CN107893419A - A kind of clip pile device of municipal road construction vibratory piling machine - Google Patents

A kind of clip pile device of municipal road construction vibratory piling machine Download PDF

Info

Publication number
CN107893419A
CN107893419A CN201711086500.1A CN201711086500A CN107893419A CN 107893419 A CN107893419 A CN 107893419A CN 201711086500 A CN201711086500 A CN 201711086500A CN 107893419 A CN107893419 A CN 107893419A
Authority
CN
China
Prior art keywords
strut
directional vibrator
piling machine
pile
collar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711086500.1A
Other languages
Chinese (zh)
Inventor
闻海强
金见习
孙启涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711086500.1A priority Critical patent/CN107893419A/en
Publication of CN107893419A publication Critical patent/CN107893419A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of clip pile device of municipal road construction vibratory piling machine, including directional vibrator mounting bracket and pile sinking prefabricated pipe, the upper end of the directional vibrator mounting bracket is connected with mechanical arm, directional vibrator is installed on the inside of the directional vibrator mounting bracket, the lower end of the directional vibrator output shaft is installed with hydraulic cylinder, and the upper end for pressing sleeve is fixedly connected with the output end of hydraulic cylinder.The clip pile device of vibratory piling machine of the present invention, it is used for the clamp structure of stake, by inside and outside clamping, it can make it that the clamping effect to stake is more preferable, so that stake is not easy to clamping device disengaging, and the clamp structure can cause after the completion of pile sinking works, and easily be dismantled, time and labour are saved, improves operating efficiency;The vibratory piling machine can be caused to be not susceptible to rock and offset in pile driving process, add its stability, it is practical, beneficial to popularization.

Description

A kind of clip pile device of municipal road construction vibratory piling machine
Technical field
The present invention relates to vibratory piling machine technical field, specially a kind of clip pile of municipal road construction vibratory piling machine Device.
Background technology
, it is necessary to use vibratory piling machine in span bridge construction engineering, vibratory piling machine groundwork device is fixed To vibrator, its exciting part is paired horizontal rotating shaft, there is some pieces of quality and shape identical eccentric block in rotating shaft.Often The eccentric block of countershaft is arranged symmetrically, and by a pair of identical gear drive, rotating speed is identical, turns on the contrary, therefore, two axles operate When caused perturbed force in the horizontal direction mutually balance offset, prevent the horizontal swing of pile-sinking machine and stake, disturbed in vertical direction Power is overlapped mutually, and is formed exciting force and is promoted pile body to vibrate.
Traditional vibratory piling machine, it still has following defect in actual motion:
1. the pile chuck on traditional vibratory piling machine is not abundant enough for the clamping degree of stake, in pile sinking and the process of lifting In easily there is the scene that stake and pile chuck depart from, and traditional pile chuck, after stake is clamped, dismounting is more inconvenient so that Reduce operating efficiency;
2. traditional vibratory piling machine carries out piling work, stake is because there is longer length, in pile driving process, Stake, which easily occurs rocking or position occurs, to be offset, less stable.
The content of the invention
It is above-mentioned to solve it is an object of the invention to provide a kind of clip pile device of municipal road construction vibratory piling machine The problem of being proposed in background technology.
To achieve the above object, the present invention provides following technical scheme:A kind of municipal road construction vibratory piling machine Clip pile device, including directional vibrator mounting bracket and pile sinking prefabricated pipe, the upper end connection of the directional vibrator mounting bracket are organic Tool arm, directional vibrator is installed on the inside of the directional vibrator mounting bracket, the lower end of the directional vibrator output shaft is consolidated Dingan County is equipped with hydraulic cylinder, and four ends of the directional vibrator have been fixedly connected with connecting rod, and the lower end of four connecting rods is welded with one Connection sleeve pipe, the upper end of the pile sinking prefabricated pipe are plugged on the inside of connection sleeve pipe, and the outer upper end of the pile sinking prefabricated pipe is fixed Fixed sleeving is arranged with, two outsides of the fixed sleeving are welded with metal sleeve, and the lower end both sides of the connection sleeve pipe are equal Connecting screw is welded with, the lower end of the connecting screw both passes through corresponding metal sleeve, and is located at metallic sheath on connecting screw The upper and lower ends of cylinder are arranged with stop nut, and the outer middle side part upper end of the pile sinking prefabricated pipe is arranged with the first spacing collar, The second spacing collar is provided with below the first spacing collar, is led between the first spacing collar and the second spacing collar Excessive root fix bar is connected, and the both ends of the connection sleeve pipe are hinged with the first gag lever post, the first spacing collar Both ends are hinged with the second gag lever post, right by the first hinge between corresponding first gag lever post and the second gag lever post The first spring is fixedly connected between the first gag lever post and the second gag lever post answered, the inner top side of the pile sinking prefabricated pipe is set It is equipped with interior installation disk, six preformed holes, the interior installation is provided with interior installation disk correspondence position in the pile sinking prefabricated pipe The outside of disk offers six screwed holes corresponding with preformed hole, and one is inserted between corresponding preformed hole and screwed hole Root high-strength bolt, the upper center of the interior installation disk are welded with guide rod, the outside lower end fixed cover of the guide rod Provided with lower retaining collar, the outer middle side part of the guide rod, which is slidingly connected, upper movable loop, the outside of the upper movable loop Four ends are hinged with the first strut, and the end of outside four of the lower retaining collar is hinged with the second strut, corresponding first strut And second between strut by the second hinge, be fixedly connected with second between the upper movable loop and lower retaining collar Spring, and second spring is set in the outside of guide rod, the upper end movable sleeve of the guide rod, which is provided with, presses sleeve, described to press The upper end of sleeve is fixedly connected with the output end of hydraulic cylinder.
Preferably, first strut and the second strut are disposed as stainless steel support bar, and the first strut and the second support The diameter of bar is not less than 1.5 centimeters.
Preferably, the lower end of the directional vibrator output shaft is welded with upper junction plate, the lower end welding of the hydraulic cylinder There is lower connecting plate, fixed between the upper junction plate and lower connecting plate by fixing bolt, and the quantity of fixing bolt is no less than Four.
Preferably, the fixed sleeving is spliced by two arc steel loops, the equal external welding in both ends of two arc steel loops There is fixation steel plate, fixed between corresponding two pieces of fixation steel plates by the caging bolt through setting, and the head of caging bolt End is arranged with nut.
Preferably, the internal diameter for pressing sleeve is more than the internal diameter of upper movable loop, the first spacing collar, the second limit The position inwall of the collar does not contact with the inwall of pile sinking prefabricated pipe.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention it is reasonable in design, compared with prior art and Speech, the clip pile device of vibratory piling machine of the present invention, it is used for the clamp structure of stake, by inside and outside clamping, can cause It is more preferable to the clamping effect of stake so that stake is not easy to clamping device disengaging, and the clamp structure can to work in pile sinking After the completion of, easily dismantled, save time and labour, improve operating efficiency;By being arranged the first limit in stake The position collar and the second spacing collar, can cause the vibratory piling machine to be not susceptible to rock and offset in pile driving process, increase Its stability, it is practical, beneficial to popularization.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is installation disk schematic diagram in the present invention;
Fig. 3 is that the present invention presses sleeve schematic diagram.
In figure:Directional vibrator mounting bracket 1, directional vibrator 2, hydraulic cylinder 3, connecting rod 4, connection sleeve pipe 5, fixed sleeving 6, Metal sleeve 7, connecting screw 8, stop nut 9, the first gag lever post 10, the second gag lever post 11, the first spring 12, the first stop collar It is ring 13, the second spacing collar 14, fix bar 15, pile sinking prefabricated pipe 16, interior installation disk 17, preformed hole 18, screwed hole 19, high-strength Degree bolt 20, lower retaining collar 21, upper movable loop 22, the first strut 23, the second strut 24, second spring 25, press sleeve 26th, guide rod 27.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Fig. 1-3 are referred to, the present invention provides a kind of technical scheme:A kind of clip pile of municipal road construction vibratory piling machine Device, including directional vibrator mounting bracket 1 and pile sinking prefabricated pipe 16 (stake of the prior art), directional vibrator mounting bracket 1 Upper end is connected with mechanical arm, and the inner side of directional vibrator mounting bracket 1 is provided with directional vibrator 2, the output shaft of directional vibrator 2 Lower end is welded with upper junction plate, and the lower end of hydraulic cylinder 3 is welded with lower connecting plate, passes through fixation between upper junction plate and lower connecting plate Bolt is fixed, and the quantity of fixing bolt is no less than four, and four ends of directional vibrator 2 have been fixedly connected with connecting rod 4, four companies The lower end of bar 4 is welded with a connection sleeve pipe 5, and the upper end of pile sinking prefabricated pipe 16 is plugged in the inner side of connection sleeve pipe 5, pile sinking prefabricated pipe 16 outer upper end fixed cover is provided with fixed sleeving 6, and fixed sleeving 6 is spliced by two arc steel loops, two arc steel loops The equal outside weld in both ends be connected to fixation steel plate, fixed between corresponding two pieces of fixation steel plates by the caging bolt through setting, And the head end of caging bolt is arranged with nut, two outsides of fixed sleeving 6 are welded with metal sleeve 7, under connection sleeve pipe 5 End both sides are welded with connecting screw 8, and the lower end of connecting screw 8 both passes through corresponding metal sleeve 7, and connecting screw 8 is upper Stop nut 9 is arranged with the upper and lower ends of metal sleeve 7, the outer middle side part upper end of pile sinking prefabricated pipe 16 is arranged with the first limit The position collar 13, the lower section of the first spacing collar 13 is provided with the second spacing collar 14, the first spacing stop collar of the collar 13 and second It is connected between ring 14 by more fix bars 15, the both ends of connection sleeve pipe 5 are hinged with the first gag lever post 10, and first is spacing The both ends of the collar 13 are hinged with the second gag lever post 11, pass through between the corresponding gag lever post 11 of first gag lever post 10 and second One hinge, the first spring 12 has been fixedly connected between the corresponding gag lever post 11 of first gag lever post 10 and second, pile sinking is pre- The inner top side of tubulation 16 is provided with interior installation disk 17, is provided with six with interior installation disk 17 correspondence position in pile sinking prefabricated pipe 16 Individual preformed hole 18, the outside of interior installation disk 17 offers six screwed holes 19 corresponding with preformed hole 18, corresponding reserved A high-strength bolt 20 is inserted between hole 18 and screwed hole 19, the upper center of interior installation disk 17 is welded with guide rod 27, the outside lower end fixed cover of guide rod 27 is provided with lower retaining collar 21, and the outer middle side part of guide rod 27 is slidingly connected and has upper work The dynamic collar 22, the end of outside four of upper movable loop 22 are hinged with the first strut 23, and the end of outside four of lower retaining collar 21 is cut with scissors The second strut 24 is connected to, passes through the second hinge, the first strut 23 between the corresponding strut 24 of first strut 23 and second Stainless steel support bar is disposed as with the second strut 24, and the diameter of the first strut 23 and the second strut 24 is public not less than 1.5 Point, second spring 25 is fixedly connected between upper movable loop 22 and lower retaining collar 21, and second spring 25 is set in guiding The outside of bar 27, the upper end movable sleeve of guide rod 27, which is provided with, presses sleeve 26, presses the upper end of sleeve 26 and the output of hydraulic cylinder 3 End is fixedly connected, and the internal diameter for pressing sleeve 26 is more than the internal diameter of upper movable loop 22, the first spacing collar 13, the second spacing collar 14 inwall does not contact with the inwall of pile sinking prefabricated pipe 16.By controlling hydraulic cylinder 3, the drive of hydraulic cylinder 3 presses sleeve 26 and pushed, Press sleeve 26 to push upper movable loop 22, the first strut 23 and the second strut 24 can be caused to strut, and it is pre- to be against pile sinking On the inwall of tubulation 16, then the connecting screw 8 set by outside is connected with metal sleeve 7 so that stake can be clamped more Tightly, break-off is not susceptible to, and it is easy for removal and installation.
The clip pile device of vibratory piling machine of the present invention, it is used for the clamp structure of stake, can be with by inside and outside clamping So that more preferable to the clamping effect of stake so that stake is not easy to clamping device disengaging, and the clamp structure can cause in pile sinking After the completion of work, easily dismantled, save time and labour, improve operating efficiency;By being arranged in stake The one spacing 13 and second spacing collar 14 of the collar, it can make it that the vibratory piling machine is not susceptible to rock and partially in pile driving process Move.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of clip pile device of municipal road construction vibratory piling machine, including directional vibrator mounting bracket (1) and pile sinking it is pre- Tubulation (16), the upper end of the directional vibrator mounting bracket (1) are connected with mechanical arm, the directional vibrator mounting bracket (1) Inner side is provided with directional vibrator (2), it is characterised in that:The lower end of directional vibrator (2) output shaft is installed with liquid Cylinder pressure (3), four ends of the directional vibrator (2) have been fixedly connected with connecting rod (4), and the lower end of four connecting rods (4) is welded with one Individual connection sleeve pipe (5), the upper end of the pile sinking prefabricated pipe (16) are plugged on the inside of connection sleeve pipe (5), the pile sinking prefabricated pipe (16) outer upper end fixed cover is provided with fixed sleeving (6), and two outsides of the fixed sleeving (6) are welded with metal sleeve (7), the lower end both sides of the connection sleeve pipe (5) are welded with connecting screw (8), and the lower end of the connecting screw (8) both passes through Corresponding metal sleeve (7), and the upper and lower ends on connecting screw (8) positioned at metal sleeve (7) are arranged with stop nut (9), the outer middle side part upper end of the pile sinking prefabricated pipe (16) is arranged with the first spacing collar (13), the first spacing collar (13) the second spacing collar (14) is provided with below, is led between the first spacing collar (13) and the second spacing collar (14) Excessive root fix bar (15) is connected, and the both ends of the connection sleeve pipe (5) are hinged with the first gag lever post (10), and described first The both ends of the spacing collar (13) are hinged with the second gag lever post (11), corresponding first gag lever post (10) and the second gag lever post (11) Between by the first hinge, has been fixedly connected between corresponding first gag lever post (10) and the second gag lever post (11) One spring (12), the inner top side of the pile sinking prefabricated pipe (16) are provided with interior installation disk (17), the pile sinking prefabricated pipe (16) six preformed holes (18) are provided with interior installation disk (17) correspondence position, the outside of the interior installation disk (17) is opened Provided with six screwed holes (19) corresponding with preformed hole (18), it is inserted between corresponding preformed hole (18) and screwed hole (19) A piece high-strength bolt (20), the upper center of the interior installation disk (17) are welded with guide rod (27), the guide rod (27) outside lower end fixed cover is provided with lower retaining collar (21), and the outer middle side part of the guide rod (27) is slidingly connected and has upper work The dynamic collar (22), the end of outside four of the upper movable loop (22) is hinged with the first strut (23), the lower retaining collar (21) the end of outside four is hinged with the second strut (24), passes through between corresponding first strut (23) and the second strut (24) Second hinge, second spring (25) is fixedly connected between the upper movable loop (22) and lower retaining collar (21), and Second spring (25) is set in the outside of guide rod (27), and the upper end movable sleeve of the guide rod (27), which is provided with, presses sleeve (26), the upper end for pressing sleeve (26) is fixedly connected with the output end of hydraulic cylinder (3).
A kind of 2. clip pile device of municipal road construction vibratory piling machine according to claim 1, it is characterised in that:Institute State the first strut (23) and the second strut (24) is disposed as stainless steel support bar, and the first strut (23) and the second strut (24) Diameter be not less than 1.5 centimeters.
A kind of 3. clip pile device of municipal road construction vibratory piling machine according to claim 1, it is characterised in that:Institute The lower end for stating directional vibrator (2) output shaft is welded with upper junction plate, and the lower end of the hydraulic cylinder (3) is welded with lower connecting plate, Fixed between the upper junction plate and lower connecting plate by fixing bolt, and the quantity of fixing bolt is no less than four.
A kind of 4. clip pile device of municipal road construction vibratory piling machine according to claim 1, it is characterised in that:Institute State fixed sleeving (6) to be spliced by two arc steel loops, the equal outside weld in both ends of two arc steel loops is connected to fixation steel plate, corresponding Two pieces of fixation steel plates between fixed by the caging bolt through setting, and the head end of caging bolt is arranged with nut.
A kind of 5. clip pile device of municipal road construction vibratory piling machine according to claim 1, it is characterised in that:Institute State and press internal diameter of the internal diameter of sleeve (26) more than upper movable loop (22), the first spacing collar (13), the second stop collar The inwall of ring (14) does not contact with the inwall of pile sinking prefabricated pipe (16).
CN201711086500.1A 2017-11-07 2017-11-07 A kind of clip pile device of municipal road construction vibratory piling machine Withdrawn CN107893419A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711086500.1A CN107893419A (en) 2017-11-07 2017-11-07 A kind of clip pile device of municipal road construction vibratory piling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711086500.1A CN107893419A (en) 2017-11-07 2017-11-07 A kind of clip pile device of municipal road construction vibratory piling machine

Publications (1)

Publication Number Publication Date
CN107893419A true CN107893419A (en) 2018-04-10

Family

ID=61804761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711086500.1A Withdrawn CN107893419A (en) 2017-11-07 2017-11-07 A kind of clip pile device of municipal road construction vibratory piling machine

Country Status (1)

Country Link
CN (1) CN107893419A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914407A (en) * 2019-03-07 2019-06-21 广州市加简派电子科技有限公司 It is a kind of that there is the heavy duty detergent piling machine for helping function for architectural engineering
JP2020101025A (en) * 2018-12-24 2020-07-02 ジャパンパイル株式会社 Pile chucking device for earth removing hopper of pile driver
CN113106974A (en) * 2021-03-03 2021-07-13 如皋市中成管桩机械有限公司 Vibration pipe-sinking pile machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020101025A (en) * 2018-12-24 2020-07-02 ジャパンパイル株式会社 Pile chucking device for earth removing hopper of pile driver
JP7248883B2 (en) 2018-12-24 2023-03-30 ジャパンパイル株式会社 Pile chucking device for dumping hopper of pile driver
CN109914407A (en) * 2019-03-07 2019-06-21 广州市加简派电子科技有限公司 It is a kind of that there is the heavy duty detergent piling machine for helping function for architectural engineering
CN113106974A (en) * 2021-03-03 2021-07-13 如皋市中成管桩机械有限公司 Vibration pipe-sinking pile machine

Similar Documents

Publication Publication Date Title
CN107893419A (en) A kind of clip pile device of municipal road construction vibratory piling machine
CN203795829U (en) Hoop assembly
CN201269057Y (en) Turnbuckle clamp
CN104070603A (en) Tensioning assembly for producing prestressed concrete pile without end plate
CN207452898U (en) A kind of clip pile device of municipal road construction vibratory piling machine
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN202064287U (en) Connection device for prestressed steel strand and high-strength tension connecting rod
CN207103489U (en) Bend pipe school circle and alignment frock
CN215801614U (en) Vibrating hammer for steel pipe pile anchor pulling combined cofferdam construction
CN207806286U (en) A kind of prestressed pipe pile end plate punch forming device
CN103669389A (en) Corrugated pipe fixing method for positioning foundation bolt
CN216990505U (en) Welding machine negative electrode connecting device used during tubular pile welding butt joint
CN214054222U (en) Adjustable welding tool rack for steel pipe pole cross arm
CN214570112U (en) Hoist device for civil engineering
CN204098031U (en) A kind of concrete precast pipe pile pile top with mechanical connecting device
CN210797558U (en) Pile planting machine for precast pile implantation method
CN202730762U (en) Pile gripper special for concrete pre-cast pile
CN203821253U (en) Holding device for broadening and splicing concrete girder bridge
CN210086056U (en) Concrete vibrating equipment for pier stud of plate bridge
CN208379655U (en) A kind of static load pullout tests quick-fitting device
CN211306196U (en) Multifunctional pipeline jacking mechanism for hydraulic and hydroelectric engineering
CN219136139U (en) Clamp for hoisting sound barrier
CN217045170U (en) Light stud welding machine auxiliary device
CN214245717U (en) Hydraulic pile gripper
CN219547809U (en) Filling pile positioning grouting frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180410

WW01 Invention patent application withdrawn after publication