CN107829342A - A kind of ecological garden road and its rapid construction engineering method - Google Patents
A kind of ecological garden road and its rapid construction engineering method Download PDFInfo
- Publication number
- CN107829342A CN107829342A CN201711023589.7A CN201711023589A CN107829342A CN 107829342 A CN107829342 A CN 107829342A CN 201711023589 A CN201711023589 A CN 201711023589A CN 107829342 A CN107829342 A CN 107829342A
- Authority
- CN
- China
- Prior art keywords
- water
- pipeline
- permeable brick
- gardens
- supercrust
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 238000012407 engineering method Methods 0.000 title claims abstract description 9
- 239000011449 brick Substances 0.000 claims abstract description 85
- 238000000465 moulding Methods 0.000 claims abstract description 13
- 238000009413 insulation Methods 0.000 claims abstract description 7
- 230000010354 integration Effects 0.000 claims abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 57
- 239000010410 layer Substances 0.000 claims description 37
- 230000002787 reinforcement Effects 0.000 claims description 19
- 239000011229 interlayer Substances 0.000 claims description 11
- 239000002689 soil Substances 0.000 claims description 11
- 239000004576 sand Substances 0.000 claims description 9
- 238000009738 saturating Methods 0.000 claims description 6
- 229910010271 silicon carbide Inorganic materials 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 5
- 238000005259 measurement Methods 0.000 claims description 5
- 239000000843 powder Substances 0.000 claims description 5
- 150000003839 salts Chemical class 0.000 claims description 5
- 230000000694 effects Effects 0.000 description 5
- 239000012530 fluid Substances 0.000 description 5
- 238000010438 heat treatment Methods 0.000 description 5
- 230000015572 biosynthetic process Effects 0.000 description 4
- 230000005611 electricity Effects 0.000 description 4
- 230000001681 protective effect Effects 0.000 description 4
- 230000008439 repair process Effects 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000004568 cement Substances 0.000 description 3
- 238000002844 melting Methods 0.000 description 3
- 238000010309 melting process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000004033 plastic Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000002679 ablation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000008018 melting Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000009938 salting Methods 0.000 description 1
- 239000005413 snowmelt Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
- E01C11/26—Permanently installed heating or blowing devices ; Mounting thereof
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/005—Individual couplings or spacer elements for joining the prefabricated units
- E01C5/006—Individual spacer elements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L53/00—Heating of pipes or pipe systems; Cooling of pipes or pipe systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/10—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
- F24D3/1058—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system disposition of pipes and pipe connections
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D5/00—Hot-air central heating systems; Exhaust gas central heating systems
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention relates to a kind of ecological garden road and its rapid construction engineering method,Include roadbase and gardens supercrust from below to up,Pipeline is embedded between roadbase and gardens supercrust,The pipeline is provided with the insulation close to roadbase,The pipeline is provided with the radiating part close to gardens supercrust,The radiating part is provided with air-vent,The air-vent is parallel to outer layer axis,The air-vent of the pipeline is uniformly distributed along outer circumferential direction,The gardens supercrust includes water-permeable brick framework,Several mounting grooves are separated with the water-permeable brick framework,The mounting groove is up big and down small,The wedge-shaped slot of up/down perforation,The water-permeable brick to match is placed with the mounting groove,The water-permeable brick framework includes end to end moulding,The moulding integration connects framed wall,Perforation is equably provided with the frame wall,The invention heats gardens road surface to melt ice and snow by steam,It is not in leaky,Securely and reliably.
Description
Technical field
The present invention relates to garden path construction work field, more particularly to a kind of ecological garden road and its rapid construction work
Method.
Background technology
At present, garden path itself does not have the ability that ice and snow is condensed in road surface or removing ice and snow that suppresses, generally use
Chemical snow-melting agent removes road snow, and chemistry reduces using salt the freezing point of water except snow dust, makes snow melting, but this salting
Method can bring many negative effects to pavement structure and garden environment, for example can produce gardens road surface and be etched destruction and environment
The problems such as contaminated.
In view of the above-mentioned problems, Publication No. CN102865617A Chinese patent discloses a kind of building plate face and road
Slab electrothermal module and system, located at the surface of a works plate face, so that the works plate face can send heat energy.By big
The first electrode layer and the second electrode lay for covering the whole works plate face area and setting in parallel to each other are caused, is supplied from an outside
Electric unit obtains power supply, using conducting concrete possessed resistance in itself, makes electric current from the conductive coagulation between electrode unit
Soil by when produce heat, and make works plate face heat up.
But the covering of roadway plate in such scheme is easily permeated by sleet, so as to cause the generation of the accidents such as electric leakage.
The content of the invention
It is an object of the invention to provide a kind of ecological garden road and its rapid construction engineering method, and gardens road is heated by steam
Ice and snow is melted in face, prevents leaky, securely and reliably.
The present invention above-mentioned technical purpose technical scheme is that:A kind of ecological garden road, from
It is upper down to include roadbase and gardens supercrust, pipeline, the pipeline are embedded between roadbase and gardens supercrust
Provided with the insulation close to roadbase, the pipeline is provided with the radiating part close to gardens supercrust, and the radiating part is provided with
Air-vent, the air-vent are uniformly distributed parallel to outer layer axis, the air-vent of the pipeline along outer circumferential direction.
By using above-mentioned technical proposal, the buried pipeline between roadbase and gardens supercrust, pipeline can realize to
Residential quarter conveys hot water or heating this basic function, meanwhile, on pipeline close to roadbase side be provided with insulation with every
Heat, prevent heat from being dissipated towards ground end, pipeline is provided with radiating part to radiate close to gardens supercrust side, and on radiating part
Open air-vent, the parallel outer layer axis of air-vent and be uniformly distributed along outer circumferential direction, even heat is effectively volatilized upwards
Infiltration melts ice and snow with this, and without using electricity the security incidents such as electric leakage will not occur for whole melting process.
Further, the pipeline includes internal layer, interlayer and outer layer from inside to outside, and the air-vent is located at outer layer and radiating
The junction in portion, the air-vent are in contact with sandwiching surface.
By using above-mentioned technical proposal, pipeline is arranged to three layers of clad structure, steam penetrates internal layer and reaches sandwich part
Position, so as to which the vapours rested on interlayer can be from air-vent slowly rising volatilization upwards, while make interlayer not invaded by vapor
Erosion, extend the service life of pipeline.
Further, spacing is provided with reinforcement on the pipeline.
By using above-mentioned technical proposal, spacing installs reinforcement on pipeline, on the one hand can protective conduit, it is anti-to strengthen it
Protect intensity;Another aspect reinforcement can play a part of similar fin, accelerated heat transmission.
Further, the pipeline side is provided with base station, and the base station is provided with water pump or air blower communicates with pipeline.
By using above-mentioned technical proposal, base station is set to provide hot water or heating in pipeline side, and pass through water pump or drum
Blower fan provides hot water, heating to residential quarter.
Further, the gardens supercrust includes water-permeable brick framework, and several installations are separated with the water-permeable brick framework
Groove, the mounting groove are up big and down small, up/down perforation wedge-shaped slot, and the water-permeable brick to match is placed with the mounting groove.
By using above-mentioned technical proposal, gardens supercrust is separated into several sponge units, in pavement snow melting
After can by sponge unit conserve absorb, surface gathered water will not be caused.
Further, the water-permeable brick framework includes end to end moulding, and the moulding integration connects framed wall, institute
State and be equably provided with perforation on frame wall.
By using above-mentioned technical proposal, set water-permeable brick framework that water-permeable brick is installed again, instead of water-permeable brick is directly mated formation
Onto garden path, being rapidly assembled and disassembled for water-permeable brick can be realized, is easily changed and repairs, and perforation is opened up on frame wall
Unnecessary snow-broth is facilitated to be oozed out from water-permeable brick side.
Another object of the present invention is to provide a kind of construction applied to above-mentioned ecological garden road.
The present invention another technical purpose technical scheme is that:One kind is applied to claim 1-
The rapid construction engineering method of ecological garden road described in 6 any bars, it is characterised in that comprise the following steps:
Step 1: selection construction site, construction site surface soil layer is cleared up according to physical features after measurement and positioning, and by the smooth rammer of soil layer
Roadbase is used as after reality;
Step 2: laying prefabricated pipeline on roadbase, and it is connected with base station;
Step 3: spacing installs reinforcement on pipeline, pipeline is fixed on roadbase by reinforcement;
Step 4: being bonded fixation with concrete after then laying prefabricated water-permeable brick framework, pipeline is arranged on water-permeable brick frame
Between the adjacent frame wall of frame;
Step 5: filled up the gap of water-permeable brick framework adjacent frame wall with heat filling, and Clad pipe;
Step 6: pave water-permeable brick in the mounting groove of water-permeable brick framework;
Step 7: with the cementation of fissures sand cementation of fissures, carry out several times, until gap is full;
Step 8: road surface is closed, more than 3h is conserved under field conditions (factors).
By using above-mentioned technical proposal, first lay water-permeable brick framework and water-permeable brick is installed again, instead of water-permeable brick is directly spread
It is attached on garden path, being rapidly assembled and disassembled for water-permeable brick can be realized, is easily changed and repairs.
Further, in step 2, the integral seamless metallic conduit of the selection for pipeline.
By using above-mentioned technical proposal, the rate of heat exchange of tube fluid and roadbed, while the heat conduction of metal can be improved
Rate is more than the thermal conductivity of roadbed, and heat energy can be provided more uniformly to supercrust using metallic conduit.
Further, in step 3, the heat filling is filling powder made of carborundum.
By using above-mentioned technical proposal, filled up in the gap of water-permeable brick framework adjacent frame wall and heat conduction is made by carborundum
Material, beneficial to heat transfer.
Further, the moulding of the water-permeable brick framework by abrasive rubber material mixing quality than the salt for 2%-8%
It is molded.
It by using above-mentioned technical proposal, on the one hand can be connected each water-permeable brick, play certain protective effect, the opposing party
It is easy to high-temperature vapor to be delivered to through water-permeable brick framework made of plastic cement on the road surface of gardens in face.
In summary, the invention has the advantages that:
1st, by the buried pipeline between roadbase and gardens supercrust, pipeline, which can be realized to residential quarter, conveys hot water or heating
This basic function, while in course of conveying, making even heat, effectively volatilization is permeated to melt ice and snow upwards, whole to melt
Without using electricity the security incidents such as electric leakage will not occur for process;
2nd, by setting water-permeable brick framework to install water-permeable brick again, instead of water-permeable brick is directly mated formation onto garden path, can realize
Water-permeable brick is rapidly assembled and disassembled, and is easily changed and is repaired, and gardens supercrust is separated into several sponge units by it, on road
It can be conserved and absorb by sponge unit after area snow melt, surface gathered water will not be caused.
Brief description of the drawings
Fig. 1 is a kind of structural representation of ecological garden in the present embodiment;
Fig. 2 is the sectional view in the A-A directions along Fig. 1;
Fig. 3 is the sectional view of pipeline in the present embodiment;
Fig. 4 is a kind of exploded perspective view of ecological garden in embodiment 1;
Fig. 5 is the enlarged diagram of part A in Fig. 4;
Fig. 6 is a kind of exploded perspective view of ecological garden in embodiment 2;
Fig. 7 is the enlarged diagram of part A in Fig. 6.
In figure, 1, roadbase;11st, gardens supercrust;21st, pipeline;211st, internal layer;212nd, interlayer;213rd, outer layer;22、
Insulation;23rd, radiating part;24th, air-vent;3rd, reinforcement;31st, base station;33rd, booster pump;41st, water-permeable brick framework;42nd, install
Groove;43rd, water-permeable brick;44th, moulding;45th, frame wall;46th, perforation;5th, heat filling;6th, hot air hose;61st, hot-water line.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment 1:
A kind of ecological garden road, as shown in Figure 1 and Figure 4, from below to up including roadbase 1 and gardens supercrust 11, in road
Hot-water line 61 is buried between base course 1 and gardens supercrust 11, the hot-water line 61 can be realized to this base of residential quarter conveying hot water
This function.
As shown in Figure 3 and Figure 4, wherein hot-water line 61 is included close to the insulation 22 of roadbase 1 and close to gardens road surface
The radiating part 23 of layer 11, is provided with air-vent 24 on radiating part 23, and air-vent 24 is parallel to outer layer axis, and air-vent 24 is along outer layer
Circumferencial direction is uniformly distributed.During this of conveying hot water, hot-water line 61 can be volatilized by air-vent 24 to gardens road surface
Vapor, conduct heat to gardens supercrust 11 and accumulated snow is melted with this, whole melting process will not occur without using electricity
The security incidents such as electric leakage.
As shown in Figure 3 and Figure 4, hot-water line 61 includes internal layer 211, interlayer 212 and outer layer 213 from inside to outside, wherein ventilative
Hole 24 is arranged on outer layer 213 and is in contact in the junction of radiating part 23, air-vent 24 with the surface of interlayer 212.Hot-water line 61 is set
Three layers of clad structure, steam penetrate internal layer 211 and reach interlayer 212 position, can be from saturating so as to rest on vapor on interlayer 212
Slowly volatilized upwards to melt ice and snow in stomata 24, while interlayer 212 by water vapor encroachment, is not kept its toughness still, is prolonged
The service life of hot-water line 61 is grown.
As shown in Figure 4 and Figure 5, spacing is provided with reinforcement 3 on hot-water line 61, on the one hand can protect hot-water line 61, strengthens
It protects intensity;Another aspect reinforcement 3 also acts as the effect of similar fin.The side of hot-water line 61 is provided with base station 31, base
Stand 31 by water pump to hot-water line 61 convey hot water, at some in particular cases, can be in hot water to realize long-distance sand transport hot water
Booster pump 33 is installed on pipe 61 and provides pressure for fluid.
In order that gardens supercrust 11 has certain air permeable effect, as shown in Figure 2 and Figure 4, gardens supercrust 11 includes saturating
Water brick framework 41, several mounting grooves 42 is separated with water-permeable brick framework 41, the mounting groove 42 is up big and down small, up/down perforation wedge
Shape groove, and the water-permeable brick 43 to match is placed in mounting groove 42, garden path can be made to form several sponge units.It is wherein saturating
Water brick framework 41, than being molded for 2%-8% salt, on the one hand can be connected each by abrasive rubber material mixing quality
Water brick 43, plays certain protective effect, is on the other hand easy to high-temperature vapor to be passed through water-permeable brick framework 41 made of plastic cement
It is delivered on the road surface of gardens.First lay water-permeable brick framework 41 and water-permeable brick 43 is installed again, instead of water-permeable brick 43 is directly mated formation to gardens
On road, being rapidly assembled and disassembled for water-permeable brick 43 can be realized, is easily changed and repairs.
As shown in figure 4, water-permeable brick framework 41 includes end to end moulding 44, the integration of moulding 44 connects framed wall 45,
Perforation 46 is equably provided with frame wall 45.After steam transmits heat ablation ice and snow, its snow-broth is through water-permeable brick 43 and water-permeable brick frame
Several sponge units self-restraint that frame 41 is formed absorbs, and equably opens up perforation 46 on frame wall 45 and facilitate unnecessary snow-broth
Oozed out from the side of water-permeable brick 43.
Embodiment 2:
A kind of ecological garden road, as shown in figures 1 to 6, from below to up including roadbase 1 and gardens supercrust 11, in road
Hot air hose 6 is buried between base course 1 and gardens supercrust 11, the hot air hose 6 can realize that this is basic to residential quarter conveying heating
Function.
As shown in Figure 3 and Figure 6, wherein hot air hose 6 is included close to the insulation 22 of roadbase 1 and close to gardens supercrust
11 radiating part 23, air-vent 24 is provided with radiating part 23, air-vent 24 is justified parallel to outer layer axis, air-vent 24 along outer layer
Circumferential direction is uniformly distributed.During this of conveying warm wind, hot air hose 6 can conduct heat by air-vent 24 to gardens road surface
And accumulated snow is melted with this, without using electricity the security incidents such as electric leakage will not occur for whole melting process.
As shown in Figure 6 and Figure 7, spacing is provided with reinforcement 3 on hot air hose 6, on the one hand can protect hot air hose 6, strengthen it
Protect intensity;Another aspect reinforcement 3 also acts as the effect of similar fin.The side of hot air hose 6 is provided with base station 31, base station 31
, at some in particular cases, can be in hot air hose 6 to realize long-distance sand transport hot blast by air blower to the heat air delivery of hot air hose 6
Upper installation booster pump 33 provides pressure for fluid.
In order that gardens supercrust 11 has certain air permeable effect, as shown in Figure 2 and Figure 6, gardens supercrust 11 includes saturating
Water brick framework 41, several mounting grooves 42 is separated with water-permeable brick framework 41, the mounting groove 42 is up big and down small, up/down perforation wedge
Shape groove, and the water-permeable brick 43 to match is placed in mounting groove 42, garden path can be made to form several sponge units.It is wherein saturating
Water brick framework 41, than being molded for 2%-8% salt, on the one hand can be connected each by abrasive rubber material mixing quality
Water brick 43, plays certain protective effect, is on the other hand easy to high-temperature vapor to be passed through water-permeable brick framework 41 made of plastic cement
It is delivered on the road surface of gardens.First lay water-permeable brick framework 41 and water-permeable brick 43 is installed again, instead of water-permeable brick 43 is directly mated formation to gardens
On road, being rapidly assembled and disassembled for water-permeable brick 43 can be realized, is easily changed and repairs.
As shown in fig. 6, water-permeable brick framework 41 includes end to end moulding 44, the integration of moulding 44 connects framed wall 45,
Perforation 46 is equably provided with frame wall 45.After steam transmits heat ablation ice and snow, its snow-broth is through water-permeable brick 43 and water-permeable brick frame
Several sponge units self-restraint that frame 41 is formed absorbs, and equably opens up perforation 46 on frame wall 45 and facilitate unnecessary snow-broth
Oozed out from the side of water-permeable brick 43.
Embodiment 3:
A kind of construction applied to embodiment 1, comprise the following steps:
Step 1: selection construction site, construction site surface soil layer is cleared up according to physical features after measurement and positioning, and by the smooth rammer of soil layer
Roadbase 1 is used as after reality;
Step 2: laying the hot-water line 61 of Seamless Steel on roadbase 1, and it is connected with base station 31;
Step 3: installing reinforcement 3 every 20 centimetres on hot-water line 61, hot-water line 61 is fixed on by reinforcement 3
On base course 1;
Step 4: being bonded fixation with concrete after then laying prefabricated water-permeable brick framework 41, hot-water line 61 is arranged on
Between the adjacent frame wall 45 of water brick framework 41;
Step 5: with heat filling 5, i.e., filling powder fills out the gap of the adjacent frame wall 45 of water-permeable brick framework 41 made of carborundum
It is full, and coat hot-water line 61;
Step 6: pave water-permeable brick 43 in the mounting groove 42 of water-permeable brick framework 41;
Step 7: with the cementation of fissures sand cementation of fissures, carry out several times, until gap is full;
Step 8: road surface is closed, more than 3h is conserved under field conditions (factors).
Embodiment 4:
A kind of construction applied to embodiment 1, comprise the following steps:
Step 1: selection construction site, construction site surface soil layer is cleared up according to physical features after measurement and positioning, and by the smooth rammer of soil layer
Roadbase 1 is used as after reality;
Step 2: laying the hot-water line 61 of Seamless Steel on roadbase 1, and it is connected with base station 31;
Step 3: installing reinforcement 3 every 50 centimetres on hot-water line 61, hot-water line 61 is fixed on by reinforcement 3
On base course 1;
Step 4: each five meter amperes dress booster pump 33 provides pressure for fluid on hot-water line 61, long-distance sand transport is realized;
Step 5: being bonded fixation with concrete after then laying prefabricated water-permeable brick framework 41, hot-water line 61 is arranged on
Between the adjacent frame wall 45 of water brick framework 41;
Step 6: with heat filling 5, i.e., filling powder fills out the gap of the adjacent frame wall 45 of water-permeable brick framework 41 made of carborundum
It is full, and coat hot-water line 61;
Step 7: pave water-permeable brick 43 in the mounting groove 42 of water-permeable brick framework 41;
Step 8: with the cementation of fissures sand cementation of fissures, carry out several times, until gap is full;
Step 9: road surface is closed, more than 5h is conserved under field conditions (factors).
Embodiment 5:
A kind of construction applied to embodiment 2, comprise the following steps:
Step 1: selection construction site, construction site surface soil layer is cleared up according to physical features after measurement and positioning, and by the smooth rammer of soil layer
Roadbase 1 is used as after reality;
Step 2: laying the hot air hose 6 of Seamless Steel on roadbase 1, and it is connected with base station 31;
Step 3: installing reinforcement 3 every 50 centimetres on base station 31, hot air hose 6 is fixed on by Road Base by reinforcement 3
On layer 1;
Step 4: each five meter amperes dress booster pump 33 provides pressure for fluid on hot air hose 6, long-distance sand transport is realized;
Step 5: being bonded fixation with concrete after then laying prefabricated water-permeable brick framework 41, hot air hose 6 is arranged on permeable
Between the adjacent frame wall 45 of brick framework 41;
Step 6: with heat filling 5, i.e., filling powder fills out the gap of the adjacent frame wall 45 of water-permeable brick framework 41 made of carborundum
It is full, and coat hot air hose 6;
Step 7: pave water-permeable brick 43 in the mounting groove 42 of water-permeable brick framework 41;
Step 8: with the cementation of fissures sand cementation of fissures, carry out several times, until gap is full;
Step 9: road surface is closed, more than 5h is conserved under field conditions (factors).
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art
Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this
All protected in the right of invention by Patent Law.
Claims (10)
- A kind of 1. ecological garden road, from below to up including roadbase(1)With gardens supercrust(11), it is characterised in that: Roadbase(1)With gardens supercrust(11)Between be embedded with pipeline(21), the pipeline(21)Provided with close to roadbase(1) Insulation(22), the pipeline(21)Provided with close to gardens supercrust(11)Radiating part(23), the radiating part(23)On Provided with air-vent(24), the air-vent(24)Parallel to outer layer axis, the pipeline(21)Air-vent(24)Justify along outer layer Circumferential direction is uniformly distributed.
- A kind of 2. ecological garden road according to claim 1, it is characterised in that:The pipeline(21)Include from inside to outside Internal layer(211), interlayer(212)And outer layer(213), the air-vent(24)Located at outer layer(213)With radiating part(23)Handing-over Place, the air-vent(24)With interlayer(212)Surface is in contact.
- A kind of 3. ecological garden road according to claim 2, it is characterised in that:The pipeline(21)Upper spacing is provided with Reinforcement(3).
- A kind of 4. ecological garden road according to claim 3, it is characterised in that:The pipeline(21)Side is provided with base station (31), the base station(31)It is provided with water pump or air blower and pipeline(21)Communicate.
- A kind of 5. ecological garden road according to claim 1, it is characterised in that:The gardens supercrust(11)Including saturating Water brick framework(41), the water-permeable brick framework(41)Inside it is separated with several mounting grooves(42), the mounting groove(42)For it is upper it is big under Small, up/down perforation wedge-shaped slot, the mounting groove(42)Inside it is placed with the water-permeable brick to match(43).
- A kind of 6. ecological garden road according to claim 5, it is characterised in that:The water-permeable brick framework(41)Including head The moulding that tail connects(44), the moulding(44)Integration connects framed wall(45), the frame wall(45)On be equably provided with and pass through Hole(46).
- A kind of 7. rapid construction engineering method of ecological garden road applied to described in claim 1-6 any bars, it is characterised in that Comprise the following steps:Step 1: selection construction site, construction site surface soil layer is cleared up according to physical features after measurement and positioning, and by the smooth rammer of soil layer Roadbase is used as after reality(1);Step 2: in roadbase(1)The prefabricated pipeline of upper laying(21), and by it and base station(31)It is connected;Step 3: in pipeline(21)Upper spacing installs reinforcement(3), pass through reinforcement(3)By pipeline(21)It is fixed on Road Base Layer(1)On;Step 4: then lay prefabricated water-permeable brick framework(41)Bonded fixation with concrete afterwards, by pipeline(21)It is arranged on Water-permeable brick framework(41)Adjacent frame wall(45)Between;Step 5: use heat filling(5)By water-permeable brick framework(41)Adjacent frame wall(45)Gap fill up, and Clad pipe (21);Step 6: in water-permeable brick framework(41)Mounting groove(42)Inside pave water-permeable brick(43);Step 7: with the cementation of fissures sand cementation of fissures, carry out several times, until gap is full;Step 8: road surface is closed, more than 3h is conserved under field conditions (factors).
- A kind of 8. rapid construction engineering method of ecological garden road according to claim 7, it is characterised in that:In step 2 In, the pipeline(21)From the metallic conduit that one is seamless.
- A kind of 9. rapid construction engineering method of ecological garden road according to claim 7, it is characterised in that:In step 3 In, the heat filling(5)To fill powder made of carborundum.
- A kind of 10. rapid construction engineering method of ecological garden road according to claim 7, it is characterised in that:It is described permeable Brick framework(41)Moulding(44)By abrasive rubber material mixing quality than being molded for 2%-8% salt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711023589.7A CN107829342A (en) | 2017-10-27 | 2017-10-27 | A kind of ecological garden road and its rapid construction engineering method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711023589.7A CN107829342A (en) | 2017-10-27 | 2017-10-27 | A kind of ecological garden road and its rapid construction engineering method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107829342A true CN107829342A (en) | 2018-03-23 |
Family
ID=61649840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711023589.7A Pending CN107829342A (en) | 2017-10-27 | 2017-10-27 | A kind of ecological garden road and its rapid construction engineering method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107829342A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110055873A (en) * | 2019-05-31 | 2019-07-26 | 刘建峰 | A kind of Simple bridge and its method of construction |
CN112853846A (en) * | 2021-03-18 | 2021-05-28 | 董杰 | Garden road construction method and road structure |
CN113005840A (en) * | 2021-03-18 | 2021-06-22 | 韩博文 | Ecological garden road and rapid construction method thereof |
CN115506199A (en) * | 2022-10-09 | 2022-12-23 | 浙江名博建设有限公司 | Sponge type road paving structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202081358U (en) * | 2010-11-24 | 2011-12-21 | 西安中交公路岩土工程有限责任公司 | Solar photo-thermal snow melting road surface device |
CN103233410A (en) * | 2013-05-14 | 2013-08-07 | 北京中景橙石建筑科技有限公司 | Permeable asphalt cement concrete road surface structure with heating function |
CN205065160U (en) * | 2015-10-15 | 2016-03-02 | 杭州博舟装饰工程有限公司 | Heat preservation water pipe |
CN205711609U (en) * | 2016-04-17 | 2016-11-23 | 吴在祥 | Framed and the multi-functional porous pavement structural system of permeable plantation |
CN107059540A (en) * | 2017-04-13 | 2017-08-18 | 浙江德润市政园林有限公司 | A kind of town road asphalt concrete pavement construction method |
CN206478720U (en) * | 2016-12-15 | 2017-09-08 | 赵勇 | The floor heating module of butt-joined radiating fin |
-
2017
- 2017-10-27 CN CN201711023589.7A patent/CN107829342A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202081358U (en) * | 2010-11-24 | 2011-12-21 | 西安中交公路岩土工程有限责任公司 | Solar photo-thermal snow melting road surface device |
CN103233410A (en) * | 2013-05-14 | 2013-08-07 | 北京中景橙石建筑科技有限公司 | Permeable asphalt cement concrete road surface structure with heating function |
CN205065160U (en) * | 2015-10-15 | 2016-03-02 | 杭州博舟装饰工程有限公司 | Heat preservation water pipe |
CN205711609U (en) * | 2016-04-17 | 2016-11-23 | 吴在祥 | Framed and the multi-functional porous pavement structural system of permeable plantation |
CN206478720U (en) * | 2016-12-15 | 2017-09-08 | 赵勇 | The floor heating module of butt-joined radiating fin |
CN107059540A (en) * | 2017-04-13 | 2017-08-18 | 浙江德润市政园林有限公司 | A kind of town road asphalt concrete pavement construction method |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110055873A (en) * | 2019-05-31 | 2019-07-26 | 刘建峰 | A kind of Simple bridge and its method of construction |
CN112853846A (en) * | 2021-03-18 | 2021-05-28 | 董杰 | Garden road construction method and road structure |
CN113005840A (en) * | 2021-03-18 | 2021-06-22 | 韩博文 | Ecological garden road and rapid construction method thereof |
CN112853846B (en) * | 2021-03-18 | 2022-02-15 | 董杰 | Garden road construction method and road structure |
CN113005840B (en) * | 2021-03-18 | 2022-11-08 | 中建三局绿色产业投资有限公司 | Ecological garden road and rapid construction method thereof |
CN115506199A (en) * | 2022-10-09 | 2022-12-23 | 浙江名博建设有限公司 | Sponge type road paving structure |
CN115506199B (en) * | 2022-10-09 | 2024-04-19 | 浙江名博建设有限公司 | Sponge type road pavement structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107829342A (en) | A kind of ecological garden road and its rapid construction engineering method | |
CN103233410B (en) | A kind of permeable asphalt cement concrete road surface structure with heating function | |
JPH0247403A (en) | Non-sprinkling snow-removing method for using heat retaining effect of water-bearing stratum at underground deep section | |
JP2017032218A (en) | Heat exchanger utilizing geothermal heat | |
JP2005315063A (en) | Snow melting panel and its manufacturing method, and snow melting roadbed | |
CN203270407U (en) | Permeable pitch cement concrete ground structure with heating function | |
CN211872472U (en) | Gravity type and horizontal heat pipe combined road snow and ice melting device | |
JP2008304141A (en) | Heat storage snow melting system using solar heat | |
KR20140002582A (en) | Withinthe structureofthe ironwalkwayheating cablecan be installedflooring meltingsnowpackeddeckmanufacturing andconstruction method ofelastic | |
CN116005506A (en) | Novel composite roadbed for arctic snowy region and construction method thereof | |
JP2007291737A (en) | Snow-melting pavement structure and permeable concrete slab for use in it | |
CN108775010A (en) | A kind of PCC energy stake and its construction method | |
CN101487236A (en) | Seepage and drainage geogrid | |
CN209619790U (en) | One kind being used for bituminous pavement underground heat heat-transfer tube layout stracture | |
JPS62237249A (en) | Method of thawing snow utilizing terrestrial heat | |
JP5824590B1 (en) | Road surface snow melting structure construction method | |
JP2012211455A (en) | Warming piping system for antifreezing or snow melting | |
JP4188771B2 (en) | Flat block and road surface structure having water permeability and water retention | |
JPS60233204A (en) | Concrete panel for melting snow | |
JP3076152B2 (en) | Sidewalk snow melting equipment | |
JP6560706B2 (en) | Snow extinguishing equipment and snow extinguishing method | |
JP2993596B2 (en) | Road surface heating device for snow melting | |
JP4052630B2 (en) | Snow melting roof structure | |
JPH11286904A (en) | Snow melting method of road or the like and device of the same | |
JP2000039157A (en) | Cooling and heating structure having water-permeable concrete surface layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180323 |