CN107651626B - A kind of worker's repairing natural gas line ancillary equipment - Google Patents

A kind of worker's repairing natural gas line ancillary equipment Download PDF

Info

Publication number
CN107651626B
CN107651626B CN201710779351.0A CN201710779351A CN107651626B CN 107651626 B CN107651626 B CN 107651626B CN 201710779351 A CN201710779351 A CN 201710779351A CN 107651626 B CN107651626 B CN 107651626B
Authority
CN
China
Prior art keywords
sliding rail
sliding
natural gas
block
bracing wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710779351.0A
Other languages
Chinese (zh)
Other versions
CN107651626A (en
Inventor
司晨骁
樊静静
黄子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Donghui Engineering Co.,Ltd.
Original Assignee
Xinchang Yixulong Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang Yixulong Machinery Technology Co Ltd filed Critical Xinchang Yixulong Machinery Technology Co Ltd
Priority to CN201710779351.0A priority Critical patent/CN107651626B/en
Publication of CN107651626A publication Critical patent/CN107651626A/en
Application granted granted Critical
Publication of CN107651626B publication Critical patent/CN107651626B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/042Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations actuated by lazy-tongs mechanisms or articulated levers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/06Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported by levers for vertical movement
    • B66F7/065Scissor linkages, i.e. X-configuration
    • B66F7/0666Multiple scissor linkages vertically arranged
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/06Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported by levers for vertical movement
    • B66F7/08Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported by levers for vertical movement hydraulically or pneumatically operated
    • B66F7/085Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported by levers for vertical movement hydraulically or pneumatically operated pneumatically operated

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Electric Cable Installation (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention relates to a kind of ancillary equipments more particularly to a kind of worker to repair natural gas line ancillary equipment.The technical problem to be solved in the present invention is to provide one kind to consolidate, protection can be clamped to worker, and is not easy tumble injury, and the worker for being also moved easily, and then improving work efficiency repairs natural gas line ancillary equipment.In order to solve the above-mentioned technical problems, the present invention provides such a workers to repair natural gas line ancillary equipment, includes bottom plate, vertical bar, wheel, lifting device etc.;Bottom base plate left and right sides symmetrical expression is equipped with vertical bar, and vertical bar bottom end is equipped with wheel, and bottom plate top center is equipped with lifting device, is connected with the second sliding rail on the lifting part of lifting device.The present invention can make that staff is comprehensive, more easily places under repair to natural gas line by rotating device, reached firm, can be clamped protection to worker, and be not easy tumble injury, the effect for being also moved easily, and then improving work efficiency.

Description

A kind of worker's repairing natural gas line ancillary equipment
Technical field
The present invention relates to a kind of ancillary equipments more particularly to a kind of worker to repair natural gas line ancillary equipment.
Background technique
Natural gas line, which refers to, is transported to city from exploitation ground or treatment plant for natural gas (associated gas including oil field production) The pipeline of city's air distribution center or Industry enterprise customer, also known as gas pipeline.
Natural gas line when something goes wrong, requires people and places under repair to it, and guarantees the use of natural gas line, and When worker places under repair to natural gas line, ladder is easy shakiness, and worker is easy to drop and lead to tumble injury, when people is located on ladder Also be inconvenient to move, and then working efficiency is low, thus need to research and develop it is a kind of it is firm, protection can be clamped to worker, and do not allow Easy tumble injury, is also moved easily, and then the worker improved work efficiency repairs natural gas line ancillary equipment.
Summary of the invention
(1) technical problems to be solved
When the present invention is in order to overcome worker to place under repair natural gas line, ladder is easy shakiness, worker be easy to drop and Lead to tumble injury, also be inconvenient to move when people is located on ladder, and then ineffective disadvantage, the invention solves technology ask Topic is to provide one kind and consolidates, can be clamped protection to worker, and is not easy tumble injury, is also moved easily, and then improve work The worker of efficiency repairs natural gas line ancillary equipment.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a workers to repair natural gas line ancillary equipment, It include bottom plate, vertical bar, wheel, lifting device, the second sliding rail, framework, N-shaped frame, sliding sleeve and fixed device, bottom base plate or so Bilateral type is equipped with vertical bar, and vertical bar bottom end is equipped with wheel, and bottom plate top center is equipped with lifting device, lifting device The second sliding rail is connected on lifting part, the second sliding rail is equipped with framework, bottom in framework at the top of the second sliding rail in being horizontally disposed with Centre is equipped with N-shaped frame, and N-shaped top of the trellis is equipped with sliding sleeve, and sliding sleeve is slidably matched with N-shaped top of the trellis, and framework connects on outer left side It is connected to fixed device.
Preferably, lifting device includes the first sliding rail, the first sliding block, crane, cylinder and the second sliding block, bottom plate top Centre is equipped with the first sliding rail, and for the first sliding rail in being horizontally disposed with, the first sliding rail is equipped with two the first sliding blocks engaged therewith, left Crane is installed between right two the first sliding blocks, the second sliding block, the installation of the second sliding block are installed at left and right sides of crane top In the second sliding rail bottom, the second sliding block is slidably matched with the second sliding rail, and the first sliding rail top left side is in such a way that pin connects Cylinder is installed, the telescopic rod of cylinder is connect with crane bottom right by pin.
Preferably, clamping device includes the first bracing wire, fixed block, the first screw rod, the second bracing wire and fixture block, sliding sleeve top Centre is connected with the first bracing wire, and the first bracing wire tail end is equipped with fixed block, and through-hole, fixed block top are laterally provided in the middle part of fixed block Centre is provided with the first threaded hole, be connected in the first threaded hole and through-hole, equipped with the first screw rod in the first threaded hole, in the first bracing wire It is connected with the second bracing wire, the second bracing wire tail end is equipped with fixture block.
It preferably, further include having fixed device, fixed device includes third sliding rail, third sliding block, spring, electronic coiling Wheel, third bracing wire, rubber block and l-shaped rod, the outer left side lower part of framework are equipped with third sliding rail, and third sliding rail is in be horizontally disposed with, Third sliding rail is equipped with two third sliding blocks engaged therewith, and two third sliding blocks are slidably matched with third sliding rail, front and rear sides L-shaped rod is fitted among third slider top, front side l-shaped rod trailing flank top and rear side l-shaped rod leading flank top are all installed Have a rubber block, rubber block be it is arranged symmetrically, be connected between front side l-shaped rod trailing flank lower part and rear side l-shaped rod leading flank lower part Spring, is equipped with electronic reel in the middle part of third sliding rail left side, around there are two third bracing wire on electronic reel, one of them It is connect in the middle part of third bracing wire tail end and front side third sliding block trailing flank, on front side of another third bracing wire tail end and rear side third sliding block Middle face connection.
It preferably, further include having rotating device, rotating device includes first motor, first gear, endless glide, annular Sliding block and gear ring, bottom plate top center are equipped with endless glide, and endless glide is equipped with ring slider engaged therewith, and annular is sliding Rack gear is installed at the top of block, the first sliding rail bottom can also be connect with gear ring top, and bottom plate top right side is equipped with first motor, First motor is in being vertically arranged, and the output shaft of first motor is connected with first gear by shaft coupling, and first gear is located at gear ring Right side, first gear are engaged with gear ring.
Preferably, further include having strut and sunshading board, strut is installed on the left of framework inner top, strut top is equipped with screening Positive plate.
It preferably, further include having guide sleeve and the second screw rod, the outer left side top of framework is equipped with guide sleeve, and strut may be located on In guide sleeve, strut bottom end is contacted with bottom in framework, and guide sleeve right flank middle part is provided with the second threaded hole, the second threaded hole and guide sleeve Interior connection, the second threaded hole is interior to be equipped with the second screw rod, and the second screw rod is located in the second threaded hole.
It preferably, further include having hook, strut right side central is equipped with hook.
It preferably, further include having messenger wire, sunshading board bottom is evenly spaced to be equipped with messenger wire.
Working principle: being operated first personnel and the present apparatus be moved to below natural gas line by wheel, operator station Operator is clamped in framework, then through clamping device, and then prevents operator from dropping from framework, Ji Keqi The lifting part of dynamic lifting device, lifting device drives framework to move up, and then operator is driven to move up, and works as operation When personnel are moved to beside natural gas line, lifting device can be closed, operator can place under repair to natural gas line. After the completion of natural gas line repairing, lifting device can be started, framework is driven to move down recovery to original position, and then drive behaviour It is moved down as personnel, closes lifting device, unclamped operator by clamping device, operator can be above and below framework Come.
Because lifting device includes the first sliding rail, the first sliding block, crane, cylinder and the second sliding block, at the top of bottom plate in Between the first sliding rail is installed, for the first sliding rail in horizontally disposed, the first sliding rail is equipped with two the first sliding blocks engaged therewith, left and right Crane is installed between two the first sliding blocks, the second sliding block is installed at left and right sides of crane top, the second sliding block is mounted on Second sliding rail bottom, the second sliding block are slidably matched with the second sliding rail, and the first sliding rail top left side is pacified in such a way that pin connects Equipped with cylinder, the telescopic rod of cylinder is connect with crane bottom right by pin, when operator station is in framework, operation Personnel can start the telescopic rod elongation of cylinder, and the telescopic rod elongation of cylinder drives crane to move up, the first sliding rail and the One sliding block play the guiding role, and crane moves upwardly through the second sliding block and the second sliding rail is driven to move up, and then drives operation Personnel move up.When operator is located at beside natural gas line, cylinder can be closed, operator can be to natural gas Pipeline places under repair.When natural gas line repairing after the completion of, can start cylinder telescopic rod shorten, and then drive crane to To original position, operator can get off out of framework for lower mobile recovery.
Because clamping device includes the first bracing wire, fixed block, the first screw rod, the second bracing wire and fixture block, at the top of sliding sleeve in Between be connected with the first bracing wire, the first bracing wire tail end is equipped with fixed block, be laterally provided with through-hole in the middle part of fixed block, at the top of fixed block in Between be provided with the first threaded hole, be connected in the first threaded hole and through-hole, equipped with the first screw rod in the first threaded hole, connects in the first bracing wire It is connected to the second bracing wire, the second bracing wire tail end is equipped with fixture block, and when operator is located in framework, operator can twist One screw rod moves up, then fixture block is inserted into through-hole, pulls fixture block, and then the first bracing wire and the second bracing wire are by operator's body Body clamps, and can reversely twist the first screw rod and move down, and then the first screw rod moves down to contact with the second bracing wire and be consolidated It is fixed, stop the first screw rod of twisting.After operator has repaired natural gas line, the first screw rod can be twisted again to moving up It is dynamic, and then the first screw rod is not contacted with the second bracing wire, can be taken out fixture block by through-hole, operator can be above and below framework Come.In this way, can prevent operator from dropping from framework when repairing natural gas line.
Because further including having fixed device, fixed device include third sliding rail, third sliding block, spring, electronic reel, Third bracing wire, rubber block and l-shaped rod, the outer left side lower part of framework are equipped with third sliding rail, and third sliding rail is in horizontally disposed, third Sliding rail is equipped with two third sliding blocks engaged therewith, and two third sliding blocks are slidably matched with third sliding rail, front and rear sides third L-shaped rod is fitted among slider top, front side l-shaped rod trailing flank top and rear side l-shaped rod leading flank top are fitted with rubber Blob of viscose, rubber block be it is arranged symmetrically, be connected with spring between front side l-shaped rod trailing flank lower part and rear side l-shaped rod leading flank lower part, Electronic reel is installed, around there are two third bracing wire, one of thirds on electronic reel in the middle part of third sliding rail left side It is connect in the middle part of bracing wire tail end and front side third sliding block trailing flank, in another third bracing wire tail end and rear side third sliding block leading flank Portion's connection is grasped when operator is located at beside natural gas line, and when natural gas line is between the l-shaped rod of front and rear sides Make personnel can electronic reel rotate forward, and then third bracing wire pulls third sliding block in front and rear sides to move inward, front and rear sides the Three sliding blocks move inward drive front and rear sides l-shaped rod move inward, spring-compressed, front and rear sides l-shaped rod move inward with naturally Feed channel contact is fixed, and rubber block and natural gas line contact increasing friction force, and then fixed to natural gas line It is more firm, electronic reel is closed, can be placed under repair to natural gas line.After the completion of natural gas line repairing Start electronic reel reversion, third bracing wire is relaxed, and because of the effect of spring, front and rear sides l-shaped rod is displaced outwardly natural gas Pipeline unclamps, and closes Electric Motor Wheel.Personnel are damaged in this way, natural gas line can be prevented in repair procedures to fall off.
Because further including having rotating device, rotating device includes first motor, first gear, endless glide, annular cunning Block and gear ring, bottom plate top center are equipped with endless glide, and endless glide is equipped with ring slider engaged therewith, ring slider Rack gear is installed at top, and the first sliding rail bottom can also be connect with gear ring top, and bottom plate top right side is equipped with first motor, the One motor is in being vertically arranged, and the output shaft of first motor is connected with first gear by shaft coupling, and first gear is located at the gear ring right side Side, first gear are engaged with gear ring, when operator, which is inconvenient to move, to place under repair to natural gas line, operator Start first motor rotation, first motor rotation drives first gear rotation, and first gear rotation drives ring gear against rotation, and gear ring turns It is dynamic to drive the rotation of the first sliding rail, and then the first sliding rail is driven to rotate with upper-part, facilitate repairing natural when operator turns to When the position of feed channel, first motor can be closed.In this way, can make operator that can carry out to natural gas line without movement Comprehensive repairing.
Because further including having strut and sunshading board, strut is installed on the left of framework inner top, strut top is equipped with sunshade Plate, when operator repairs natural gas line, sunshading board covers sunlight, and then sunlight is prevented to be radiated at operator On keep operator awfully hot, and influence repairing to natural gas line.
Because further including having guide sleeve and the second screw rod, the outer left side top of framework is equipped with guide sleeve, and strut may be located on leading In set, strut bottom end is contacted with bottom in framework, and guide sleeve right flank middle part is provided with the second threaded hole, in the second threaded hole and guide sleeve Connection, the second threaded hole is interior to be equipped with the second screw rod, and the second screw rod is located in the second threaded hole, when operator station is in framework When, operator can pull strut to move up and down, and then block sunshading board preferably to sunlight, when strut moves Afterwards, the second screw rod can be twisted to be moved to the left, the second screw rod is moved to the left to contact with strut and be fixed, in this way, adjusting strut Position, sunshading board can be made preferably to carry out sunshade.
Because further including having hook, strut right side central is equipped with hook, when operator has tool to need to place, behaviour Making personnel can hang over tool on hook.In this way, held without operator, it is time saving and energy saving.
Because further including having messenger wire, sunshading board bottom is evenly spaced to be equipped with messenger wire, and messenger wire can make sunshading board more beautiful It sees.
(3) beneficial effect
The present invention passes through fixed device, it can be kept more firm, do not fallen out when natural gas line is repaired, and rotates Device, can make that staff is comprehensive, more easily places under repair to natural gas line, reached firm, can carry out to worker Protection is clamped, and is not easy tumble injury, the effect for being also moved easily, and then improving work efficiency.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of lifting device of the present invention.
Fig. 3 is the schematic view of the front view of clamping device of the present invention.
Fig. 4 is the schematic view of the front view of the fixed device of the present invention.
Fig. 5 is the left view structural representation of the fixed device of the present invention.
Fig. 6 is the schematic view of the front view of rotating device of the present invention.
Fig. 7 is the first part schematic view of the front view of the invention.
Fig. 8 is second of part schematic view of the front view of the invention.
Fig. 9 is the third part schematic view of the front view of the invention.
Figure 10 is the 4th kind of part schematic view of the front view of the invention.
The label in accompanying drawing is: 1- bottom plate, 2- vertical bar, 3- wheel, 4- lifting device, the first sliding rail of 41-, 42- first are sliding Block, 43- crane, 44- cylinder, the second sliding block of 45-, the second sliding rail of 5-, 6- framework, 7-n type frame, 8- sliding sleeve, 9- clamping device, The first bracing wire of 91-, 92- fixed block, 93- through-hole, the first threaded hole of 94-, the first screw rod of 95-, the second bracing wire of 96-, 97- fixture block, 10- fixation device, 101- third sliding rail, 102- third sliding block, 103- spring, the electronic reel of 104-, 105- third bracing wire, 106- rubber block, 107-L type bar, 11- rotating device, 111- first motor, 112- first gear, 113- endless glide, 114- Ring slider, 115- gear ring, 12- strut, 13- sunshading board, 14- guide sleeve, the second threaded hole of 15-, the second screw rod of 16-, 17- are hung Hook, 18- messenger wire.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of worker repairs natural gas line ancillary equipment, as Figure 1-10 shows, include bottom plate 1, vertical bar 2, wheel 3, Lifting device 4, the second sliding rail 5, framework 6, N-shaped frame 7, sliding sleeve 8 and fixed device 10,1 bottom of bottom plate left and right sides symmetrical expression Vertical bar 2 is installed, 2 bottom end of vertical bar is equipped with wheel 3, and 1 top center of bottom plate is equipped with lifting device 4, the lifting unit of lifting device 4 The second sliding rail 5 is connected on part, the second sliding rail 5 is equipped with framework 6, bottom in framework 6 in being horizontally disposed at the top of the second sliding rail 5 Centre is equipped with N-shaped frame 7, and sliding sleeve 8 is equipped at the top of N-shaped frame 7, and sliding sleeve 8 and 7 top slide of N-shaped frame cooperate, the outer left side of framework 6 Fixed device 10 is connected on face.
Embodiment 2
A kind of worker repairs natural gas line ancillary equipment, as Figure 1-10 shows, include bottom plate 1, vertical bar 2, wheel 3, Lifting device 4, the second sliding rail 5, framework 6, N-shaped frame 7, sliding sleeve 8 and fixed device 10,1 bottom of bottom plate left and right sides symmetrical expression Vertical bar 2 is installed, 2 bottom end of vertical bar is equipped with wheel 3, and 1 top center of bottom plate is equipped with lifting device 4, the lifting unit of lifting device 4 The second sliding rail 5 is connected on part, the second sliding rail 5 is equipped with framework 6, bottom in framework 6 in being horizontally disposed at the top of the second sliding rail 5 Centre is equipped with N-shaped frame 7, and sliding sleeve 8 is equipped at the top of N-shaped frame 7, and sliding sleeve 8 and 7 top slide of N-shaped frame cooperate, the outer left side of framework 6 Fixed device 10 is connected on face.
Lifting device 4 includes the first sliding rail 41, the first sliding block 42, crane 43, cylinder 44 and the second sliding block 45, bottom plate 1 top center is equipped with the first sliding rail 41, and for the first sliding rail 41 in being horizontally disposed with, the first sliding rail 41 is equipped with two engaged therewith First sliding block 42 is equipped with crane 43 between two the first sliding blocks 42 in left and right, and the is equipped at left and right sides of 43 top of crane Two sliding blocks 45, the second sliding block 45 are mounted on 5 bottom of the second sliding rail, and the second sliding block 45 is slidably matched with the second sliding rail 5, the first sliding rail 41 top left sides are equipped with cylinder 44 in such a way that pin connects, and telescopic rod and 43 bottom right of crane of cylinder 44 pass through Pin connection.
Embodiment 3
A kind of worker repairs natural gas line ancillary equipment, as Figure 1-10 shows, include bottom plate 1, vertical bar 2, wheel 3, Lifting device 4, the second sliding rail 5, framework 6, N-shaped frame 7, sliding sleeve 8 and fixed device 10,1 bottom of bottom plate left and right sides symmetrical expression Vertical bar 2 is installed, 2 bottom end of vertical bar is equipped with wheel 3, and 1 top center of bottom plate is equipped with lifting device 4, the lifting unit of lifting device 4 The second sliding rail 5 is connected on part, the second sliding rail 5 is equipped with framework 6, bottom in framework 6 in being horizontally disposed at the top of the second sliding rail 5 Centre is equipped with N-shaped frame 7, and sliding sleeve 8 is equipped at the top of N-shaped frame 7, and sliding sleeve 8 and 7 top slide of N-shaped frame cooperate, the outer left side of framework 6 Fixed device 10 is connected on face.
Lifting device 4 includes the first sliding rail 41, the first sliding block 42, crane 43, cylinder 44 and the second sliding block 45, bottom plate 1 top center is equipped with the first sliding rail 41, and for the first sliding rail 41 in being horizontally disposed with, the first sliding rail 41 is equipped with two engaged therewith First sliding block 42 is equipped with crane 43 between two the first sliding blocks 42 in left and right, and the is equipped at left and right sides of 43 top of crane Two sliding blocks 45, the second sliding block 45 are mounted on 5 bottom of the second sliding rail, and the second sliding block 45 is slidably matched with the second sliding rail 5, the first sliding rail 41 top left sides are equipped with cylinder 44 in such a way that pin connects, and telescopic rod and 43 bottom right of crane of cylinder 44 pass through Pin connection.
Clamping device 9 includes the first bracing wire 91, fixed block 92, the first screw rod 95, the second bracing wire 96 and fixture block 97, sliding sleeve 8 top centers are connected with the first bracing wire 91, and 91 tail end of the first bracing wire is equipped with fixed block 92, and 92 middle part of fixed block is laterally provided with logical Hole 93,92 top center of fixed block are provided with the first threaded hole 94, are connected in the first threaded hole 94 and through-hole 93, the first threaded hole 94 It is inside equipped with the first screw rod 95, the second bracing wire 96 is connected in the first bracing wire 91,96 tail end of the second bracing wire is equipped with fixture block 97.
Embodiment 4
A kind of worker repairs natural gas line ancillary equipment, as Figure 1-10 shows, include bottom plate 1, vertical bar 2, wheel 3, Lifting device 4, the second sliding rail 5, framework 6, N-shaped frame 7, sliding sleeve 8 and fixed device 10,1 bottom of bottom plate left and right sides symmetrical expression Vertical bar 2 is installed, 2 bottom end of vertical bar is equipped with wheel 3, and 1 top center of bottom plate is equipped with lifting device 4, the lifting unit of lifting device 4 The second sliding rail 5 is connected on part, the second sliding rail 5 is equipped with framework 6, bottom in framework 6 in being horizontally disposed at the top of the second sliding rail 5 Centre is equipped with N-shaped frame 7, and sliding sleeve 8 is equipped at the top of N-shaped frame 7, and sliding sleeve 8 and 7 top slide of N-shaped frame cooperate, the outer left side of framework 6 Fixed device 10 is connected on face.
Lifting device 4 includes the first sliding rail 41, the first sliding block 42, crane 43, cylinder 44 and the second sliding block 45, bottom plate 1 top center is equipped with the first sliding rail 41, and for the first sliding rail 41 in being horizontally disposed with, the first sliding rail 41 is equipped with two engaged therewith First sliding block 42 is equipped with crane 43 between two the first sliding blocks 42 in left and right, and the is equipped at left and right sides of 43 top of crane Two sliding blocks 45, the second sliding block 45 are mounted on 5 bottom of the second sliding rail, and the second sliding block 45 is slidably matched with the second sliding rail 5, the first sliding rail 41 top left sides are equipped with cylinder 44 in such a way that pin connects, and telescopic rod and 43 bottom right of crane of cylinder 44 pass through Pin connection.
Clamping device 9 includes the first bracing wire 91, fixed block 92, the first screw rod 95, the second bracing wire 96 and fixture block 97, sliding sleeve 8 top centers are connected with the first bracing wire 91, and 91 tail end of the first bracing wire is equipped with fixed block 92, and 92 middle part of fixed block is laterally provided with logical Hole 93,92 top center of fixed block are provided with the first threaded hole 94, are connected in the first threaded hole 94 and through-hole 93, the first threaded hole 94 It is inside equipped with the first screw rod 95, the second bracing wire 96 is connected in the first bracing wire 91,96 tail end of the second bracing wire is equipped with fixture block 97.
It further include having fixed device 10, fixed device 10 includes third sliding rail 101, third sliding block 102, spring 103, electricity Dynamic reel 104, third bracing wire 105, rubber block 106 and l-shaped rod 107, the outer left side lower part of framework 6 are equipped with third sliding rail 101, for third sliding rail 101 in being horizontally disposed with, third sliding rail 101 is equipped with two third sliding blocks 102 engaged therewith, two thirds Sliding block 102 is slidably matched with third sliding rail 101, and third sliding block 102 top center in front and rear sides is fitted with l-shaped rod 107, front side 107 trailing flank top of l-shaped rod and 107 leading flank top of rear side l-shaped rod are fitted with rubber block 106, and rubber block 106 is symmetrically to set It sets, 107 trailing flank lower part of front side l-shaped rod and rear side l-shaped rod are connected with spring 103, third sliding rail between 107 leading flank lower part Electronic reel 104 is installed in the middle part of 101 left sides, around there are two third bracing wire 105 on electronic reel 104, one of them Connect in the middle part of 105 tail end of third bracing wire and 102 trailing flank of front side third sliding block, another 105 tail end of third bracing wire and rear side the Connection in the middle part of three sliding blocks, 102 leading flank.
It further include having rotating device 11, rotating device 11 includes first motor 111, first gear 112, endless glide 113, ring slider 114 and gear ring 115,1 top center of bottom plate are equipped with endless glide 113, and endless glide 113 is equipped with and it The ring slider 114 of cooperation installs rack gear 115 at the top of ring slider 114, and 41 bottom of the first sliding rail can also be with gear ring 115 Top connection, 1 top right side of bottom plate are equipped with first motor 111, first motor 111 in being vertically arranged, first motor 111 it is defeated Shaft is connected with first gear 112 by shaft coupling, and first gear 112 is located at 115 right side of gear ring, first gear 112 and gear ring 115 engagements.
Further include having strut 12 and sunshading board 13, strut 12 is installed on the left of 6 inner top of framework, 12 top of strut is equipped with Sunshading board 13.
It further include having guide sleeve 14 and the second screw rod 16, the outer left side top of framework 6 is equipped with guide sleeve 14, and strut 12 can be with position In in guide sleeve 14,12 bottom end of strut is contacted with bottom in framework 6, and 14 right flank middle part of guide sleeve is provided with the second threaded hole 15, and second It is connected in threaded hole 15 and guide sleeve 14, is equipped with the second screw rod 16 in the second threaded hole 15, the second screw rod 16 is located at the second threaded hole In 15.
It further include having hook 17,12 right side central of strut is equipped with hook 17.
It further include having messenger wire 18,13 bottom of sunshading board is evenly spaced to be equipped with messenger wire 18.
Working principle: being operated first personnel and the present apparatus be moved to below natural gas line by wheel 3, operator station Operator is clamped in framework 6, then through clamping device 9, and then prevents operator from dropping from framework 6, i.e., Lifting device 4 can be started, the lifting part of lifting device 4 drives framework 6 to move up, and then drives operator to moving up It is dynamic, when operator is moved to beside natural gas line, lifting device 4 can be closed, operator can be to natural gas tube Road places under repair.After the completion of natural gas line repairing, lifting device 4 can be started, framework 6 is driven to move down recovery to original Position, and then operator is driven to move down, lifting device 4 is closed, is unclamped operator by clamping device 9, operator Member can get off from framework 6.
Because lifting device 4 includes the first sliding rail 41, the first sliding block 42, crane 43, cylinder 44 and the second sliding block 45, 1 top center of bottom plate is equipped with the first sliding rail 41, and in being horizontally disposed with, the first sliding rail 41 is equipped with engaged therewith the first sliding rail 41 Two the first sliding blocks 42 control and are equipped with crane 43 between two the first sliding blocks 42, installation at left and right sides of 43 top of crane There is the second sliding block 45, the second sliding block 45 is mounted on 5 bottom of the second sliding rail, and the second sliding block 45 is slidably matched with the second sliding rail 5, and first 41 top left side of sliding rail is equipped with cylinder 44, the telescopic rod and 43 bottom right of crane of cylinder 44 in such a way that pin connects It is connected by pin, when operator station is in framework 6, operator can start the telescopic rod elongation of cylinder 44, cylinder 44 telescopic rod elongation drives crane 43 to move up, and the first sliding rail 41 play the guiding role with the first sliding block 42, crane 43 Moving upwardly through the second sliding block 45 drives the second sliding rail 5 to move up, and then operator is driven to move up.Work as operator When member is located at beside natural gas line, cylinder 44 can be closed, operator can place under repair to natural gas line.When natural After the completion of feed channel is repaired, the telescopic rod that can start cylinder 44 shortens, and then crane 43 is driven to move down recovery to original Position, operator can get off out of framework 6.
Because clamping device 9 includes the first bracing wire 91, fixed block 92, the first screw rod 95, the second bracing wire 96 and fixture block 97, 8 top center of sliding sleeve is connected with the first bracing wire 91, and 91 tail end of the first bracing wire is equipped with fixed block 92, and 92 middle part of fixed block is laterally opened There is through-hole 93,92 top center of fixed block is provided with the first threaded hole 94, is connected in the first threaded hole 94 and through-hole 93, the first screw thread It is equipped with the first screw rod 95 in hole 94, is connected with the second bracing wire 96 in the first bracing wire 91,96 tail end of the second bracing wire is equipped with fixture block 97, When operator is located in framework 6, operator can twist the first screw rod 95 and move up, then fixture block 97 is inserted into through-hole In 93, fixture block 97 is pulled, and then the first bracing wire 91 clamps operator's body with the second bracing wire 96, can reversely twist first Screw rod 95 moves down, and then the first screw rod 95 is moved down to contact with the second bracing wire 96 and is fixed, and stops the first spiral shell of twisting Bar 95.After operator has repaired natural gas line, the first screw rod 95 can be twisted again and is moved up, and then the first screw rod 95 do not contact with the second bracing wire 96, can take out fixture block 97 by through-hole 93, operator can get off from framework 6.Such as This, can prevent operator from dropping from framework 6 when repairing natural gas line.
Because further including having fixed device 10, fixed device 10 includes third sliding rail 101, third sliding block 102, spring 103, electronic reel 104, third bracing wire 105, rubber block 106 and l-shaped rod 107, the outer left side lower part of framework 6 are equipped with third Sliding rail 101, for third sliding rail 101 in horizontally disposed, third sliding rail 101 is equipped with two third sliding blocks 102 engaged therewith, and two Third sliding block 102 is slidably matched with third sliding rail 101, and third sliding block 102 top center in front and rear sides is fitted with l-shaped rod 107, 107 trailing flank top of front side l-shaped rod and 107 leading flank top of rear side l-shaped rod are fitted with rubber block 106, and rubber block 106 is pair Claim setting, spring 103 is connected between 107 leading flank lower part of 107 trailing flank lower part of front side l-shaped rod and rear side l-shaped rod, third is sliding Electronic reel 104 is installed, around there are two third bracing wires 105 on electronic reel 104, wherein one in the middle part of 101 left side of rail It is connect in the middle part of a 105 tail end of third bracing wire and 102 trailing flank of front side third sliding block, another 105 tail end of third bracing wire and rear side Connection in the middle part of 102 leading flank of third sliding block, when operator is located at beside natural gas line, and natural gas line is located at front and back When between two sides l-shaped rod 107, operator can electronic reel 104 rotate forward, and then third bracing wire 105 pulls front and rear sides Third sliding block 102 moves inward, and front and rear sides third sliding block 102, which moves inward, drives front and rear sides l-shaped rod 107 to move inward, Spring 103 compresses, and front and rear sides l-shaped rod 107 is moved inward to contact with natural gas line and is fixed, and rubber block 106 and day Right feed channel contacts increasing friction force, and then more consolidates to natural gas line is fixed, closes electronic reel 104 It places under repair to natural gas line.After the completion of natural gas line repairing, electronic reel 104 can be started and inverted, third is drawn Line 105 is relaxed, and because of the effect of spring 103, front and rear sides l-shaped rod 107, which is displaced outwardly, unclamps natural gas line, is closed electronic Wheel.Personnel are damaged in this way, natural gas line can be prevented in repair procedures to fall off.
Because further including having rotating device 11, rotating device 11 includes first motor 111, first gear 112, annular cunning Rail 113, ring slider 114 and gear ring 115,1 top center of bottom plate are equipped with endless glide 113, endless glide 113 be equipped with Its ring slider 114 cooperated, installs rack gear 115 at the top of ring slider 114,41 bottom of the first sliding rail can also and gear ring 115 top connections, 1 top right side of bottom plate are equipped with first motor 111, and first motor 111 is in be vertically arranged, first motor 111 Output shaft first gear 112 is connected with by shaft coupling, first gear 112 is located at 115 right side of gear ring, first gear 112 with Gear ring 115 engages, and when operator, which is inconvenient to move, to place under repair to natural gas line, operator can start the first electricity Machine 111 rotates, and the rotation of first motor 111 drives first gear 112 to rotate, and the rotation of first gear 112 drives gear ring 115 to rotate, The rotation of gear ring 115 drives the rotation of the first sliding rail 41, and then the first sliding rail 41 is driven to rotate with upper-part, when operator turns to When facilitating the position for repairing natural gas line, first motor 111 can be closed.In this way, can make operator can without movement Comprehensive repairing is carried out to natural gas line.
Because further including having strut 12 and sunshading board 13, strut 12,12 top of strut peace are installed on the left of 6 inner top of framework Equipped with sunshading board 13, when operator repairs natural gas line, sunshading board 13 covers sunlight, and then prevents solar irradiation Penetrate makes operator awfully hot on operator, and influences the repairing to natural gas line.
Because further including having guide sleeve 14 and the second screw rod 16, the outer left side top of framework 6 is equipped with guide sleeve 14, and strut 12 may be used also To be located in guide sleeve 14,12 bottom end of strut is contacted with bottom in framework 6, and 14 right flank middle part of guide sleeve is provided with the second threaded hole 15, It is connected in second threaded hole 15 and guide sleeve 14, is equipped with the second screw rod 16 in the second threaded hole 15, the second screw rod 16 is located at the second spiral shell In pit 15, when operator station is in framework 6, operator can pull strut 12 to move up and down, and then make sunshading board 13 Preferably sunlight is blocked, after strut 12 is mobile good, can twist the second screw rod 16 is moved to the left, the second screw rod 16 It is moved to the left to contact with strut 12 and be fixed, in this way, adjusting the position of strut 12, sunshading board 13 can be made preferably to be hidden Sun.
Because further including having hook 17,12 right side central of strut is equipped with hook 17, when operator has tool needs to put When setting, operator can be hung over tool on hook 17.In this way, held without operator, it is time saving and energy saving.
Because further including having messenger wire 18,13 bottom of sunshading board is evenly spaced to be equipped with messenger wire 18, and messenger wire 18 can make sunshade Plate 13 is more beautiful.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (6)

1. a kind of worker repairs natural gas line ancillary equipment, which is characterized in that include bottom plate (1), vertical bar (2), wheel (3), lifting device (4), the second sliding rail (5), framework (6), N-shaped frame (7), sliding sleeve (8) and fixed device (10), bottom plate (1) bottom Symmetrical at left and right sides of portion to be equipped with vertical bar (2), vertical bar (2) bottom end is equipped with wheel (3), and bottom plate (1) top center is equipped with Lifting device (4) is connected with the second sliding rail (5) on the lifting part of lifting device (4), and the second sliding rail (5) is in horizontally disposed, and the It is equipped with framework (6) at the top of two sliding rails (5), is equipped with N-shaped frame (7) among framework (6) interior bottom, is equipped at the top of N-shaped frame (7) Sliding sleeve (8), sliding sleeve (8) and N-shaped frame (7) top slide cooperate, and are connected with fixed device (10) on framework (6) outer left side;It rises Falling unit (4) includes the first sliding rail (41), the first sliding block (42), crane (43), cylinder (44) and the second sliding block (45), bottom Plate (1) top center is equipped with the first sliding rail (41), and the first sliding rail (41) is in being horizontally disposed with, and the first sliding rail (41) is equipped with and it Two the first sliding blocks (42) of cooperation control and are equipped with crane (43) between two the first sliding blocks (42), crane (43) top The end left and right sides is equipped with the second sliding block (45), and the second sliding block (45) is mounted on the second sliding rail (5) bottom, the second sliding block (45) with Second sliding rail (5) is slidably matched, and the first sliding rail (41) top left side is equipped with cylinder (44), cylinder in such a way that pin connects (44) telescopic rod is connect with crane (43) bottom right by pin;Clamping device (9) includes the first bracing wire (91), consolidates Determine block (92), the first screw rod (95), the second bracing wire (96) and fixture block (97), sliding sleeve (8) top center is connected with the first bracing wire (91), the first bracing wire (91) tail end is equipped with fixed block (92), and through-hole (93), fixed block are laterally provided in the middle part of fixed block (92) (92) top center is provided with the first threaded hole (94), is connected in the first threaded hole (94) and through-hole (93), the first threaded hole (94) It is inside equipped with the first screw rod (95), is connected in the first bracing wire (91) the second bracing wire (96), the second bracing wire (96) tail end is equipped with card Block (97);Fixed device (10) include third sliding rail (101), third sliding block (102), spring (103), electronic reel (104), third bracing wire (105), rubber block (106) and l-shaped rod (107), the outer left side lower part of framework (6) are equipped with third sliding rail (101), for third sliding rail (101) in being horizontally disposed with, third sliding rail (101) is equipped with two third sliding blocks (102) engaged therewith, Two third sliding blocks (102) are slidably matched with third sliding rail (101), and front and rear sides third sliding block (102) top center is all installed Have l-shaped rod (107), front side l-shaped rod (107) trailing flank top and rear side l-shaped rod (107) leading flank top are fitted with rubber block (106), rubber block (106) is arranged symmetrically, under front side l-shaped rod (107) trailing flank lower part and rear side l-shaped rod (107) leading flank It is connected between portion spring (103), electronic reel (104), electronic reel is installed in the middle part of third sliding rail (101) left side (104) around there are two third bracing wire (105), one of third bracing wire (105) tail end and front side third sliding block (102) rear sides on It is connect in the middle part of Middle face connection, another third bracing wire (105) tail end and rear side third sliding block (102) leading flank.
2. a kind of worker according to claim 1 repairs natural gas line ancillary equipment, which is characterized in that further include having rotation Rotary device (11), rotating device (11) include first motor (111), first gear (112), endless glide (113), annular cunning Block (114) and gear ring (115), bottom plate (1) top center are equipped with endless glide (113), and endless glide (113) is equipped with and it The ring slider (114) of cooperation installs rack gear (115) at the top of ring slider (114), and the first sliding rail (41) bottom can also be with Connection, bottom plate (1) top right side are equipped with first motor (111) at the top of gear ring (115), and first motor (111) is in be vertically arranged, The output shaft of first motor (111) is connected with first gear (112) by shaft coupling, and first gear (112) is located at gear ring (115) Right side, first gear (112) are engaged with gear ring (115).
3. a kind of worker according to claim 2 repairs natural gas line ancillary equipment, which is characterized in that further include having branch Bar (12) and sunshading board (13), framework (6) inner top left side are equipped with strut (12), and strut (12) top is equipped with sunshading board (13).
4. a kind of worker according to claim 3 repairs natural gas line ancillary equipment, which is characterized in that further include leading Set (14) and the second screw rod (16), framework (6) outer left side top are equipped with guide sleeve (14), and strut (12) may be located on guide sleeve (14) in, strut (12) bottom end is contacted with framework (6) interior bottom, and guide sleeve (14) right flank middle part is provided with the second threaded hole (15), It is connected in second threaded hole (15) and guide sleeve (14), is equipped with the second screw rod (16) in the second threaded hole (15), the second screw rod (16) In the second threaded hole (15).
5. a kind of worker according to claim 4 repairs natural gas line ancillary equipment, which is characterized in that further include having extension Hook (17), strut (12) right side central are equipped with hook (17).
6. a kind of worker according to claim 5 repairs natural gas line ancillary equipment, which is characterized in that further include hanging Line (18), sunshading board (13) bottom is evenly spaced to be equipped with messenger wire (18).
CN201710779351.0A 2017-09-01 2017-09-01 A kind of worker's repairing natural gas line ancillary equipment Active CN107651626B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710779351.0A CN107651626B (en) 2017-09-01 2017-09-01 A kind of worker's repairing natural gas line ancillary equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710779351.0A CN107651626B (en) 2017-09-01 2017-09-01 A kind of worker's repairing natural gas line ancillary equipment

Publications (2)

Publication Number Publication Date
CN107651626A CN107651626A (en) 2018-02-02
CN107651626B true CN107651626B (en) 2019-04-12

Family

ID=61128767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710779351.0A Active CN107651626B (en) 2017-09-01 2017-09-01 A kind of worker's repairing natural gas line ancillary equipment

Country Status (1)

Country Link
CN (1) CN107651626B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108483359A (en) * 2018-03-08 2018-09-04 杨煜海 A kind of aerial working platform vehicle with multiple protective
CN108527281A (en) * 2018-03-12 2018-09-14 冯云鹏 A kind of construction protection construction tool place apparatus
CN110775905A (en) * 2019-11-15 2020-02-11 苏州富力宝物流机械有限公司 Platform for building elevator
CN113464786A (en) * 2021-06-25 2021-10-01 深圳市志腾永盛科技有限公司 Vertical flat plate for adjusting self inclination

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204848170U (en) * 2015-08-26 2015-12-09 国网新疆电力公司奎屯供电公司 Aerial working platform protector
CN205114983U (en) * 2015-11-18 2016-03-30 南京信息工程大学 Folding lift platform of safety and stability
CN205241163U (en) * 2015-08-31 2016-05-18 徐工集团工程机械股份有限公司道路机械分公司 Movable lifting platform
CN205294759U (en) * 2015-11-27 2016-06-08 重庆市合川区盐井建筑工程有限公司 Improved generation is lift for construction
CN205527606U (en) * 2016-01-28 2016-08-31 河南鸿宇工业装备工程有限公司 Portable rotation tile press elevating platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009184749A (en) * 2008-02-01 2009-08-20 Yoshinobu Sato Up-and-down liftable platform device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204848170U (en) * 2015-08-26 2015-12-09 国网新疆电力公司奎屯供电公司 Aerial working platform protector
CN205241163U (en) * 2015-08-31 2016-05-18 徐工集团工程机械股份有限公司道路机械分公司 Movable lifting platform
CN205114983U (en) * 2015-11-18 2016-03-30 南京信息工程大学 Folding lift platform of safety and stability
CN205294759U (en) * 2015-11-27 2016-06-08 重庆市合川区盐井建筑工程有限公司 Improved generation is lift for construction
CN205527606U (en) * 2016-01-28 2016-08-31 河南鸿宇工业装备工程有限公司 Portable rotation tile press elevating platform

Also Published As

Publication number Publication date
CN107651626A (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN107651626B (en) A kind of worker's repairing natural gas line ancillary equipment
CN107984323B (en) A kind of machining iron pipe end derusting grinding device
CN204209580U (en) Tire automatic clamping device
CN108083163B (en) A kind of small-sized rack of municipal works summer circuit emergency maintenance
CN206606862U (en) A kind of capstan winch wire attaching/detaching apparatus
CN209283161U (en) A kind of solar energy photovoltaic power generator
CN107138445A (en) A kind of special cleaning plant of building implement
CN208979692U (en) A kind of supporting and regulating device of vibrating drawing machine
CN106076469B (en) A kind of mining engineering stone efficiency crushing device
CN107163619A (en) Natural dye extraction equipment is used in one kind weaving
CN207502332U (en) A kind of display screen component processing shell rigidity detection device
CN208409874U (en) A kind of automated machine arm assembly
CN108942524A (en) Vertical grinder is used in a kind of processing of water pump
CN211470604U (en) Hoisting device for transformer substation
CN205371781U (en) Underground valve headstock gear
CN206263452U (en) High-precision laser cutting machine
CN108275447A (en) A kind of lumps of wood withdrawing device for building
CN205477440U (en) Calandria mechanism
CN206992588U (en) A kind of moveable double bundle conductor Distance limiter
CN206937213U (en) Extract the specific purpose tool of infusion bag manufacturing equipment bearing pin
CN208854428U (en) A kind of mining jack cylinder barrel grinding equipment
CN208686427U (en) A kind of emergency management and rescue forcible entry device
CN104260053B (en) The horizontal helical silk ribbon electricity fastened tools of substation equipment
CN208845979U (en) The express delivery cabinet being easily installed
CN208977452U (en) Grinding apparatus is used in a kind of processing of spring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190314

Address after: 312500 Taoyuan Xincun No. 21-101, Juzhen, Juzhen, Dashi, Xinchang County, Shaoxing City, Zhejiang Province (Residence Declaration)

Applicant after: Xinchang Yixulong Machinery Technology Co.,Ltd.

Address before: 518040 No. 10 Vocational Education Street, Futian District, Shenzhen City, Guangdong Province

Applicant before: Si Chenxiao

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20180202

Assignee: Jiaxing kopuno Machinery Technology Co.,Ltd.

Assignor: Xinchang Yixulong Machinery Technology Co.,Ltd.

Contract record no.: X2021980008507

Denomination of invention: An auxiliary equipment for workers to repair natural gas pipeline

Granted publication date: 20190412

License type: Common License

Record date: 20210828

EE01 Entry into force of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Jiaxing kopuno Machinery Technology Co.,Ltd.

Assignor: Xinchang Yixulong Machinery Technology Co.,Ltd.

Contract record no.: X2021980008507

Date of cancellation: 20221116

EC01 Cancellation of recordation of patent licensing contract
TR01 Transfer of patent right

Effective date of registration: 20230407

Address after: 521000 Yingwang Industrial Zone, Fuyang Town, Fudong Village, Chao'an District, Chaozhou City, Guangdong Province

Patentee after: Guangdong Donghui Engineering Co.,Ltd.

Address before: 312500 dashiju town dashiju village Taoyuan Xincun 21-101, Xinchang County, Shaoxing City, Zhejiang Province

Patentee before: Xinchang Yixulong Machinery Technology Co.,Ltd.

TR01 Transfer of patent right