A kind of river course groynes structure and its construction method Download PDFInfo
- Publication number
- CN107881985A CN107881985A CN201711211111.7A CN201711211111A CN107881985A CN 107881985 A CN107881985 A CN 107881985A CN 201711211111 A CN201711211111 A CN 201711211111A CN 107881985 A CN107881985 A CN 107881985A
- Authority
- CN
- China
- Prior art keywords
- groynes
- hollow shell
- river course
- shell pill
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 239000006187 pill Substances 0.000 claims abstract description 41
- 239000004575 stone Substances 0.000 claims abstract description 11
- 239000002689 soil Substances 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 23
- 239000010959 steel Substances 0.000 claims description 23
- 241000209094 Oryza Species 0.000 claims description 6
- 235000007164 Oryza sativa Nutrition 0.000 claims description 6
- 235000009566 rice Nutrition 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000001125 extrusion Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
This application discloses a kind of river course groynes structure, including groynes body, the groynes body includes dam root and dam body from dam root to river course that extended from the soil body for the side for being arranged on river course, and stone is filled with around dam body;Groynes body includes concrete bodies and the spaced hollow shell pill of outer rim along concrete bodies, and the stake bottom of hollow shell pill is less than the bottom surface of concrete bodies, and through hole is offered on the pile lining of hollow shell pill, and the through hole is in the straight hole shape tilted down from inside to outside;Connection beam is set between adjacent hollow shell pill.Disclosed herein as well is the construction method of above-mentioned river course groynes structure.River course groynes structure has stronger anti-impact force, reduces width of the groynes body along river direction, reduces the expenditure of construction of groynes.
Description
Technical field
The present invention relates to hydraulic engineering field, it is more particularly related to a kind of river course groynes structure and its construction
Method.
Background technology
Groynes is the river regulating structure that or oblique orthogonal with riverbank is stretched into river course, and the end on dam connects with embankment is in
" T " font, the structure and form of construction work of existing groynes still use traditional dam construction method, in order to meet needs, dam
Body is larger along the width of water (flow) direction, and the expenditure of construction made is higher, and construction speed is slower.
The content of the invention
To reduce the expenditure of construction of groynes and improving construction speed, the application first proposed a kind of groynes structure, specifically
Technical scheme it is as follows:
A kind of river course groynes structure, including groynes body, the groynes body include the soil body for being arranged on the side in river course
Interior dam root and the dam body extended from dam root into river course, are filled with stone around dam body;Groynes body include concrete bodies,
With the spaced hollow shell pill of outer rim along concrete bodies, the stake bottom of hollow shell pill is less than the bottom surface of concrete bodies, hollow
Through hole is offered on the pile lining of pile tube, the through hole is in the straight hole shape tilted down from inside to outside;Adjacent hollow shell pill it
Between connection beam is set.
Further, pea gravel concreten is filled with the centre bore of hollow shell pill, pea gravel concreten via through holes are connected to mixed
On the solidifying soil body.Preferably, the stake bottom of hollow shell pill is less than the bottom surface 4-6 rice of concrete bodies.
In the groynes structure of the application, using hollow shell pill as the supporter around groynes body, and in hollow shell pill
Pea gravel concreten is inside poured into a mould, part pea gravel concreten can overflow from the through hole on pile lining, the microlith coagulation that this part is overflowed
Soil can be connected on concrete bodies, made to contact even closer between hollow shell pill and concrete bodies, also enhanced groynes body
Anti-impact force, width of the groynes body along river direction can be efficiently reduced., can on the basis of groynes body width is reduced
The matrix of groynes body is efficiently reduced, reduces the expenditure of construction of groynes.Hollow shell pill is connected as an entirety by linking beam, is protected
The intensity of groynes body is demonstrate,proved.
The application also provides a kind of construction method of above-mentioned groynes structure, specifically comprises the following steps:
(1) according to setting position sinking hollow shell pill, in the lateral surface sinking steel sheet pile of hollow shell pill, steel sheet pile is mutually twisted
Cofferdam is formed, excavation pit and is completed in the range of cofferdam institute corral;
(2) connection beam is installed between adjacent hollow shell pill;
(3) pea gravel concreten is poured into a mould into the centre bore of hollow shell pill, and makes pea gravel concreten from the through hole on pile lining
Extrusion;
(4) concrete is poured into a mould in foundation ditch, while stone is put into concrete, until the designed elevation of groynes body, its
In in the soil body of the side in river course groynes body form dam root, groynes body in river course forms dam body;
(5) steel sheet pile is extracted before concrete solidifies completely;
(6) to surrounding's throwing stone of dam body.
Preferably, the steel sheet pile is U-shaped steel sheet pile.
Preferably, the hollow shell pill is concrete tubular pile.
Preferably, the stake bottom of the steel sheet pile is less than bottom of foundation ditch 3-4 rice.
Using steel sheet pile as cofferdam in this method, the cofferdam formed by steel sheet pile has good water resistance,
In work progress, outside body of water can be effectively prevented from and entered in foundation ditch.At present in the work progress of groynes, still more generally
Using first excavating foundation ditch, then after the inwall installation form of foundation ditch, the cast of concrete is carried out, and in this application, steel sheet pile
The cofferdam formed also has the function that template, eliminates and sets up template in addition, can reduce operating expenses.
Brief description of the drawings
Fig. 1 is the sketch of groynes structure.
Fig. 2 be Fig. 1 in A-A to view.
Fig. 3 is to complete the schematic diagram after hollow shell pill and steel sheet pile sinking.
Fig. 4 is to complete foundation ditch to excavate and the schematic diagram after connection beam installation.
Fig. 5 is to complete the schematic diagram after being poured into a mould in the centre bore of hollow shell pill.
Fig. 6 is to complete concrete cast, and pulls out the schematic diagram after steel sheet pile.
Specific embodiment
Fig. 1 and Fig. 2, a kind of river course groynes structure, including groynes body 10 are referred to, groynes body 10 includes being arranged on river
Dam root 12 in the soil body 11 of the side in road and the dam body 14 extended from dam root 12 into river course 30, are filled with around dam body 14
Stone 15.
Groynes body 10 includes concrete bodies 40 and the spaced hollow shell pill 13 of outer rim along concrete bodies 40, empty
The stake bottom of heart pile tube 13 is less than the bottom surface of concrete bodies 40, through hole 21 is offered on the pile lining of hollow shell pill 40, through hole 21 is in
The straight hole shape tilted down from inside to outside.
Connection beam 22 is set between adjacent hollow shell pill 13.
Pea gravel concreten 26 is filled with the centre bore 23 of hollow shell pill 13, the via through holes 21 of pea gravel concreten 26 are connected to
On concrete bodies 40.
In the present embodiment, the stake bottom of hollow shell pill 13 is less than 5 meters of the bottom surface of concrete bodies 40.In other embodiments,
The stake bottom of hollow shell pill 13 may also be below the bottom surface 4-6 rice of concrete bodies 40.
The construction method of above-mentioned river course groynes structure is described below in conjunction with Fig. 3-Fig. 6, comprised the following steps:
(1) Fig. 3 is referred to, according to setting position sinking hollow pipe 13, in the lateral surface sinking steel sheet pile of hollow shell pill 13, steel plate
The stake bottom of stake is less than bottom of foundation ditch 3-4 rice, steel sheet pile is mutually twisted to form cofferdam 17, is opened in the range of the corral of 17, cofferdam
Dig foundation ditch and complete.
(2) Fig. 4 is referred to, connection beam 22 is installed between adjacent hollow shell pill 13 and completed.
(3) Fig. 5 is referred to, pea gravel concreten 26 is poured into a mould into the centre bore 23 of hollow shell pill 13, and make pea gravel concreten 26
Extruded from the through hole 21 on pile lining, the pea gravel concreten of extrusion forms a small concrete block 24.
(4) Fig. 6 is referred to, concrete 14 is poured into a mould in foundation ditch, while stone is put into concrete, until setting for groynes body
Absolute altitude is counted, wherein groynes body forms dam root in the soil body of the side in river course, the groynes body in river course forms dam
Body;
(5) steel sheet pile is extracted before concrete solidifies completely;
(6) to surrounding's throwing stone of dam body.
In the present embodiment, steel sheet pile specifically uses U-shaped steel sheet pile.Hollow shell pill is concrete tubular pile.
Claims (7)
1. a kind of river course groynes structure, including groynes body, it is characterised in that the groynes body includes being arranged on the one of river course
Dam root in the soil body of side and the dam body extended from dam root into river course, are filled with stone around dam body;
Groynes body includes concrete bodies and the spaced hollow shell pill of outer rim along concrete bodies, the stake bottom of hollow shell pill
Less than the bottom surface of concrete bodies, through hole is offered on the pile lining of hollow shell pill, the through hole is in what is tilted down from inside to outside
Straight hole shape;
Connection beam is set between adjacent hollow shell pill.
2. groynes structure in river course according to claim 1, it is characterised in that filled with thin in the centre bore of hollow shell pill
Stone concrete, pea gravel concreten via through holes are connected on concrete bodies.
3. groynes structure in river course according to claim 1, it is characterised in that the stake bottom of hollow shell pill is less than concrete bodies
Bottom surface 4-6 rice.
4. the construction method of the river course groynes structure described in a kind of claim 2, it is characterised in that comprise the following steps:
(1) according to setting position sinking hollow shell pill, in the lateral surface sinking steel sheet pile of hollow shell pill, steel sheet pile is mutually twisted to be formed
Cofferdam, excavation pit and completed in the range of cofferdam institute corral;
(2) connection beam is installed between adjacent hollow shell pill;
(3) pea gravel concreten is poured into a mould into the centre bore of hollow shell pill, and pea gravel concreten is extruded from the through hole on pile lining;
(4) concrete is poured into a mould in foundation ditch, while stone is put into concrete, until the designed elevation of groynes body, its middle position
Dam root is formed in groynes body in the soil body of the side in river course, the groynes body in river course forms dam body;
(5) steel sheet pile is extracted before concrete solidifies completely;
(6) to surrounding's throwing stone of dam body.
5. construction method according to claim 4, it is characterised in that the steel sheet pile is U-shaped steel sheet pile.
6. construction method according to claim 4, it is characterised in that the hollow shell pill is concrete tubular pile.
7. construction method according to claim 4, it is characterised in that the stake bottom of the steel sheet pile is less than bottom of foundation ditch 3-4
Rice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711211111.7A CN107881985A (en) | 2017-11-28 | 2017-11-28 | A kind of river course groynes structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711211111.7A CN107881985A (en) | 2017-11-28 | 2017-11-28 | A kind of river course groynes structure and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107881985A true CN107881985A (en) | 2018-04-06 |
Family
ID=61775615
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711211111.7A Pending CN107881985A (en) | 2017-11-28 | 2017-11-28 | A kind of river course groynes structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107881985A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118563710A (en) * | 2024-08-01 | 2024-08-30 | 浙江江南春建设集团有限公司 | Anti-impact T-dam structure and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002242164A (en) * | 2001-02-20 | 2002-08-28 | Nippon Steel Metal Prod Co Ltd | Civil engineering structure such as sediment control weir and levee or the like using steel sheet pile and thinning member or the like and construction method therefor |
JP2005200933A (en) * | 2004-01-15 | 2005-07-28 | Komiyama Doboku:Kk | Comb dam |
CN101666098A (en) * | 2009-08-03 | 2010-03-10 | 天津大学 | Sheet-cell conduit frame prefabricated part pilling structure and dock using same |
CN201459674U (en) * | 2009-09-01 | 2010-05-12 | 黄河水利委员会黄河水利科学研究院 | PHC tubular pile dam |
CN101775788A (en) * | 2010-02-10 | 2010-07-14 | 王军 | Block stone-reinforced concrete piling composite groyne bank protection structure |
JP2013002086A (en) * | 2011-06-14 | 2013-01-07 | Kenji Ishikura | Pile frame structure and structure of the same |
CN204000840U (en) * | 2014-07-10 | 2014-12-10 | 安徽省金田建筑设计咨询有限责任公司 | Concrete floral tube slip casting uplift pile |
-
2017
- 2017-11-28 CN CN201711211111.7A patent/CN107881985A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002242164A (en) * | 2001-02-20 | 2002-08-28 | Nippon Steel Metal Prod Co Ltd | Civil engineering structure such as sediment control weir and levee or the like using steel sheet pile and thinning member or the like and construction method therefor |
JP2005200933A (en) * | 2004-01-15 | 2005-07-28 | Komiyama Doboku:Kk | Comb dam |
CN101666098A (en) * | 2009-08-03 | 2010-03-10 | 天津大学 | Sheet-cell conduit frame prefabricated part pilling structure and dock using same |
CN201459674U (en) * | 2009-09-01 | 2010-05-12 | 黄河水利委员会黄河水利科学研究院 | PHC tubular pile dam |
CN101775788A (en) * | 2010-02-10 | 2010-07-14 | 王军 | Block stone-reinforced concrete piling composite groyne bank protection structure |
JP2013002086A (en) * | 2011-06-14 | 2013-01-07 | Kenji Ishikura | Pile frame structure and structure of the same |
CN204000840U (en) * | 2014-07-10 | 2014-12-10 | 安徽省金田建筑设计咨询有限责任公司 | Concrete floral tube slip casting uplift pile |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118563710A (en) * | 2024-08-01 | 2024-08-30 | 浙江江南春建设集团有限公司 | Anti-impact T-dam structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1837511B (en) | Double-rowed cofferdam and method for manufacturing the same | |
CN101255691B (en) | Construction method for complete casing tube thin wall filling pile and movable internal mold | |
CN107513994A (en) | One kind segmentation becomes supporting rotary digging stake and its construction method without leave | |
CN104988907A (en) | Construction method of concrete pile | |
CN108330764B (en) | Shallow layer solidified pile bearing type embankment and construction method | |
CN208136652U (en) | Shallow-layer solidifies Piled Embankments | |
CN203403404U (en) | High-efficiency cast-in-place pile device | |
CN107905221A (en) | A kind of method for being accurately positioned percussive drilling bored concrete pile | |
CN108193642A (en) | A kind of revetment reinforces facility and its construction method | |
CN103696416A (en) | Novel foundation treatment method | |
CN202323865U (en) | Novel revetment combined structure | |
CN109184221A (en) | Anchor rib construction method is planted after a kind of concrete | |
CN110485444B (en) | Construction method for seepage prevention and reinforcement of deepwater cofferdam | |
CN203834468U (en) | Internal expansion type miniature concrete pile | |
CN107587502A (en) | A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method | |
CN107881985A (en) | A kind of river course groynes structure and its construction method | |
CN103343534A (en) | Closed precipitation method for foundation pit construction | |
CN205776282U (en) | A kind of immersed tube tunnel rebuilds cofferdam structure | |
CN105155421B (en) | Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water | |
CN106638646A (en) | Secondary bottom sealing structure of open caisson and construction method | |
CN110144881A (en) | One kind is drowned oneself type precast hollow friction pile and its construction method | |
CN207109804U (en) | A kind of quick spreading structure configuration of soft soil foundation bored concrete pile | |
CN206655217U (en) | Precast concrete drainage pile | |
CN207538090U (en) | A kind of externally reinforced structure of Urban underground Tunnel | |
CN110219256A (en) | A kind of channel complexity Construction of Supporting method for passing through box culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180406 |