CN107886821A - Towards the simulation test stand and its data communications method of PLC school duty rooms - Google Patents

Towards the simulation test stand and its data communications method of PLC school duty rooms Download PDF

Info

Publication number
CN107886821A
CN107886821A CN201711343995.1A CN201711343995A CN107886821A CN 107886821 A CN107886821 A CN 107886821A CN 201711343995 A CN201711343995 A CN 201711343995A CN 107886821 A CN107886821 A CN 107886821A
Authority
CN
China
Prior art keywords
student
plc
control
controlled device
software
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711343995.1A
Other languages
Chinese (zh)
Other versions
CN107886821B (en
Inventor
郑松
林志诚
熊华锋
刘朝儒
郑蓉
王云霞
何俊欣
林玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201711343995.1A priority Critical patent/CN107886821B/en
Publication of CN107886821A publication Critical patent/CN107886821A/en
Application granted granted Critical
Publication of CN107886821B publication Critical patent/CN107886821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/06Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
    • G09B23/18Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism
    • G09B23/183Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism for circuits
    • G09B23/186Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism for circuits for digital electronics; for computers, e.g. microprocessors

Abstract

The present invention relates to a kind of simulation test stand and its data communications method towards PLC school duty rooms.Using the framework of HWIL simulation, teacher station system provides abundant industrial equipment simulation model, student can manipulate the device model of industrial control system by PLC and emulation configuration software, monitor and debug in real time the control dynamic of controlled device, so as to reach the real training purpose of simulation industrial control system, and the simulated effect of this method it is more life-like, closer to produce reality, can effectively motivate students' interest in learning, creativity.The present invention can provide the motor control that industry is common at present, automatic charging system control, the device models such as forming machine control, make the properer actual production of teaching practice, it is extremely advantageous for the PLC application powers of training student, the ability of engineering practice of training student.

