CN107858994B - 一种大型码头模块的合拢方法 - Google Patents
一种大型码头模块的合拢方法 Download PDFInfo
- Publication number
- CN107858994B CN107858994B CN201711016717.5A CN201711016717A CN107858994B CN 107858994 B CN107858994 B CN 107858994B CN 201711016717 A CN201711016717 A CN 201711016717A CN 107858994 B CN107858994 B CN 107858994B
- Authority
- CN
- China
- Prior art keywords
- riser
- gauge
- bracket
- jack
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000006073 displacement reaction Methods 0.000 claims abstract description 12
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 13
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000011900 installation process Methods 0.000 abstract description 2
- 238000010422 painting Methods 0.000 abstract description 2
- 238000007790 scraping Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000003973 paint Substances 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/068—Landing stages for vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Jib Cranes (AREA)
Abstract
一种大型码头模块的合拢方法,包括以下步骤:竖第一块竖片Ⅰ,竖第二块竖片Ⅱ,安装下部支撑结构,安装上部支撑结构,合拢位移。本发明的有益效果是采用较低吊力实现大吨位物件组装,并防止部件在安装过程中油漆刮擦,保证安装部件质量。
Description
技术领域
本发明涉及海洋工程船舶建造领域,具体涉及一种大型码头模块的合拢方法。
背景技术
海底用码头模块油漆工艺复杂,防腐蚀要求很高,由于吊机吊力不足,支撑结构直接向两个竖片中往下放的时候容易碰撞变形,油漆容易碰撞破损,油漆破损后修补很困难。
发明内容
为了解决以上技术问题,本发明提供一种大型码头模块的合拢方法,包括以下步骤:
1)固定第一块竖片Ⅰ
将竖片Ⅰ吊装到基座上,用缆风绳将竖片Ⅰ固定,所述缆风绳上设有手拉葫芦,缆风绳用地锚固定在地面上,用手拉葫芦将缆风绳收紧,竖片Ⅰ上设有防倒卡板和托架;
2)设置第二块竖片Ⅱ
将竖片Ⅱ吊装到基座上,位置在理论线外300-500mm处,竖片Ⅱ上设有防倒卡板和托架;
3)安装下部支撑结构
将下部支撑结构K型结构通过防倒卡板和托架吊装到竖片Ⅰ上,同时竖片Ⅱ上的防倒卡板和托架将K型结构支撑住;
4)安装上部支撑结构
将上部支撑结构通过防倒卡板和托架安装到竖片Ⅰ上,同时竖片Ⅱ上的防倒卡板和托架将上部支撑结构支撑住;
5)合拢位移
用设在基座上的千斤顶与龙门吊小车配合,龙门吊小车拉动竖片Ⅱ时千斤顶同时通过顶推座推动竖片Ⅱ向理论线位移,实现合拢。
作为本发明的一种改进,千斤顶和支撑座之间设有调节垫块。
本发明的有益效果是采用较低吊力实现大吨位物件组装,并防止部件在安装过程中油漆刮擦,以及碰撞变形,保证安装部件质量。在千斤顶和支撑座之间设置调节垫块,增大千斤顶横向位移范围,灵活适应多种尺寸位移。
附图说明
图1为本发明合拢结构图。
图2为本发明第一竖片Ⅰ安装示意图。
图3为本发明第二块竖片Ⅱ安装示意图。
图4为本发明安装下部K型结构支撑示意图。
图5为本发明安装上部支撑示意图。
图6为本发明合拢状态示意图。
图7为本发明千斤顶A局部放大图。
图中,1. 竖片Ⅰ,2. 竖片Ⅱ,3. 缆风绳,4. 托架,5. 防倒卡板,6. 地锚,7. 手拉葫芦,8. K型结构,9.上部支撑结构,10. 基座,11.龙门吊小车,12. 顶推座,13. 支撑座,14. 调节垫块,15. 千斤顶。
具体实施方式
如图1-7所示,一种大型码头模块的合拢方法,包括以下合拢步骤:
1)固定第一块竖片Ⅰ
如图2,将竖片Ⅰ1吊装到基座10上,用缆风绳3将竖片Ⅰ1固定,用地锚6将缆风绳3固定在地面上,用缆风绳3上的手拉葫芦7将缆风绳3收紧,使竖片Ⅰ1固定在基座10上。竖片Ⅰ1上设有防倒卡板5和托架4。
2)设置第二块竖片Ⅱ
如图3,将竖片Ⅱ2吊装到基座10上,竖片Ⅱ2位置在理论线外300-500mm处。用缆风绳3将竖片Ⅱ2固定,用地锚6将缆风绳3固定在地面上,用缆风绳3上的手拉葫芦7将缆风绳3收紧,使竖片Ⅱ2固定于基座10上。竖片Ⅱ2上设有防倒卡板5和托架4。
3)安装下部支撑结构
如图4,将下部支撑结构K型结构8吊装到两个竖片的托架4上,同时竖片Ⅱ2上的防倒卡板5将K型结构8支撑住,以防掉落。
4)安装上部支撑结构
如图5,将上部支撑结构9通过防倒卡板5和托架4安装到竖片Ⅰ1上,同时两个竖片上的防倒卡板5将上部支撑结构9支撑住,以防掉落。
5)合拢位移
如图6,用设在基座10上的千斤顶15与龙门吊小车11配合,千斤顶15和支撑座13之间设有调节垫块14,增大千斤顶15横向位移范围,灵活适应多种尺寸位移。由于竖片Ⅰ1重量达90t,起重机吊力为75t,中间K型结构重量72.5t,所以中间K型结构安装到位后,普通安装方法无法实现结构的吊装。
另外基座10上的滑移面摩擦系数为0.5,不均匀受力系数为1.5,两个竖片的承载重量为33.125t,由此得出实际需要顶推力33.125*0.5*1.5≈25.5t,所以选用50吨千斤顶。
龙门吊小车11拉动竖片Ⅱ2时千斤顶15同时通过顶推座12推动竖片Ⅱ2向理论线位移,用经纬仪及时跟踪位移情况,保持龙门吊小车11与千斤顶15同时动作,轻松完成合拢。
Claims (2)
1.一种大型码头模块的合拢方法,其特征在于:包括以下步骤:
1)固定第一块竖片Ⅰ
将竖片Ⅰ(1)吊装到基座(10)上,用缆风绳(3)将竖片Ⅰ(1)固定,所述缆风绳(3)上设有手拉葫芦(7),缆风绳(3)用地锚(6)固定在地面上,用手拉葫芦(7)将缆风绳(3)收紧,竖片Ⅰ(1)上设有防倒卡板(5)和托架(4);
2)设置第二块竖片Ⅱ
将竖片Ⅱ(2)吊装到基座(10)上,位置在理论线外300-500mm处,竖片Ⅱ(2)上设有防倒卡板(5)和托架(4);
3)安装下部支撑结构
将下部支撑结构K型结构(8)通过防倒卡板(5)和托架(4)吊装到竖片Ⅰ(1)上,同时竖片Ⅱ(2)上的防倒卡板(5)和托架(4)将K型结构(8)支撑住;
4)安装上部支撑结构
将上部支撑结构(9)通过防倒卡板(5)和托架(4)安装到竖片Ⅰ(1)上,同时竖片Ⅱ(2)上的防倒卡板(5)和托架(4)将上部支撑结构(9)支撑住;
5)合拢位移
用设在基座(10)上的千斤顶(15)与龙门吊小车(11)配合,龙门吊小车(11)拉动竖片Ⅱ(2)时千斤顶(15)同时通过顶推座(12)推动竖片Ⅱ(2)向理论线位移,实现合拢。
2.按照权利要求1所述的一种大型码头模块的合拢方法,其特征在于:所述基座(10)上设支撑座(13);千斤顶(15)和支撑座(13)之间设有调节垫块(14),用于增大千斤顶(15)横向位移范围。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711016717.5A CN107858994B (zh) | 2017-10-26 | 2017-10-26 | 一种大型码头模块的合拢方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711016717.5A CN107858994B (zh) | 2017-10-26 | 2017-10-26 | 一种大型码头模块的合拢方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107858994A CN107858994A (zh) | 2018-03-30 |
CN107858994B true CN107858994B (zh) | 2019-08-30 |
Family
ID=61697805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711016717.5A Active CN107858994B (zh) | 2017-10-26 | 2017-10-26 | 一种大型码头模块的合拢方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107858994B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110044497A (ko) * | 2009-10-23 | 2011-04-29 | 은광산업 주식회사 | 데릭의 운송방법 |
CN204162300U (zh) * | 2014-09-30 | 2015-02-18 | 福建海源自动化机械股份有限公司 | 大型龙门架连接梁的调节机构 |
CN105152040A (zh) * | 2015-09-08 | 2015-12-16 | 山东海湾吊装工程股份有限公司 | 自升式海洋石油平台桩腿分段履带吊合拢吊装工艺 |
CN105692449A (zh) * | 2016-03-22 | 2016-06-22 | 中交第二航务工程勘察设计院有限公司 | 自升式钻井平台桩腿接长合拢的方法 |
-
2017
- 2017-10-26 CN CN201711016717.5A patent/CN107858994B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110044497A (ko) * | 2009-10-23 | 2011-04-29 | 은광산업 주식회사 | 데릭의 운송방법 |
CN204162300U (zh) * | 2014-09-30 | 2015-02-18 | 福建海源自动化机械股份有限公司 | 大型龙门架连接梁的调节机构 |
CN105152040A (zh) * | 2015-09-08 | 2015-12-16 | 山东海湾吊装工程股份有限公司 | 自升式海洋石油平台桩腿分段履带吊合拢吊装工艺 |
CN105692449A (zh) * | 2016-03-22 | 2016-06-22 | 中交第二航务工程勘察设计院有限公司 | 自升式钻井平台桩腿接长合拢的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107858994A (zh) | 2018-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1518053B1 (en) | Method and crane for installing, maintaining, and decommissioning wind turbines | |
US7044685B2 (en) | Method of installation of a tension leg platform | |
US9097033B2 (en) | Tower lifting stand system | |
US20140119866A1 (en) | Hoisting platform system | |
EP3456960B1 (en) | Auxiliary floating system for the installation and/or transport of marine structures and method comprising said system | |
CN204473079U (zh) | 海上风机整机运输与安装专用船 | |
US11629698B2 (en) | Device for mounting wind turbine components and mounting method using said device | |
US11808250B2 (en) | Method and equipment for replacing wind turbine components | |
SG177019A1 (en) | Movable brace frame for self-installing platform | |
CA2713161A1 (en) | Load transportation system | |
CN104527937A (zh) | 海上风机整机运输与安装专用船及方法 | |
CN102491162A (zh) | 吊装设备和吊装方法 | |
CN113966435A (zh) | 风力发电机安装和拆卸装置及利用此装置的施工方法 | |
CN103193163A (zh) | 船厂龙门式起重机的坞口安装方法 | |
CN107858994B (zh) | 一种大型码头模块的合拢方法 | |
CN112062007B (zh) | 一种基于小型作业船的立管安装方法 | |
CN107010551A (zh) | 一种受限空间吊装施工方法 | |
EP3586001B1 (en) | Parking assembly | |
JP2541897B2 (ja) | 浅海用ボ―リング櫓の設置方法及びその櫓装置 | |
CN106025882B (zh) | 一种水上光伏逆变器安装方法 | |
WO2020099053A1 (en) | Method for moving an object between a platform of a wind turbine and a deck of a vessel and frame structure used for cou-pling of a pulling means | |
NL2031453B1 (en) | Method and structures for use in mounting a super structure on a foundation pile | |
EP2911971B1 (en) | Hoisting platform system | |
KR102213470B1 (ko) | 수중터널을 계류하는 계류선의 정착 및 인장력 조절 장치 | |
CN104528538B (zh) | 气垫船柔性橡胶气垫吊装方法及微型便携式起吊装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 226100 No. 2, Xin'anjiang Road, Binjiang street, Haimen District, Nantong City, Jiangsu Province Patentee after: Nantong COSCO Shipping Heavy Industry Equipment Co.,Ltd. Address before: 226100 No.2 Xin'anjiang Road, HaimenGang, Haimen City, Nantong City, Jiangsu Province Patentee before: NANTONG COSCO HEAVY INDUSTRY CO.,LTD. |