template 8 integral, so as to significantly improve the bearing capacity of monolithic metope template 8, also improves The compatibility of the building wall mould plate supporting device, can be applied to the support of all metope templates 8 and verticality tune School.
First bottom plate 71 is fixed on mattess 9 during installation, then the first secondary bar 61 is articulated on bottom plate 71, then The pin 66 being fixed in the second secondary bar 63 is passed through two lateral opening 81 of two adjacent metope templates, finally using mobile jib 62 by the One secondary bar 61 and the second secondary bar 63 connect to form scheduled support oblique angle, plug selling sheet, complete installation;In use, rotation Mobile jib 62 realizes the flexible of 6 length of supporting rod component, completes the verticality adjustment to metope template 8;During dismounting, mobile jib is rotated 62, the second secondary bar 63 is made to be detached from the connection of mobile jib 62, extracts selling sheet, removes the second secondary bar, rotates mobile jib 62, is detached from and first is secondary Bottom plate 71 is separated in the connection of bar 61, completes dismounting.
Parts used in the building wall mould plate supporting device that the application provides as a result, greatly reduce, greatly The efficiency installed and used is improved, can quickly realize installation and removal;Significantly reduce building wall mould plate supporting device Weight, relative to the metope mould plate supporting device of the relevant technologies, its weight can be carried extremely by mitigating more than 20 kilograms to 2 kilograms Simplicity, cost significantly reduce;Occupied space is reduced, and the probability that operating personnel's contact is stumbled is substantially reduced, and effectively reduces work The security risk on ground.
In present embodiment, pedestal 7 further includes axis pin 73 and the first sleeve 721 being fixed on bottom plate 71 and second set Pipe 722.Supporting rod component 6 further includes the axially vertical sleeve 64 of axial direction Yu the first secondary bar 61 for being fixed on the first secondary bar 61. Sleeve 64 is located between 721 and second casing 722 of first sleeve, and axis pin 73 sequentially passes through first sleeve 721, sleeve 64, second Casing 722 is the first secondary bar 61 is articulated on bottom plate 71.Quickly the first secondary bar 61 can be articulated on bottom plate 71 as a result, together When, the first secondary bar 61 can be articulated on bottom plate 71 to form an entirety in advance, installation is directly used in, so as to further improve Installation effectiveness.After such as axis pin 73 is plugged, one end contact first sleeve 721, the other end is stretched in outside the second casing 722, you can It is fixed on bottom plate 71 by welding manner, without carrying out hinged installation to the first secondary bar 61 and bottom plate 71 in erecting bed.
More specifically, mobile jib 62 is in hollow form, and mobile jib 62 offers several circular holes 621 in its peripheral wall.It can be used as a result, Rotation handle is served as in erecting bed as the object of steel pipe one kind is stretched into across circular hole 621 in mobile jib 62, by managing steel pipe reality Mobile jib 62 is now rotated, improves the convenience of operation.The circular hole 621 to be preferred between two sections of screw threads being located at set by mobile jib 62, When being threadedly coupled to avoid mobile jib 62 with the first secondary bar 61, the second secondary bar 63, the object of steel pipe one kind is inserted into mobile jib 62 may It can cause to interfere.
More specifically, the number of circular hole 621 is 2, is located in the Different Plane axially vertical with mobile jib 62 respectively.I.e. two The setting of a circular hole 621 is offset from each other not in the same cross section of mobile jib 62.Manipulation is further improved as a result, The convenience of mobile jib 62, as the object of steel pipe one kind can quickly search out circular hole 621, while can be according to circular hole 621 from coagulation The actual height situation in soil face 9 selects suitable circular hole 621.
Certainly, the application does not limit the number of circular hole specifically, and what is provided is only not influence mobile jib the last 62 To the preferred embodiment of circular hole number setting under the premise of degree.Such as, the number of circular hole 621 can also be 4, and along the axial direction of mobile jib 62 It is symmetrical two-by-two.That is it is two groups that four circular holes 621, which are divided to, and every group of two circular holes 621 are located at mobile jib in same group of two circular holes 621 In 62 cross section.The object of such as steel pipe one kind can once pass through one group of circular hole 621 as a result, be carried by hands grasping into one Height manipulates the convenience of mobile jib 62, and running accuracy is more controllable.
More specifically, pedestal 7 further includes the dismounting slot 713 for being raised up and being formed by 71 part of bottom plate.The portion of bottom plate 71 Divide and raise up, can be formed and be used for when bottom plate 71 is fixed on mattess 9, between the protrusion and mattess 9 Dismantle the dismounting slot 713 of bottom plate 71.The cross section of the dismounting slot 713 is arc-shaped.When dismantling bottom plate 71, drill rod can be stretched into and torn open It unloads in slot 713, agitating drill rod makes bottom plate 71 be detached from mattess 9.So as to further improve removal efficiency.
More specifically, pedestal 7 further includes the location hole 711 being disposed through on bottom plate 71, and location hole 711 is located at sleeve Between 64 and dismounting slot 713.The location hole 711 can be applied to built-in fitting consolidating in the bottom plate 71 in mattess 9 pre-buried Fixed, the receiving of built-in fitting one end is fixed in mattess 9, and the other end stretches out in 71 top of bottom plate across location hole 711, and can Bottom plate 71 is fixed by way of bolt or selling sheet.And location hole 711 is set between dismounting slot 713 and sleeve 64, then is conducive to The balance of 71 stress of bottom plate, prevents its rotation, influences its support effect.
More specifically, the angle between the first secondary bar 61 and bottom plate 71 is 30-40 °.Support effect is more preferable as a result, hangs down Straight degree adjustment number is less, service efficiency higher.
More specifically, pedestal 7 and supporting rod component 6 are made of steel alloy.Thus, it is ensured that building wall template The intensity of support device.
More specifically, pedestal 7, which further includes, is disposed through on bottom plate 71 and positioned at two groups of nail hole of 713 both sides of dismounting slot 712, it plugs to fix bottom plate 71 for cement steel nail 74.The fixed effect of bottom plate 71 is more preferable as a result,.It is described to pass through cement steel nail 74 Or built-in fitting realizes the fixation to bottom plate 71, selects one, the setting of location hole 711 is the adaptation in order to improve fixed bottom plate 71 Degree mainly realizes fixation to bottom plate 71 by cement steel nail 74, when having built-in fitting that can utilize, then can save cement steel nail and consolidate This fixed mode, is fixed bottom plate 71 using existing built-in fitting.
Compared with the relevant technologies, the beneficial effects of the present invention are, install and use efficiency is higher, carry easy, cost compared with Low and security risk is low.
Above-described is only embodiments of the present invention, it should be noted here that for those of ordinary skill in the art For, without departing from the concept of the premise of the invention, improvement can also be made, but these belong to the protection model of the present invention It encloses.

Claims (5)

1. a kind of building wall mould plate supporting device, it is characterised in that:Including pedestal and supporting rod component, the pedestal includes Bottom plate, the supporting rod component include the first secondary bar, mobile jib, the second secondary bar, lantern ring and pin, one end of first secondary bar It is articulated on the bottom plate, the both ends of the mobile jib are respectively equipped with oppositely oriented screw thread, one end of the mobile jib and described the The other end of one secondary bar is threadedly coupled, and one end of second secondary bar is threadedly coupled with the other end of the mobile jib, the second secondary bar The other end be fixed with axial with the second secondary bar axially vertical lantern ring, one end of the pin is fixed on described In second secondary bar, the other end of the pin is extended vertically towards the direction far from second secondary bar, and the pin is in its radial direction Offer selling sheet slot;
The pedestal further includes axis pin and the first sleeve being fixed on the bottom plate and the second casing, the supporting rod component The axially vertical sleeve of axial direction Yu first secondary bar for being fixed on first secondary bar is further included, the sleeve is located at described Between first sleeve and second casing, the axis pin sequentially passes through the first sleeve, sleeve, the second casing with by described in First secondary bar is articulated on the bottom plate;
The mobile jib is in hollow form, and the mobile jib offers several circular holes in its peripheral wall;
The number of the circular hole is 2, is located in the Different Plane axially vertical with the mobile jib respectively;
The number of the circular hole is 4, symmetrical two-by-two along the axial direction of the mobile jib;
The pedestal further includes the dismounting slot for being raised up and being formed by the bottom parts.
2. building wall mould plate supporting device according to claim 1, it is characterised in that:The pedestal, which further includes, to be run through The location hole being set on the bottom plate, the location hole are located between the sleeve and the dismounting slot.
3. building wall mould plate supporting device according to claim 2, it is characterised in that:First secondary bar with it is described Angle between bottom plate is 30-40 °.
4. building wall mould plate supporting device according to claim 3, it is characterised in that:The pedestal and support bar group Part is made of steel alloy.
5. building wall mould plate supporting device according to claim 4, it is characterised in that:The pedestal, which further includes, to be run through It is set on the bottom plate and positioned at two groups of nail hole of the dismounting slot both sides, is plugged for cement steel nail with the fixation bottom plate.
CN201610281762.2A 2016-04-29 2016-04-29 Building wall mould plate supporting device Active CN105756345B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610281762.2A CN105756345B (en) 2016-04-29 2016-04-29 Building wall mould plate supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610281762.2A CN105756345B (en) 2016-04-29 2016-04-29 Building wall mould plate supporting device

Publications (2)

Publication Number Publication Date
CN105756345A CN105756345A (en) 2016-07-13
CN105756345B true CN105756345B (en) 2018-07-03

Family

ID=56322502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610281762.2A Active CN105756345B (en) 2016-04-29 2016-04-29 Building wall mould plate supporting device

Country Status (1)

Country Link
CN (1) CN105756345B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4253691A3 (en) * 2020-10-14 2023-11-22 Premform Limited Formwork systems and related methods

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130799B (en) * 2017-05-03 2023-06-09 中国建筑第八工程局有限公司 Formwork diagonal bracing reinforcing device and construction method thereof
CN107299775A (en) * 2017-06-21 2017-10-27 山东新活新材料科技有限公司 Branch guard bar and its application method for aluminum template system
CN107268993A (en) * 2017-06-26 2017-10-20 中建铝新材料广东有限公司 building template system
CN108798005A (en) * 2018-06-29 2018-11-13 江西鼎城铝模科技有限公司 Drop in beam positioning supporting part under aluminum alloy mould plate
CN109322482A (en) * 2018-10-24 2019-02-12 中建二局第二建筑工程有限公司 A kind of cast-in-place wall column formwork of convenient adjustable reinforces support construction and its construction method
CN111561179A (en) * 2020-05-29 2020-08-21 晟通科技集团有限公司 Support device and building frame with same
CN112459475B (en) * 2020-11-30 2022-04-01 四川仟坤建设集团有限责任公司 Stair formwork supporting structure and mounting method thereof
CN112900862A (en) * 2021-01-21 2021-06-04 浙江宜和新型材料有限公司 Formwork support system
CN112900863B (en) * 2021-01-24 2022-11-18 晟通科技集团有限公司 Diagonal bracing structure and template frame
CN113250457A (en) * 2021-05-21 2021-08-13 中铁二十五局集团第三工程有限公司 Template reinforcing apparatus

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08128202A (en) * 1994-10-27 1996-05-21 Okabe Co Ltd Inclination support for concrete construction
KR100945892B1 (en) * 2009-07-08 2010-03-05 정옥순 Support device outer wall for aluminum form and euro form
CN201730338U (en) * 2010-08-11 2011-02-02 孔伟兵 Strut for supporting polyphenyl foam formwork walls
KR20130122189A (en) * 2012-04-30 2013-11-07 김용일 Supporter for use of concrete forms of slab
CN204492192U (en) * 2015-02-10 2015-07-22 重庆华硕建设有限公司 A kind of building form tension and compression rod member
CN205116733U (en) * 2015-11-16 2016-03-30 龙口市丛林铝模板工程技术有限公司 Aluminum alloy is bearing diagonal for building templates

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08128202A (en) * 1994-10-27 1996-05-21 Okabe Co Ltd Inclination support for concrete construction
KR100945892B1 (en) * 2009-07-08 2010-03-05 정옥순 Support device outer wall for aluminum form and euro form
CN201730338U (en) * 2010-08-11 2011-02-02 孔伟兵 Strut for supporting polyphenyl foam formwork walls
KR20130122189A (en) * 2012-04-30 2013-11-07 김용일 Supporter for use of concrete forms of slab
CN204492192U (en) * 2015-02-10 2015-07-22 重庆华硕建设有限公司 A kind of building form tension and compression rod member
CN205116733U (en) * 2015-11-16 2016-03-30 龙口市丛林铝模板工程技术有限公司 Aluminum alloy is bearing diagonal for building templates

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4253691A3 (en) * 2020-10-14 2023-11-22 Premform Limited Formwork systems and related methods

Also Published As

Publication number Publication date
CN105756345A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105756345B (en) Building wall mould plate supporting device
CN205713080U (en) A kind of for making the shaper of dual-shear force wall at expansion joint
CN204311745U (en) A kind of construction formwork bracing or strutting arrangement
CN105040971B (en) Early-dismantling levelling jacking for concrete structure formwork
US20050161571A1 (en) Adjustable shoring post
CN208668908U (en) Movable Scaffold for construction
CN107237272A (en) Crash barrier template structure and anticollision barrier casting system
CN208168343U (en) A kind of supporting adn fixing device of slope ridge internal corner formwork
CN207453462U (en) Hang mould support device in cigarette air passage
CN106320689B (en) A kind of easy-disassembling-assembling scaffold connecting piece
CN207960010U (en) A kind of detachable support device
CN107044204B (en) Facilitate the pre-buried ring of cutting
CN208844919U (en) A kind of construction form and shoring early-dismantling device
CN203654880U (en) Safety fence
CN106193600A (en) A kind of steel pipe scaffold early tears component open
CN206902700U (en) A kind of novel architecture steel reinforcement cage
CN109025263A (en) A kind of construction form and shoring early-dismantling device
CN211621650U (en) Assembled steel mould for foundation bearing platform of house building engineering
CN211143751U (en) Scalable waterstop template structure
CN207553657U (en) A kind of multi-functional rod assemblies
CN209538695U (en) A kind of building template support device
CN204023765U (en) Inspection shaft anti-drop device
KR102086816B1 (en) Apparatus for self lifting and pull down jack support, and method for lifting and pull down jack support using this same
CN208152048U (en) A kind of pile foundation tremie folding and unfolding locking device
CN208950615U (en) A kind of protective device that catchments of mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181102

Address after: 410200 Jinxing Road, Wangcheng economic and Technological Development Zone, Changsha, Hunan 109

Patentee after: Hunan Fast Construction Technology Co., Ltd.

Address before: No. 109, Wangcheng District, Wangcheng District, Changsha, Hunan

Patentee before: Suntown Technology Group Corporation