Description

Towards the simulation test stand and its data communications method of PLC school duty rooms
Technical field
The invention belongs to automated teaching application field, more specifically to a kind of towards the imitative of PLC school duty rooms True testing stand and its data communications method.
Background technology
Programmable logic Controller (PLC) technique initially be substitute relay-contactor control technology and it is caused, with science and technology hair Exhibition, this technology have developed into network between PLC and PLC via single logic control and controlled, and present PLC with Communication Control between computer, it progressively penetrates into every field, and application is extremely extensive.In terms of educational applications, PLC Have become the required course of the electric relevant speciality of industry science class universities and colleges, it is a set of efficient in order to consolidate the knowwhy that student is learned PLC laboratory simulations method just seems very necessary and urgent.
PLC teaching experimental base devices now emerge in an endless stream, but it is most of there is cumbersome module, it is not only bulky and And the function that can be realized is very single, although also there is some experimental benches to integrate more than ten experiment reluctantly, complexity Circuit has also dampened the learning interest of PLC beginner;Only has controller for large scale industry experiment, without controlled device, student Confirmatory programming operation can only be carried out, is connected without condition with peripheral advanced industrial equipment and carries out experiment;PLC it Between independently of each other, it is difficult to communicating data;In addition, these Practical training equipment prices are high, in order to reduce cost, experimental bench uses for producer Switch and LED etc. can not be emulated to the system of complexity, are limited only to infrastest, have impact on teaching come the scene of simulating Intuitive and interest.The main reason for causing above-mentioned phenomenon be the PLC teaching experimental bases framework for lacking a kind of opening and Effective data communications method.
The content of the invention
A kind of the shortcomings that it is an object of the invention to overcome prior art, there is provided new imitating towards PLC school duty rooms True testing stand and its data communications method, to solve, existing PLC school duty rooms experiential function is single, is difficult to carry out complicated system The technical problem of the analogue simulation experiment of system.
To achieve the above object, the technical scheme is that:A kind of simulation test stand towards PLC school duty rooms, Including teaching station system and student station system, both are connected by total switch Ethernet;
The teaching station system includes:One industrial computer, teacher's PC, a server;
The server is used to storing and run the physical model of industrial complication system controlled device, M void of server-assignment Intend control node, including 1 teacher's node and M-1 student's node, each control node correspond to specific port;It is described virtual There is control node analog physical control station to perform functions of control program;
The industrial computer is connected by hardwire with the M-1 platform students PLC of the student station system, and industrial computer each inputs/and it is defeated Going out signal can correspond with the input/output relay inside M-1 platform students PLC respectively;The industrial computer is used to gather M-1 Platform student PLC all inputoutput datas, it is monitoring interface program and M-1 platform students PLC on student's PC of student station In logic control program between provide data transfer passage;
Teacher's PC is equipped with emulation configuration software;The emulation configuration software includes Logical Configuration software, and monitoring interface is soft Part, and communication interface modules;The monitoring interface software is used for the physical model for designing controlled device, and shows controlled device Control effect;The Logical Configuration software is used for the control logic for writing controlled device, realizes preset control function;
The server is mounted with data resettlement software with industrial computer, and the data resettlement software is used to realize each void of server Intend the data resettlement between control node and industrial computer internal memory and share;
The student station system includes:M-1 student station, each student station are made up of a student PLC and student's PC, and two Person is connected by minor exchange;
Student's PC is equipped with emulation configuration software;The emulation configuration software includes Logical Configuration software, and monitoring interface is soft Part, and communication interface modules;The monitoring interface software is used for the physical model for designing controlled device, and shows controlled device Control effect;The Logical Configuration software is used for the control logic for writing controlled device, realizes preset control function, and will It is downloaded in student PLC and run.
In an embodiment of the present invention, the operation principle of the simulation test stand is first by the student PLC of student station and Raw PC serial ports connects, and recycles emulation configuration software to build the simulation model of control system controlled device, and pass through Simulation model and control configuration program are run on teacher's PC, student's PC, is emulated to reach under the conditions of half material object Purpose.
In an embodiment of the present invention, the simulation model of the controlled device can be carried out by monitoring interface corresponding assembly Modification, so as to realize that system control program carries out online modification and debugging.
Present invention also offers a kind of data communication based on the simulation test stand described above towards PLC school duty rooms Method, comprise the following steps,
Step S1, the physical model data of controlled device is downloaded to server by teacher by the monitoring interface software of teacher's PC In corresponding virtual controlling node;
Step S2, when student starts experiment, picture is tested by monitoring interface Software for Design on student's PC, and designed Experiment picture on trigger the manipulation instruction of controlled device, manipulation instruction signal value is sent to corresponding virtual control on server Node address processed;
Step S3, software is moved using data to move the corresponding manipulation instruction data in server on each virtual controlling node To the input memory field of industrial computer;
Step S4, the manipulation instruction data of industrial computer are passed into corresponding student PLC by hardwire;
