CN107838511A - A kind of copper pipe fast-connection pipeline and its Joining Technology - Google Patents

A kind of copper pipe fast-connection pipeline and its Joining Technology Download PDF

Info

Publication number
CN107838511A
CN107838511A CN201710927777.6A CN201710927777A CN107838511A CN 107838511 A CN107838511 A CN 107838511A CN 201710927777 A CN201710927777 A CN 201710927777A CN 107838511 A CN107838511 A CN 107838511A
Authority
CN
China
Prior art keywords
pipe
branch pipe
solder
base tube
copper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710927777.6A
Other languages
Chinese (zh)
Inventor
曹银生
蒋强
王文文
杨永宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710927777.6A priority Critical patent/CN107838511A/en
Publication of CN107838511A publication Critical patent/CN107838511A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00Soldering, e.g. brazing, or unsoldering
    • B23K1/0008Soldering, e.g. brazing, or unsoldering specially adapted for particular articles or work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00Soldering, e.g. brazing, or unsoldering
    • B23K1/002Soldering by means of induction heating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00Soldering, e.g. brazing, or unsoldering
    • B23K1/20Preliminary treatment of work or areas to be soldered, e.g. in respect of a galvanic coating
    • B23K1/203Fluxing, i.e. applying flux onto surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K3/00Tools, devices, or special appurtenances for soldering, e.g. brazing, or unsoldering, not specially adapted for particular methods
    • B23K3/04Heating appliances
    • B23K3/043Flame-heated appliances
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K3/00Tools, devices, or special appurtenances for soldering, e.g. brazing, or unsoldering, not specially adapted for particular methods
    • B23K3/08Auxiliary devices therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention discloses a kind of copper pipe fast-connection pipeline, including a base tube, be provided with the base tube can be by the base tube together with being inserted into pipe fitting welding welder;A kind of quick Joining Technology of copper pipe is also disclosed, is comprised the following steps:Firstth, the part surface for being inserted into pipe fitting and the contact of both branch pipe or base tube is cleaned, and solder flux is applied to and is inserted on pipe fitting;Secondth, position to be welded is carried out being heated to corresponding brazing temperature;3rd, welded using induction welding equipment or flame mode of heating.The present invention can solve the welding of the φ 150 of φ 2 pipeline, and connecting pipe and the interface of pipe fitting to be connected is fully sealed, No leakage, and intensity is high, can be widely applied to the welding of copper pipe and copper pipe, copper pipe and metal tube, copper pipe and other metal tubes.

Description

A kind of copper pipe fast-connection pipeline and its Joining Technology
Technical field
The present invention relates to a kind of copper pipe fast-connection pipeline and its Joining Technology, the invention can be widely applied to electromechanical add Work manufacture, chemical pipeline connection, are used especially for air-conditioning duct connection area.
Technical background
The pipeline of air-conditioning equipment and heat exchanger generally use copper pipe, the connected mode of copper pipe mainly have two kinds at present:Pricker Weldering welding and sub- connection of receiving.
Welding mode firm welding, good seal;But need welding material-oxygen, acetylene, welding rod and help weldering Agent, not readily portable, dangerous property, in some occasions combustible material etc. be present around copper pipe can not be welded, and work is defended Carded sliver part difference can be to operator smell and eyesight have injury, it is all susceptible to be not easy to industrial automation connecting copper pipe and pipe fitting etc. Used under condition.
Sub- connection of receiving uses mechanical seal, and copper pipe one end is made into horn mouth, bell-mouthed inner face and the outer of sub- joint of receiving The conical surface is bonded to each other, finally by screw thread by sealing surface compact.Sub- connected mode of receiving does not have to carry welding equipment and material, special Instrument is also easy to carry very much, and the attended operation time is very short, is widely used in the connection of domestic air conditioning indoor set and outdoor unit;
But sealing surface sealing effectiveness is less desirable, leakage is easily produced, for example the failure of present domestic air conditioning is mainly made Cryogen deficiency.
The connection of copper pipe is constantly present some not except both the above connected mode is also with other connected modes Foot, or bonding strength are low, or cost is too high, or easily leakage.
The content of the invention
The technical problem to be solved in the present invention is to overcome the above-mentioned deficiency of prior art, there is provided a kind of good sealing effect, into This low, easy processing, copper pipe fast-connection pipeline that low to operator's skill set requirements, the Connection Time is short.
In order to solve the above problems, the present invention uses following technical scheme:
A kind of copper pipe fast-connection pipeline, including a base tube, being provided with the base tube by the base tube and can be inserted into pipe fitting weldering The welder being connected together.
It is further optimization of the present invention to such scheme below:
The welder is the solder of c-type structure, and the equivalent diameter of the solder is 1-10mm.
Further optimization:The welder is arranged in base tube close to the position of end.
Further optimization:The position corresponding with solder is respectively arranged with the U-shaped section that can accommodate solder in the base tube First annular groove.
Further optimization:The internal diameter of the outside section of the first annular groove is bigger 1-10mm than the internal diameter of base tube, is most preferably 1-2mm。
Another scheme is:The branch pipe that at least one internal diameter is more than base pipe diameter is connected with the base tube, welding Device is arranged in branch pipe close to the position at middle part.
Further optimization:The position corresponding with solder is respectively arranged with the U-shaped section that can accommodate solder in the branch pipe The second annular groove.
Another scheme is:The branch pipe that at least one internal diameter is more than base pipe diameter is connected with the base tube, welding Device is arranged in branch pipe close to the position at middle part.
Further optimization:The branch pipe that at least one internal diameter is more than base pipe diameter, welding dress are connected with the base tube Put and be arranged in branch pipe close to the position of end.
Further optimization:The position corresponding with solder is respectively arranged with the U-shaped section that can accommodate solder in the branch pipe The second annular groove.
Another scheme is:The branch pipe that at least one internal diameter is more than base pipe diameter is connected with the base tube, welding Device is arranged in branch pipe close to the position at middle part.
Further optimization:The branch pipe that at least one internal diameter is more than base pipe diameter, welding dress are connected with the base tube Put and be arranged in branch pipe close to the position of end.
Further optimization:The internal diameter of the outside section of second annular groove is bigger 1-10mm than the internal diameter of branch pipe, is most preferably 1-2mm。
Another scheme is:The branch pipe that at least one internal diameter is more than base pipe diameter is connected with the base tube, welding Device is arranged in branch pipe close to the position at middle part.
Further optimization:The branch pipe that at least one internal diameter is more than base pipe diameter, welding dress are connected with the base tube Put and be arranged in branch pipe close to the position of end.
Further optimization:The position corresponding with solder is respectively arranged with the horn mouth that can place solder in the branch pipe.
The present invention also provides a kind of quick Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
Firstth, the part surface for being inserted into pipe fitting and the contact of both branch pipe or base tube is cleaned, and solder flux is applied to and treated Insert on pipe fitting;
Secondth, position to be welded is carried out being heated to corresponding brazing temperature;
3rd, welded using induction welding equipment or flame mode of heating.
The present invention can solve the welding of φ 2- φ 150 pipeline, make connecting pipe and the interface of pipe fitting to be connected complete It is hermetically sealed, No leakage, intensity height;And by setting welder, the requirement to operator's labour skill is greatly reduced, is subtracted Lack the operation of upper welding rod, reduce labor intensity and complexity;And multiple weld bonds can operate simultaneously, facilitate factory automatic Metaplasia producing line welding copper pipe, copper alloy;The special pipe fitting of the present invention is simple to manufacture, and cost is low, and cost is well below receiving son even Mode is connect, it is simple in construction, it is easy to weld, can be widely applied to copper pipe and copper pipe, copper pipe and metal tube(It may need to change weldering The material of material), copper pipe and other metal tubes welding.
Below by drawings and examples, the present invention will be further described.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention in embodiment 1;
Fig. 2 is the structural representation of the present invention in example 2;
Fig. 3 is the structural representation of the present invention in embodiment 3;
Fig. 4 is the structural representation of the present invention in example 4;
Fig. 5 is structural representation of the present invention in embodiment 5;
Fig. 6 is structural representation of the present invention in embodiment 6;
Fig. 7 is structural representation of the present invention in embodiment 7;
Fig. 8 is structural representation of the present invention in embodiment 8;
Fig. 9 is structural representation of the present invention in embodiment 9.
In figure:1- solders;2- base tubes;The annular grooves of 3- second;4- branch pipes;5- horn mouths;7- boss;The first annular grooves of 8-.
Embodiment
Embodiment 1, as shown in figure 1, a kind of copper pipe fast-connection pipeline, including columnar structured base tube 2, on base tube 2 Symmetrically arranged two branch pipe 4 is connected with, is interconnected between each branch pipe 4, should at least provided with one on each branch pipe 4 Welder of the branch pipe 4 together with being inserted into pipe fitting welding.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
The internal diameter of each branch pipe 4 is more bigger than the external diameter for being inserted into pipe fitting, to meet the requirement of copper brazing gap size.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned on one end of one end or close base tube 2 away from base tube 2 of each branch pipe 4.
The welder is the solder 1 of c-type structure, and the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 Can be circular, rectangle or other shapes.
One end on each branch pipe 4 away from base tube 2 or close to one end of base tube 2 position corresponding with solder 1 respectively Put and be connected with the second annular groove 3 that can accommodate solder 1, and the section of each second annular groove 3 is U-shaped.
The internal diameter of the outside section of each second annular groove 3 is bigger 1-10mm than the internal diameter of the branch pipe 4, is most preferably 1- 2mm, after being inserted into pipe fitting and inserting branch pipe 4, the gap that the pipe fitting of second annular groove 3 and interpolation leaves 1-10mm can be used To observe weld seam welding quality.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube 2, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surfaces that will be inserted into the contact of both pipe fitting and branch pipe 4 are cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the second annular groove 3, that is, inserts pipe fitting and branch pipe The overlapping position of 4 grafting, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, It is liquid that solder 1, which melts, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weld seam matter Amount, complete operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 2, as shown in Fig. 2 a kind of copper pipe fast-connection pipeline, including base tube 2, three branch are connected with base tube 2 Pipe 4, it is interconnected between each branch pipe 4, by the branch pipe 4 and is inserted into pipe fitting welding at least provided with one on each branch pipe 4 and exists Welder together.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass, And the cavity connected with each branch pipe 4 is offered in base tube 2.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
Three branch pipes 4 form T-type structure or y-type structure or abnormally-structured, its concrete structure with the integrally connected of base tube 2 Can designed, designed as needed.
The internal diameter of each branch pipe 4 is more bigger than being inserted into the external diameter of pipe fitting, to meet wanting for copper brazing gap size Ask.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned on one end of one end or close base tube 2 away from base tube 2 of each branch pipe 4.
The welder is the solder 1 of c-type structure, and the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 Can be circular, rectangle or other shapes.
One end on each branch pipe 4 away from base tube 2 or close to one end of base tube 2 position corresponding with solder 1 respectively Put and be connected with the second annular groove 3 that can accommodate solder 1, and the section of each second annular groove 3 is U-shaped.
The internal diameter of the outside section of each second annular groove 3 is bigger 1-10mm than the internal diameter of the branch pipe 4, is most preferably 1- 2mm, after being inserted into pipe fitting and inserting branch pipe 4, the gap that the pipe fitting of second annular groove 3 and interpolation leaves 1-10mm can be used To observe weld seam welding quality.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube 2, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surfaces that will be inserted into the contact of both pipe fitting and branch pipe 4 are cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the second annular groove 3, that is, inserts pipe fitting and branch pipe The overlapping position of 4 grafting, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, It is liquid that solder 1, which melts, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weld seam matter Amount, complete operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 3, as shown in figure 3, a kind of copper pipe fast-connection pipeline, include the base tube 2 of U-shape structure, integrally connected on base tube 2 There is the branch pipe 4 of two axis not on the same line, be interconnected between two branch pipes 4, will at least provided with one on each branch pipe 4 The welder of the branch pipe 4 together with being inserted into pipe fitting welding.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass, And it is circular cavity that the section connected with each branch pipe 4 is offered in base tube 2.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
The internal diameter of each branch pipe 4 is more bigger than being inserted into the external diameter of pipe fitting, to meet wanting for copper brazing gap size Ask.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned on one end of one end or close base tube 2 away from base tube 2 of each branch pipe 4.
The welder is the solder 1 of c-type structure, and the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 Can be circular, rectangle or other shapes.
One end on each branch pipe 4 away from base tube 2 or close to one end of base tube 2 position corresponding with solder 1 respectively Put and be connected with the second annular groove 3 that can accommodate solder 1, and the section of each second annular groove 3 is U-shaped.
The internal diameter of the outside section of each second annular groove 3 is bigger 1mm-10mm than the internal diameter of the branch pipe 4, is most preferably 1mm-2mm, after being inserted into pipe fitting and inserting branch pipe 4, the pipe fitting of second annular groove 3 and interpolation leaves 1mm-10mm gap It can be used for observing weld seam welding quality.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surfaces that will be inserted into the contact of both pipe fitting and branch pipe 4 are cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the second annular groove 3, that is, inserts pipe fitting and branch pipe The overlapping position of 4 grafting, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, It is liquid that solder 1, which melts, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weld seam matter Amount, complete operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 4, as shown in figure 4, a kind of copper pipe fast-connection pipeline, include the base tube 2 of cross-shaped configuration, one on base tube 2 Four symmetrically arranged branch pipes 4 are connected with, are interconnected between each branch pipe 4, should at least provided with one on each branch pipe 4 Welder of the branch pipe 4 together with being inserted into pipe fitting welding.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass, And the cavity connected with each branch pipe 4 is offered in base tube 2.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
The internal diameter of each branch pipe 4 is more bigger than being inserted into the external diameter of pipe fitting, to meet wanting for copper brazing gap size Ask.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned on one end of one end or close base tube 2 away from base tube 2 of each branch pipe 4.
The welder is the solder 1 of c-type structure, and the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 Can be circular, rectangle or other shapes.
One end on each branch pipe 4 away from base tube 2 or close to one end of base tube 2 position corresponding with solder 1 respectively Put and be connected with the second annular groove 3 that can accommodate solder 1, and the section of each second annular groove 3 is U-shaped.
The internal diameter of the outside section of each second annular groove 3 is bigger 1-10mm than the internal diameter of the branch pipe 4, is most preferably 1- 2mm, after being inserted into pipe fitting and inserting branch pipe 4, the gap that the pipe fitting of second annular groove 3 and interpolation leaves 1-10mm can be used To observe weld seam welding quality.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube 2, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surfaces that will be inserted into the contact of both pipe fitting and branch pipe 4 are cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the second annular groove 3, that is, inserts pipe fitting and branch pipe The overlapping position of 4 grafting, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, It is liquid that solder 1, which melts, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weld seam matter Amount, complete operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 5, as shown in figure 5, a kind of copper pipe fast-connection pipeline, include the base tube 2 of cylinder type, one end of base tube 2 Branch pipe 4 is connected with, base tube 2 is with existing the branch pipe 4 or base tube 2 with being inserted into pipe fitting welding at least provided with one on branch pipe 4 Welder together.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass.
The internal diameter of the base tube 2 is less than the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, and so designing can be with Ensure that during fluid circulation pressure drop and throttling action will not be produced, while play a part of control and be inserted into pipe fitting intubating length, and Welding quality can be ensured.
The internal diameter of the branch pipe 4 is more bigger than the external diameter for being inserted into pipe fitting, to meet the requirement of copper brazing gap size.
The internal diameter of the branch pipe 4 is bigger than the internal diameter of base tube 2, and so design is easy to the pipe fitting by different bores to be attached.
The internal diameter of the branch pipe 4 subtracts successively along the one end of the branch pipe 4 away from base tube 2 to the direction of one end close to base tube 2 Small, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The boss 7 of the loop configuration with certain altitude is provided with the inwall of base tube 2 close to the position at middle part, this is convex Platform 7 is used for the insertion depth for limiting insertion pipe fitting.
The welder is separately positioned on one end on branch pipe 4 away from base tube 2 or one end and the base tube 2 of close base tube 2 Upper one end away from branch pipe 4 or the position of close boss 7.
The welder is the solder 1 of c-type structure, and the equivalent diameter of solder 1 is 1-10mm, and solder 1 is transversal Face can be circular, rectangle or other shapes.
One end or the position corresponding with solder 1 close to one end of base tube 2 on the branch pipe 4 away from base tube 2 integrally connect The second annular groove 3 of solder 1 can be accommodated by being connected to.
The position corresponding with solder 1 is connected with the first annular groove 8 that can accommodate solder 1 on the base tube 2.
The section of the annular groove 3 of first annular groove 8 and second is U-shaped.
The internal diameter of the outside section of the first annular groove 8 is bigger 1-10mm than the internal diameter of the base tube 2 where it, is most preferably 1- 2mm, after being inserted into pipe fitting and inserting base tube 2, the gap that the pipe fitting of the first annular groove 8 and interpolation leaves 1-10mm can be used To observe weld seam welding quality.
The internal diameter of the outside section of second annular groove 3 is bigger 1-10mm than the internal diameter of the branch pipe 4 where it, is most preferably 1- 2mm, after being inserted into pipe fitting and inserting branch pipe 4, the gap that the pipe fitting of second annular groove 3 and interpolation leaves 1-10mm can be used To observe weld seam welding quality.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surfaces that will be inserted into the contact of both pipe fitting and branch pipe 4 or base tube 2 are cleaned, and solder flux is smeared To being inserted on pipe fitting;
When branch pipe 4 or base tube 2 weld with copper pipe, copper pipe End outer surface is cleaned first;
When branch pipe 4 or base tube 2 weld with copper alloy, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 or base tube 2 weld with stainless steel tube, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding matter Amount;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4 or base tube 2, while the reducing among branch pipe 4 can control insertion Depth, the boss 7 in base tube 2 can control interpolation pipe fitting to insert the depth of the base tube 2.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the first annular annular groove 3 of groove 8 or second, i.e., The pipe fitting position overlapping with branch pipe 4 or the grafting of base tube 2 is inserted, when the temperature of branch pipe 4 or base tube 2 and insertion pipe fitting reaches corresponding Brazing temperature, such as at 600 DEG C -750 DEG C, it be liquid that solder 1, which melts, now due to capillarity, solder liquid infiltration inflow In weld seam, natural cooling, weldquality is observed, complete operation.
(2), when being heated using flame, branch pipe 4 or base tube 2 are heated to peony, it is liquid that solder 1, which melts, now by In capillarity, solder liquid infiltration is flowed into weld seam, natural cooling, is observed weldquality, is completed operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 6, as shown in fig. 6, a kind of copper pipe fast-connection pipeline, include the base tube 2 of cylinder-like structure, one on base tube 2 It is connected with symmetrically arranged two branch pipe 4, is interconnected between each branch pipe 4, at least provided with one by the branch pipe on each branch pipe 4 4 welder together with being inserted into pipe fitting welding.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
The internal diameter of each branch pipe 4 is more bigger than being inserted into the external diameter of pipe fitting, to meet wanting for copper brazing gap size Ask.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned in each branch pipe 4 close to the position at middle part, and welder is the weldering of c-type structure Material 1, the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 can be circular, rectangle or other shapes.
Position corresponding with solder 1 respectively offers the second annular groove 3 that can accommodate solder 1 in each branch pipe 4, And the section of each second annular groove 3 is U-shaped, so design can be such that the solder of thawing is oozed to bottom in vertical welding Thoroughly, to ensure the welding quality of the soldering opening.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surface for being inserted into the contact of both pipe fitting and branch pipe is cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the second annular groove 3, that is, inserts pipe fitting and branch pipe The overlapping position of 4 grafting, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, It is liquid that solder 1, which melts, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weld seam matter Amount, complete operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 7, as shown in fig. 7, a kind of copper pipe fast-connection pipeline, including columnar structured base tube 2, one on base tube 2 It is connected with symmetrically arranged two branch pipe 4, is interconnected between each branch pipe 4, at least provided with one by the branch pipe on each branch pipe 4 4 welder together with being inserted into pipe fitting welding.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
The internal diameter of each branch pipe 4 is more bigger than the external diameter for being inserted into pipe fitting, to meet the requirement of copper brazing gap size.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned on close to the position at both ends in each branch pipe 4, and welder is c-type structure Solder 1, the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 can be circular, rectangle or other shapes Shape.
Position corresponding with solder 1 respectively is provided with the second annular groove 3 that can accommodate solder 1 in each branch pipe 4, and The section of each second annular groove 3 is U-shaped, by setting two second annular grooves 3 on each branch pipe 4, can make the weldering of thawing Expect to permeate among the branch pipe 4, ensure that welding is full.
The internal diameter of the outside section of each second annular groove 3 positioned at the one end of branch pipe 4 away from base tube 2 is than the branch pipe The 4 big 1mm-10mm of internal diameter, is most preferably 1mm-2mm, after being inserted into pipe fitting and inserting branch pipe 4, second annular groove 3 and interpolation Pipe fitting leave 1mm-10mm gap can be used for observe weld seam welding quality.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surfaces that will be inserted into the contact of both pipe fitting and branch pipe 4 are cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the second annular groove 3, that is, inserts pipe fitting and branch pipe The overlapping position of 4 grafting, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, It is liquid that solder 1, which melts, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weld seam matter Amount, complete operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 8, as shown in figure 8, a kind of copper pipe fast-connection pipeline, including columnar structured base tube 2, one on base tube 2 It is connected with symmetrically arranged two branch pipe 4, is interconnected between each branch pipe 4, at least provided with one by the branch pipe on each branch pipe 4 4 welder together with being inserted into pipe fitting welding.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
The internal diameter of each branch pipe 4 is more bigger than the external diameter for being inserted into pipe fitting, to meet the requirement of copper brazing gap size.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned on one end away from base tube 2 in each branch pipe 4, and welder is c-type structure Solder 1, the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 can be circular, rectangle or other shapes Shape.
The position corresponding with solder 1 of one end away from base tube 2, which is respectively arranged with, on each branch pipe 4 can place solder 1 horn mouth 5.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube 2, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surfaces that will be inserted into the contact of both pipe fitting and branch pipe 4 are cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of horn mouth 5, that is, inserts pipe fitting and is inserted with branch pipe 4 Overlapping position is connect, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, solder 1 thawing is liquid, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weldquality, complete Into operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
Embodiment 9, as shown in figure 9, a kind of copper pipe fast-connection pipeline, include the base tube 2 of cylinder-like structure, one on base tube 2 It is connected with symmetrically arranged two branch pipe 4, is interconnected between each branch pipe 4, at least provided with one by the branch pipe on each branch pipe 4 4 welder together with being inserted into pipe fitting welding.
The base tube 2 uses the metal easily welded with copper pipe and copper alloy and other metals, especially red copper, brass.
The internal diameter of the base tube 2 is less than or equal to the internal diameter of branch pipe 4, more than or equal to the internal diameter for being inserted into pipe fitting, so sets Meter can ensure that during fluid circulation pressure drop and throttling action will not be produced, while play the work that control is inserted into pipe fitting intubating length With, and welding quality can be ensured.
The internal diameter of each branch pipe 4 is more bigger than being inserted into the external diameter of pipe fitting, to meet wanting for copper brazing gap size Ask.
The internal diameter of each branch pipe 4 along the one end of the branch pipe 4 away from base tube 2 to close to the direction of one end of base tube 2 according to Secondary reduction, so design can control the insertion depth of insertion pipe fitting, to meet that soldering processes are defined.
The welder is separately positioned in each branch pipe 4 close to one end of base tube 2, and welder is c-type structure Solder 1, the equivalent diameter of solder 1 is 1-10mm, and the cross section of solder 1 can be circular, rectangle or other shapes Shape.
Position corresponding with solder 1 respectively offers the second annular groove 3 that can accommodate solder 1 in each branch pipe 4, And the section of each second annular groove 3 is U-shaped, so design can be such that the solder of thawing is oozed to bottom in vertical welding Thoroughly, to ensure the welding quality of the soldering opening.
The Joining Technology of above-mentioned copper pipe fast-connection pipeline, comprises the following steps:
A. sorting
The solder 1 can use phos copper, can also use the phos copper of argentiferous, can also use strong solder, have The material that body uses determines according to the material of welding workpiece and base tube, to meet that soldering processes are defined;Such as red copper and red copper weldering Connect and the phos copper for using argentiferous, red copper and ferrous metal are welded using phos copper, the phos copper of argentiferous, red copper and brass Welding uses strong solder.
B. clean and smear solder flux
During welding, the part surface for being inserted into the contact of both pipe fitting and branch pipe is cleaned, and solder flux is applied to and is inserted into On pipe fitting;
When branch pipe 4 and copper pipe weld, copper pipe End outer surface is cleaned first;
When branch pipe 4 and copper alloy weld, except cleaning end outer surface will also smear scaling powder;
When branch pipe 4 and stainless steel tube weld, filling with inert gas is carried out, prevents stainless steel oxidation, ensures welding quality;
Then pipe fitting will be inserted into insert in corresponding branch pipe 4, while the reducing among branch pipe 4 can control insertion depth.
C. the method for selecting heating
The heating of welding position has a variety of methods, new commercially available induction welding equipment can be used to heat, and can also use and pass Acetylene-oxygen, liquefied gas-oxygen or the heating of other flames of system.
D. weld
(1), using induction welding equipment when, induction coil is placed on to the position of the second annular groove 3, that is, inserts pipe fitting and branch pipe The overlapping position of 4 grafting, when the temperature of branch pipe 4 and insertion pipe fitting reaches corresponding brazing temperature, such as at 600 DEG C -750 DEG C, It is liquid that solder 1, which melts, now because capillarity, solder liquid infiltration are flowed into weld seam, natural cooling, observes weld seam matter Amount, complete operation.
(2), when being heated using flame, branch pipe 4 is heated to peony, it be liquid that solder 1, which melts, now due to capillary work With solder liquid infiltration is flowed into weld seam, natural cooling, observes weldquality, completes operation.
The present invention with conventional brazing, receive sub- connection contrast it is as follows:
Project The present invention Conventional brazing Receive sub- connection
Intensity By force By force It is weak
Sealing Zero leakage Zero leakage Easily leakage
Service life It is long It is long Typically
Worker skill requires It is low It is high It is high
Cost It is very low It is low It is higher
Operability Simply It is complicated Simply
Automatic production line can be adapted to Energy Difficulty is larger Difficulty is larger
The sealed connection of copper and other metals can be realized Easily Difficulty is larger Difficulty is larger
Whether naked light is had There is no naked light during using sensing heating It is It is no
The present invention can solve the welding of φ 2- φ 150 pipeline, make connecting pipe and the interface of pipe fitting to be connected completely close Envelope, No leakage, intensity are high;And by setting welder, the requirement to operator's labour skill is greatly reduced, is reduced The operation of upper welding rod, reduces labor intensity and complexity;And multiple weld bonds can operate simultaneously, facilitate factory automation to give birth to Producing line welding copper pipe, copper alloy;The special pipe fitting of the present invention is simple to manufacture, and cost is low, and cost is well below receiving sub- connection side Formula, it is simple in construction, it is easy to weld, can be widely applied to copper pipe and copper pipe, copper pipe and metal tube(It may need to change solder Material), copper pipe and other metal tubes welding.

Claims (10)

1. a kind of copper pipe fast-connection pipeline, including a base tube(2), it is characterised in that:The base tube(2)On be provided with can should Base tube(2)Welder together with being inserted into pipe fitting welding.
A kind of 2. copper pipe fast-connection pipeline according to claim 1, it is characterised in that:Welder is c-type structure Solder(1), the solder(1)Equivalent diameter be 1-10mm.
A kind of 3. copper pipe fast-connection pipeline according to claim 1 or 2, it is characterised in that:Welder is arranged on base Pipe(2)The position of interior close end.
A kind of 4. copper pipe fast-connection pipeline according to claim 3, it is characterised in that:Base tube(2)Interior and solder(1)Phase Corresponding position, which is respectively arranged with, can accommodate solder(1)U-shaped section first annular groove(8).
A kind of 5. copper pipe fast-connection pipeline according to claim 4, it is characterised in that:First annular groove(8)Outside The internal diameter of section compares base tube(2)The big 1-10mm of internal diameter, be most preferably 1-2mm.
A kind of 6. copper pipe fast-connection pipeline according to claim 2, it is characterised in that:The base tube(2)It is upper integrally to connect It is connected at least one internal diameter and is more than base tube(2)The branch pipe of internal diameter(4), welder is arranged on branch pipe(4)Interior close middle part/end Position.
A kind of 7. copper pipe fast-connection pipeline according to claim 6, it is characterised in that:The branch pipe(4)Interior and solder (1)Corresponding position, which is respectively arranged with, can accommodate solder(1)U-shaped section the second annular groove(3).
A kind of 8. copper pipe fast-connection pipeline according to claim 7, it is characterised in that:Second annular groove(3)Outside The internal diameter of section compares branch pipe(4)The big 1-10mm of internal diameter, be most preferably 1-2mm.
A kind of 9. copper pipe fast-connection pipeline according to claim 6, it is characterised in that:The branch pipe(4)Interior and solder (1)Corresponding position, which is respectively arranged with, can place solder(1)Horn mouth(5).
A kind of 10. quick Joining Technology of copper pipe, it is characterised in that:Comprise the following steps:
Firstth, pipe fitting and branch pipe will be inserted into(4)Or base tube(2)Both are cleaned the part surface of contact, and solder flux is applied Smear to being inserted on pipe fitting;
Secondth, position to be welded is carried out being heated to corresponding brazing temperature;
3rd, welded using induction welding equipment or flame mode of heating.
CN201710927777.6A 2017-10-09 2017-10-09 A kind of copper pipe fast-connection pipeline and its Joining Technology Pending CN107838511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710927777.6A CN107838511A (en) 2017-10-09 2017-10-09 A kind of copper pipe fast-connection pipeline and its Joining Technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710927777.6A CN107838511A (en) 2017-10-09 2017-10-09 A kind of copper pipe fast-connection pipeline and its Joining Technology

