CN107813263B - A kind of Petroleum refining pipeline flanges docking facilities - Google Patents

A kind of Petroleum refining pipeline flanges docking facilities Download PDF

Info

Publication number
CN107813263B
CN107813263B CN201711211403.0A CN201711211403A CN107813263B CN 107813263 B CN107813263 B CN 107813263B CN 201711211403 A CN201711211403 A CN 201711211403A CN 107813263 B CN107813263 B CN 107813263B
Authority
CN
China
Prior art keywords
block
bearing seat
screw rod
sliding block
sliding rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711211403.0A
Other languages
Chinese (zh)
Other versions
CN107813263A (en
Inventor
聂新杰
夏东海
许诺勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Gaoning Forging Flange Factory
Original Assignee
Nanjing Gaoning Forging Flange Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Gaoning Forging Flange Factory filed Critical Nanjing Gaoning Forging Flange Factory
Priority to CN201711211403.0A priority Critical patent/CN107813263B/en
Publication of CN107813263A publication Critical patent/CN107813263A/en
Application granted granted Critical
Publication of CN107813263B publication Critical patent/CN107813263B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • B25B27/14Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same
    • B25B27/16Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same abutted flanges

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Transmission Devices (AREA)
  • Surgical Instruments (AREA)

Abstract

The present invention relates to a kind of docking facilities more particularly to a kind of Petroleum refining pipeline flanges docking facilities.The technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, docking speed is fast, ring flange can be fixed, and dock convenient Petroleum refining pipeline flanges docking facilities.In order to solve the above-mentioned technical problems, the present invention provides such a Petroleum refining pipeline flanges docking facilities, include first sliding rail etc.;First sliding block there are two being set on first sliding rail, first sliding block is slidably matched with the first sliding rail, and mobile device is equipped between two the first slider tops, and the first sliding rail left side and right side are fitted with supporting leg, riser is installed, riser leading flank is equipped with fixed device among the first slider bottom.The present invention can move ring flange by auxiliary device, and make the mounting hole of ring flange to correspondence, and it is fast to have reached time saving and energy saving, docking speed, and ring flange can be fixed, and dock convenient effect.

Description

A kind of Petroleum refining pipeline flanges docking facilities
Technical field
The present invention relates to a kind of docking facilities more particularly to a kind of Petroleum refining pipeline flanges docking facilities.
Background technique
Petroleum, one of main object of geological prospecting are a kind of sticky, dark brown liquid, referred to as " industrial blood Liquid ".There are petroleum storage in upper crustal some areas.Main component is the mixture of various alkane, cycloalkane, aromatic hydrocarbon.
It when Petroleum refining, requires to use pipeline, and ring flange need to be docked, and manually ring flange is docked When, it is time-consuming and laborious, docking speed is slow, when docking ring flange it is easily mobile to lead to docking inconvenient, therefore need to research and develop a kind of time saving It is laborsaving, docking speed is fast, ring flange can be fixed, and dock convenient Petroleum refining pipeline flanges docking facilities.
Summary of the invention
(1) technical problems to be solved
It is time-consuming and laborious, docking speed is slow, ring flange when docking when the present invention manually docks ring flange to overcome The easily mobile disadvantage for causing docking inconvenient, the technical problem to be solved in the present invention is to provide a kind of time saving and energy saving, docking speed Fastly, ring flange can be fixed, and docks convenient Petroleum refining pipeline flanges docking facilities.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a Petroleum refining pipeline flanges to tipping It sets, includes the first sliding rail, the first sliding block, supporting leg, riser, fixed device and mobile device, set that there are two the on the first sliding rail One sliding block, the first sliding block are slidably matched with the first sliding rail, and mobile device is equipped between two the first slider tops, and the first sliding rail is left Side and right side are fitted with supporting leg, and riser is equipped among the first slider bottom, and riser leading flank is equipped with fixed device.
Preferably, fixed device includes fixed block, the first nut, the first screw rod, first bearing seat and arc block, riser Leading flank top is equipped with fixed block, and riser leading flank lower part is equipped with the first nut, and the first screw rod is equipped in the first nut, the One screw tip is equipped with first bearing seat, and first bearing seat top is equipped with arc block, and arc block is located at immediately below fixed block.
Preferably, mobile device includes guide sleeve, the second screw rod, the second nut, second bearing seat and the first switch block, left side First slider top is equipped with guide sleeve, and the second nut is equipped on the left of the first slider top of right side, is equipped with second in the second nut Screw rod, the second screw rod left part are located in guide sleeve, and the second nut right side is equipped with second bearing seat, and the second screw rod is located at the second axis It holds in seat, the second screw rod right end is equipped with the first switch block.
Preferably, further include having auxiliary device, auxiliary device include arc panel, the second sliding rail, the second sliding block, transverse slat, 3rd bearing seat, rubber cylinder, shaft, the second switch block, l-shaped rod, ball and fourth bearing seat, right side supporting leg right side top peace Equipped with arc panel, arc panel is located on the right side of the fixed block of right side, and arc panel medial surface is evenly spaced to be equipped with ball, right side supporting leg Second sliding rail is installed, for the second sliding rail in being vertically arranged, the second sliding rail is equipped with engaged therewith second on the right side of leading flank lower part Sliding block, the second sliding block are slidably matched with the second sliding rail, and the second sliding block right side top is equipped with transverse slat, the left and right sides at the top of transverse slat It is fitted with 3rd bearing seat, shaft is installed between the 3rd bearing seat of the left and right sides, shaft right end is equipped with the second switch block, turns Axis left part is equipped with rubber cylinder, and right side arc block bottom right is equipped with fourth bearing seat, is equipped with L-type in fourth bearing seat Bar, l-shaped rod and the second sliding block cooperate.
It preferably, further include having inserted link, limited block and rubber sleeve, the second screw rod right part is provided with through-hole, is equipped with and inserts in through-hole Bar, inserted link bottom end are equipped with limited block, and inserted link top covers rubber sleeve.
It preferably, further include having lanyard and fixed link, right side riser leading flank is all connected with lanyard, lanyard tail in two sides up and down End is connected with fixed link.
Working principle: being operated first personnel two ring flanges passed through the fixed device in the left and right sides respectively and fix, Ji Keqi Dynamic mobile device, mobile device drive the first sliding block of right side to be moved to the left, and the first sliding block of right side is moved to the left drive right side riser It is moved to the left, right side riser, which is moved to the left, drives right flange disk to be moved to the left, and then right flange disk is moved to the left and left side Ring flange contact is docked, and can stop moving.It, can be by fixed device by two after the completion of two ring flanges dock Ring flange unclamps, then is removed, then drives right side riser to move right by mobile device and restore to original position.
Because fixed device includes fixed block, the first nut, the first screw rod, first bearing seat and arc block, before riser Side surface upper part is equipped with fixed block, and riser leading flank lower part is equipped with the first nut, is equipped with the first screw rod in the first nut, and first Screw tip is equipped with first bearing seat, and first bearing seat top is equipped with arc block, and arc block is located at immediately below fixed block, first Two ring flanges are individually positioned between left and right sides fixed block and arc block by first operator, then twist the left and right sides first Screw rod moves up, and the first screw rod of the left and right sides moves up drive left and right sides arc block and moves up, left and right sides arc Block is moved up to contact with ring flange and is fixed, and is stopped the first screw rod of twisting, can be driven right flange by mobile device Disk, which is moved to the left, to be docked.Similarly, after the completion of ring flange docking, the first screw rod of the left and right sides can reversely be twisted to moving down It is dynamic, and then arc block unclamps ring flange, operator can remove ring flange.
Because mobile device includes guide sleeve, the second screw rod, the second nut, second bearing seat and the first switch block, left side One slider top is equipped with guide sleeve, and the second nut is equipped on the left of the first slider top of right side, is equipped with the second spiral shell in the second nut Bar, the second screw rod left part are located in guide sleeve, and the second nut right side is equipped with second bearing seat, and the second screw rod is located at second bearing In seat, the second screw rod right end is equipped with the first switch block, and when ring flange is fixed, operator can twist the first switch block, the The rotation of one switch block drives the rotation of the second screw rod, and the rotation of the second screw rod drives the second nut to be moved to the left, and the second nut is moved to the left The first sliding block of right side is driven to be moved to the left, the first sliding block of right side is moved to the left drive right side riser and is moved to the left, and then drives right Side flange, which is moved to the left, is docked.After the completion of ring flange docking, and when removing, the first switch block can be reversely twisted, into And it drives right side riser to move right and restores to original position.
Because further including having auxiliary device, auxiliary device includes arc panel, the second sliding rail, the second sliding block, transverse slat, third Bearing block, rubber cylinder, shaft, the second switch block, l-shaped rod, ball and fourth bearing seat, right side supporting leg right side top are equipped with Arc panel, arc panel are located on the right side of the fixed block of right side, and arc panel medial surface is evenly spaced to be equipped with ball, right side supporting leg front side Second sliding rail is installed on the right side of the lower part of face, for the second sliding rail in being vertically arranged, the second sliding rail is equipped with the second sliding block engaged therewith, Second sliding block is slidably matched with the second sliding rail, and the second sliding block right side top is equipped with transverse slat, and the left and right sides is all pacified at the top of transverse slat Equipped with 3rd bearing seat, shaft is installed between the 3rd bearing seat of the left and right sides, shaft right end is equipped with the second switch block, and shaft is left Portion is equipped with rubber cylinder, and right side arc block bottom right is equipped with fourth bearing seat, l-shaped rod, L are equipped in fourth bearing seat Type bar and the second sliding block cooperate, and when ring flange is between fixed block and arc block, operator can twist right side first Screw rod moves up, so arc block move up drive l-shaped rod move up, l-shaped rod move up drive the second sliding block to Upper movement, the second sliding block move up band motion plate and move up, and transverse slat is moved up to move up with the component on motion plate, And then rubber cylinder is contacted with ring flange, stops the first screw rod of twisting right side, i.e., rotatably right flange disk makes right flange disk With the mounting hole of left side ring flange to corresponding, and to rotate ring flange more smooth for ball.When the mounting hole pair of two ring flanges Ying Hou, i.e. rotatable l-shaped rod, and then when l-shaped rod is not with the second shoe contact, it is upward that the first screw rod of right side can be twisted again It is mobile, and right flange disk is fixed.In this way, the ring flange after docking can be made to be more convenient subsequent processing installation.
Because further including having inserted link, limited block and rubber sleeve, the second screw rod right part is provided with through-hole, is equipped with inserted link in through-hole, Inserted link bottom end is equipped with limited block, and inserted link top covers rubber sleeve, and after ring flange is fixed, operator can hold inserted link, Be rotated further by inserted link, inserted link rotation drives the rotation of the second screw rod, and then ring flange movement is driven to be docked, and rubber sleeve increase with The frictional force of water, and the rotation inserted link for keeping operator more firm.In this way, operator can be made more easily to rotate the second spiral shell Bar.
Because further including having lanyard and fixed link, right side riser leading flank is all connected with lanyard, lanyard tail end in two sides up and down It is connected with fixed link, after ring flange is fixed, fixed link can be inserted into the mounting hole of ring flange, and then fixed link is by two Ring flange is fixed, then is docked to two ring flanges.After the completion of ring flange docking, fixed link is taken out of ring flange mounting hole Out.In this way, can prevent from causing the mounting hole of ring flange not correspond to when ring flange is mobile.
(3) beneficial effect
The present invention can move ring flange by auxiliary device, and make the mounting hole of ring flange to correspondence, and pass through Fixed device, can be fixed ring flange, and ring flange is mobile when preventing docking, and it is fast to have reached time saving and energy saving, docking speed, Ring flange can be fixed, and dock convenient effect.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the right side structural representation of arc panel of the present invention.
Fig. 4 is the enlarged diagram of part A of the present invention.
Fig. 5 is the third schematic view of the front view of the invention.
Fig. 6 is the 4th kind of schematic view of the front view of the invention.
The label in accompanying drawing is: the first sliding rail of 1-, the first sliding block of 2-, 3- supporting leg, 4- riser, the fixed device of 5-, 51- are fixed Block, the first nut of 52-, the first screw rod of 53-, 54- first bearing seat, 55- arc block, 6- mobile device, 61- guide sleeve, 62- second Screw rod, the second nut of 63-, 64- second bearing seat, the first switch block of 65-, 7- auxiliary device, 71- arc panel, the second sliding rail of 72-, The second sliding block of 73-, 74- transverse slat, 75- 3rd bearing seat, 76- rubber cylinder, 77- shaft, the second switch block of 78-, 79-L type bar, 710- ball, 711- fourth bearing seat, 8- through-hole, 9- inserted link, 10- limited block, 11- rubber sleeve, 12- lanyard, 13- fixed link.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of Petroleum refining pipeline flanges docking facilities include as shown in figures 1 to 6 the first sliding rail 1, the first sliding block 2, supporting leg 3, riser 4, fixed device 5 and mobile device 6 are set on first sliding rail 1 there are two the first sliding block 2, the first sliding block 2 and the One sliding rail 1 is slidably matched, and is equipped with mobile device 6 between two 2 tops of the first sliding block, 1 left side of the first sliding rail and right side are all Supporting leg 3 is installed, riser 4 is installed among first sliding block, 2 bottom, 4 leading flank of riser is equipped with fixed device 5.
Embodiment 2
A kind of Petroleum refining pipeline flanges docking facilities include as shown in figures 1 to 6 the first sliding rail 1, the first sliding block 2, supporting leg 3, riser 4, fixed device 5 and mobile device 6 are set on first sliding rail 1 there are two the first sliding block 2, the first sliding block 2 and the One sliding rail 1 is slidably matched, and is equipped with mobile device 6 between two 2 tops of the first sliding block, 1 left side of the first sliding rail and right side are all Supporting leg 3 is installed, riser 4 is installed among first sliding block, 2 bottom, 4 leading flank of riser is equipped with fixed device 5.
Fixed device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc block 55, 4 leading flank top of riser is equipped with fixed block 51, and 4 leading flank lower part of riser is equipped with the first nut 52, sets in the first nut 52 There is the first screw rod 53,53 top of the first screw rod is equipped with first bearing seat 54, and 54 top of first bearing seat is equipped with arc block 55, Arc block 55 is located at immediately below fixed block 51.
Embodiment 3
A kind of Petroleum refining pipeline flanges docking facilities include as shown in figures 1 to 6 the first sliding rail 1, the first sliding block 2, supporting leg 3, riser 4, fixed device 5 and mobile device 6 are set on first sliding rail 1 there are two the first sliding block 2, the first sliding block 2 and the One sliding rail 1 is slidably matched, and is equipped with mobile device 6 between two 2 tops of the first sliding block, 1 left side of the first sliding rail and right side are all Supporting leg 3 is installed, riser 4 is installed among first sliding block, 2 bottom, 4 leading flank of riser is equipped with fixed device 5.
Fixed device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc block 55, 4 leading flank top of riser is equipped with fixed block 51, and 4 leading flank lower part of riser is equipped with the first nut 52, sets in the first nut 52 There is the first screw rod 53,53 top of the first screw rod is equipped with first bearing seat 54, and 54 top of first bearing seat is equipped with arc block 55, Arc block 55 is located at immediately below fixed block 51.
Mobile device 6 includes guide sleeve 61, the second screw rod 62, the second nut 63, second bearing seat 64 and the first switch block 65, Guide sleeve 61 is installed, 2 top left side of the first sliding block of right side is equipped with the second nut 63, the second nut at the top of the first sliding block of left side 2 The second screw rod 62 is equipped in 63,62 left part of the second screw rod is located in guide sleeve 61, and 63 right side of the second nut is equipped with second bearing Seat 64, the second screw rod 62 is located in second bearing seat 64, and 62 right end of the second screw rod is equipped with the first switch block 65.
Embodiment 4
A kind of Petroleum refining pipeline flanges docking facilities include as shown in figures 1 to 6 the first sliding rail 1, the first sliding block 2, supporting leg 3, riser 4, fixed device 5 and mobile device 6 are set on first sliding rail 1 there are two the first sliding block 2, the first sliding block 2 and the One sliding rail 1 is slidably matched, and is equipped with mobile device 6 between two 2 tops of the first sliding block, 1 left side of the first sliding rail and right side are all Supporting leg 3 is installed, riser 4 is installed among first sliding block, 2 bottom, 4 leading flank of riser is equipped with fixed device 5.
Fixed device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc block 55, 4 leading flank top of riser is equipped with fixed block 51, and 4 leading flank lower part of riser is equipped with the first nut 52, sets in the first nut 52 There is the first screw rod 53,53 top of the first screw rod is equipped with first bearing seat 54, and 54 top of first bearing seat is equipped with arc block 55, Arc block 55 is located at immediately below fixed block 51.
Mobile device 6 includes guide sleeve 61, the second screw rod 62, the second nut 63, second bearing seat 64 and the first switch block 65, Guide sleeve 61 is installed, 2 top left side of the first sliding block of right side is equipped with the second nut 63, the second nut at the top of the first sliding block of left side 2 The second screw rod 62 is equipped in 63,62 left part of the second screw rod is located in guide sleeve 61, and 63 right side of the second nut is equipped with second bearing Seat 64, the second screw rod 62 is located in second bearing seat 64, and 62 right end of the second screw rod is equipped with the first switch block 65.
It further include having auxiliary device 7, auxiliary device 7 includes arc panel 71, the second sliding rail 72, the second sliding block 73, transverse slat 74,3rd bearing seat 75, rubber cylinder 76, shaft 77, the second switch block 78, l-shaped rod 79, ball 710 and fourth bearing seat 711, Supporting leg 3 right side top in right side is equipped with arc panel 71, and arc panel 71 is located at 51 right side of right side fixed block, 71 medial surface of arc panel It is evenly spaced that ball 710 is installed, the second sliding rail 72 is installed on the right side of 3 leading flank lower part of right side supporting leg, the second sliding rail 72 is in It being vertically arranged, the second sliding rail 72 is equipped with the second sliding block 73 engaged therewith, and the second sliding block 73 is slidably matched with the second sliding rail 72, Second sliding block, 73 right side top is equipped with transverse slat 74, and the 74 top left and right sides of transverse slat is fitted with 3rd bearing seat 75, left and right Shaft 77 is installed, 77 right end of shaft is equipped with the second switch block 78, and 77 left part of shaft is equipped between two sides 3rd bearing seat 75 Rubber cylinder 76,55 bottom right of right side arc block are equipped with fourth bearing seat 711, are equipped with l-shaped rod in fourth bearing seat 711 79, l-shaped rod 79 and the second sliding block 73 cooperate.
It further include having inserted link 9, limited block 10 and rubber sleeve 11,62 right part of the second screw rod is provided with through-hole 8, is equipped in through-hole 8 Inserted link 9,9 bottom end of inserted link are equipped with limited block 10, and 9 top of inserted link covers rubber sleeve 11.
It further include having lanyard 12 and fixed link 13, riser 4 leading flank in right side is all connected with lanyard 12, lanyard 12 in two sides up and down Tail end is connected with fixed link 13.
Working principle: personnel are operated first by two ring flanges and pass through the left and right sides fixation fixation of device 5, Ji Keqi respectively Dynamic mobile device 6, mobile device 6 drive the first sliding block 2 of right side to be moved to the left, and the first sliding block of right side 2 is moved to the left drive right side Riser 4 is moved to the left, and right side riser 4, which is moved to the left, drives right flange disk to be moved to the left, and then right flange disk is moved to the left It contacts and is docked with left side ring flange, can stop moving.After the completion of two ring flanges dock, fixed device can be passed through 5 by two ring flanges releases, then are removed, then drive right side riser 4 to move right by mobile device 6 and restore to original position i.e. It can.
Because fixed device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc Block 55,4 leading flank top of riser are equipped with fixed block 51, and 4 leading flank lower part of riser is equipped with the first nut 52, the first nut 52 It is inside equipped with the first screw rod 53,53 top of the first screw rod is equipped with first bearing seat 54, and 54 top of first bearing seat is equipped with arc Block 55, arc block 55 are located at immediately below fixed block 51, are operated first personnel for two ring flanges and are individually positioned in the left and right sides admittedly Determine between block 51 and arc block 55, then twist the first screw rod 53 of the left and right sides and move up, the first screw rod of the left and right sides 53 is upward Mobile that left and right sides arc block 55 is driven to move up, left and right sides arc block 55, which moves up to contact with ring flange, to be consolidated It is fixed, stop the first screw rod 53 of twisting, right flange disk can be driven to be moved to the left by mobile device 6 and be docked.Similarly, when After the completion of ring flange docking, it can reversely twist the first screw rod 53 of the left and right sides and move down, and then arc block 55 is by ring flange It unclamps, operator can remove ring flange.
Because mobile device 6 includes guide sleeve 61, the second screw rod 62, the second nut 63, second bearing seat 64 and first turn Block 65, is equipped with guide sleeve 61 at the top of the first sliding block of left side 2, and 2 top left side of the first sliding block of right side is equipped with the second nut 63, and second The second screw rod 62 is equipped in nut 63,62 left part of the second screw rod is located in guide sleeve 61, and 63 right side of the second nut is equipped with second Bearing block 64, the second screw rod 62 are located in second bearing seat 64, and 62 right end of the second screw rod is equipped with the first switch block 65, work as ring flange When being fixed, operator can twist the first switch block 65, and the rotation of the first switch block 65 drives the rotation of the second screw rod 62, the second screw rod 62 rotations drive the second nut 63 to be moved to the left, and the second nut 63 is moved to the left the first sliding block 2 of drive right side and is moved to the left, right side First sliding block 2 is moved to the left drive right side riser 4 and is moved to the left, and then drives right flange disk to be moved to the left and docked.When After the completion of ring flange docking, and when removing, the first switch block 65 can be reversely twisted, and then it is extensive to drive right side riser 4 to move right Again to original position.
Because further including having auxiliary device 7, auxiliary device 7 include arc panel 71, the second sliding rail 72, the second sliding block 73, Transverse slat 74,3rd bearing seat 75, rubber cylinder 76, shaft 77, the second switch block 78, l-shaped rod 79, ball 710 and fourth bearing seat 711, supporting leg 3 right side top in right side is equipped with arc panel 71, and arc panel 71 is located on the right side of right side fixed block 51, in arc panel 71 Side is evenly spaced to be equipped with ball 710, is equipped with the second sliding rail 72, the second sliding rail on the right side of 3 leading flank lower part of right side supporting leg 72 in being vertically arranged, and the second sliding rail 72 is equipped with the second sliding block 73 engaged therewith, and the second sliding block 73 and the second sliding rail 72 slide Cooperation, 73 right side top of the second sliding block are equipped with transverse slat 74, and the 74 top left and right sides of transverse slat is fitted with 3rd bearing seat 75, Shaft 77 is installed, 77 right end of shaft is equipped with the second switch block 78,77 left part of shaft peace between left and right sides 3rd bearing seat 75 Equipped with rubber cylinder 76, arc block 55 bottom right in right side is equipped with fourth bearing seat 711, is equipped with L in fourth bearing seat 711 Type bar 79, l-shaped rod 79 and the second sliding block 73 cooperate, when ring flange is between fixed block 51 and arc block 55, operator The first screw rod 53 of right side can be twisted to move up, and then arc block 55 moves up and l-shaped rod 79 is driven to move up, l-shaped rod 79, which move up the second sliding block 73 of drive, moves up, and the second sliding block 73 moves up band motion plate 74 and moves up, transverse slat 74 It moves up and is moved up with the component on motion plate 74, and then rubber cylinder 76 is contacted with ring flange, stop twisting right side the One screw rod 53, i.e., rotatably right flange disk makes right flange disk and the mounting hole of left side ring flange to corresponding, and ball 710 makes Ring flange rotates more smooth.After the mounting hole of two ring flanges corresponds to, i.e. rotatable l-shaped rod 79, and then when l-shaped rod 79 not When being contacted with the second sliding block 73, the first screw rod 53 of right side can be twisted again and is moved up, and right flange disk is fixed.Such as This, the ring flange after capable of making docking is more convenient subsequent processing installation.
Because further including having inserted link 9, limited block 10 and rubber sleeve 11,62 right part of the second screw rod is provided with through-hole 8, in through-hole 8 Equipped with inserted link 9,9 bottom end of inserted link is equipped with limited block 10, and 9 top of inserted link covers rubber sleeve 11, after ring flange is fixed, operator Member can hold inserted link 9, be rotated further by inserted link 9, and the rotation of inserted link 9 drives the rotation of the second screw rod 62, so drive ring flange mobile into Row docking, and rubber sleeve 11 increases and the frictional force of water, and the rotation inserted link 9 for keeping operator more firm.In this way, can make to operate Personnel more easily rotate the second screw rod 62.
Because further including having lanyard 12 and fixed link 13, riser 4 leading flank in right side is all connected with lanyard 12 in two sides up and down, hangs 12 tail ends of restricting are connected with fixed link 13, after ring flange is fixed, can be inserted into fixed link 13 in the mounting hole of ring flange, in turn Fixed link 13 fixes two ring flanges, then docks to two ring flanges.After the completion of ring flange docking, by fixed link 13 from method It is taken out in the mounting hole of blue disk.In this way, can prevent from causing the mounting hole of ring flange not correspond to when ring flange is mobile.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (3)

1. a kind of Petroleum refining pipeline flanges docking facilities, which is characterized in that include the first sliding rail (1), the first sliding block (2), supporting leg (3), riser (4), fixed device (5) and mobile device (6), set on the first sliding rail (1) there are two the first sliding block (2), the first sliding block (2) is slidably matched with the first sliding rail (1), is equipped with mobile device (6) between two the first sliding blocks (2) tops, First sliding rail (1) left side and right side are fitted with supporting leg (3), are equipped with riser (4) among the first sliding block (2) bottom, are erected Plate (4) leading flank is equipped with fixed device (5);Fixed device (5) include fixed block (51), the first nut (52), the first screw rod (53), first bearing seat (54) and arc block (55), riser (4) leading flank top are equipped with fixed block (51), on front side of riser (4) Face lower part is equipped with the first nut (52), is equipped with the first screw rod (53) in the first nut (52), the installation of the first screw rod (53) top Have first bearing seat (54), first bearing seat (54) top is equipped with arc block (55), and arc block (55) is located at fixed block (51) Underface;Mobile device (6) includes guide sleeve (61), the second screw rod (62), the second nut (63), second bearing seat (64) and One switch block (65) is equipped with guide sleeve (61) at the top of the first sliding block of left side (2), and right side the first sliding block (2) top left side is equipped with the Two nuts (63), the second nut (63) is interior to be equipped with the second screw rod (62), and the second screw rod (62) left part is located in guide sleeve (61), and second Nut (63) right side is equipped with second bearing seat (64), and the second screw rod (62) is located in second bearing seat (64), the second screw rod (62) right end is equipped with the first switch block (65);It further include having auxiliary device (7), auxiliary device (7) includes arc panel (71), Two sliding rails (72), the second sliding block (73), transverse slat (74), 3rd bearing seat (75), rubber cylinder (76), shaft (77), second turn Block (78), l-shaped rod (79), ball (710) and fourth bearing seat (711), right side supporting leg (3) right side top are equipped with arc panel (71), arc panel (71) is located on the right side of right side fixed block (51), and arc panel (71) medial surface is evenly spaced to be equipped with ball (710), it being equipped with the second sliding rail (72) on the right side of right side supporting leg (3) leading flank lower part, the second sliding rail (72) is in be vertically arranged, and second Sliding rail (72) is equipped with the second sliding block (73) engaged therewith, and the second sliding block (73) is slidably matched with the second sliding rail (72), and second Sliding block (73) right side top is equipped with transverse slat (74), and the left and right sides is fitted with 3rd bearing seat (75) at the top of transverse slat (74), It is equipped between left and right sides 3rd bearing seat (75) shaft (77), shaft (77) right end is equipped with the second switch block (78), shaft (77) left part is equipped with rubber cylinder (76), and right side arc block (55) bottom right is equipped with fourth bearing seat (711), the 4th axis It holds in seat (711) and is equipped with l-shaped rod (79), l-shaped rod (79) and the second sliding block (73) cooperate.
2. a kind of Petroleum refining pipeline flanges docking facilities according to claim 1, which is characterized in that further include having Inserted link (9), limited block (10) and rubber sleeve (11), the second screw rod (62) right part are provided with through-hole (8), and inserted link is equipped in through-hole (8) (9), inserted link (9) bottom end is equipped with limited block (10), and inserted link (9) top covers rubber sleeve (11).
3. a kind of Petroleum refining pipeline flanges docking facilities according to claim 2, which is characterized in that further include having Lanyard (12) and fixed link (13), right side riser (4) leading flank are all connected with lanyard (12) two sides up and down, and lanyard (12) tail end connects It is connected to fixed link (13).
CN201711211403.0A 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities Active CN107813263B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711211403.0A CN107813263B (en) 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711211403.0A CN107813263B (en) 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities

Publications (2)

Publication Number Publication Date
CN107813263A CN107813263A (en) 2018-03-20
CN107813263B true CN107813263B (en) 2019-07-05

Family

ID=61610508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711211403.0A Active CN107813263B (en) 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities

Country Status (1)

Country Link
CN (1) CN107813263B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109955194B (en) * 2019-01-29 2020-11-03 东方电气集团东方汽轮机有限公司 Guide pin for steam turbine and steam turbine cylinder assembling method
CN111571202B (en) * 2020-05-09 2021-07-23 海盐县法兰厂 Automatic assembling device for flange component
CN113334322B (en) * 2021-04-20 2023-04-11 山东恩乐驰锻造有限公司 Pipeline flange plate butt joint equipment capable of avoiding abrasion dislocation for petroleum refining

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE718740C (en) * 1941-06-25 1942-03-19 Max Schuster Tool for dismantling pipelines
US4769889A (en) * 1985-10-16 1988-09-13 Michael J. Landman Apparatus for replacing pipe gaskets
CN2928396Y (en) * 2006-07-21 2007-08-01 将军烟草集团有限公司 Assembling and disassembling tool for flange
CN204772377U (en) * 2015-06-17 2015-11-18 中国石油天然气股份有限公司 A to hole device for flange
CN206072518U (en) * 2016-10-17 2017-04-05 重庆市久庆仪器仪表有限公司 gas pipeline flange mounting tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE718740C (en) * 1941-06-25 1942-03-19 Max Schuster Tool for dismantling pipelines
US4769889A (en) * 1985-10-16 1988-09-13 Michael J. Landman Apparatus for replacing pipe gaskets
CN2928396Y (en) * 2006-07-21 2007-08-01 将军烟草集团有限公司 Assembling and disassembling tool for flange
CN204772377U (en) * 2015-06-17 2015-11-18 中国石油天然气股份有限公司 A to hole device for flange
CN206072518U (en) * 2016-10-17 2017-04-05 重庆市久庆仪器仪表有限公司 gas pipeline flange mounting tool

Also Published As

Publication number Publication date
CN107813263A (en) 2018-03-20

Similar Documents

Publication Publication Date Title
CN107813263B (en) A kind of Petroleum refining pipeline flanges docking facilities
CN105817435B (en) A kind of comprehensive computer surface dust removing machine
CN107984323B (en) A kind of machining iron pipe end derusting grinding device
CN108125471B (en) Mining machinery accessory show shelf
CN207423491U (en) A kind of door and window performance detection apparatus
CN205762798U (en) A kind of Lubricating oil barrel device for high-efficiency cleaning
CN106820582B (en) Multifunctional workstation is used in a kind of exploitation of computer software
CN105855876B (en) Point device is spelled in the automation of engineering machinery arm
CN208727831U (en) A kind of robot coating suspension hanger
CN107651626B (en) A kind of worker's repairing natural gas line ancillary equipment
CN107520563B (en) A kind of petroleum pipeline auxiliary welding equipment
CN108221595A (en) A kind of asphalt road surface repairing floating device
CN209043792U (en) Product appearance inspection device based on machine vision
CN204323649U (en) A kind of mast wing drop device
CN206980856U (en) A kind of dry powder extinguisher dry powder making apparatus
CN209565344U (en) A kind of drum cleaning location structure
CN208845979U (en) The express delivery cabinet being easily installed
CN210773793U (en) Pantograph maintenance workbench based on working state self-simulation principle
CN108406543A (en) A kind of machinery heavy parts processing iron plate surface automation Physical rust removalling equipment
CN111975882A (en) Wood cutting equipment convenient to equipment is changed
CN209444671U (en) Sloped rotating welt device
CN207380396U (en) A kind of type leading wheel framework of COG/FOG bonding machines
CN205607754U (en) A remove elevating gear for supporting split conductor disc
CN109340232A (en) Sloped rotating welt device
CN110104419A (en) A kind of automatic poking moving device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190327

Address after: No. 1 Dongfeng Road, Yaxi Town, Gaochun District, Nanjing City, Jiangsu Province, 210000

Applicant after: Nanjing Gaoning Forging Flange Factory

Address before: 518000 Yucai Road, Nanshan District, Shenzhen, Guangdong Province

Applicant before: Nie Xinjie

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant