CN107859188A - Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage - Google Patents

Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage Download PDF

Info

Publication number
CN107859188A
CN107859188A CN201711071221.8A CN201711071221A CN107859188A CN 107859188 A CN107859188 A CN 107859188A CN 201711071221 A CN201711071221 A CN 201711071221A CN 107859188 A CN107859188 A CN 107859188A
Authority
CN
China
Prior art keywords
expansion joint
guiding gutter
soil stack
aqueduct
concrete floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711071221.8A
Other languages
Chinese (zh)
Inventor
张健
胡涌
赵雪剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Original Assignee
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd filed Critical Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority to CN201711071221.8A priority Critical patent/CN107859188A/en
Publication of CN107859188A publication Critical patent/CN107859188A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention provides a kind of expansion joint leakage-proof structure, concrete floor outer end is provided with upper anti-edge, expansion joint is provided between concrete floor, concrete floor is provided with osculum, and the lower water of installation leaks on osculum, and lower water, which leaks down, installs soil stack, the expansion joint has the guiding gutter for prolonging whole expansion joint, water guide trench bottom sets aqueduct, and guiding gutter is connected by aqueduct with soil stack, a kind of construction method of expansion joint leak drainage:1 makes guiding gutter;The edge of 2 guiding gutter two can be preferably bonded with expansion joint both sides concrete structure, is adjusted water guide trough slope, current is converged a bit;3 is Nian Jie with concrete structure closely knit by guiding gutter using structure sealant;4 are punched in guiding gutter lowest part with piercer, and are punched on soil stack;5 installation aqueducts, guiding gutter is connected with soil stack;Encapsulation process is carried out at 6 pairs of pipeline tappings, the present invention converges the Shui Yu buildings body draining of seepage, and solving infiltration at secondary pouring construction seam influences delivery receiving acceptance.

Description

Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage
Technical field
The present invention relates to concrete water-proof technical field of construction.
Background technology
According to the survey, how leakage problem in varying degrees in most of complete engineering at present be present in root Control the quality problems of waterproof construction turns into the standard for weighing construction enterprises' level, while is also the master for influenceing final acceptance of construction Want project.Water leakage is not only related to reliability of structure, is also directly result in economic loss.At current existing outdoor expansion joint Waterproof construction technology is conventional atlas way, exist in work progress worker lack a sense of responsibility, waterproof material it is unqualified with And construction common quality defect the problems such as cause the situation of uncertain leakage point.
For above-mentioned Seepage, existing conventional repair method is that structure glue is filled up at breakthrough, blocks seepage point. But because concrete structure vibration causes the reasons such as bonding part loosens or colloid aging comes off, the time one, which is grown, still can discontinuously ooze Water, it can not tackle the problem at its root.
The content of the invention
Present invention seek to address that the phenomenon that seeped water at the secondary pouring construction seam of expansion joint concrete structure, because a variety of causes is led The uncertain leakage point caused is from leak at the coagulation earthen platform of expansion joint.
A kind of expansion joint leakage-proof structure, concrete floor outer end are provided with upper anti-edge, expansion joint are provided between concrete floor, mix Solidifying Tulou plate is provided with osculum, and the lower water of installation leaks on osculum, and lower water, which leaks down, installs soil stack, and the expansion joint has Prolong the guiding gutter at whole expansion joint, water guide trench bottom sets aqueduct, and guiding gutter is connected by aqueduct with soil stack.
This structure guiding gutter extends to whole expansion joint bottom, is simply combined using several parts, by the Shui Yu buildings of seepage Body draining converges, and solving infiltration at secondary pouring construction seam influences delivery receiving acceptance.
A kind of construction method of expansion joint leak drainage:
1st, guiding gutter, live processing and fabricating or utilization finished product semi-circular tube are made;
2nd, determine that the edge of guiding gutter two can be preferably bonded with expansion joint both sides concrete structure, adjust water guide trough slope, make Current can converge a bit;
3rd, it is using structure sealant that guiding gutter is Nian Jie with concrete structure closely knit;
4th, punched with piercer in guiding gutter lowest part, and punched on soil stack;
The 5th, aqueduct is installed, guiding gutter is connected with soil stack;
6th, to carrying out encapsulation process at pipeline tapping.
This method is blocked up with dredging generation, covers all points for easily producing seepage, and guiding gutter is communicated with building body soil stack, avoided Wall leakage phenomenon.
Brief description of the drawings
Fig. 1 is the schematic diagram of leakage-proof structure;
Fig. 2 is leakage-proof structure stereogram.
Embodiment
The present invention is described in detail below:
Causes of seepage:
Concrete construction needs prefabricated concrete floor 1, splices floor structure at the scene.Because environment temperature changes in temperature become Change, in construction, the edge of concrete floor 1 needs to leave the expansion joint 3 of one fixed width between other structures, prevents floor heat expansion Deformation and differential settlement.Anti- edge on secondary casting concrete is needed at the expansion joint 3 of the position such as concrete roof and big plate 2.Due to pouring respectively, therefore construction joint 4 be present between two structures, if do problematic of waterproof or applied during construction Basic unit's residual moisture is not easy to find discharge during work waterproof layer, will outwards be seeped water from this construction joint.And breakthrough may be Any point occurs on construction joint 4.
Solves the problems, such as thinking:
First, the requirement of waterproof construction is improved:In strict accordance with code requirement construction waterproof coiled material layer, gone through before construction Whether waterproof layer substructure layer material is dried, and additional waterproofing layer is carried out in the position that extra play is done at negative and positive angle and design requirement. Waterproof weakness multi-way prevention, coiled material lapping width meet the requirements and heated closely knit.After material in situ sampling censorship retrial is qualified Paving coiled material can be started, laying method and layup sequence are constructed in strict accordance with code requirement.
2nd, water conservancy diversion is carried out to infiltration.Construction joint 4 close installation, one water receiving tank, then the draining by tank and building body can be prolonged Connect, infiltration is guided to drainage position.
Prepare to implement part:
A) guiding gutter, a drainpipe can be processed into semi-circular tube.B) piercer.C) aqueduct.D) structure sealant.
The concrete structure solved the problems, such as of design is:The outer end of concrete floor 1 is provided with upper instead along 2, is set between concrete floor 1 There is expansion joint 3, concrete floor 1 is provided with osculum, and the lower water of installation leaks 5 on osculum, and lower water leaks 5 times installation soil stacks 6, The expansion joint 3 has the guiding gutter 8 for prolonging whole expansion joint 3, and the bottom of guiding gutter 8 sets aqueduct 7, and guiding gutter 8 passes through water guide Pipe 7 connects with soil stack 6.
Installation step:
1st, guiding gutter 8, live processing and fabricating or utilization finished product semi-circular tube are made.
2nd, determine that 8 liang of edges of guiding gutter can be preferably bonded with the both sides concrete structure of expansion joint 3, adjust the gradient of guiding gutter 8, Current are enable to converge a bit.
3rd, it is using structure sealant 9 that guiding gutter 8 and the structural bond of concrete floor 1 is closely knit.
4th, punched with piercer in the lowest part of guiding gutter 8, and punched on soil stack 6.
The 5th, aqueduct 7 is installed, guiding gutter 8 is connected with soil stack 6.
6th, to carrying out encapsulation process at pipeline tapping.
Invention effect:The present invention carries out examination operation in practice of construction through my company, solves expansion joint waterproof well The seepy question of weak spot, can be after test ne-leakage water, while can also reach effect attractive in appearance for many years, and material is easily purchased, price It is low, belong to conventional drainage pipeline material.

Claims (2)

1. a kind of expansion joint leakage-proof structure, concrete floor outer end is provided with upper anti-edge, and expansion joint, coagulation are provided between concrete floor Tulou plate is provided with osculum, and the lower water of installation leaks on osculum, and lower water, which leaks down, installs soil stack, it is characterized in that:It is described flexible Seam has the guiding gutter for prolonging whole expansion joint, and water guide trench bottom sets aqueduct, and guiding gutter is connected by aqueduct and soil stack It is logical.
A kind of 2. construction method of expansion joint leak drainage:
1) guiding gutter, live processing and fabricating or utilization finished product semi-circular tube are made;
2) determine that the edge of guiding gutter two can be preferably bonded with expansion joint both sides concrete structure, adjust water guide trough slope, make current It can converge a bit;
3) it is using structure sealant that guiding gutter is Nian Jie with concrete structure closely knit;
4) punched with piercer in guiding gutter lowest part, and punched on soil stack;
5) aqueduct is installed, guiding gutter is connected with soil stack;
6) to carrying out encapsulation process at pipeline tapping.
CN201711071221.8A 2017-11-03 2017-11-03 Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage Withdrawn CN107859188A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711071221.8A CN107859188A (en) 2017-11-03 2017-11-03 Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711071221.8A CN107859188A (en) 2017-11-03 2017-11-03 Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage

Publications (1)

Publication Number Publication Date
CN107859188A true CN107859188A (en) 2018-03-30

Family

ID=61700707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711071221.8A Withdrawn CN107859188A (en) 2017-11-03 2017-11-03 Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage

Country Status (1)

Country Link
CN (1) CN107859188A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930756A (en) * 2019-04-16 2019-06-25 中建四局第一建筑工程有限公司 A kind of high-low bay top plate back filled region expansion joint Seepage method and device
CN113565248A (en) * 2021-07-07 2021-10-29 王子亮 Assembled coincide floor
CN114382184A (en) * 2021-12-31 2022-04-22 杭州西曙置业有限公司 Current type expansion joint drainage device for detecting falling object quality and drainage quantity

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202370079U (en) * 2011-12-28 2012-08-08 中建七局第三建筑有限公司 Tank for collecting percolating water at bottom of deformation joint
CN203834698U (en) * 2014-02-17 2014-09-17 袁石江 Waterproof structure of expansion joint of building structure
CN104295009A (en) * 2014-10-15 2015-01-21 苏州工业园区设计研究院股份有限公司 Deformation joint structure of planted roof
CN204940205U (en) * 2015-09-11 2016-01-06 中国长江电力股份有限公司 A kind of plugging device that leaks of shrinkage joint
CN207376843U (en) * 2017-11-03 2018-05-18 唐山曹妃甸二十二冶工程技术有限公司 Expansion joint leakage-proof structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202370079U (en) * 2011-12-28 2012-08-08 中建七局第三建筑有限公司 Tank for collecting percolating water at bottom of deformation joint
CN203834698U (en) * 2014-02-17 2014-09-17 袁石江 Waterproof structure of expansion joint of building structure
CN104295009A (en) * 2014-10-15 2015-01-21 苏州工业园区设计研究院股份有限公司 Deformation joint structure of planted roof
CN204940205U (en) * 2015-09-11 2016-01-06 中国长江电力股份有限公司 A kind of plugging device that leaks of shrinkage joint
CN207376843U (en) * 2017-11-03 2018-05-18 唐山曹妃甸二十二冶工程技术有限公司 Expansion joint leakage-proof structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930756A (en) * 2019-04-16 2019-06-25 中建四局第一建筑工程有限公司 A kind of high-low bay top plate back filled region expansion joint Seepage method and device
CN113565248A (en) * 2021-07-07 2021-10-29 王子亮 Assembled coincide floor
CN113565248B (en) * 2021-07-07 2022-11-11 卓成建设集团有限公司 Assembled coincide floor
CN114382184A (en) * 2021-12-31 2022-04-22 杭州西曙置业有限公司 Current type expansion joint drainage device for detecting falling object quality and drainage quantity
CN114382184B (en) * 2021-12-31 2023-10-17 杭州西曙置业有限公司 Current type expansion joint drainage device for detecting weight and drainage quantity of falling materials

Similar Documents

Publication Publication Date Title
CN109915180B (en) Tunnel secondary lining cracking leakage treatment method
CN107859188A (en) Expansion joint leakage-proof structure and the construction method of expansion joint leak drainage
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN103161173B (en) Shut-in construction method of pumping shaft in basement base plate
CN103161172B (en) Elevator shaft bottom precipitation construction method
CN208280185U (en) A kind of post-cast strip advanced water-stopping construction
CN103031835B (en) Method for increasing foundation bearing capacity
CN109440951A (en) New-old concrete works intersection stitches waterproof construction and construction technology
CN108018885A (en) A kind of Novel underground room seepage treatment structure and method
CN108301466A (en) Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN207268004U (en) Toilet leakage protective system
CN102912945B (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN109025899B (en) Well sealing device
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN208379645U (en) The waterproof system of anti-float anchor rod
CN207376843U (en) Expansion joint leakage-proof structure
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN103882889A (en) Bottom plate waterproofing system of foundation of building
CN103267181B (en) Plain end concrete pipe connecting method
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN208668952U (en) A kind of kitchen drainage standpipe through-flooring structure
CN103031887B (en) Construction method and water guide system of house bathroom water guide system
CN205954651U (en) Concrete open caisson back cover structure
CN205369917U (en) Bathroom antiseep built -in fitting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180330