Step S5, the control program for the Logical Configuration programming controlled device that student passes through student's PC, and it is loaded into student PLC Middle execution;
Step S6, the control output result after execution is passed to the industrial computer by student PLC by hardwire;
Step S7, software is moved by data to move the input and output value of industrial computer to virtual controlling node corresponding to server In, the calculating of controlled device physical model is driven, realizes the execution of controlled device action;
Step S8, by the monitoring interface software of student's PC from virtual controlling node corresponding to server reading numerical values, and Dynamically show the state of a control of controlled device;
Step S9, student judges whether experiment demand is completed by the current intelligence of monitoring interface, if reaching the demand of experiment, examination Test end, if fall flat, continue to change student PLC control program, repeat step S5, S6, S7, S8 until Reach experiment effects of demand, terminate experiment.
Compared to prior art, the invention has the advantages that:
1st, simulation test stand provided by the invention, using the framework of HWIL simulation, teacher station system provides abundant industry and set Standby simulation model, student can be manipulated the device model of industrial control system by PLC and emulation configuration software, monitor and adjust in real time The control dynamic of controlled device is tried, so as to reach the real training purpose of simulation industrial control system, and the simulated effect of this method More life-like, closer produce reality, can effectively motivate students' interest in learning, creativity.For example, it can provide at present The common motor control of industry, the device model such as automatic charging system control, forming machine control, make the properer reality of teaching practice Border produces, extremely advantageous for the PLC application powers of training student, the ability of engineering practice of training student;
2nd, the communication means of simulation test stand provided by the invention, the data transfer transfer of software and industrial computer is moved using data Effect so that testing stand framework has more flexibility and scalability.In the case where system software and the network architecture are constant, system Middle various types of hardware, including PC, PLC, industrial computer etc. can not limit vendor source, and laboratory can independently choose, upgrade or more Change, and the hardware unit of student station can also needing neatly to adjust, extend according to student's quantity and experimental teaching.
Brief description of the drawings
Fig. 1 is the hardware architecture diagram of simulation test stand in invention.
Fig. 2 is the Data communication principle figure of simulation test stand in the present invention.
Embodiment
Below in conjunction with the accompanying drawings, technical scheme is specifically described.
A kind of simulation test stand towards PLC school duty rooms of the present invention, including teaching station system and student station system, Both are connected by total switch Ethernet;
The teaching station system includes:One industrial computer, teacher's PC, a server;
The server is used to storing and run the physical model of industrial complication system controlled device, M void of server-assignment Intend control node, including 1 teacher's node and M-1 student's node, each control node correspond to specific port;It is described virtual There is control node analog physical control station to perform functions of control program;
The industrial computer is connected by hardwire with the M-1 platform students PLC of the student station system, and industrial computer each inputs/and it is defeated Going out signal can correspond with the input/output relay inside M-1 platform students PLC respectively;The industrial computer is used to gather M-1 Platform student PLC all inputoutput datas, it is monitoring interface program and M-1 platform students PLC on student's PC of student station In logic control program between provide data transfer passage;
Teacher's PC is equipped with emulation configuration software;The emulation configuration software includes Logical Configuration software, and monitoring interface is soft Part, and communication interface modules;The monitoring interface software is used for the physical model for designing controlled device, and shows controlled device Control effect;The Logical Configuration software is used for the control logic for writing controlled device, realizes preset control function;
The server is mounted with data resettlement software with industrial computer, and the data resettlement software is used to realize each void of server Intend the data resettlement between control node and industrial computer internal memory and share;
The student station system includes:M-1 student station, each student station are made up of a student PLC and student's PC, and two Person is connected by minor exchange;
Student's PC is equipped with emulation configuration software;The emulation configuration software includes Logical Configuration software, and monitoring interface is soft Part, and communication interface modules;The monitoring interface software is used for the physical model for designing controlled device, and shows controlled device Control effect;The Logical Configuration software is used for the control logic for writing controlled device, realizes preset control function, and will It is downloaded in student PLC and run.
The operation principle of the simulation test stand is first to connect the student PLC of student station and student's PC serial ports, Emulation configuration software is recycled to build the simulation model of control system controlled device, and by teacher's PC, student's PC Upper operation simulation model and control configuration program, to reach the purpose emulated under the conditions of half material object.The controlled device Simulation model can be modified by monitoring interface corresponding assembly, so as to realize system control program carry out online modification and Debugging.
Present invention also offers a kind of data communication based on the simulation test stand described above towards PLC school duty rooms Method, comprise the following steps,
Step S1, the physical model data of controlled device is downloaded to server by teacher by the monitoring interface software of teacher's PC In corresponding virtual controlling node;
Step S2, when student starts experiment, picture is tested by monitoring interface Software for Design on student's PC, and designed Experiment picture on trigger the manipulation instruction of controlled device, manipulation instruction signal value is sent to corresponding virtual control on server Node address processed;
Step S3, software is moved using data to move the corresponding manipulation instruction data in server on each virtual controlling node To the input memory field of industrial computer;
Step S4, the manipulation instruction data of industrial computer are passed into corresponding student PLC by hardwire;
Step S5, the control program for the Logical Configuration programming controlled device that student passes through student's PC, and it is loaded into student PLC Middle execution;
Step S6, the control output result after execution is passed to the industrial computer by student PLC by hardwire;
Step S7, software is moved by data to move the input and output value of industrial computer to virtual controlling node corresponding to server In, the calculating of controlled device physical model is driven, realizes the execution of controlled device action;
Step S8, by the monitoring interface software of student's PC from virtual controlling node corresponding to server reading numerical values, and Dynamically show the state of a control of controlled device;
Step S9, student judges whether experiment demand is completed by the current intelligence of monitoring interface, if reaching the demand of experiment, examination Test end, if fall flat, continue to change student PLC control program, repeat step S5, S6, S7, S8 until Reach experiment effects of demand, terminate experiment.
It is below the specific implementation process of the present invention.
(One), the present invention the simulation test stand towards PLC school duty rooms, the simulation test stand provided is using being based on The framework of PLC HWIL simulation, as shown in figure 1, specific as follows:
1st, including teaching station system and student station system, both are connected by total switch Ethernet.
2nd, the teaching station system includes:One large-scale industrial computer, teacher's PC, a server.
(1)The server is mainly used to store and runs the physical model of industrial complication system controlled device, server It is assigned with M virtual controlling node, including 1 teacher's node and M-1 student's node, the corresponding specific end of each control node Mouthful;There is the virtual controlling node analog physical control station to perform functions of control program.
(2)The industrial computer is connected by hardwire with the M-1 platform small PLCs of student station system, and industrial computer each inputs/ Output signal can correspond with the input/output relay inside PLC respectively.The industrial computer is small-sized for gathering M-1 platforms PLC all inputoutput datas, between the logic control program in the monitoring interface program and small PLC on student station PC The passage of data transfer is provided.
(3)The server is mounted with data resettlement software with industrial computer, and the data resettlement software is mainly used in reality Existing data resettlement between each virtual controlling node of server and industrial computer internal memory is with sharing.
3rd, the student station system includes:M-1 student station, each student station is by one group of PLC device and student's PC Form, both are connected by minor exchange.
(1)Student's PC is respectively arranged with emulation configuration software with teacher's PC.
(2)The emulation configuration software mainly includes Logical Configuration software, monitoring interface software, and communication interface mould Block;The monitoring interface software is used for the physical model for designing controlled device, and shows the control effect of controlled device;
(3)The Logical Configuration software is used for the control logic for writing controlled device, realizes specific control function, and by under it It is loaded onto in small PLC and runs.
(Two), the present invention the simulation test stand towards PLC school duty rooms:The work of the simulation test stand provided is former Reason is first to connect the PLC of student station and PC serial ports, recycles emulation configuration software to build control system quilt The simulation model of object is controlled, and by running simulation model and control configuration program on PC, to reach under the conditions of half is in kind The purpose emulated.Further, the simulation model of controlled device can also be modified by monitoring interface corresponding assembly, So as to realize that system control program carries out online modification and debugging.
(Three), present invention also offers a kind of data based on the above-mentioned simulation test stand towards PLC school duty rooms to lead to Letter method, as shown in Fig. 2 concrete principle is as follows:
1st, the physical model data of controlled device is downloaded to corresponding to server by teacher by teacher PC monitoring interface software In virtual controlling node.
2nd, when student starts experiment, picture is tested by monitoring interface Software for Design on student PC, and designed Test the manipulation instruction that controlled device is triggered on picture(Such as the start-up operation of certain equipment), by manipulation instruction signal value send to Corresponding virtual controlling node address on server;
3rd, the corresponding manipulation instruction data in server on each virtual controlling node are moved to work using data resettlement software The input memory field of control machine;
4th, the manipulation instruction data of industrial computer are passed into corresponding small PLC by hardwire;
(The step of the above 2,3,4 is realized the monitored picture start stop operation data transfer on student PC to small PLC correspondence memory In.)
5th, the control program for the Logical Configuration programming controlled device that student passes through student PC, and be loaded into small PLC and perform;
6th, the control output result after execution is passed to the industrial computer by small PLC by hardwire;
7th, move software by data to move the input and output value of industrial computer into virtual controlling node corresponding to server, drive The calculating of dynamic controlled device physical model, realizes the execution of controlled device action;
8th, by student PC monitoring interface software from virtual controlling node corresponding to server reading numerical values, and dynamically show Show the state of a control of controlled device;
9th, student judges whether experiment demand is completed by the current intelligence of monitoring interface, if reaching the demand of experiment, experiment knot Beam, if fall flat, continue to change the control program of small PLC, repeat 5,6,7,8 until reaching experiment demand Effect, terminate experiment.
Above is presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, caused function are made During with scope without departing from technical solution of the present invention, protection scope of the present invention is belonged to.

Claims (4)

  1. A kind of 1. simulation test stand towards PLC school duty rooms, it is characterised in that:Including teaching station system and student station system System, both are connected by total switch Ethernet;
    The teaching station system includes:One industrial computer, teacher's PC, a server;
    The server is used to storing and run the physical model of industrial complication system controlled device, M void of server-assignment Intend control node, including 1 teacher's node and M-1 student's node, each control node correspond to specific port;It is described virtual There is control node analog physical control station to perform functions of control program;
    The industrial computer is connected by hardwire with the M-1 platform students PLC of the student station system, and industrial computer each inputs/and it is defeated Going out signal can correspond with the input/output relay inside M-1 platform students PLC respectively;The industrial computer is used to gather M-1 Platform student PLC all inputoutput datas, it is monitoring interface program and M-1 platform students PLC on student's PC of student station In logic control program between provide data transfer passage;
    Teacher's PC is equipped with emulation configuration software;The emulation configuration software includes Logical Configuration software, and monitoring interface is soft Part, and communication interface modules;The monitoring interface software is used for the physical model for designing controlled device, and shows controlled device Control effect;The Logical Configuration software is used for the control logic for writing controlled device, realizes preset control function;
    The server is mounted with data resettlement software with industrial computer, and the data resettlement software is used to realize each void of server Intend the data resettlement between control node and industrial computer internal memory and share;
    The student station system includes:M-1 student station, each student station are made up of a student PLC and student's PC, and two Person is connected by minor exchange;
    Student's PC is equipped with emulation configuration software;The emulation configuration software includes Logical Configuration software, and monitoring interface is soft Part, and communication interface modules;The monitoring interface software is used for the physical model for designing controlled device, and shows controlled device Control effect;The Logical Configuration software is used for the control logic for writing controlled device, realizes preset control function, and will It is downloaded in student PLC and run.
  2. 2. the simulation test stand according to claim 1 towards PLC school duty rooms, it is characterised in that:The emulation examination The operation principle for testing platform is first to connect the student PLC of student station and student's PC serial ports, recycles emulation configuration software To build the simulation model of control system controlled device, and by running simulation model and control on teacher's PC, student's PC Configuration program processed, to reach the purpose emulated under the conditions of half material object.
  3. 3. the simulation test stand according to claim 2 towards PLC school duty rooms, it is characterised in that:Described controlled pair The simulation model of elephant can be modified by monitoring interface corresponding assembly, so as to realize that system control program carries out online modification And debugging.
  4. 4. a kind of data communications method based on any simulation test stands towards PLC school duty rooms of claim 1-3, It is characterized in that:Comprise the following steps,
    Step S1, the physical model data of controlled device is downloaded to server by teacher by the monitoring interface software of teacher's PC In corresponding virtual controlling node;
    Step S2, when student starts experiment, picture is tested by monitoring interface Software for Design on student's PC, and designed Experiment picture on trigger the manipulation instruction of controlled device, manipulation instruction signal value is sent to corresponding virtual control on server Node address processed;
    Step S3, software is moved using data to move the corresponding manipulation instruction data in server on each virtual controlling node To the input memory field of industrial computer;
    Step S4, the manipulation instruction data of industrial computer are passed into corresponding student PLC by hardwire;
    Step S5, the control program for the Logical Configuration programming controlled device that student passes through student's PC, and it is loaded into student PLC Middle execution;
    Step S6, the control output result after execution is passed to the industrial computer by student PLC by hardwire;
    Step S7, software is moved by data to move the input and output value of industrial computer to virtual controlling node corresponding to server In, the calculating of controlled device physical model is driven, realizes the execution of controlled device action;
    Step S8, by the monitoring interface software of student's PC from virtual controlling node corresponding to server reading numerical values, and Dynamically show the state of a control of controlled device;
    Step S9, student judges whether experiment demand is completed by the current intelligence of monitoring interface, if reaching the demand of experiment, examination Test end, if fall flat, continue to change student PLC control program, repeat step S5, S6, S7, S8 until Reach experiment effects of demand, terminate experiment.
CN201711343995.1A 2017-12-15 2017-12-15 Simulation test bed for PLC teaching laboratory and data communication method thereof Active CN107886821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711343995.1A CN107886821B (en) 2017-12-15 2017-12-15 Simulation test bed for PLC teaching laboratory and data communication method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711343995.1A CN107886821B (en) 2017-12-15 2017-12-15 Simulation test bed for PLC teaching laboratory and data communication method thereof

Publications (2)

Publication Number Publication Date
CN107886821A true CN107886821A (en) 2018-04-06
CN107886821B CN107886821B (en) 2020-01-14

Family

ID=61770806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711343995.1A Active CN107886821B (en) 2017-12-15 2017-12-15 Simulation test bed for PLC teaching laboratory and data communication method thereof

Country Status (1)

Country Link
CN (1) CN107886821B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470506A (en) * 2018-04-09 2018-08-31 重庆鲁班机器人技术研究院有限公司 Half robot teaching's device in kind
CN108762188A (en) * 2018-06-05 2018-11-06 湖南商学院 Fireworks based on PLC controls sort assembly line Virtual Simulative Experiment method and system
CN109754683A (en) * 2019-03-04 2019-05-14 中国矿业大学 A kind of half full-scale investigation device of PLC towards classroom instruction
CN110688050A (en) * 2019-09-17 2020-01-14 上海海洋大学 Use method of touch screen
CN112462627A (en) * 2020-12-09 2021-03-09 中交一航局安装工程有限公司 Port control system simulation test system and test method
CN114596746A (en) * 2022-02-24 2022-06-07 烽台科技(北京)有限公司 Simulation education training system and learning method based on simulation education training system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202230624U (en) * 2011-08-05 2012-05-23 陕西科技大学 Computer comprehensive simulation experiment platform based on PLC
CN103019102A (en) * 2012-11-28 2013-04-03 河南科技大学东海硅产业节能技术研究院 Semi-physical computer simulation network experimental apparatus
US20130132059A1 (en) * 2011-03-31 2013-05-23 Udmtek Co., Ltd. Multiple plc simulation system
CN203812071U (en) * 2014-04-17 2014-09-03 浙江先锋教育设备有限公司 Integrated experiment device for industrial automation industrial control network control
CN106781761A (en) * 2017-01-04 2017-05-31 无锡职业技术学院 A kind of automation training platform with Web functions

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130132059A1 (en) * 2011-03-31 2013-05-23 Udmtek Co., Ltd. Multiple plc simulation system
CN202230624U (en) * 2011-08-05 2012-05-23 陕西科技大学 Computer comprehensive simulation experiment platform based on PLC
CN103019102A (en) * 2012-11-28 2013-04-03 河南科技大学东海硅产业节能技术研究院 Semi-physical computer simulation network experimental apparatus
CN203812071U (en) * 2014-04-17 2014-09-03 浙江先锋教育设备有限公司 Integrated experiment device for industrial automation industrial control network control
CN106781761A (en) * 2017-01-04 2017-05-31 无锡职业技术学院 A kind of automation training platform with Web functions

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李世伟: "基于Q系列PLC的三层网络实验控制系统的研究", 《中国优秀硕士学位论文全文数据库》 *
熊凯: "工业控制网络综合实验系统", 《中国优秀硕士学位论文全文数据库》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470506A (en) * 2018-04-09 2018-08-31 重庆鲁班机器人技术研究院有限公司 Half robot teaching's device in kind
CN108762188A (en) * 2018-06-05 2018-11-06 湖南商学院 Fireworks based on PLC controls sort assembly line Virtual Simulative Experiment method and system
CN109754683A (en) * 2019-03-04 2019-05-14 中国矿业大学 A kind of half full-scale investigation device of PLC towards classroom instruction
CN110688050A (en) * 2019-09-17 2020-01-14 上海海洋大学 Use method of touch screen
CN112462627A (en) * 2020-12-09 2021-03-09 中交一航局安装工程有限公司 Port control system simulation test system and test method
CN114596746A (en) * 2022-02-24 2022-06-07 烽台科技(北京)有限公司 Simulation education training system and learning method based on simulation education training system

Also Published As

Publication number Publication date
CN107886821B (en) 2020-01-14

Similar Documents

Publication Publication Date Title
CN107886821A (en) Towards the simulation test stand and its data communications method of PLC school duty rooms
CN107885097B (en) Nuclear power station simulator control system DCS transformation closed loop verification system and method
CN204706215U (en) Rudder system operation training simulator
CN104777758A (en) General purpose simulator for microsatellite equipment
KR20090114139A (en) Method for realistic interactive technology education based on three dimension type contents
CN105719528A (en) Semi-physical simulation teaching device for control circuit and gas circuit of urban rail vehicle
CN108182854B (en) PLC teaching experiment method for multi-person collaborative simulation of industrial system control process
Aliane A MATLAB/Simulink-based interactive module for servo systems learning
CN104035340A (en) Practical operation training simulation system for ship fuel oil purifier
CN109765802A (en) A kind of virtual DCS analogue system of large size phase modifier
CN103700311B (en) Simulating training system and training method for training operation of printing equipment
CN105632273B (en) A kind of tightly coupled Internet of Things education experience system and its practical training method
CN106952518A (en) A kind of therrmodynamic system real-time simulation tutoring system based on smart mobile phone
CN103116286A (en) Implement method and device of network-based robot development platform based on cyber
CN106710346A (en) Simulation training system
CN112581850A (en) Virtual debugging system of multifunctional production line and equipment
CN107015482A (en) A kind of ship central station of floating dock operation training simulator
Afonso et al. Innovative teaching/learning methodologies in control, automation and robotics: a short review
CN106155017A (en) Simulation sand table and the method for production scene Rapid transplant towards industrial control system
Ilc et al. Ftsim: A 3d tool for teaching automation concepts
CN203405975U (en) A PLC technology application teaching apparatus
CN203102650U (en) Analogue simulating teaching resource platform for repairing automotive body
CN206541481U (en) Embedded experimental system
CN109493701A (en) A kind of inexpensive relay protection teaching experiment platform based on ARM framework
CN112150874A (en) Open type robot simulation development platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant