CN208379645U - The waterproof system of anti-float anchor rod - Google Patents

The waterproof system of anti-float anchor rod Download PDF

Info

Publication number
CN208379645U
CN208379645U CN201820650007.1U CN201820650007U CN208379645U CN 208379645 U CN208379645 U CN 208379645U CN 201820650007 U CN201820650007 U CN 201820650007U CN 208379645 U CN208379645 U CN 208379645U
Authority
CN
China
Prior art keywords
waterproof
layer
anchor rod
float anchor
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820650007.1U
Other languages
Chinese (zh)
Inventor
沈敏
郭晓乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN DONGFANG YUHONG WATERPROOF ENGINEERING Co Ltd
Original Assignee
SICHUAN DONGFANG YUHONG WATERPROOF ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN DONGFANG YUHONG WATERPROOF ENGINEERING Co Ltd filed Critical SICHUAN DONGFANG YUHONG WATERPROOF ENGINEERING Co Ltd
Priority to CN201820650007.1U priority Critical patent/CN208379645U/en
Application granted granted Critical
Publication of CN208379645U publication Critical patent/CN208379645U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a kind of waterproof system of anti-float anchor rod, and the waterproof system of the anti-float anchor rod includes: cement-base infiltration crystallization waterproof layer, and the cement-base infiltration crystallization waterproof layer is set to the surrounding of anti-float anchor rod anchor rib;Waterproof roll layer, the waterproof roll layer are arranged on the cement-base infiltration crystallization waterproof layer, are provided with first through hole in the middle part of the waterproof roll layer, the anchor rib of anti-float anchor rod is located in the first through hole;Seal ring, the seal ring are set on the waterproof roll layer;Uncured rubber-asphalt waterproof layer, the uncured rubber-asphalt waterproof layer are arranged in the first through hole, are filled on the inside of the seal ring.The waterproof system of the anti-float anchor rod is suitable for anti-float anchor rod waterproof, and waterproof effect is good.

Description

The waterproof system of anti-float anchor rod
Technical field
The utility model belongs to waterproof field, more particularly, to a kind of waterproof system of anti-float anchor rod.
Background technique
House and town and country construction portion are after on November 27th, 2008 has issued " Technical code for water proof in underground engineering ", with regard to conduct The directive document and foundation of Waterproofing Technology of Underground Works and examination.The detail structure for mainly including in specification be deformation joint, after Band, wall pipe (box), built-in fitting, reserved channel connector, pile crown, aperture, hole pond etc. are poured, essentially general detail structure is done Method, and do not include the waterproofing node way of anti-float anchor rod.In the actual construction process, basement bottom board has designed anti-float anchor rod It is generally existing phenomenon, because not designing the way of anti-float anchor rod in national regulation and national atlas, designing institute is generally referring to stake The way of head designs anti-float anchor rod, and there are biggish leak risk.The reason is as follows that: anti-float anchor rod is hypogee structural anti-buoyancy One kind of measure is mainly used for balance a part by underground water bring buoyancy, and stake is the pressure for bearing built-loading, Stress is transmitted from stake top to stake bottom.The action principle of the two is completely different, and the detail treatment of waterproof is also answered different.
The waterproofing design of " Technical code for water proof in underground engineering " GB50108-2008 5.6.1 pile crown should meet following rule It is fixed: 1, stake top should to be picked by design requirement and be dug to concrete dense crucial point, and should cleaned up;2, as found percolating water after broken pile, Leaking-stopping measure should be taken in time;3, should be continuous, uniform when brushing cement based penetration crystallization type water proofing paint, it must not holiday or few It applies, and should be conserved in time;4, when using other waterproof materials, basal plane should meet construction requirement;5, reply water-swellable stops Water bar (glue) is protected.The technology is mainly for the waterproofing process of pile crown, and stake is a kind of force transfer structure, in the upper surface of pile crown This rigidity water-proofing material of cement based penetration crystallization type water proofing paint is only allowed to exist.The position of the main leak of pile crown is stake root Reinforcement waterproof is done to this position by portion, and if with this waterproofing design method come anti-float anchor rod of constructing, it is meant that it is easiest to leak One layer of cement based penetration crystallization type water proofing paint is only existed before the dowel of water, does not have the effect of waterproof.
The pile crown water proof structure of " hypogee water proof structure " 10J301 page 59 designs, and designer is for anti-float anchor rod Waterproof detail treatment is designed all referring to this node diagram substantially.
The waterproofing process of this detail treatment design, only brushes one of cement-base infiltration crystallization within the scope of dowel 250mm Type water-repellent paint, and this material belongs to rigid waterproof layer, once base generates crack because of sedimentation, cement-base infiltration crystallization type is anti- Water paint can also crack therewith, can not play waterproof action.Binding the water expandable waterstop on reinforcing bar is even more to perform practically no function, It during binding finishes exposed, encounters after raining, has expanded, do not have the work for intercepting underground water along reinforcing bar toward rising With.
Therefore, it is necessary to develop a kind of suitable for anti-float anchor rod waterproof, the anti-water systems of waterproof effect more preferably anti-float anchor rod System.
Utility model content
The purpose of the utility model is to provide a kind of waterproof system of anti-float anchor rod, the waterproof system of the anti-float anchor rod is applicable in In anti-float anchor rod waterproof, waterproof effect is good.
To achieve the goals above, the utility model provides a kind of waterproof system of anti-float anchor rod, which prevents Water system includes:
Cement-base infiltration crystallization waterproof layer, the cement-base infiltration crystallization waterproof layer are set to the four of anti-float anchor rod anchor rib Week;
Waterproof roll layer, the waterproof roll layer are arranged on the cement-base infiltration crystallization waterproof layer, the waterproof roll It is provided with first through hole in the middle part of material layer, the anchor rib of anti-float anchor rod is located in the first through hole;
Seal ring, the seal ring are set on the waterproof roll layer;
Uncured rubber-asphalt waterproof layer, the uncured rubber-asphalt waterproof layer are arranged in the first through hole, fill out It fills on the inside of the seal ring.
Preferably, further include waterproof roll extra play, the waterproof roll extra play be set to the waterproof roll layer with Between the cement-base infiltration crystallization waterproof layer.
Preferably, the waterproof roll extra play is square, and the second through-hole, institute are offered at the center of the square The shape for stating the second through-hole is matched with the first through hole shape.
Preferably, the area of the waterproof roll layer is greater than the waterproof roll extra play, the big face waterproof roll Bottom surface is completely bonded in the waterproof roll extra play.
Preferably, the waterproof roll extra play is completely bonded in the cement-base infiltration crystallization waterproof layer.
Preferably, the cement-base infiltration crystallization waterproof layer with a thickness of 1mm-2mm.
Preferably, outside diameter where multiple anchor ribs of the diameter with anti-float anchor rod of the first through hole matches.
Preferably, the seal ring is prepared by expansion sealing strip.
Preferably, the waterproof roll extra play is square, side length 200mm-300mm.
Preferably, the diameter of the first through hole is 20mm-80mm.
The utility model has the beneficial effects that: passing through the setting pair of cement-base infiltration crystallization waterproof layer and waterproof roll layer Anti-float anchor rod carries out periphery waterproof and forms the pitch lake of sealing by the setting of seal ring and uncured rubber-asphalt waterproof layer, Anchor rib is coated, prevents anchor rib from seeping water, waterproof effect is good.
Other features and advantages of the utility model will then part of the detailed description can be specified.
Detailed description of the invention
The utility model illustrative embodiments are described in more detail in conjunction with the accompanying drawings, the utility model it is upper It states and other purposes, feature and advantage will be apparent, wherein in the utility model illustrative embodiments, phase Same reference label typically represents same parts.
Fig. 1 shows the schematic structure of the waterproof system of the anti-float anchor rod of one embodiment according to the present utility model Figure.
Fig. 2 a- Fig. 2 d shows the laying of the waterproof system of the anti-float anchor rod of one embodiment according to the present utility model Journey schematic diagram.
1, cement-base infiltration crystallization waterproof layer;2, waterproof roll layer;3, seal ring;4, uncured rubber-asphalt waterproof layer; 5, waterproof roll extra play;6, anchor rib.
Specific embodiment
Preferred embodiments of the present invention are described in more detail below.Although the following describe the utility model Preferred embodiment, however, it is to be appreciated that may be realized in various forms the utility model without the implementation that should be illustrated here Mode is limited.On the contrary, thesing embodiments are provided so that the utility model is more thorough and complete, and can be by this The range of utility model is completely communicated to those skilled in the art.
The utility model provides a kind of waterproof system of anti-float anchor rod, and the waterproof system of the anti-float anchor rod includes:
Cement-base infiltration crystallization waterproof layer, the cement-base infiltration crystallization waterproof layer are set to the four of anti-float anchor rod anchor rib Week;
Waterproof roll layer, the waterproof roll layer are arranged on the cement-base infiltration crystallization waterproof layer, the waterproof roll It is provided with first through hole in the middle part of material layer, the anchor rib of anti-float anchor rod is located in the first through hole;
Seal ring, the seal ring are set on the waterproof roll layer;
Uncured rubber-asphalt waterproof layer, the uncured rubber-asphalt waterproof layer are arranged in the first through hole, fill out It fills on the inside of the seal ring.
Specifically, during the waterproof construction of anti-float anchor rod, anchor rib break it is curved before, water is coated around anchor rib Mud based penetrant crystalline waterproof layer is laid with waterproof coiled material layer, wherein preventing as basic waterproof on cement-base infiltration crystallization waterproof layer First through hole is provided in the middle part of water coiled material layer, first through hole then installs seal ring, seal ring is arranged anti-for being arranged anchor rib All anchor ribs of drogue bar, and uncured rubber-asphalt waterproof layer is poured on the inside of backward seal ring, it forms pitch lake and covers anchor Gu the root of muscle, prevents anchor rib from seeping water.Seal ring is met water and is bonded in the casting process of uncured rubber-asphalt waterproof layer Waterproof roll layer makes anti-float anchor rod waterproof effect more preferably.
It preferably, further include waterproof roll extra play, the waterproof roll extra play is set to the waterproof roll Between material layer and the cement-base infiltration crystallization waterproof layer.
Specifically, in order to keep base's waterproof more firm.Reliably.In cement-base infiltration crystallization waterproof layer in waterproof roll layer Waterproof roll extra play is set.
Preferably, the waterproof roll extra play is square, and offers second at the center of the square Through-hole, the shape of second through-hole are matched with the first through hole shape.
Specifically, the diameter of the second through-hole is not more than the diameter of first through hole, prevents under uncured rubber-asphalt waterproof layer It seeps.
Preferably, the area of the waterproof roll layer is greater than the waterproof roll extra play, the big face waterproof The bottom surface of coiled material is completely bonded in the waterproof roll extra play.
Preferably, the waterproof roll extra play is completely bonded in the cement-base infiltration crystallization waterproof layer.
Specifically, full bonding may insure the sticking effect of waterproof roll extra play and cement-base infiltration crystallization waterproof layer with Waterproofness.
Preferably, the cement-base infiltration crystallization waterproof layer with a thickness of 1mm-2mm.
It is highly preferred that the cement-base infiltration crystallization waterproof layer with a thickness of 1mm.
Preferably, outside diameter matches where multiple anchor ribs of the diameter and anti-float anchor rod of the first through hole It closes.
Specifically, the anchor rib of anti-float anchor rod is multiple, and first through hole is arranged all anchor ribs, makes all anchor ribs Root is all disposed within uncured rubber-asphalt waterproof layer.
Preferably, the seal ring is prepared by expansion sealing strip.
Preferably, the waterproof roll extra play is square, side length 200mm-300mm.
Preferably, the diameter of the first through hole is 20mm-80mm.
Embodiment
Fig. 1 shows the schematic structure of the waterproof system of the anti-float anchor rod of one embodiment according to the present utility model Figure.
Fig. 2 a- Fig. 2 d shows the laying of the waterproof system of the anti-float anchor rod of one embodiment according to the present utility model Journey schematic diagram.
As shown in Fig. 1 and Fig. 2 a- Fig. 2 d, the waterproof system of the anti-float anchor rod includes:
Cement-base infiltration crystallization waterproof layer 1, the cement-base infiltration crystallization waterproof layer 1 are set to anti-float anchor rod anchor rib 6 Surrounding;
Waterproof roll layer 2, the waterproof roll layer 2 are arranged on the cement-base infiltration crystallization waterproof layer 1, the waterproof First through hole is provided in the middle part of coiled material layer 2, the anchor rib 6 of anti-float anchor rod is located in the first through hole;
Waterproof roll extra play 5, the waterproof roll extra play 5 are set to the waterproof roll layer 2 and the cement base Between penetration crystal waterproof layer 1;
Seal ring 3, the seal ring 3 are set to the interior edge of the first through hole of the waterproof roll layer 2;
Uncured rubber-asphalt waterproof layer 4, the uncured rubber-asphalt waterproof layer 4 are arranged in the first through hole, It is filled in 3 inside of seal ring.
Wherein, the seal ring 3 is prepared by expansion sealing strip.
Specifically, in the waterproof system construction of anti-float anchor rod, steps are as follows for Specific construction:
1, the waterproof system of anti-float anchor rod anchor rib break it is curved before construct;
2,1mm solid cement based penetrant crystalline waterproof layer 1 is brushed within the scope of 6 surrounding 250mm of anchor rib;
3, the paving waterproof roll extra play 5 within the scope of 6 surrounding 250mm of anchor rib, the long * wide of extra play are 250*250mm, It carries out cutting the second through-hole among waterproof roll extra play 5 with 6 outer circle size of anchor rib, then by 5 sets of waterproof roll extra play Enter in anchor rib;
4, paving waterproof roll layer 2 should carry out positioning according to the position of anchor pole on coiled material, then again with anchor rib outside Circle size cuts first through hole and is inserted in anchor rib, and waterproof roll layer 2 and waterproof roll extra play 5 completely bond;
5, at 6 periphery 50mm of anchor rib, centered on anchor rib 6, the water-swellable for the 20*30mm that makes a circle outside stops Water bar is pasted on waterproof roll layer 2 using the self-adhesion function of water expandable waterstop;
6, in the uncured rubber-asphalt waterproof layer 4 of water expandable waterstop central filler, pitch lake is formed.
Each embodiment of the utility model is described above, above description is exemplary, and non-exclusive, and And it is also not necessarily limited to disclosed each embodiment.Without departing from the scope and spirit of illustrated each embodiment, for Many modifications and changes are obvious for those skilled in the art.

Claims (10)

1. a kind of waterproof system of anti-float anchor rod, which is characterized in that the waterproof system of the anti-float anchor rod includes:
Cement-base infiltration crystallization waterproof layer, the cement-base infiltration crystallization waterproof layer are set to the surrounding of anti-float anchor rod anchor rib;
Waterproof roll layer, the waterproof roll layer are arranged on the cement-base infiltration crystallization waterproof layer, the waterproof roll layer Middle part is provided with first through hole, and the anchor rib of anti-float anchor rod is located in the first through hole;
Seal ring, the seal ring are set on the waterproof roll layer;
Uncured rubber-asphalt waterproof layer, the uncured rubber-asphalt waterproof layer are arranged in the first through hole, are filled in On the inside of the seal ring.
2. the waterproof system of anti-float anchor rod according to claim 1, which is characterized in that it further include waterproof roll extra play, The waterproof roll extra play is set between the waterproof roll layer and the cement-base infiltration crystallization waterproof layer.
3. the waterproof system of anti-float anchor rod according to claim 2, which is characterized in that the waterproof roll extra play is positive It is rectangular, the second through-hole, the shape of second through-hole and the first through hole shape phase are offered at the center of the square Cooperation.
4. the waterproof system of anti-float anchor rod according to claim 2, which is characterized in that the area of the waterproof roll layer is big In the waterproof roll extra play, the bottom surface of the waterproof roll layer is completely bonded in the waterproof roll extra play.
5. the waterproof system of anti-float anchor rod according to claim 2, which is characterized in that the waterproof roll extra play is completely viscous It ties in the cement-base infiltration crystallization waterproof layer.
6. the waterproof system of anti-float anchor rod according to claim 1, which is characterized in that the cement-base infiltration crystallization waterproof Layer with a thickness of 1mm-2mm.
7. the waterproof system of anti-float anchor rod according to claim 1, which is characterized in that the diameter of the first through hole and anti- Outside diameter where multiple anchor ribs of drogue bar matches.
8. the waterproof system of anti-float anchor rod according to claim 1, which is characterized in that the seal ring is by expansion sealing strip It is prepared.
9. the waterproof system of anti-float anchor rod according to claim 2, which is characterized in that the waterproof roll extra play is positive It is rectangular, side length 200mm-300mm.
10. the waterproof system of anti-float anchor rod according to claim 1, which is characterized in that the diameter of the first through hole is 20mm-80mm。
CN201820650007.1U 2018-05-03 2018-05-03 The waterproof system of anti-float anchor rod Expired - Fee Related CN208379645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820650007.1U CN208379645U (en) 2018-05-03 2018-05-03 The waterproof system of anti-float anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820650007.1U CN208379645U (en) 2018-05-03 2018-05-03 The waterproof system of anti-float anchor rod

Publications (1)

Publication Number Publication Date
CN208379645U true CN208379645U (en) 2019-01-15

Family

ID=64973813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820650007.1U Expired - Fee Related CN208379645U (en) 2018-05-03 2018-05-03 The waterproof system of anti-float anchor rod

Country Status (1)

Country Link
CN (1) CN208379645U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144978A (en) * 2019-06-05 2019-08-20 中国建筑第七工程局有限公司 A kind of anti-float anchor rod construction method
CN111535367A (en) * 2020-04-20 2020-08-14 深圳市卓宝科技股份有限公司 Anti-floating anchor rod waterproof treatment structure and installation method thereof
CN115288210A (en) * 2022-07-26 2022-11-04 成都建工第四建筑工程有限公司 Construction method of anti-floating anchor rod waterproof node

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144978A (en) * 2019-06-05 2019-08-20 中国建筑第七工程局有限公司 A kind of anti-float anchor rod construction method
CN110144978B (en) * 2019-06-05 2021-03-26 中国建筑第七工程局有限公司 Anti-floating anchor rod construction method
CN111535367A (en) * 2020-04-20 2020-08-14 深圳市卓宝科技股份有限公司 Anti-floating anchor rod waterproof treatment structure and installation method thereof
CN115288210A (en) * 2022-07-26 2022-11-04 成都建工第四建筑工程有限公司 Construction method of anti-floating anchor rod waterproof node

Similar Documents

Publication Publication Date Title
CN208379645U (en) The waterproof system of anti-float anchor rod
CN101787742B (en) Planted roof soil lower deformation joint construction structure and construction method thereof
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN102758456B (en) Construction method of basement waterproofing projects
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
RU2011134016A (en) WATERED FABRIC
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
US11401724B2 (en) Below grade fluid containment
CN103774663A (en) Waterproof structure and construction method of basement anti-floating anchor bar
CN104060634A (en) Water stopping method and structure for reserved hole of pipe jacking work well
CN110735499A (en) parapet waterproof structure and construction method thereof
CN108842816A (en) A kind of waterproofing for subway station structure and its construction technology
CN110747909A (en) Waterproof structure of open cut tunnel movement joint
JPS5947791B2 (en) How to build a swimming pool or water retention
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN106869304A (en) Outer wall of basement waterproof construction and construction method in a kind of confined space
CN208379803U (en) A kind of fine fitment kitchen and toilet waterproof construction modular system
JPH08269984A (en) Construction of basement in outside waterproofing construction method
CN207794117U (en) A kind of foundation base configuration
CN102733427B (en) Water-proofing and permeability-proofing construction method for coastal civil air-defense constructions
CN206545284U (en) A kind of subsided rest room
CN206678144U (en) A kind of ring main unit base concrete prefabricated-member mould
JP2008202304A (en) Waterproof panel and construction method of wall using the same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115