CN107882160A - Rainwater collecting and utilizing system for construction period of highway reconstruction and extension project - Google Patents

Rainwater collecting and utilizing system for construction period of highway reconstruction and extension project Download PDF

Info

Publication number
CN107882160A
CN107882160A CN201711127974.6A CN201711127974A CN107882160A CN 107882160 A CN107882160 A CN 107882160A CN 201711127974 A CN201711127974 A CN 201711127974A CN 107882160 A CN107882160 A CN 107882160A
Authority
CN
China
Prior art keywords
tank
collecting
pipeline
clarifier
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711127974.6A
Other languages
Chinese (zh)
Other versions
CN107882160B (en
Inventor
孟宪山
赵�智
姚艳
朱宏宇
董俊峰
赵旭召
朱拓
杨伟东
张荣健
王鸿颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Overseas Traffic Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711127974.6A priority Critical patent/CN107882160B/en
Publication of CN107882160A publication Critical patent/CN107882160A/en
Application granted granted Critical
Publication of CN107882160B publication Critical patent/CN107882160B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H3/00Applying liquids to roads or like surfaces, e.g. for dust control; Stationary flushing devices
    • E01H3/04Fixed devices, e.g. permanently- installed flushing means
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Filtration Of Liquid (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a rainwater collecting and utilizing system in the construction period of a highway reconstruction and extension project, which comprises a water collecting tank; a drain tank connected to the sump through a first pipe; two side walls of the drainage groove are provided with interception hooks; the filtering device comprises a hollow fixed shaft, a hollow telescopic shaft, a screen and a supporting rod; the purification tank is connected to the water collecting tank through a second pipeline; a fine sand purification layer is arranged in the purification tank; a water outlet is arranged at the bottom of the purification tank; the spraying device is connected to the purification tank through a third pipeline and comprises a main pipe, a branch pipe and a spraying head; wherein the shower head includes: a connecting rod and a spray plate; a control device including a motor and a controller. It can realize utilizing the rainwater to spray and the dust fall at the job site through the collection and the processing to the rainwater, has maintained the environment of job site, has guaranteed constructor's health, and has practiced thrift a large amount of water resources.

Description

Expressway Extension Project construction time Rainwater collection system
Technical field
The present invention relates to the technical field of auxiliary equipment of construction highway, more particularly to a kind of highway extension project work Journey construction time Rainwater collection system.
Background technology
With the rapid development of the national economy, the construction of China's highway is very swift and violent.Society's warp during due to being built Ji level, technical merit and the restriction for building thought, in the highway to have completed for use, the overwhelming majority is two-way four car Road, six-lane and eight lane highway proportions are relatively low.Have at present quite a few do not adapted to the volume of traffic increase and The requirement of social development, there is an urgent need to expand road passage capability.But during the reorganization and expansion of highway, it can cause big The dust pollution of amount, the health of the workmen at the scene of not only endangering, while resident to surrounding and passerby also result in harm. Construction site uses artificial depositing dust more at present, is directly connected to running water water pipe, job site is sprayed, still, many institute's weeks Know, China is in shortage of water resources state, freshwater resources total amount about 2,620,000,000,000 m3, only occupancy volume per person 2392m3, the world The a quarter of occupancy volume per person, influenceed because each department are in different hydrology bands and monsoon climate, water resource and soil, ore deposit Produce resource distribution and industrial water structure is incompatible, water pollution is serious, and water quality type lacks the shortage for more exacerbating water resource.And Using artificial spray, not only water consumption is big, and dust-laying effect is unsatisfactory.
At present, in the reorganization and expansion of highway, rainwater is directly drained through gutter, if can enter rainwater Row is collected, then does the spray for being used for job site after proper treatment, had both been maintained the environment of job site, and had also been protected scene to apply The health of worker person, while substantial amounts of originally water resource can also be saved.
The content of the invention
It is an object of the invention to solve at least the above, and provide the advantages of at least will be described later.
It is a still further object of the present invention to provide a kind of Expressway Extension Project construction time Rainwater collection system, By the collection and processing to rainwater, it can realize and spray simultaneously depositing dust using rainwater at the construction field (site), it is existing to maintain construction The environment of field, ensure that the health of workmen, and saved substantial amounts of water resource.
In order to realize according to object of the present invention and further advantage, there is provided a kind of Expressway Extension Project is applied Duration Rainwater collection system, including:
Collecting-tank, it is the cylindric setting of upper opening, and the collecting-tank is embedded in job site, and makes described catchment The opening in pond flushes with ground;
Rhone, it is arranged at the job site, and the rhone is arranged to a plurality of, and a plurality of rhone passes through First pipeline is connected to the collecting-tank;Interception hook is provided with the two side of the rhone, the interception hook includes the neck of hook And coupler body, the first end of the neck of hook are fixedly connected on the side wall of the rhone, the second end of the neck of hook connects the hook Body, and the coupler body is protruded from the side wall of the rhone, and the direction of the coupler body and the current side in the rhone To opposite;Also, the interception hook on the two side of the rhone is staggered;
Filter, it includes hollow fixing axle, hollow telescopic shaft, screen cloth and support bar;The fixing axle is vertical The center of the collecting-tank is arranged at, the telescopic shaft is vertically arranged at the top of the fixing axle in telescopic manner, and When the telescopic shaft extends completely, make the top of the telescopic shaft concordant with the opening of the collecting-tank;The support bar Length is identical with the radius of the collecting-tank, and the first end of the support bar is foldably connected solid with the telescopic shaft It is fixed, and when the support bar folds, the second end of the support bar is flushed with the top of the telescopic shaft;The support bar 5-10 roots are arranged to, radially uniform distribution of the support bar described in 5-10 roots along the telescopic shaft;The screen cloth is arranged to fan-shaped Flexible sieve, the both sides of the screen cloth are connected on adjacent two support bars so that the support bar open when, Mutually supported with the inwall of the collecting-tank on the arc side of the screen cloth;Second end of the support bar is provided with liquid level sensor;Institute The size for stating the sieve aperture of screen cloth is 4-8mm;
Clarifier-tank, it is connected to the collecting-tank by the second pipeline, and the clarifier-tank is supported by support, and supports from the ground Height be not less than 2m;The first end of second pipeline is penetrated by the cavity of the fixing axle and via the sky of the telescopic shaft Chamber passes, and is connected with the inside with the collecting-tank, and the first end of second pipeline is located at the first end of the support bar Top;Second end of second pipeline is arranged at the top of the clarifier-tank, and is connected with the inside of the clarifier-tank;It is described Fine sand purifying layer is provided with clarifier-tank, the fine sand purifying layer is horizontally placed on the middle and upper part in the clarifier-tank, and described The inwall of the outer wall of fine sand purifying layer and the clarifier-tank is mutually supported;The bottom of the clarifier-tank is provided with delivery port;
Spray equipment, it is connected to the clarifier-tank by the 3rd pipeline, and the spray equipment includes supervisor, branch pipe and spray Drench head;The first end of 3rd pipeline is connected to the delivery port, and the second end of the 3rd pipeline is connected to the supervisor; The supervisor is arranged to more, and the more supervisors are connected to the second end of the 3rd pipeline;The of the branch pipe One end is connected to the supervisor, and the second end of the branch pipe is straight down;Second end of the branch pipe is connected to the spray head; Wherein described spray head includes:
Connecting rod, it is arranged to 3, and the first end of 3 connecting rods is all connected to the side at the second end of the branch pipe Wall, and 3 connecting rods are uniformly distributed;
Shower tray, 3-5 times of the caliber of its a diameter of branch pipe, the shower tray is arranged at the second end of the branch pipe Lower section, and edge is connected with the second end of the connecting rod respectively, so that the shower tray be arranged in parallel relative to ground;Institute State centered on shower tray is set relative to ground arch protruding upward, multiple through holes, institute are uniformly offered in the shower tray The aperture for stating through hole is 2-3mm;
Control device, it includes motor and controller, and the motor connection is in the telescopic shaft and support bar, the control Device is connected to the motor and liquid level sensor.
Preferably, in described Expressway Extension Project construction time Rainwater collection system, second pipe The elevator pump that the rainwater in collecting-tank is pumped into the clarifier-tank is provided with road.
Preferably, in described Expressway Extension Project construction time Rainwater collection system, in addition to:
Lid, it is arranged at the overthe openings of the collecting-tank, and the opening of the collecting-tank is covered;The lid is set The cambered surface being recessed downwards relative to ground Middle face is set to, osculum, the upper surface of the lid are provided with the middle part of the lid Edge on the inside of be provided with anti-block apparatus, the anti-block apparatus includes:
Block water bar, it is described to block the body of rod that water bar is length 1-3cm, it is described block water bar be vertically arranged at the upper of the lid On surface, and more are blocked circumferencial direction of the water bar along the lid and are evenly arranged, and the water bar that blocks is arranged as 2-4 circles, and adjacent The spacing blocked described in two between water bar is gradually reduced from outer ring to inner ring;
Sediment trapping net, circumferential directions of the sediment trapping net along the lid, and the sediment trapping net, which are located at described in inner ring, to be blocked Between water bar and osculum.
Preferably, in described Expressway Extension Project construction time Rainwater collection system, the collecting-tank Bottom and clarifier-tank fine sand purifying layer above be separately provided for the conveying worm of sediment.
Preferably, in described Expressway Extension Project construction time Rainwater collection system, the 3rd pipe The force (forcing) pump for increasing hydraulic pressure is provided with road, the force (forcing) pump is connected to the controller.
Preferably, in described Expressway Extension Project construction time Rainwater collection system, in addition to:
Solar power system, it includes solar panel, rechargeable battery and heating rod, and the solar panel is set The top of the clarifier-tank is placed in, the rechargeable battery is connected respectively with the solar panel and heating rod, the heating Rod is arranged in the cavity of the fixing axle, and in the clarifier-tank;The rechargeable battery is controlled by the controller.
Preferably, in described Expressway Extension Project construction time Rainwater collection system, first pipe The control valve for being controlled by the controller is respectively arranged with road, the second pipeline and supervisor.
The present invention comprises at least following beneficial effect:
The rainwater when present invention is rained by setting rhone is flowed into collecting-tank via rhone to be collected, and is led to Cross and filter is set in collecting-tank, and liquid level sensor is set at the second end of support bar so that controller controlled motor Drive telescopic shaft to carry out flexible up and down, and sense that stopping is flexible after the liquid level of rainwater in collecting-tank in liquid level sensor so that The top of telescopic shaft is located at the water surface in collecting-tank, and then controls support bar to open laterally by controller so that support Screen cloth between bar follows support bar to open, and then until formed in the collecting-tank, and parallel to the screen cloth of collecting-tank bottom surface, from And realize the opening by screen cloth, the solid material that will be floated on the water surface in collecting-tank or in water, for example, leaf, branch and Various construction material packagings etc. are isolated in below the water surface by screen cloth, that is, realize the preliminary filtering of rainwater.By setting clarifier-tank, The dmp filter in collecting-tank that will be passed through by clarifier-tank by the second pipeline so that the fine sand in rainwater is further filtered, And then when needing to carry out dust cleaning at the construction field (site), by spray equipment sprinkling at the construction field (site), realize the recovery of rainwater again Utilize, avoid the use of running water, save substantial amounts of water resource, and ensure that the environment of job site.
Hook is intercepted by being set in rhone, interception that can be tentatively is especially built into the solid refuse in gutter Build the disposed wastes such as packaging bag and be easier to intercepted hook and hook, and then prevent the first pipeline blockage, and realize to rainwater just Step removal of impurities.Meanwhile by setting the direction of coupler body so that rubbish is easier to be tangled, and in cleaning, it is only necessary to it is along coupler body direction The solid refuse that can easily clear up on coupler body, facilitates the cleaning in rhone.
By setting filter in collecting-tank, the remaining floating object into collecting-tank is enabled to be filtered to the The lower section of two pipelines, and by the precipitation in collecting-tank, most of sediment deposition in rainwater is enabled to, and then realize To the secondary filter of rainwater, and by the cooperation of liquid level sensor and telescopic shaft, filter is enabled to be carried out according to water level Height automatically adjusts so that using more convenient and smart.
It is not less than 2m apart from ground level by the way that clarifier-tank is arranged at so that the rainwater after purification can be most of Automatic spray is realized by gravity, so as to save the energy, reduces use cost.
By the way that the supervisor of spray equipment is arranged into more, multiple spray points can be arranged as required to, to meet to construct The spraying and dedusting requirement at scene.And the spray head of spray equipment is arranged to be made up of connecting rod and shower tray, enables to current Flowed out by branch pipe, by the velocity shock of current in shower tray, realize the purpose outwards sprayed along around shower tray, and Shower tray, which is attended class, has set through hole so that a small amount of current can be fallen on the ground below shower tray by through hole, and then ensure that The comprehensive of scope is sprayed, and then ensure that the effect of spraying and dedusting.
Further advantage, target and the feature of the present invention embodies part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is the structural representation of Expressway Extension Project construction time Rainwater collection system of the present invention Figure;
Fig. 2 is the structural representation of rhone of the present invention;
Fig. 3 is the structural scheme of mechanism of screen cloth of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein are not precluded from one or more The presence or addition of individual other elements or its combination.
As shown in Figure 1, Figure 2 and Figure 3, the present invention provides a kind of Expressway Extension Project construction time rainwater catchment system System, including:Collecting-tank 1, it is the cylindric setting of upper opening, and the collecting-tank 1 is embedded in job site, and is made described The opening of collecting-tank 1 flushes with ground.
Rhone 2, it is arranged at the job site, and the rhone 2 is arranged to a plurality of, and a plurality of rhone 2 is equal The collecting-tank 1 is connected to by the first pipeline 3;It is provided with the two side of the rhone 2 and intercepts hook 4, the interception hook Including the neck of hook 5 and coupler body 6, the first end of the neck of hook 5 is fixedly connected on the side wall of the rhone 2, and the second of the neck of hook 5 End connects the coupler body 6, and the coupler body 6 is protruded from the side wall of the rhone 2, and the direction of the coupler body 6 with it is described Water (flow) direction in rhone 2 is opposite;Also, the interception hook on the two side of the rhone 2 is staggered.
Filter, it includes hollow fixing axle 7, hollow telescopic shaft 8, screen cloth 9 and support bar 10;The fixing axle 7 are vertically arranged at the center of the collecting-tank 1, and the telescopic shaft 8 is vertically arranged at the fixing axle 7 in telescopic manner Top, and when the telescopic shaft 8 extends completely, make the top of the telescopic shaft 8 concordant with the opening of the collecting-tank 1;Institute It is identical with the radius of the collecting-tank 1 to state the length of support bar 10, the first end of the support bar 10 and the telescopic shaft 8 are with can The mode of folding is connected, and when the support bar 10 folds, makes the second end of the support bar 10 and the telescopic shaft 8 Top flush;The support bar 10 is arranged to 5-10 roots, and support bar 10 described in 5-10 roots is radially uniform along the telescopic shaft 8 Distribution;The screen cloth 9 is arranged to fan-shaped Flexible sieve, and the both sides of the screen cloth 9 are connected to adjacent two supports On bar 10, so that the support bar 10, when opening, the arc side of the screen cloth 9 and the inwall of the collecting-tank 1 are mutually supported;It is described Second end of support bar 10 is provided with liquid level sensor;The size of the sieve aperture of the screen cloth 9 is 4-8mm.
Clarifier-tank 11, it is connected to the collecting-tank 1 by the second pipeline 12, and the clarifier-tank 11 is supported by support, and The height of support from the ground is not less than 2m;The first end of second pipeline 12 is penetrated by the cavity of the fixing axle 7 and via institute The cavity for stating telescopic shaft 8 passes, and is connected with the inside with the collecting-tank 1, and the first end of second pipeline 12 is positioned at described The top of the first end of support bar 10;Second end of second pipeline 12 is arranged at the top of the clarifier-tank 11, and with institute State the inside connection of clarifier-tank 11;Fine sand purifying layer 13 is provided with the clarifier-tank 11, the level of fine sand purifying layer 13 is set The middle and upper part being placed in the clarifier-tank 11, and the inwall of the outer wall of the fine sand purifying layer 13 and the clarifier-tank 11 offsets Top;The bottom of the clarifier-tank 11 is provided with delivery port 14.
Spray equipment, it is connected to the clarifier-tank 11 by the 3rd pipeline 15, and the spray equipment includes supervisor 16, branch Pipe 17 and spray head;The first end of 3rd pipeline 15 is connected to the delivery port 14, the second end of the 3rd pipeline 15 It is connected to the supervisor 16;The supervisor 16 is arranged to more, and the more supervisors 16 are connected to the 3rd pipeline 15 the second end;The first end of the branch pipe 17 is connected to the supervisor 16, and the second end of the branch pipe 17 is straight down;It is described Second end of branch pipe 17 is connected to the spray head;Wherein described spray head includes:Connecting rod 18, it is arranged to 3,3 institutes State connecting rod 18 first end be all connected to the branch pipe 17 the second end side wall, and 3 connecting rods 18 are uniformly distributed; Shower tray 19,3-5 times of the caliber of its a diameter of branch pipe 17, the shower tray 19 is arranged at the second end of the branch pipe 17 Lower section, and second end of the edge respectively with the connecting rod 18 is connected, so that the shower tray 19 is set relative to ground is parallel Put;The shower tray 19 set centered on relative to ground arch protruding upward, uniformly offered in the shower tray 19 more Individual through hole, the aperture of the through hole is 2-3mm.
Control device, it includes motor and controller, and the motor connection is described in the telescopic shaft 8 and support bar 10 Controller is connected to the motor and liquid level sensor.
In such scheme, rainwater when being rained by setting rhone is flowed into collecting-tank via rhone to be carried out Collect, liquid level sensor is set by setting filter in collecting-tank, and at the second end of support bar so that controller control Motor driven telescopic shaft processed stretch up and down, and is sensed in liquid level sensor and stop stretching after the liquid level of rainwater in collecting-tank Contracting so that the top of telescopic shaft is located at the water surface in collecting-tank, and then controls support bar to open laterally by controller, makes The screen cloth obtained between support bar follows support bar to open, and then is located at until being formed in collecting-tank, and parallel to collecting-tank bottom surface Screen cloth, it is achieved thereby that by the opening of screen cloth, the solid material that will be floated on the water surface in collecting-tank or in water, such as leaf, Branch and various construction materials packaging etc. are isolated in below the water surface by screen cloth, that is, realize the preliminary filtering of rainwater.By setting Clarifier-tank is put, the dmp filter in collecting-tank that will be passed through by clarifier-tank by the second pipeline so that the fine sand in rainwater enters one When walking and filtered, and then needing to carry out dust cleaning at the construction field (site), by spray equipment sprinkling at the construction field (site), rainwater is realized Recycling, avoid the use of running water, save substantial amounts of water resource, and ensure that the environment of job site.
Hook is intercepted by being set in rhone, interception that can be tentatively is especially built into the solid refuse in gutter Build the disposed wastes such as packaging bag and be easier to intercepted hook and hook, and then prevent the first pipeline blockage, and realize to rainwater just Step removal of impurities.Meanwhile by setting the direction of coupler body so that rubbish is easier to be tangled, and in cleaning, it is only necessary to it is along coupler body direction The solid refuse that can easily clear up on coupler body, facilitates the cleaning in rhone.
By setting filter in collecting-tank, the remaining floating object into collecting-tank is enabled to be filtered to the The lower section of two pipelines, and by the precipitation in collecting-tank, most of sediment deposition in rainwater is enabled to, and then realize To the secondary filter of rainwater, and by the cooperation of liquid level sensor and telescopic shaft, filter is enabled to be carried out according to water level Height automatically adjusts so that using more convenient and smart.
It is not less than 2m apart from ground level by the way that clarifier-tank is arranged at so that the rainwater after purification can be most of Automatic spray is realized by gravity, so as to save the energy, reduces use cost.
By the way that the supervisor of spray equipment is arranged into more, multiple spray points can be arranged as required to, to meet to construct The spraying and dedusting requirement at scene.And the spray head of spray equipment is arranged to be made up of connecting rod and shower tray, enables to current Flowed out by branch pipe, by the velocity shock of current in shower tray, realize the purpose outwards sprayed along around shower tray, and Shower tray, which is attended class, has set through hole so that a small amount of current can be fallen on the ground below shower tray by through hole, and then ensure that The comprehensive of scope is sprayed, and then ensure that the effect of spraying and dedusting.
In one preferred scheme, it is provided with second pipeline 12 and the rainwater in collecting-tank 1 is pumped into the purification The elevator pump 20 in pond 11.
In such scheme, by setting elevator pump on the second pipeline so that can be incited somebody to action by the lifting force of elevator pump Rainwater is sent into clarifier-tank.
In one preferred scheme, in addition to:Lid 21, it is arranged at the overthe openings of the collecting-tank 1, by the collection The opening covering in pond 1;The lid 21 is arranged with respect to the cambered surface that ground Middle face is recessed downwards, the middle part of the lid 21 Osculum 22 is provided with, is provided with anti-block apparatus on the inside of the edge of the upper surface of the lid, the anti-block apparatus includes:Block water Bar 23, it is described to block the body of rod that water bar 23 is length 1-3cm, the upper surface for being vertically arranged at the lid 21 for blocking water bar 23 On, and more are blocked circumferencial direction of the water bar 23 along the lid 21 and are evenly arranged, the water bar 23 that blocks is arranged as 2-4 circles, and phase The spacing blocked described in adjacent two between water bar 23 is gradually reduced from outer ring to inner ring.
Sediment trapping net 24, circumferential directions of the sediment trapping net 24 along the lid 21, and the sediment trapping net 24 are positioned at interior Blocked described in circle between water bar 23 and osculum 22.
In such scheme, by setting lid on collecting-tank, the evaporation damage of the rainwater under summer sunlight is reduced Lose, and by the way that lid is arranged into concave surface so that rain water-harvesting is flowed into by the osculum in the middle part of lid and catchmented in the middle part of lid In pond.By setting sediment trapping net on the surface of lid and blocking water bar so that the solid refuse of band in rainwater can be intercepted by blocking water bar, And by setting multilayer to block water bar, and interval is gradually reduced, and can successively be intercepted solid refuse, be avoided lid ambient water from blocking up Plug, causes rain water-harvesting, and the setting of sediment trapping net can filter most of silt, avoids silt from blocking osculum.
In one preferred scheme, the top of the bottom of the collecting-tank 1 and the fine sand purifying layer 13 of clarifier-tank 11 is set respectively It is equipped with the conveying worm for sediment.
, can by setting conveying worm in the bottom of collecting-tank and the top of fine sand purifying layer in such scheme The silt assembled in collecting-tank and clarifier-tank is cleared up, to ensure the normal use of system, and the system is easy to Cleaning.
In one preferred scheme, the force (forcing) pump 25 for increasing hydraulic pressure, the force (forcing) pump 25 are provided with the 3rd pipeline 15 It is connected to the controller.
In such scheme, the force (forcing) pump of controller is controlled by by being set on the 3rd pipeline, can be in clarifier-tank Current are pressurizeed when water is less, and then ensure the normal operation of spray equipment, that is, ensure that the effect of spraying and dedusting.
In one preferred scheme, in addition to:Solar power system, it include solar panel 26, rechargeable battery and Heating rod, the solar panel 26 are arranged at the top of the clarifier-tank 11, the rechargeable battery and the solar-electricity Pond plate 26 and heating rod are connected respectively, and the heating rod is arranged in the cavity of the fixing axle 7, and the clarifier-tank 11 It is interior;The rechargeable battery is controlled by the controller.
In such scheme, by setting solar panel above clarifier-tank so that solar cell can be utilized Electric power caused by plate heats to the water in collecting-tank and clarifier-tank, and then avoids, because of the too low icing of temperature, influenceing system Normal use, and avoid the damage of system.
In one preferred scheme, it is respectively arranged with first pipeline 3, the second pipeline 12 and supervisor 16 described in being controlled by The control valve of controller.
In such scheme, by setting multiple control valves, the environment of weather and job site can be directed to in system The control distinguished of each device, and then ensure that the normal use of system, and the flexibility that system uses.
Although embodiment of the present invention is disclosed as above, it is not restricted in specification and embodiment listed With it can be applied to various suitable the field of the invention completely, can be easily for those skilled in the art Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, it is of the invention and unlimited In specific details and shown here as the legend with description.

Claims (7)

1. a kind of Expressway Extension Project construction time Rainwater collection system, wherein, including:
Collecting-tank, it is the cylindric setting of upper opening, and the collecting-tank is embedded in job site, and makes the collecting-tank Opening flushes with ground;
Rhone, it is arranged at the job site, and the rhone is arranged to a plurality of, and a plurality of rhone passes through first Pipeline is connected to the collecting-tank;Interception hook is provided with the two side of the rhone, the interception hook includes the neck of hook and hook Body, the first end of the neck of hook are fixedly connected on the side wall of the rhone, and the second end of the neck of hook connects the coupler body, and The coupler body is set to protrude from the side wall of the rhone, and the direction of the coupler body and the water (flow) direction phase in the rhone Instead;Also, the interception hook on the two side of the rhone is staggered;
Filter, it includes hollow fixing axle, hollow telescopic shaft, screen cloth and support bar;The fixing axle is vertically arranged In the center of the collecting-tank, the telescopic shaft is vertically arranged at the top of the fixing axle in telescopic manner, and in institute When stating telescopic shaft and extending completely, make the top of the telescopic shaft concordant with the opening of the collecting-tank;The length of the support bar Identical with the radius of the collecting-tank, the first end of the support bar is foldably connected with the telescopic shaft, And when the support bar folds, the second end of the support bar is set to be flushed with the top of the telescopic shaft;The support bar is set 5-10 roots are set to, radially uniform distribution of the support bar described in 5-10 roots along the telescopic shaft;The screen cloth is arranged to fan-shaped bullet Property screen cloth, the both sides of the screen cloth are connected on adjacent two support bars so that the support bar is when opening, institute The arc side of screen cloth is stated mutually to support with the inwall of the collecting-tank;Second end of the support bar is provided with liquid level sensor;It is described The size of the sieve aperture of screen cloth is 4-8mm;
Clarifier-tank, it is connected to the collecting-tank by the second pipeline, and the clarifier-tank is supported by support, and supports height from the ground Degree is not less than 2m;The first end of second pipeline is penetrated by the cavity of the fixing axle and worn via the cavity of the telescopic shaft Go out, connected with the inside with the collecting-tank, the first end of second pipeline is located at the top of the first end of the support bar; Second end of second pipeline is arranged at the top of the clarifier-tank, and is connected with the inside of the clarifier-tank;The purification Fine sand purifying layer is provided with pond, the fine sand purifying layer is horizontally placed on the middle and upper part in the clarifier-tank, and the fine sand The inwall of the outer wall of purifying layer and the clarifier-tank is mutually supported;The bottom of the clarifier-tank is provided with delivery port;
Spray equipment, it is connected to the clarifier-tank by the 3rd pipeline, and the spray equipment includes supervisor, branch pipe and spray Head;The first end of 3rd pipeline is connected to the delivery port, and the second end of the 3rd pipeline is connected to the supervisor;Institute State supervisor and be arranged to more, and the more supervisors are connected to the second end of the 3rd pipeline;The first of the branch pipe End is connected to the supervisor, and the second end of the branch pipe is straight down;Second end of the branch pipe is connected to the spray head;Its Described in spray head include:
Connecting rod, it is arranged to 3, and the first end of 3 connecting rods is all connected to the side wall at the second end of the branch pipe, and 3 connecting rods are uniformly distributed;
Shower tray, 3-5 times of the caliber of its a diameter of branch pipe, the shower tray is arranged under the second end of the branch pipe Side, and edge is connected with the second end of the connecting rod respectively, so that the shower tray be arranged in parallel relative to ground;The spray Tray set centered on relative to ground arch protruding upward, multiple through holes are uniformly offered in the shower tray, it is described logical The aperture in hole is 2-3mm;
Control device, it includes motor and controller, and the motor connection connects in the telescopic shaft and support bar, the controller It is connected to the motor and liquid level sensor.
2. Expressway Extension Project construction time Rainwater collection system as claimed in claim 1, wherein, described second The elevator pump that the rainwater in collecting-tank is pumped into the clarifier-tank is provided with pipeline.
3. Expressway Extension Project construction time Rainwater collection system as claimed in claim 1, wherein, in addition to:
Lid, it is arranged at the overthe openings of the collecting-tank, and the opening of the collecting-tank is covered;The lid is arranged to The cambered surface being recessed downwards relative to ground Middle face, osculum, the side of the upper surface of the lid are provided with the middle part of the lid Anti-block apparatus is provided with the inside of edge, the anti-block apparatus includes:
Water bar is blocked, it is described to block the body of rod that water bar is length 1-3cm, the upper surface for being vertically arranged at the lid for blocking water bar On, and more are blocked circumferencial direction of the water bar along the lid and are evenly arranged, the water bar that blocks is arranged as 2-4 circles, and adjacent two The spacing blocked between water bar is gradually reduced from outer ring to inner ring;
Sediment trapping net, circumferential directions of the sediment trapping net along the lid, and the sediment trapping net, which are located at described in inner ring, blocks water bar Between osculum.
4. Expressway Extension Project construction time Rainwater collection system as claimed in claim 1, wherein, it is described to catchment The conveying worm of sediment is separately provided for above the bottom in pond and the fine sand purifying layer of clarifier-tank.
5. Expressway Extension Project construction time Rainwater collection system as claimed in claim 1, wherein, the described 3rd The force (forcing) pump for increasing hydraulic pressure is provided with pipeline, the force (forcing) pump is connected to the controller.
6. Expressway Extension Project construction time Rainwater collection system as claimed in claim 1, wherein, in addition to:
Solar power system, it includes solar panel, rechargeable battery and heating rod, and the solar panel is arranged at The top of the clarifier-tank, the rechargeable battery are connected respectively with the solar panel and heating rod, and the heating rod is set It is placed in the cavity of the fixing axle, and in the clarifier-tank;The rechargeable battery is controlled by the controller.
7. Expressway Extension Project construction time Rainwater collection system as claimed in claim 6, wherein, described first The control valve for being controlled by the controller is respectively arranged with pipeline, the second pipeline and supervisor.
CN201711127974.6A 2017-11-15 2017-11-15 Rainwater collecting and utilizing system for construction period of highway reconstruction and extension project Active CN107882160B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711127974.6A CN107882160B (en) 2017-11-15 2017-11-15 Rainwater collecting and utilizing system for construction period of highway reconstruction and extension project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711127974.6A CN107882160B (en) 2017-11-15 2017-11-15 Rainwater collecting and utilizing system for construction period of highway reconstruction and extension project

Publications (2)

Publication Number Publication Date
CN107882160A true CN107882160A (en) 2018-04-06
CN107882160B CN107882160B (en) 2019-02-26

Family

ID=61777159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711127974.6A Active CN107882160B (en) 2017-11-15 2017-11-15 Rainwater collecting and utilizing system for construction period of highway reconstruction and extension project

Country Status (1)

Country Link
CN (1) CN107882160B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985118A (en) * 2019-11-05 2020-04-10 襄阳信风展宏建材有限公司 Semicircular heat-preservation annular blind pipe used in highway tunnel in cold region
CN115178038A (en) * 2022-06-28 2022-10-14 中国十七冶集团有限公司 Construction dust settling device and method used after rainwater is collected

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3727762A (en) * 1970-09-10 1973-04-17 G Padovan Filter press for continuous filtration under pressure
CN201634542U (en) * 2009-05-25 2010-11-17 朱宇晴 Sewage reclamation harmless purification device
CN204811334U (en) * 2015-07-27 2015-12-02 潍坊友容实业有限公司 A solar energy water conservation irrigation equipment for saline and alkaline land afforestation
CN206538840U (en) * 2016-12-20 2017-10-03 山东科技大学 A kind of novel rainwater collection system
CN107354844A (en) * 2017-09-01 2017-11-17 沈阳建筑大学 Ecological pavement with water storage module and section dirty purified treatment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3727762A (en) * 1970-09-10 1973-04-17 G Padovan Filter press for continuous filtration under pressure
CN201634542U (en) * 2009-05-25 2010-11-17 朱宇晴 Sewage reclamation harmless purification device
CN204811334U (en) * 2015-07-27 2015-12-02 潍坊友容实业有限公司 A solar energy water conservation irrigation equipment for saline and alkaline land afforestation
CN206538840U (en) * 2016-12-20 2017-10-03 山东科技大学 A kind of novel rainwater collection system
CN107354844A (en) * 2017-09-01 2017-11-17 沈阳建筑大学 Ecological pavement with water storage module and section dirty purified treatment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985118A (en) * 2019-11-05 2020-04-10 襄阳信风展宏建材有限公司 Semicircular heat-preservation annular blind pipe used in highway tunnel in cold region
CN110985118B (en) * 2019-11-05 2021-10-29 襄阳信风展宏建材有限公司 Semicircular heat-preservation annular blind pipe used in highway tunnel in cold region
CN115178038A (en) * 2022-06-28 2022-10-14 中国十七冶集团有限公司 Construction dust settling device and method used after rainwater is collected
CN115178038B (en) * 2022-06-28 2024-01-23 中国十七冶集团有限公司 Device and method for construction dust fall after rainwater collection

Also Published As

Publication number Publication date
CN107882160B (en) 2019-02-26

Similar Documents

Publication Publication Date Title
US5143623A (en) Nutrient and particle removal: method and apparatus for treatment of existing lakes, ponds and water bodies
CN106639180B (en) A kind of rainwater accumulation system and its construction method for roof garden
CN207520798U (en) A kind of scene rainwater recycle spraying and dust-removing system
CN106082536A (en) The recycling system of a kind of sponge ground water and construction method thereof
CN211200624U (en) Urban park rainwater collection, purification and recycling system
CN102531282A (en) Device and method for quality-based rainwater collection, treatment and utilization
CN107653928A (en) A kind of garden landscape rainwater-collecting cyclic utilization system
CN105746303A (en) Rainwater storage irrigation system for green belts under viaducts
CN205455048U (en) A rainwater regulation irrigation system for greenbelt under overpass
CN107893471A (en) Expressway Extension Project construction time Pavement surface drainage system
CN107882160B (en) Rainwater collecting and utilizing system for construction period of highway reconstruction and extension project
CN105201040B (en) Catch basin with incipient rain separation and purification function
CN207499048U (en) A kind of rainwater-collecting cleaning system
CN206319222U (en) Urban road drainage and water purification intelligent apparatus
CN110761499B (en) Reduce urban waterlogging's energy-conserving building wall device
CN106759797B (en) A kind of sunk type greenery patches rain processing system and its construction method
CN211172270U (en) Forebay rainwater garden system for large roof
CN210342083U (en) Rainwater collecting and utilizing device
CN106400927A (en) Rainwater collection integrated ecosystem
CN207933838U (en) A kind of type pervious ground rainwater gathering device
CN106567505A (en) Household separate rainwater collecting and processing device and method for drought regions
CN207109711U (en) A kind of full-automatic road cleaning system
CN105804201B (en) A kind of novel intelligent grid storm water man- agement system
KR102173363B1 (en) A river water purification system that is applied to a nature-friendly eco-friendly method that cleanly purifies various pollutants and river water flowing into the river from point and non-point sources.
CN107605009A (en) Living area rainwater is regulated and stored system automatically

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Chaohui

Inventor after: Wei Zhiqian

Inventor after: Liu Li

Inventor after: Wang Yancai

Inventor after: Hu Zhipeng

Inventor after: Wu Guofang

Inventor after: Huang Fengfeng

Inventor after: Chang Xueling

Inventor before: Meng Xianshan

Inventor before: Wang Hongying

Inventor before: Zhao Zhi

Inventor before: Yao Yan

Inventor before: Zhu Hongyu

Inventor before: Dong Junfeng

Inventor before: Zhao Xuzhao

Inventor before: Zhu Tuo

Inventor before: Yang Weidong

Inventor before: Zhang Rongjian

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181210

Address after: Block A, 256-1 Yangtze River Avenue, Yuhua District, Shijiazhuang City, Hebei Province

Applicant after: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

Address before: 067499 Hebei province Chengde County Chengde County lower plate Town Board city street traffic bureau engineering team family courtyard No. 261

Applicant before: Meng Xianshan

Applicant before: Wang Hongying

Applicant before: Zhao Zhi

Applicant before: Yao Yan

Applicant before: Zhu Hongyu

Applicant before: Dong Junfeng

Applicant before: Zhao Xuzhao

Applicant before: Zhu Tuo

Applicant before: Yang Weidong

Applicant before: Zhang Rongjian

GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 050000 block a, No. 404, Yuhua East Road, high tech Zone, Shijiazhuang City, Hebei Province

Patentee after: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

Address before: Block a, No. 256-1, Changjiang Avenue, Yuhua District

Patentee before: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Room 106-582, Unit 1, Building 201, Yujingwan B, Caofeidian New City, Caofeidian Area, China (Hebei) Pilot Free Trade Zone, Tangshan City, Hebei Province, 063000

Patentee after: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

Address before: 050000 block a, No. 404, Yuhua East Road, high tech Zone, Shijiazhuang City, Hebei Province

Patentee before: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

CP02 Change in the address of a patent holder