CN107859496A - Ice core borehole opening protection device - Google Patents
Ice core borehole opening protection device Download PDFInfo
- Publication number
- CN107859496A CN107859496A CN201711221021.6A CN201711221021A CN107859496A CN 107859496 A CN107859496 A CN 107859496A CN 201711221021 A CN201711221021 A CN 201711221021A CN 107859496 A CN107859496 A CN 107859496A
- Authority
- CN
- China
- Prior art keywords
- ice core
- frid
- hole
- borehole
- steel ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B25/00—Apparatus for obtaining or removing undisturbed cores, e.g. core barrels, core extractors
Abstract
The present invention relates to a kind of ice core borehole opening protection device, its architectural feature is that frid is downward for surrounding edge bending, rectangular box like structure, is buckled in the top of ice core borehole, and there is hole its corner, and frid is fixed on superglacial by drill rod by hole;Steel ring is consolidated in the center of frid, and relative in the center of drilling;Block is covered with steel ring, hole and otch are provided with block, when drilling through ice core, the cable being connected with drill bit is placed in hole by otch.The present invention is simple in construction, reasonable in design, can effectively avoid in ice core drilling operation, ice core borehole obstruction caused by implements are fallen into ice core borehole, ice core rig damage and stuck, ensures that ice core drills through being smoothed out for work, reduces the waste of manpower and materials.
Description
Technical field
The present invention relates to a kind of ice core borehole opening protection device, in rig running, can prevent implements from falling into ice
Core drilling internal congestion ice core borehole, damage even stuck ice core rig, ensure that ice core drills through being smoothed out for work.
Background technology
Ice core borehole is continuously to drill through more piece ice core vertically downward from superglacial using ice core rig and lift ice core
The hole formed after to ground, ice core borehole extend to subglacial basement rock from the ice core borehole opening of superglacial.
When drilling through ice core, ice core rig is opened by the ice core rig bracket positioned at ice core borehole top and cable multipass ice core borehole
Mouth declines and lifted to drill through and extract ice core, and because exposed ice core borehole opening is parallel to the ground, staff takes with oneself
Instrument, utensil and other articles such as implements such as screwdriver, gloves, marking pen of band are inadvertently fallen off, and are slipped into ice core from ground and are bored
Hole.Due to ice core borehole diameter very little and depth is very deep, it is difficult to which implements are taken out from hole, causes the obstruction of ice core borehole, hard
Hard implements may damage the cutter head of ice core rig, cause ice core rig not to be drilled down into;Another aspect ice core rig also can
Blocked by implements, make ice core rig is stuck can not be proposed in drilling, can only finally abandon ice core rig, cause the Zhi Bingxin to bore
Take the failure of work, it has to select suitable ice core to drill through and a little drill through ice core again, cause the significant wastage of manpower and materials.
The content of the invention
In view of it is above-mentioned, it is an object of the invention to provide a kind of ice core borehole opening protection device, for preventing implements from falling
Enter in ice core borehole.
The object of the present invention is achieved like this:
A kind of ice core borehole opening protection device, is made up of frid, steel ring, block and drill rod, frid be surrounding edge bending to
Under, rectangular box like structure, it is buckled in above ice core borehole.There is hole frid corner, and frid is fixed on ground by drill rod by hole;Steel
Circle is consolidated in the center of frid, and relative with the center of drilling, and block is covered with steel ring, and block center is provided with hole and otch, bores
When taking ice core, the cable being connected with drill bit is placed in hole by otch.
Advantages of the present invention and caused beneficial effect are:
1st, frid of the invention is rectangular box-shaped structure, and box mouth can be buckled in above ice core borehole downwards, and the trough rim of frid can cut into
Superglacial, four fixed drill rods so can effectively prevent rotation, the slip of frid in the horizontal direction from Corner Strapped frid
With the movement in vertical direction so that the present invention keeps fixing with ice core borehole opening relative position, and steel ring is located in frid
The heart, one is consolidated in frid, the center of steel ring is relative with the center to drill, is easy to ice core rig to pass in and out ice core borehole, improves
Ice core drills through the efficiency of work.
2nd, the bore of steel ring is 150 mm on frid of the present invention, more than the mm of ice core borehole diameter 95;The bore 170 of block
Mm is more than the bore of steel ring again, covers on steel ring, prevents block from freezing with steel ring, facilitates the quick of block to cover and remove, keeps away
Exempt to collide with steel ring when ice core rig frequently passes in and out ice core borehole;Block cable through-hole diameter is more than cable size, this sample prescription
Just cable walking in block hole, the friction of cable and block hole hole wall is reduced;Steel ring is erect, and can prevent the ground implements that drop
Slide into ice core borehole;The cable being connected with drill bit is placed in cable through-hole by the otch of block, carries out drilling through and proposing for ice core
Take work.
3rd, the present invention is simple in construction, reasonable in design, can effectively avoid during ice core drills through, implements fall into ice core borehole
It is interior, phenomena such as ice core borehole blocks, ice core rig damages and be stuck occurs, ensures that ice core drills through being smoothed out for work, reduces
The waste of manpower and materials.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
Embodiment
The ice core rig that the present invention uses is aims at the light rig designed under high mountain extreme condition(Model:BZXJ-Ⅱ
D), the drilling cramp height of the light rig:~ 3 m, bit weight:21 kg, bore bucket length:1.75 m, drill through ice core diameter:94-95
Mm, single drill through ice core length:0.7-0.8 m, power of motor:0.3 kW, mains power:220 V, 2 kW exchange gasoline generate electricity
Mechanical, electrical cable(Model:4H-181A)Length:300 m, cable size(4.72 mm), bore deep degree:200-250 m.Rig connects
It is as follows to connect mode:Cable is connected after winch extraction by the pulley on drilling cramp with drill bit, and ice core bores bucket and is stuck in chisel edge,
Cutter head, which is arranged on, bores bucket front end, and so whole ice core rig is by cable vertical lifting under drilling cramp.
Technical scheme is described further with reference to the accompanying drawings and examples:
As shown in figure 1, a kind of ice core borehole opening protection device, is made up of frid 1, steel ring 2, block 3 and drill rod 4.Steel ring 2
Bore is 150 mm, more than the mm of ice core borehole diameter 95;The bore of block 3 is 170 mm;Frid 1 is that surrounding edge is downward
Hem with invisible stitches, rectangular box like structure, be buckled in above ice core borehole.1 four jiaos of frid has a hole, and the mm drill rods 4 of length 300 pass through 1 four jiaos of frid
Hole frid 1 is fixed on to the snow of superglacial(Ice)Layer;High 35 mm of steel ring wall, is consolidated in the center of frid 1, and with drilling 5
Center it is relative, block 3 is covered with steel ring 2, the center of block 3 is provided with hole 8 and otch 7, wide 5.5 mm of otch;Hole 8 it is a diameter of
7.5 mm;In drilling 5, the cable 6 being connected with drill bit is placed in hole 8 by otch 7.
During work, after first ice core drills through, the opening of 95 mm ice core borehole 5 is formed, and lifting ice core rig is extremely
Superglacial is simultaneously removed from the opening of ice core borehole 5.The box mouth of frid 1 is first buckled in the glacier table of the opening of ice core borehole 5 down
Face, and allow the center of ice core borehole 5 and the center alignment of steel ring 2, then frid 1 is pressed down on hand, makes the surrounding of frid 1
Trough rim from superglacial cut, until the bottom of frid 1 contacts with superglacial;Frid 1 is each passed through by 4 drill rods 4
Frid 1 is fixed on superglacial by the hole of corner, and taps fixed drill rod 4 downwards with iron hammer, until drill rod 4 gos deep into glacier completely
It is internal.After frid 1 fixes, block 3 is buckled on steel ring 2, completes the protection of ice core borehole opening.When continuation ice core drills through,
Move block 3 away, expose ice core borehole 5, ice core rig vertically declines in the presence of cable, and enters ice core by steel ring 2 and bore
In hole 5, cable 6 is then allowed to be moved on to by the otch 7 in block 3 in the hole 8 of block 3, block 3 covers steel ring 2, continues to fall ice
Core rig to the bottom of ice core borehole 5 carries out drilling through and extracting for ice core.Ice core borehole 5 is finished and is promoted to when a section ice core drills through
During opening, block 3 is removed from steel ring 2, then cable 6 is removed from hole 8 and otch 7, continues to lift up ice core rig extremely
The top of ice core borehole 5, cover steel ring 2 with block 3 immediately, to protect the opening of ice core borehole 5, avoid implements drop ground cunning
Enter ice core borehole.
Claims (2)
- A kind of 1. ice core borehole opening protection device, by frid(1), steel ring(2), block(3)And drill rod(4)Composition, its feature It is frid(1)It is downward for surrounding edge bending, rectangular box like structure, it is buckled in ice core borehole(5)Top, frid(1)Four There are hole, drill rod in angle(4)By hole by frid(1)It is fixed on ground;Steel ring(2)It is consolidated in frid(1)Center, and with drilling (5)Center it is relative, steel ring(2)On be covered with block(3), block(3)On be provided with hole(8)And otch(7), drilling(5)In, with brill The cable of head connection(6)Pass through otch(7)It is placed in hole(8)In.
- A kind of 2. ice core borehole opening protection device according to claim 1, it is characterized in that steel ring(2)Bore be 120- 150 mm, the high 30-45 mm of steel ring wall;Block(3)Bore be 140-170 mm;The a width of mm of 5.5 of otch;Hole(8)It is straight Footpath is 8.0 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711221021.6A CN107859496A (en) | 2017-11-29 | 2017-11-29 | Ice core borehole opening protection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711221021.6A CN107859496A (en) | 2017-11-29 | 2017-11-29 | Ice core borehole opening protection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107859496A true CN107859496A (en) | 2018-03-30 |
Family
ID=61703764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711221021.6A Pending CN107859496A (en) | 2017-11-29 | 2017-11-29 | Ice core borehole opening protection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107859496A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110987513A (en) * | 2019-12-23 | 2020-04-10 | 哈尔滨工程大学 | Device for taking ice on site |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2165330Y (en) * | 1993-07-13 | 1994-05-18 | 天津机器人锅炉有限公司 | Cap for protecting connecting hole female screw of boiler |
JPH1183486A (en) * | 1997-09-02 | 1999-03-26 | Ripuro:Kk | Marking apparatus |
US6394192B1 (en) * | 1997-08-15 | 2002-05-28 | Benthic Geotech Pty Ltd | Methods for seabed piston coring |
CN102828689A (en) * | 2012-07-25 | 2012-12-19 | 吉林大学 | Cable suspending type air partial reverse circulating motor mechanical core bit |
CN102852460A (en) * | 2012-08-31 | 2013-01-02 | 吉林大学 | Downhole deflecting device for drilling ice layer of polar region and downhole deflecting method |
CN103389226A (en) * | 2013-07-30 | 2013-11-13 | 中国地质大学(武汉) | Slip soil original state soil sampler |
CN203334961U (en) * | 2013-06-20 | 2013-12-11 | 中国科学院寒区旱区环境与工程研究所 | Drill bit for glacier drilling |
CN203337437U (en) * | 2013-07-10 | 2013-12-11 | 中国科学院寒区旱区环境与工程研究所 | Ice core sample decontamination device |
CN103894653A (en) * | 2012-12-27 | 2014-07-02 | 重庆科众机械有限公司 | Steel magnetizing shell bit |
CN203729621U (en) * | 2013-10-12 | 2014-07-23 | 上海邦浦实业集团有限公司 | Novel shaft cover structure used for submersible axial-flow pump |
CN203798621U (en) * | 2014-04-18 | 2014-08-27 | 中国科学院青藏高原研究所 | Ice core drilling device |
CN105019928A (en) * | 2015-08-05 | 2015-11-04 | 中国十九冶集团有限公司 | Construction method for rib planting and wall protecting of tunnel arc arch |
CN205778547U (en) * | 2016-07-13 | 2016-12-07 | 新疆工程学院 | A kind of preparing coal, core drill bit device |
CN205895188U (en) * | 2016-07-25 | 2017-01-18 | 徐州华超矿山设备有限公司 | Simply visit ore device convenient to dismouting and carrying |
CN106441982A (en) * | 2016-08-30 | 2017-02-22 | 中国科学院寒区旱区环境与工程研究所 | Ice core drilling device |
CN106869921A (en) * | 2015-12-14 | 2017-06-20 | 中央民族大学 | A kind of abyssal floor cone-type spiral fetches earth rig and method |
CN106869842A (en) * | 2017-03-06 | 2017-06-20 | 济南轨道交通集团有限公司 | A kind of aqueous scall maintains coring device, method and the application of soil body overall picture |
CN106894781A (en) * | 2017-03-17 | 2017-06-27 | 湖南科技大学 | It is a kind of in core-drilling for fixing the device of irregular rock |
CN207553999U (en) * | 2017-11-29 | 2018-06-29 | 中国科学院寒区旱区环境与工程研究所 | A kind of safety device for covering ice core borehole opening |
-
2017
- 2017-11-29 CN CN201711221021.6A patent/CN107859496A/en active Pending
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2165330Y (en) * | 1993-07-13 | 1994-05-18 | 天津机器人锅炉有限公司 | Cap for protecting connecting hole female screw of boiler |
US6394192B1 (en) * | 1997-08-15 | 2002-05-28 | Benthic Geotech Pty Ltd | Methods for seabed piston coring |
JPH1183486A (en) * | 1997-09-02 | 1999-03-26 | Ripuro:Kk | Marking apparatus |
CN102828689A (en) * | 2012-07-25 | 2012-12-19 | 吉林大学 | Cable suspending type air partial reverse circulating motor mechanical core bit |
CN102852460A (en) * | 2012-08-31 | 2013-01-02 | 吉林大学 | Downhole deflecting device for drilling ice layer of polar region and downhole deflecting method |
CN103894653A (en) * | 2012-12-27 | 2014-07-02 | 重庆科众机械有限公司 | Steel magnetizing shell bit |
CN203334961U (en) * | 2013-06-20 | 2013-12-11 | 中国科学院寒区旱区环境与工程研究所 | Drill bit for glacier drilling |
CN203337437U (en) * | 2013-07-10 | 2013-12-11 | 中国科学院寒区旱区环境与工程研究所 | Ice core sample decontamination device |
CN103389226A (en) * | 2013-07-30 | 2013-11-13 | 中国地质大学(武汉) | Slip soil original state soil sampler |
CN203729621U (en) * | 2013-10-12 | 2014-07-23 | 上海邦浦实业集团有限公司 | Novel shaft cover structure used for submersible axial-flow pump |
CN203798621U (en) * | 2014-04-18 | 2014-08-27 | 中国科学院青藏高原研究所 | Ice core drilling device |
CN105019928A (en) * | 2015-08-05 | 2015-11-04 | 中国十九冶集团有限公司 | Construction method for rib planting and wall protecting of tunnel arc arch |
CN106869921A (en) * | 2015-12-14 | 2017-06-20 | 中央民族大学 | A kind of abyssal floor cone-type spiral fetches earth rig and method |
CN205778547U (en) * | 2016-07-13 | 2016-12-07 | 新疆工程学院 | A kind of preparing coal, core drill bit device |
CN205895188U (en) * | 2016-07-25 | 2017-01-18 | 徐州华超矿山设备有限公司 | Simply visit ore device convenient to dismouting and carrying |
CN106441982A (en) * | 2016-08-30 | 2017-02-22 | 中国科学院寒区旱区环境与工程研究所 | Ice core drilling device |
CN106869842A (en) * | 2017-03-06 | 2017-06-20 | 济南轨道交通集团有限公司 | A kind of aqueous scall maintains coring device, method and the application of soil body overall picture |
CN106894781A (en) * | 2017-03-17 | 2017-06-27 | 湖南科技大学 | It is a kind of in core-drilling for fixing the device of irregular rock |
CN207553999U (en) * | 2017-11-29 | 2018-06-29 | 中国科学院寒区旱区环境与工程研究所 | A kind of safety device for covering ice core borehole opening |
Non-Patent Citations (1)
Title |
---|
陈晨,张祖培: "南极冰层电缆式机械取芯钻进", 长春科技大学学报, no. 04 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110987513A (en) * | 2019-12-23 | 2020-04-10 | 哈尔滨工程大学 | Device for taking ice on site |
CN110987513B (en) * | 2019-12-23 | 2022-09-27 | 哈尔滨工程大学 | Device for taking ice on site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108894740B (en) | Device and method for cleaning rock debris during deep water surface drilling | |
CN102587380A (en) | Construction method for wholly removing drilling pile head | |
CN104533296B (en) | Drill bit used for exploiting combustible ice | |
CN106149683A (en) | A kind of cast-in-place pile construction method using double casing to pass through deep metalling | |
CN205989070U (en) | A kind of electric drill | |
CN105298390A (en) | Equipment for exploiting offshore oil | |
CN107476774B (en) | The processing method of burying in a kind of drill-pouring work progress mesoporous | |
CN101713201B (en) | Underground hole-forming device of hydraulic grab bucket | |
CN107859496A (en) | Ice core borehole opening protection device | |
CN202073553U (en) | Quick butt-joint tool for downhole logging instruments | |
CN207553999U (en) | A kind of safety device for covering ice core borehole opening | |
CN201078192Y (en) | Well-digging core drill | |
CN104278676A (en) | Real-time treatment method and equipment of bored pile head | |
CN205663419U (en) | Gyro -inclinometer unfreezing fishing device in drilling | |
CN202228029U (en) | Sand bailer for down-hole operation of oil field | |
CN203847014U (en) | Auxiliary device facilitating recovering of offshore drilling marine riser | |
CN203206706U (en) | Portable earth drill | |
CN203334973U (en) | Anti-suction device for horizontal well cutting bed removing, trip and piston pulling | |
CN202946012U (en) | Sleeving spiral drilling machine for pile head processing | |
RU2301879C1 (en) | Method for torn pipe removal from well | |
CN105839618A (en) | Cleaner with six-star rotating wheel used for long-spiral drilling machine | |
CN205178033U (en) | Grounding device | |
CN108222877A (en) | A kind of drilling rod fishing device | |
CN205172433U (en) | Equipment of exploitation offshore oil | |
CN105019824B (en) | A kind of mechanical drilling impactor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |