CN107842376A - A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction - Google Patents
A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction Download PDFInfo
- Publication number
- CN107842376A CN107842376A CN201711315072.5A CN201711315072A CN107842376A CN 107842376 A CN107842376 A CN 107842376A CN 201711315072 A CN201711315072 A CN 201711315072A CN 107842376 A CN107842376 A CN 107842376A
- Authority
- CN
- China
- Prior art keywords
- rod iron
- steel form
- locking plug
- steel
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 71
- 239000010959 steel Substances 0.000 title claims abstract description 71
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 229910000754 Wrought iron Inorganic materials 0.000 claims abstract description 44
- 241000357293 Leptobrama muelleri Species 0.000 claims abstract description 3
- 238000009434 installation Methods 0.000 claims abstract description 3
- 238000004080 punching Methods 0.000 claims description 2
- 238000003466 welding Methods 0.000 abstract description 3
- 238000009415 formwork Methods 0.000 abstract description 2
- 238000005728 strengthening Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 235000000396 iron Nutrition 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of power tunnel telescoping steel form locking plug template to install ruggedized construction, and on the outside of locking plug template, more piece channel-section steel is arranged circumferentially along the radian of telescoping steel form, often saves channel-section steel and is fixed on by rod iron on telescoping steel form panel;Long timber wedge is provided between the channel-section steel and the locking plug template;The rod iron comprises at least the first rod iron and the second rod iron, and first rod iron encircles the channel-section steel and telescoping steel form panel welding from side, and second rod iron is welded in the channel-section steel back side through the telescoping steel form panel.By the present invention, two lined steel mould trolley plug formwork erections are quick, simple, firm, are easy to operating personnel to operate, accelerating construction progress, reduce operating personnel, reduce risk, shorten the duration, and installation and strengthening quality are significantly improved.
Description
Technical field
The present invention relates to power tunnel telescoping steel form technical field of construction, specifically a kind of power tunnel telescoping steel form locking plug template
Ruggedized construction is installed.
Background technology
Power tunnel barrel engineering in two lining concrete placements, with shaped mix by the side at telescoping steel form both ends
Solidifying soil contact, it is not necessary to block, face the side of sky in addition, then need to set locking plug template.Due to the thickness of Tunnel Second Lining
Changed with Grades of Surrounding Rock, and country rock basal plane caused by drilling and blasting method excavation is uneven, locking plug template can not make sizing
Punching block.
In the prior art, generally use plank and steel pipe combination, because reinforcement technique is not in place, are deposited as chassis end plug
In following problem.
1. the engineering time is grown:Because tunnel cross-section changes, supporting steel pipe can not follow skewed horizontal load scaffolding steel pipe with template
Ring utilizes, and concrete vibrating has a great influence to locking plug template and support tube, causes spillage at form joint, and race mould occurs, leads
The skew of the positions such as waterstop, built-in fitting is caused, it is necessary to repeatedly be handled, engineering time length.
2. circulation material wastes big:Tunnel excavation section is influenceed by various factors, often circulates two thickness of the liner degree of each section
It is uneven, it is necessary to the plank of various different lengths;The locking plug template damage of dismounting is more, it is necessary to a large amount of planks are had enough to meet the need, week
It is low to turn stock utilization, construction cost increase.
3. security risk is big:Locking plug template is reinforced, and mould is seen in concreting process, and often circulation needs several templates
Work, average each form fixer expends 3-6h, it is necessary to which personnel are more, and stream time is grown, and security risk is big.
The content of the invention
In view of the above-mentioned problems, the present invention provides a kind of power tunnel telescoping steel form locking plug template installation ruggedized construction.
A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, on the outside of locking plug template, along the arc of telescoping steel form
Degree is arranged circumferentially more piece channel-section steel, often saves channel-section steel and is fixed on by rod iron on telescoping steel form panel.
Preferably, the long 1-2m of channel-section steel is often saved.
Preferably, long timber wedge is provided between the channel-section steel and the locking plug template.
Preferably, the rod iron comprises at least the first rod iron and the second rod iron, and first rod iron is encircled described from side
Channel-section steel and telescoping steel form panel welding, second rod iron are welded in the channel-section steel back of the body through the telescoping steel form panel
Face;The rod iron also includes the 3rd rod iron, and the 3rd rod iron welds side by side with second rod iron, and the steel is fixed in one end
On mould trolley panel.
Preferably, first rod iron uses the screw-thread steels of φ 25, and second rod iron and the 3rd rod iron use φ 12
Round steel.
Beneficial effects of the present invention:1. two lined steel mould trolley plug formwork erections are quick, simple, firm, it is easy to operating personnel to grasp
Make, accelerating construction progress, reduce operating personnel, reduce risk, shorten the duration;2. compared with reinforcement means before, turnover is improved
Materials'use rate, reduce project cost;3. two lined steel mould trolley locking plug templates are installed and strengthening quality is significantly improved.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment 1.
Description of reference numerals
10- telescoping steel form panels, 20- locking plug templates, 30- channel-section steels, the rod irons of 401- first, the rod irons of 402- second, the steel of 403- the 3rd
Rod, the long timber wedges of 50-, 60- rubber fastening bands.
Embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.Embodiments of the invention are
Provided for the sake of example and description, and be not exhaustively or limit the invention to disclosed form.A lot
Modifications and variations are obvious for the ordinary skill in the art.Selection and description embodiment are in order to more preferable
Illustrate the principle and practical application of the present invention, and make one of ordinary skill in the art it will be appreciated that the present invention is suitable so as to design
In the various embodiments with various modifications of special-purpose.
Embodiment 1
A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, as shown in figure 1, outside the thick wooden locking plug templates 20 of 5cm
Side, more piece channel-section steel 30 is arranged circumferentially along the radian of telescoping steel form, often saves channel-section steel and be fixed on by rod iron on telescoping steel form panel 10,
Often save the long 1-2m of channel-section steel.
Long timber wedge 50, by long timber wedge wedging, the long long 15- of timber wedge are provided between the channel-section steel 30 and the locking plug template 20
25cm。
The rod iron comprises at least the first rod iron 401 and the second rod iron 402, and first rod iron 401 encircles institute from side
State channel-section steel 30 and the telescoping steel form panel 10 welds, second rod iron 402 is welded in through the telescoping steel form panel 10
The back side of channel-section steel 30;The rod iron also includes the 3rd rod iron 403, and the 3rd rod iron 403 and second rod iron 402 are side by side
Welding, one end is fixed on the telescoping steel form panel 10;First rod iron uses the screw-thread steels of φ 25, second rod iron and
3rd rod iron uses the round steel of φ 12.By such fixed structure, channel-section steel is relatively fixed to telescoping steel form panel securely
On.
Obviously, described embodiment is only the part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, this area and the those of ordinary skill in the related art institute on the premise of creative work is not made
The every other embodiment obtained, should all belong to the scope of protection of the invention.
Claims (6)
1. a kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, it is characterised in that on the outside of locking plug template, along punching block
The radian of chassis is arranged circumferentially more piece channel-section steel, often saves channel-section steel and is fixed on by rod iron on telescoping steel form panel.
2. power tunnel telescoping steel form locking plug template according to claim 1 installs ruggedized construction, it is characterised in that often saves groove
The long 1-2m of steel.
3. power tunnel telescoping steel form locking plug template according to claim 2 installs ruggedized construction, it is characterised in that the groove
Long timber wedge is provided between steel and the locking plug template.
4. the power tunnel telescoping steel form locking plug template installation ruggedized construction according to claim 1-3 any one, its feature
It is, the rod iron comprises at least the first rod iron and the second rod iron, and first rod iron encircles the channel-section steel and described from side
Telescoping steel form panel welds, and second rod iron is welded in the channel-section steel back side through the telescoping steel form panel.
5. power tunnel telescoping steel form locking plug template according to claim 4 installs ruggedized construction, it is characterised in that the steel
Rod also includes the 3rd rod iron, and the 3rd rod iron welds side by side with second rod iron, and the telescoping steel form face is fixed in one end
On plate.
6. power tunnel telescoping steel form locking plug template according to claim 5 installs ruggedized construction, it is characterised in that described the
One rod iron uses the screw-thread steels of φ 25, and second rod iron and the 3rd rod iron use the round steel of φ 12.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711315072.5A CN107842376A (en) | 2017-12-12 | 2017-12-12 | A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711315072.5A CN107842376A (en) | 2017-12-12 | 2017-12-12 | A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107842376A true CN107842376A (en) | 2018-03-27 |
Family
ID=61664833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711315072.5A Pending CN107842376A (en) | 2017-12-12 | 2017-12-12 | A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107842376A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108386210A (en) * | 2018-04-26 | 2018-08-10 | 中国水利水电第四工程局有限公司 | Length pipe plug template blocks ruggedized construction |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202731935U (en) * | 2012-07-20 | 2013-02-13 | 湖南五新重型装备有限公司 | Tunnel lining trolley reserved groove |
JP2014141880A (en) * | 2014-04-10 | 2014-08-07 | Kajima Corp | Joint formation method for lining concrete |
CN204357448U (en) * | 2014-11-27 | 2015-05-27 | 中建一局集团第五建筑有限公司 | A kind of tunnel lining deformation joint red copper waterstop end head formwork consolidation process device |
CN204827478U (en) * | 2015-08-06 | 2015-12-02 | 中铁十八局集团隧道工程有限公司 | Tunnel lining platform truck |
CN204899938U (en) * | 2015-06-30 | 2015-12-23 | 中铁隧道股份有限公司 | Tunnel secondary lining formworking jumbo bulkhead |
CN206360709U (en) * | 2016-12-29 | 2017-07-28 | 中铁十八局集团第五工程有限公司 | For end head formwork installation auxiliary device in Tunnel Second Lining Construction |
CN206419031U (en) * | 2016-12-20 | 2017-08-18 | 中铁二十局集团第五工程有限公司 | A kind of tunnel double-lining chassis steel and wood composite end head formwork |
CN207829909U (en) * | 2017-12-12 | 2018-09-07 | 中国水利水电第四工程局有限公司 | A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction |
-
2017
- 2017-12-12 CN CN201711315072.5A patent/CN107842376A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202731935U (en) * | 2012-07-20 | 2013-02-13 | 湖南五新重型装备有限公司 | Tunnel lining trolley reserved groove |
JP2014141880A (en) * | 2014-04-10 | 2014-08-07 | Kajima Corp | Joint formation method for lining concrete |
CN204357448U (en) * | 2014-11-27 | 2015-05-27 | 中建一局集团第五建筑有限公司 | A kind of tunnel lining deformation joint red copper waterstop end head formwork consolidation process device |
CN204899938U (en) * | 2015-06-30 | 2015-12-23 | 中铁隧道股份有限公司 | Tunnel secondary lining formworking jumbo bulkhead |
CN204827478U (en) * | 2015-08-06 | 2015-12-02 | 中铁十八局集团隧道工程有限公司 | Tunnel lining platform truck |
CN206419031U (en) * | 2016-12-20 | 2017-08-18 | 中铁二十局集团第五工程有限公司 | A kind of tunnel double-lining chassis steel and wood composite end head formwork |
CN206360709U (en) * | 2016-12-29 | 2017-07-28 | 中铁十八局集团第五工程有限公司 | For end head formwork installation auxiliary device in Tunnel Second Lining Construction |
CN207829909U (en) * | 2017-12-12 | 2018-09-07 | 中国水利水电第四工程局有限公司 | A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108386210A (en) * | 2018-04-26 | 2018-08-10 | 中国水利水电第四工程局有限公司 | Length pipe plug template blocks ruggedized construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106968257B (en) | Concrete-fabricated profile steel mixed supporting system for ultra-large deep foundation pit and construction method thereof | |
CN204984441U (en) | It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction | |
US20210231014A1 (en) | Full-circle secondary lining inverted arch construction formwork system for long-distance tunnel and formwork transporting method | |
CN102797481A (en) | Large-span tunnel arch secondary lining steel bar binding construction method based on skeleton beams | |
CN105625581A (en) | Bearer for gliding reticulated shell | |
CN103982188A (en) | Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system | |
CN107989034A (en) | A kind of manually digging hole filling pile and its construction method | |
CN106979027A (en) | Control the convergent lock pin stake supporting construction of Tunnel sedimentation | |
CN102650212A (en) | Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel | |
CN107524461A (en) | A kind of device and method for improving Tunnel Second Lining ring waterstop waterproof effect | |
CN102518300A (en) | Embedded conical bearing joint type steel structural support and construction method thereof | |
CN107268634A (en) | Deep basal pit waist rail construction typified form system | |
CN207829909U (en) | A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction | |
CN107842376A (en) | A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction | |
CN214883827U (en) | Construction elevator foundation support system device that encorbelments | |
CN106149744A (en) | Pile foundation steel bar cage skeletal support device and construction method | |
CN205189894U (en) | A lining cutting end mould for having bury formula waterstop in | |
CN108179754A (en) | The construction method of long and narrow Extra-Deep Foundation Pit system | |
CN203907010U (en) | Flexible connection device for pipe jacking construction in soft soil layer | |
CN102562098B (en) | Tunnel steel temporary inverted arch with rapid assembly and disassembly | |
CN102605945B (en) | Manufacturing method of big wood formwork | |
US8613567B2 (en) | Clip and method for joining steel ribs used as tunnel liner supports | |
CN204728149U (en) | Be applicable to the quick lap joint track of geological hazard control engineering rolling topography | |
CN105275482A (en) | Lining end module for embedded water stop belt | |
CN211692489U (en) | Connection structure of track beam and shield tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180327 |