Publications (1)

Publication Number Publication Date
CN107838511A true CN107838511A (en) 2018-03-27

Family

ID=61662289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710927777.6A Pending CN107838511A (en) 2017-10-09 2017-10-09 A kind of copper pipe fast-connection pipeline and its Joining Technology

Country Status (1)

Country Link
CN (1) CN107838511A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110038920A (en) * 2019-05-24 2019-07-23 佛山市南海汇丰铜业制品有限公司 Realize copper pipe quantity-produced method and apparatus
WO2022028240A1 (en) * 2020-08-03 2022-02-10 新乡市丰鑫金属制品有限公司 Internally inlaid solder-type pipe fitting and welding process
CN114222639A (en) * 2019-09-05 2022-03-22 松下知识产权经营株式会社 Joint structure
CN114310026A (en) * 2021-11-16 2022-04-12 福建同越管件有限公司 Pipe fitting with welding ring and branch pipe with pipe fitting
CN115229321A (en) * 2022-06-15 2022-10-25 武汉船用电力推进装置研究所(中国船舶重工集团公司第七一二研究所) Welding method of water channel part for water cooling device

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104403A (en) * 1986-06-25 1988-02-03 昭和铅株式会社 intake manifold and production method thereof
CN1778507A (en) * 2004-11-26 2006-05-31 方大集团股份有限公司 High-frequency Welding method
CN102151930A (en) * 2011-03-18 2011-08-17 哈尔滨工业大学深圳研究生院 Dissimilar metal material brazing method
CN102528193A (en) * 2011-12-30 2012-07-04 刘字冬 Copper and stainless steel brazing process
US20120247741A1 (en) * 2011-03-28 2012-10-04 Showa Denko K.K. Heat exchanger and method of joining heat exchanger pipe
CN104289805A (en) * 2014-08-21 2015-01-21 江苏天舒电器有限公司 Welding method of brass liquid dividing head component
CN104625287A (en) * 2013-11-08 2015-05-20 青岛宏泰铜业有限公司 Copper pipe braze welding technology
CN204735806U (en) * 2015-05-08 2015-11-04 昆山方佳机械制造有限公司 Middleware is connected to circumscribed copper iron
CN105171172A (en) * 2015-09-14 2015-12-23 沈阳飞机工业(集团)有限公司 Brazing filler metal presetting method for guide pipe brazing connection piece
CN204913086U (en) * 2015-08-03 2015-12-30 广东五星太阳能股份有限公司 Three expand copper brazing interface to taking over
CN207431449U (en) * 2017-10-09 2018-06-01 曹银生 A kind of copper pipe fast-connection pipeline

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104403A (en) * 1986-06-25 1988-02-03 昭和铅株式会社 intake manifold and production method thereof
CN1778507A (en) * 2004-11-26 2006-05-31 方大集团股份有限公司 High-frequency Welding method
CN102151930A (en) * 2011-03-18 2011-08-17 哈尔滨工业大学深圳研究生院 Dissimilar metal material brazing method
US20120247741A1 (en) * 2011-03-28 2012-10-04 Showa Denko K.K. Heat exchanger and method of joining heat exchanger pipe
CN102528193A (en) * 2011-12-30 2012-07-04 刘字冬 Copper and stainless steel brazing process
CN104625287A (en) * 2013-11-08 2015-05-20 青岛宏泰铜业有限公司 Copper pipe braze welding technology
CN104289805A (en) * 2014-08-21 2015-01-21 江苏天舒电器有限公司 Welding method of brass liquid dividing head component
CN204735806U (en) * 2015-05-08 2015-11-04 昆山方佳机械制造有限公司 Middleware is connected to circumscribed copper iron
CN204913086U (en) * 2015-08-03 2015-12-30 广东五星太阳能股份有限公司 Three expand copper brazing interface to taking over
CN105171172A (en) * 2015-09-14 2015-12-23 沈阳飞机工业(集团)有限公司 Brazing filler metal presetting method for guide pipe brazing connection piece
CN207431449U (en) * 2017-10-09 2018-06-01 曹银生 A kind of copper pipe fast-connection pipeline

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110038920A (en) * 2019-05-24 2019-07-23 佛山市南海汇丰铜业制品有限公司 Realize copper pipe quantity-produced method and apparatus
CN114222639A (en) * 2019-09-05 2022-03-22 松下知识产权经营株式会社 Joint structure
WO2022028240A1 (en) * 2020-08-03 2022-02-10 新乡市丰鑫金属制品有限公司 Internally inlaid solder-type pipe fitting and welding process
CN114310026A (en) * 2021-11-16 2022-04-12 福建同越管件有限公司 Pipe fitting with welding ring and branch pipe with pipe fitting
CN115229321A (en) * 2022-06-15 2022-10-25 武汉船用电力推进装置研究所(中国船舶重工集团公司第七一二研究所) Welding method of water channel part for water cooling device

Similar Documents

Publication Publication Date Title
CN107838511A (en) A kind of copper pipe fast-connection pipeline and its Joining Technology
CN101666568B (en) Liquid reservoir and manufacture method thereof as well as air-conditioner
CN103978286A (en) Tubular part welding method and application thereof
CN107345603A (en) A kind of nozzle structure and its liquid reservoir
CN207431449U (en) A kind of copper pipe fast-connection pipeline
US20090140196A1 (en) Fluid pressure device and manufacturing method for fluid pressure device
CN214618417U (en) Pipe connecting assembly and stainless steel four-way valve with same
CN103567649A (en) Shell, manufacturing method and application of shell
CN107096973B (en) A kind of soldering and detection device
US4322598A (en) Method for forming a conduit extending through and beyond opposite sides of a housing wall
CN103032294A (en) Compressor air suction pipe and manufacturing method and application of compressor air suction pipe
CN110227869A (en) A kind of method for welding, heat exchanger structure, plate heat exchanger and air-conditioning
CN105773015B (en) A kind of stationary fixture of the upper soldering gun of robot welder
CN212338320U (en) Pipe orifice structure and four-way valve
CN111594637B (en) Four-way reversing valve
CN207961872U (en) A kind of connecting pipe and three-way pipe
CN108506545B (en) Electronic expansion valve
US6478213B1 (en) Fluxless fabrication of a multi-tubular structure
CN213515238U (en) Connecting pipe and air conditioner
KR20160117376A (en) Manufacturing method for heat exchanger with i-o pipe connecting member for heat exchanger
CN207064204U (en) Air-breathing instlated tubular and compressor
KR101608493B1 (en) Tube connection structure of the accumulator
CN219318619U (en) Stainless steel muffler assembly and exhaust pipe assembly
US20120211208A1 (en) Brazing joints
CN212840023U (en) Built-in solder type pipeline joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination