Prior art keywords
rod iron
steel form
locking plug
steel
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711315072.5A
Other languages
Chinese (zh)
Inventor
窦志强
谢延强
刘钊
刘家宁
程进东
冯勤
杨鑫
黄登福
赵亚妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201711315072.5A priority Critical patent/CN107842376A/en
Publication of CN107842376A publication Critical patent/CN107842376A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of power tunnel telescoping steel form locking plug template to install ruggedized construction, and on the outside of locking plug template, more piece channel-section steel is arranged circumferentially along the radian of telescoping steel form, often saves channel-section steel and is fixed on by rod iron on telescoping steel form panel;Long timber wedge is provided between the channel-section steel and the locking plug template;The rod iron comprises at least the first rod iron and the second rod iron, and first rod iron encircles the channel-section steel and telescoping steel form panel welding from side, and second rod iron is welded in the channel-section steel back side through the telescoping steel form panel.By the present invention, two lined steel mould trolley plug formwork erections are quick, simple, firm, are easy to operating personnel to operate, accelerating construction progress, reduce operating personnel, reduce risk, shorten the duration, and installation and strengthening quality are significantly improved.

Description

A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction
Technical field
The present invention relates to power tunnel telescoping steel form technical field of construction, specifically a kind of power tunnel telescoping steel form locking plug template Ruggedized construction is installed.
Background technology
Power tunnel barrel engineering in two lining concrete placements, with shaped mix by the side at telescoping steel form both ends Solidifying soil contact, it is not necessary to block, face the side of sky in addition, then need to set locking plug template.Due to the thickness of Tunnel Second Lining Changed with Grades of Surrounding Rock, and country rock basal plane caused by drilling and blasting method excavation is uneven, locking plug template can not make sizing Punching block.
In the prior art, generally use plank and steel pipe combination, because reinforcement technique is not in place, are deposited as chassis end plug In following problem.
1. the engineering time is grown:Because tunnel cross-section changes, supporting steel pipe can not follow skewed horizontal load scaffolding steel pipe with template Ring utilizes, and concrete vibrating has a great influence to locking plug template and support tube, causes spillage at form joint, and race mould occurs, leads The skew of the positions such as waterstop, built-in fitting is caused, it is necessary to repeatedly be handled, engineering time length.
2. circulation material wastes big:Tunnel excavation section is influenceed by various factors, often circulates two thickness of the liner degree of each section It is uneven, it is necessary to the plank of various different lengths;The locking plug template damage of dismounting is more, it is necessary to a large amount of planks are had enough to meet the need, week It is low to turn stock utilization, construction cost increase.
3. security risk is big:Locking plug template is reinforced, and mould is seen in concreting process, and often circulation needs several templates Work, average each form fixer expends 3-6h, it is necessary to which personnel are more, and stream time is grown, and security risk is big.
The content of the invention
In view of the above-mentioned problems, the present invention provides a kind of power tunnel telescoping steel form locking plug template installation ruggedized construction.
A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, on the outside of locking plug template, along the arc of telescoping steel form Degree is arranged circumferentially more piece channel-section steel, often saves channel-section steel and is fixed on by rod iron on telescoping steel form panel.
Preferably, the long 1-2m of channel-section steel is often saved.
Preferably, long timber wedge is provided between the channel-section steel and the locking plug template.
Preferably, the rod iron comprises at least the first rod iron and the second rod iron, and first rod iron is encircled described from side Channel-section steel and telescoping steel form panel welding, second rod iron are welded in the channel-section steel back of the body through the telescoping steel form panel Face;The rod iron also includes the 3rd rod iron, and the 3rd rod iron welds side by side with second rod iron, and the steel is fixed in one end On mould trolley panel.
Preferably, first rod iron uses the screw-thread steels of φ 25, and second rod iron and the 3rd rod iron use φ 12 Round steel.
Beneficial effects of the present invention:1. two lined steel mould trolley plug formwork erections are quick, simple, firm, it is easy to operating personnel to grasp Make, accelerating construction progress, reduce operating personnel, reduce risk, shorten the duration;2. compared with reinforcement means before, turnover is improved Materials'use rate, reduce project cost;3. two lined steel mould trolley locking plug templates are installed and strengthening quality is significantly improved.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment 1.
Description of reference numerals
10- telescoping steel form panels, 20- locking plug templates, 30- channel-section steels, the rod irons of 401- first, the rod irons of 402- second, the steel of 403- the 3rd Rod, the long timber wedges of 50-, 60- rubber fastening bands.
Embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.Embodiments of the invention are Provided for the sake of example and description, and be not exhaustively or limit the invention to disclosed form.A lot Modifications and variations are obvious for the ordinary skill in the art.Selection and description embodiment are in order to more preferable Illustrate the principle and practical application of the present invention, and make one of ordinary skill in the art it will be appreciated that the present invention is suitable so as to design In the various embodiments with various modifications of special-purpose.
Embodiment 1
A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, as shown in figure 1, outside the thick wooden locking plug templates 20 of 5cm Side, more piece channel-section steel 30 is arranged circumferentially along the radian of telescoping steel form, often saves channel-section steel and be fixed on by rod iron on telescoping steel form panel 10, Often save the long 1-2m of channel-section steel.
Long timber wedge 50, by long timber wedge wedging, the long long 15- of timber wedge are provided between the channel-section steel 30 and the locking plug template 20 25cm。
The rod iron comprises at least the first rod iron 401 and the second rod iron 402, and first rod iron 401 encircles institute from side State channel-section steel 30 and the telescoping steel form panel 10 welds, second rod iron 402 is welded in through the telescoping steel form panel 10 The back side of channel-section steel 30;The rod iron also includes the 3rd rod iron 403, and the 3rd rod iron 403 and second rod iron 402 are side by side Welding, one end is fixed on the telescoping steel form panel 10;First rod iron uses the screw-thread steels of φ 25, second rod iron and 3rd rod iron uses the round steel of φ 12.By such fixed structure, channel-section steel is relatively fixed to telescoping steel form panel securely On.
Obviously, described embodiment is only the part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, this area and the those of ordinary skill in the related art institute on the premise of creative work is not made The every other embodiment obtained, should all belong to the scope of protection of the invention.

Claims (6)

1. a kind of power tunnel telescoping steel form locking plug template installs ruggedized construction, it is characterised in that on the outside of locking plug template, along punching block The radian of chassis is arranged circumferentially more piece channel-section steel, often saves channel-section steel and is fixed on by rod iron on telescoping steel form panel.
2. power tunnel telescoping steel form locking plug template according to claim 1 installs ruggedized construction, it is characterised in that often saves groove The long 1-2m of steel.
3. power tunnel telescoping steel form locking plug template according to claim 2 installs ruggedized construction, it is characterised in that the groove Long timber wedge is provided between steel and the locking plug template.
4. the power tunnel telescoping steel form locking plug template installation ruggedized construction according to claim 1-3 any one, its feature It is, the rod iron comprises at least the first rod iron and the second rod iron, and first rod iron encircles the channel-section steel and described from side Telescoping steel form panel welds, and second rod iron is welded in the channel-section steel back side through the telescoping steel form panel.
5. power tunnel telescoping steel form locking plug template according to claim 4 installs ruggedized construction, it is characterised in that the steel Rod also includes the 3rd rod iron, and the 3rd rod iron welds side by side with second rod iron, and the telescoping steel form face is fixed in one end On plate.
6. power tunnel telescoping steel form locking plug template according to claim 5 installs ruggedized construction, it is characterised in that described the One rod iron uses the screw-thread steels of φ 25, and second rod iron and the 3rd rod iron use the round steel of φ 12.
CN201711315072.5A 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction Pending CN107842376A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711315072.5A CN107842376A (en) 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711315072.5A CN107842376A (en) 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction

Publications (1)

Publication Number Publication Date
CN107842376A true CN107842376A (en) 2018-03-27

Family

ID=61664833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711315072.5A Pending CN107842376A (en) 2017-12-12 2017-12-12 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction

Country Status (1)

Country Link
CN (1) CN107842376A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386210A (en) * 2018-04-26 2018-08-10 中国水利水电第四工程局有限公司 Length pipe plug template blocks ruggedized construction

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202731935U (en) * 2012-07-20 2013-02-13 湖南五新重型装备有限公司 Tunnel lining trolley reserved groove
JP2014141880A (en) * 2014-04-10 2014-08-07 Kajima Corp Joint formation method for lining concrete
CN204357448U (en) * 2014-11-27 2015-05-27 中建一局集团第五建筑有限公司 A kind of tunnel lining deformation joint red copper waterstop end head formwork consolidation process device
CN204827478U (en) * 2015-08-06 2015-12-02 中铁十八局集团隧道工程有限公司 Tunnel lining platform truck
CN204899938U (en) * 2015-06-30 2015-12-23 中铁隧道股份有限公司 Tunnel secondary lining formworking jumbo bulkhead
CN206360709U (en) * 2016-12-29 2017-07-28 中铁十八局集团第五工程有限公司 For end head formwork installation auxiliary device in Tunnel Second Lining Construction
CN206419031U (en) * 2016-12-20 2017-08-18 中铁二十局集团第五工程有限公司 A kind of tunnel double-lining chassis steel and wood composite end head formwork
CN207829909U (en) * 2017-12-12 2018-09-07 中国水利水电第四工程局有限公司 A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202731935U (en) * 2012-07-20 2013-02-13 湖南五新重型装备有限公司 Tunnel lining trolley reserved groove
JP2014141880A (en) * 2014-04-10 2014-08-07 Kajima Corp Joint formation method for lining concrete
CN204357448U (en) * 2014-11-27 2015-05-27 中建一局集团第五建筑有限公司 A kind of tunnel lining deformation joint red copper waterstop end head formwork consolidation process device
CN204899938U (en) * 2015-06-30 2015-12-23 中铁隧道股份有限公司 Tunnel secondary lining formworking jumbo bulkhead
CN204827478U (en) * 2015-08-06 2015-12-02 中铁十八局集团隧道工程有限公司 Tunnel lining platform truck
CN206419031U (en) * 2016-12-20 2017-08-18 中铁二十局集团第五工程有限公司 A kind of tunnel double-lining chassis steel and wood composite end head formwork
CN206360709U (en) * 2016-12-29 2017-07-28 中铁十八局集团第五工程有限公司 For end head formwork installation auxiliary device in Tunnel Second Lining Construction
CN207829909U (en) * 2017-12-12 2018-09-07 中国水利水电第四工程局有限公司 A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386210A (en) * 2018-04-26 2018-08-10 中国水利水电第四工程局有限公司 Length pipe plug template blocks ruggedized construction

Similar Documents

Publication Publication Date Title
CN106968257B (en) Concrete-fabricated profile steel mixed supporting system for ultra-large deep foundation pit and construction method thereof
CN204984441U (en) It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction
US20210231014A1 (en) Full-circle secondary lining inverted arch construction formwork system for long-distance tunnel and formwork transporting method
CN102797481A (en) Large-span tunnel arch secondary lining steel bar binding construction method based on skeleton beams
CN105625581A (en) Bearer for gliding reticulated shell
CN103982188A (en) Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system
CN107989034A (en) A kind of manually digging hole filling pile and its construction method
CN106979027A (en) Control the convergent lock pin stake supporting construction of Tunnel sedimentation
CN102650212A (en) Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel
CN107524461A (en) A kind of device and method for improving Tunnel Second Lining ring waterstop waterproof effect
CN102518300A (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN107268634A (en) Deep basal pit waist rail construction typified form system
CN207829909U (en) A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction
CN107842376A (en) A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction
CN214883827U (en) Construction elevator foundation support system device that encorbelments
CN106149744A (en) Pile foundation steel bar cage skeletal support device and construction method
CN205189894U (en) A lining cutting end mould for having bury formula waterstop in
CN108179754A (en) The construction method of long and narrow Extra-Deep Foundation Pit system
CN203907010U (en) Flexible connection device for pipe jacking construction in soft soil layer
CN102562098B (en) Tunnel steel temporary inverted arch with rapid assembly and disassembly
CN102605945B (en) Manufacturing method of big wood formwork
US8613567B2 (en) Clip and method for joining steel ribs used as tunnel liner supports
CN204728149U (en) Be applicable to the quick lap joint track of geological hazard control engineering rolling topography
CN105275482A (en) Lining end module for embedded water stop belt
CN211692489U (en) Connection structure of track beam and shield tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180327