CN107813263A - A kind of Petroleum refining pipeline flanges docking facilities - Google Patents

A kind of Petroleum refining pipeline flanges docking facilities Download PDF

Info

Publication number
CN107813263A
CN107813263A CN201711211403.0A CN201711211403A CN107813263A CN 107813263 A CN107813263 A CN 107813263A CN 201711211403 A CN201711211403 A CN 201711211403A CN 107813263 A CN107813263 A CN 107813263A
Authority
CN
China
Prior art keywords
block
screw rod
slide rail
bearing seat
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711211403.0A
Other languages
Chinese (zh)
Other versions
CN107813263B (en
Inventor
聂新杰
夏东海
许诺勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Gaoning Forging Flange Factory
Original Assignee
聂新杰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 聂新杰 filed Critical 聂新杰
Priority to CN201711211403.0A priority Critical patent/CN107813263B/en
Publication of CN107813263A publication Critical patent/CN107813263A/en
Application granted granted Critical
Publication of CN107813263B publication Critical patent/CN107813263B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • B25B27/14Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same
    • B25B27/16Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same abutted flanges

Abstract

The present invention relates to a kind of docking facilities, more particularly to a kind of Petroleum refining pipeline flanges docking facilities.The technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, docking speed is fast, ring flange can be fixed, and dock convenient Petroleum refining pipeline flanges docking facilities.In order to solve the above-mentioned technical problem, the invention provides such a Petroleum refining pipeline flanges docking facilities, first slide rail etc. is included;First slide rail is provided with two the first sliding blocks, first sliding block is slidably matched with the first slide rail, and mobile device is provided between two the first slider tops, and the first slide rail left surface is fitted with supporting leg with right flank, riser is installed, riser leading flank is provided with fixing device among the first slider bottom.The present invention can be moved to ring flange by servicing unit, and makes the mounting hole of ring flange to corresponding, and it is fast to have reached time saving and energy saving, docking speed, and ring flange can be fixed, and docks convenient effect.

Description

A kind of Petroleum refining pipeline flanges docking facilities
Technical field
The present invention relates to a kind of docking facilities, more particularly to a kind of Petroleum refining pipeline flanges docking facilities.
Background technology
One of oil, the main object of geological prospecting, it is a kind of sticky, dark brown liquid, is referred to as " industrial blood Liquid ".There is petroleum storage upper crustal some areas.Main component is the mixture of various alkane, cycloalkane, aromatic hydrocarbon.
During Petroleum refining, it is required for pipeline, and ring flange need to be docked, and manually ring flange is docked When, waste time and energy, to dock speed slow, ring flange is easily mobile during docking causes docking inconvenient, therefore it is a kind of time saving to need research and development badly It is laborsaving, docking speed is fast, ring flange can be fixed, and dock convenient Petroleum refining pipeline flanges docking facilities.
The content of the invention
(1) technical problems to be solved
The present invention is to overcome to ring flange when manually docking, and wastes time and energy, to dock speed slow, ring flange during docking Easily mobile the shortcomings that causing to dock inconvenience, the technical problem to be solved in the present invention is to provide a kind of time saving and energy saving, docking speed It hurry up, ring flange can be fixed, and dock convenient Petroleum refining pipeline flanges docking facilities.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a Petroleum refining pipeline flanges to tipping Put, include the first slide rail, the first sliding block, supporting leg, riser, fixing device and mobile device, the first slide rail is provided with two the One sliding block, the first sliding block are slidably matched with the first slide rail, and mobile device is provided between two the first slider tops, and the first slide rail is left Side is fitted with supporting leg with right flank, riser is provided among the first slider bottom, riser leading flank is provided with fixing device.
Preferably, fixing device includes fixed block, the first nut, the first screw rod, first bearing seat and arc block, riser Leading flank top is provided with fixed block, and riser leading flank bottom is provided with the first nut, the first screw rod is provided with the first nut, the One screw tip is provided with first bearing seat, and first bearing seat top is provided with arc block, and arc block is located at immediately below fixed block.
Preferably, mobile device includes guide pin bushing, the second screw rod, the second nut, second bearing seat and the first switch block, left side First slider top is provided with guide pin bushing, and the second nut is provided with the left of the slider top of right side first, second is provided with the second nut Screw rod, the second screw rod left part are located in guide pin bushing, and the second nut right flank is provided with second bearing seat, and the second screw rod is located at the second axle In bearing, the second screw rod right-hand member is provided with the first switch block.
Preferably, also include servicing unit, servicing unit include arc, the second slide rail, the second sliding block, transverse slat, 3rd bearing seat, rubber cylinder, rotating shaft, the second switch block, L-type bar, ball and fourth bearing seat, right side supporting leg right flank top peace Equipped with arc, arc is located on the right side of the fixed block of right side, and arc medial surface is evenly spaced to be provided with ball, right side supporting leg Second slide rail is installed, for the second slide rail in being vertically arranged, the second slide rail is provided with second coordinated with it on the right side of leading flank bottom Sliding block, the second sliding block are slidably matched with the second slide rail, and the second sliding block right flank top is provided with transverse slat, the transverse slat top left and right sides 3rd bearing seat is fitted with, rotating shaft is installed between the 3rd bearing seat of the left and right sides, rotating shaft right-hand member is provided with the second switch block, turns Axle left part is provided with rubber cylinder, and right side arc block bottom right is provided with fourth bearing seat, L-type is provided with fourth bearing seat Bar, L-type bar and the second sliding block coordinate.
Preferably, inserted link, limited block and rubber sleeve are also included, the second screw rod right part is provided with through hole, is provided with and inserts in through hole Bar, inserted link bottom are provided with limited block, inserted link top set rubber sleeve.
Preferably, lanyard and fix bar are also included, right side riser leading flank is all connected with lanyard, lanyard tail in both sides up and down End is connected with fix bar.
Operation principle:Operating personnel fix two ring flanges by left and right sides fixing device respectively first, you can open Dynamic mobile device, mobile device drive the first sliding block of right side to be moved to the left, and the sliding block of right side first is moved to the left drive right side riser It is moved to the left, right side riser, which is moved to the left, drives right flange disk to be moved to the left, and then right flange disk is moved to the left and left side Ring flange contact is docked, you can stops movement.After the completion of two ring flanges dock, you can by fixing device by two Ring flange unclamps, then is removed, then drives right side riser to move right by mobile device and recover to original position.
Because fixing device includes fixed block, the first nut, the first screw rod, first bearing seat and arc block, before riser Side surface upper part is provided with fixed block, and riser leading flank bottom is provided with the first nut, is provided with the first screw rod in the first nut, and first Screw tip is provided with first bearing seat, and first bearing seat top is provided with arc block, and arc block is located at immediately below fixed block, first Two ring flanges are individually positioned between left and right sides fixed block and arc block by first operating personnel, then twist the left and right sides first Screw rod moves up, and the screw rod of the left and right sides first moves up drive left and right sides arc block and moved up, left and right sides arc Block is moved up to contact with ring flange and is fixed, and stops the first screw rod of twisting, you can drive right flange by mobile device Disk, which is moved to the left, to be docked.Similarly, after the completion of ring flange docking, you can reversely the first screw rod of the twisting left and right sides is to moving down It is dynamic, and then arc block unclamps ring flange, operating personnel can remove ring flange.
Because mobile device includes guide pin bushing, the second screw rod, the second nut, second bearing seat and the first switch block, left side One slider top is provided with guide pin bushing, and the second nut is provided with the left of the slider top of right side first, the second spiral shell is provided with the second nut Bar, the second screw rod left part are located in guide pin bushing, and the second nut right flank is provided with second bearing seat, and the second screw rod is located at second bearing In seat, the second screw rod right-hand member is provided with the first switch block, and when ring flange is fixed, operating personnel can twist the first switch block, the One switch block, which rotates, drives the second screw rod to rotate, and the second screw rod, which rotates, drives the second nut to be moved to the left, and the second nut is moved to the left The first sliding block of right side is driven to be moved to the left, the sliding block of right side first is moved to the left drive right side riser and is moved to the left, and then drives right Side flange, which is moved to the left, is docked.After the completion of ring flange docking, and when removing, you can reversely the first switch block of twisting, enter And drive right side riser to move right and recover to original position.
Because also including servicing unit, servicing unit includes arc, the second slide rail, the second sliding block, transverse slat, the 3rd Bearing block, rubber cylinder, rotating shaft, the second switch block, L-type bar, ball and fourth bearing seat, right side supporting leg right flank top are provided with Arc, arc are located on the right side of the fixed block of right side, and arc medial surface is evenly spaced to be provided with ball, right side supporting leg front side Second slide rail is installed on the right side of the bottom of face, for the second slide rail in being vertically arranged, the second slide rail is provided with the second sliding block coordinated with it, Second sliding block is slidably matched with the second slide rail, and the second sliding block right flank top is provided with transverse slat, and the left and right sides is all pacified at the top of transverse slat Equipped with 3rd bearing seat, rotating shaft is installed between the 3rd bearing seat of the left and right sides, rotating shaft right-hand member is provided with the second switch block, and rotating shaft is left Portion is provided with rubber cylinder, and right side arc block bottom right is provided with fourth bearing seat, L-type bar, L are provided with fourth bearing seat Type bar and the second sliding block coordinate, and when ring flange is between fixed block and arc block, operating personnel can twist right side first Screw rod moves up, so arc block move up drive L-type bar move up, L-type bar move up drive the second sliding block to Upper movement, the second sliding block move up band motion plate and moved up, and transverse slat moves up to move up with the part on motion plate, And then rubber cylinder contacts with ring flange, stop the first screw rod of twisting right side, you can rotating right flange disk makes right flange disk With the mounting hole of left side ring flange to corresponding, and to rotate ring flange more smooth for ball.When the mounting hole pair of two ring flanges Ying Hou, you can L-type bar is rotated, and then when L-type bar is not with the second shoe contact, you can the first screw rod of twisting right side is upward again It is mobile, and right flange disk is fixed.In this way, the ring flange after docking can be made to be more convenient follow-up processing installation.
Because also including inserted link, limited block and rubber sleeve, the second screw rod right part is provided with through hole, and inserted link is provided with through hole, Inserted link bottom is provided with limited block, and inserted link top set rubber sleeve, after ring flange is fixed, operating personnel can hold inserted link, Be rotated further by inserted link, inserted link, which rotates, drives the second screw rod to rotate, and then drives ring flange movement to be docked, and rubber sleeve increase with The frictional force of water, and make the more firm rotation inserted link of operating personnel.In this way, operating personnel can be made more easily to rotate the second spiral shell Bar.
Because also including lanyard and fix bar, right side riser leading flank is all connected with lanyard, lanyard tail end in both sides up and down Fix bar is connected with, after ring flange is fixed, you can fix bar is inserted in the mounting hole of ring flange, and then fix bar is by two Ring flange is fixed, then two ring flanges are docked.After the completion of ring flange docking, fix bar is taken out of ring flange mounting hole Go out.In this way, it can prevent from causing the mounting hole of ring flange not correspond to when ring flange from moving.
(3) beneficial effect
The present invention can be moved to ring flange by servicing unit, and makes the mounting hole of ring flange to corresponding, and is passed through Fixing device, ring flange can be fixed, and prevent docking when ring flange move, reached it is time saving and energy saving, docking speed it is fast, Ring flange can be fixed, and dock convenient effect.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the right side structural representation of arc of the present invention.
Fig. 4 is the enlarged diagram of part A of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Mark in accompanying drawing for:The slide rails of 1- first, the sliding blocks of 2- first, 3- supporting legs, 4- risers, 5- fixing devices, 51- are fixed Block, the nuts of 52- first, the screw rods of 53- first, 54- first bearing seats, 55- arc blocks, 6- mobile devices, 61- guide pin bushings, 62- second Screw rod, the nuts of 63- second, 64- second bearing seats, the switch blocks of 65- first, 7- servicing units, 71- arcs, the slide rails of 72- second, The sliding blocks of 73- second, 74- transverse slats, 75- 3rd bearing seats, 76- rubber cylinders, 77- rotating shafts, the switch blocks of 78- second, 79-L type bars, 710- balls, 711- fourth bearing seats, 8- through holes, 9- inserted links, 10- limited blocks, 11- rubber sleeves, 12- lanyards, 13- fix bars.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of Petroleum refining pipeline flanges docking facilities, as shown in figures 1 to 6, include the first slide rail 1, the first sliding block 2nd, supporting leg 3, riser 4, fixing device 5 and mobile device 6, the first slide rail 1 are provided with two the first sliding blocks 2, the first sliding block 2 and One slide rail 1 is slidably matched, and is provided with mobile device 6 between two tops of the first sliding block 2, the left surface of the first slide rail 1 and right flank are all Supporting leg 3 is installed, riser 4 is installed among the bottom of first sliding block 2, the leading flank of riser 4 is provided with fixing device 5.
Embodiment 2
A kind of Petroleum refining pipeline flanges docking facilities, as shown in figures 1 to 6, include the first slide rail 1, the first sliding block 2nd, supporting leg 3, riser 4, fixing device 5 and mobile device 6, the first slide rail 1 are provided with two the first sliding blocks 2, the first sliding block 2 and One slide rail 1 is slidably matched, and is provided with mobile device 6 between two tops of the first sliding block 2, the left surface of the first slide rail 1 and right flank are all Supporting leg 3 is installed, riser 4 is installed among the bottom of first sliding block 2, the leading flank of riser 4 is provided with fixing device 5.
Fixing device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc block 55, The leading flank top of riser 4 is provided with fixed block 51, and the leading flank bottom of riser 4 is provided with the first nut 52, set in the first nut 52 There is the first screw rod 53, the top of the first screw rod 53 is provided with first bearing seat 54, and the top of first bearing seat 54 is provided with arc block 55, Arc block 55 is located at immediately below fixed block 51.
Embodiment 3
A kind of Petroleum refining pipeline flanges docking facilities, as shown in figures 1 to 6, include the first slide rail 1, the first sliding block 2nd, supporting leg 3, riser 4, fixing device 5 and mobile device 6, the first slide rail 1 are provided with two the first sliding blocks 2, the first sliding block 2 and One slide rail 1 is slidably matched, and is provided with mobile device 6 between two tops of the first sliding block 2, the left surface of the first slide rail 1 and right flank are all Supporting leg 3 is installed, riser 4 is installed among the bottom of first sliding block 2, the leading flank of riser 4 is provided with fixing device 5.
Fixing device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc block 55, The leading flank top of riser 4 is provided with fixed block 51, and the leading flank bottom of riser 4 is provided with the first nut 52, set in the first nut 52 There is the first screw rod 53, the top of the first screw rod 53 is provided with first bearing seat 54, and the top of first bearing seat 54 is provided with arc block 55, Arc block 55 is located at immediately below fixed block 51.
Mobile device 6 includes guide pin bushing 61, the second screw rod 62, the second nut 63, the switch block 65 of second bearing seat 64 and first, The top of the first sliding block of left side 2 is provided with guide pin bushing 61, and the top left side of the first sliding block of right side 2 is provided with the second nut 63, the second nut The second screw rod 62 is provided with 63, the left part of the second screw rod 62 is located in guide pin bushing 61, and the right flank of the second nut 63 is provided with second bearing Seat 64, the second screw rod 62 is located in second bearing seat 64, and the right-hand member of the second screw rod 62 is provided with the first switch block 65.
Embodiment 4
A kind of Petroleum refining pipeline flanges docking facilities, as shown in figures 1 to 6, include the first slide rail 1, the first sliding block 2nd, supporting leg 3, riser 4, fixing device 5 and mobile device 6, the first slide rail 1 are provided with two the first sliding blocks 2, the first sliding block 2 and One slide rail 1 is slidably matched, and is provided with mobile device 6 between two tops of the first sliding block 2, the left surface of the first slide rail 1 and right flank are all Supporting leg 3 is installed, riser 4 is installed among the bottom of first sliding block 2, the leading flank of riser 4 is provided with fixing device 5.
Fixing device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc block 55, The leading flank top of riser 4 is provided with fixed block 51, and the leading flank bottom of riser 4 is provided with the first nut 52, set in the first nut 52 There is the first screw rod 53, the top of the first screw rod 53 is provided with first bearing seat 54, and the top of first bearing seat 54 is provided with arc block 55, Arc block 55 is located at immediately below fixed block 51.
Mobile device 6 includes guide pin bushing 61, the second screw rod 62, the second nut 63, the switch block 65 of second bearing seat 64 and first, The top of the first sliding block of left side 2 is provided with guide pin bushing 61, and the top left side of the first sliding block of right side 2 is provided with the second nut 63, the second nut The second screw rod 62 is provided with 63, the left part of the second screw rod 62 is located in guide pin bushing 61, and the right flank of the second nut 63 is provided with second bearing Seat 64, the second screw rod 62 is located in second bearing seat 64, and the right-hand member of the second screw rod 62 is provided with the first switch block 65.
Also include servicing unit 7, servicing unit 7 includes arc 71, the second slide rail 72, the second sliding block 73, transverse slat 74th, 3rd bearing seat 75, rubber cylinder 76, rotating shaft 77, the second switch block 78, L-type bar 79, ball 710 and fourth bearing seat 711, The right flank top of right side supporting leg 3 is provided with arc 71, and arc 71 is located at the right side of right side fixed block 51, the medial surface of arc 71 It is evenly spaced that ball 710 is installed, second slide rail 72 is installed on the right side of the leading flank bottom of right side supporting leg 3, the second slide rail 72 is in It is vertically arranged, the second slide rail 72 is provided with the second sliding block 73 coordinated with it, and the second sliding block 73 is slidably matched with the second slide rail 72, The right flank top of second sliding block 73 is provided with transverse slat 74, and the top of transverse slat 74 left and right sides is fitted with 3rd bearing seat 75, left and right Rotating shaft 77 is installed, the right-hand member of rotating shaft 77 is provided with the second switch block 78, and the left part of rotating shaft 77 is provided between both sides 3rd bearing seat 75 Rubber cylinder 76, the bottom right of right side arc block 55 are provided with fourth bearing seat 711, L-type bar are provided with fourth bearing seat 711 79, L-type bar 79 coordinates with the second sliding block 73.
Also include inserted link 9, limited block 10 and rubber sleeve 11, the right part of the second screw rod 62 is provided with through hole 8, is provided with through hole 8 Inserted link 9, the bottom of inserted link 9 are provided with limited block 10, the top of inserted link 9 set rubber sleeve 11.
Also include lanyard 12 and fix bar 13, the leading flank of right side riser 4 is all connected with lanyard 12, lanyard 12 in both sides up and down Tail end is connected with fix bar 13.
Operation principle:Operating personnel fix two ring flanges by left and right sides fixing device 5 respectively first, you can open Dynamic mobile device 6, mobile device 6 drive the first sliding block 2 of right side to be moved to the left, and the first sliding block of right side 2 is moved to the left drive right side Riser 4 is moved to the left, and right side riser 4, which is moved to the left, drives right flange disk to be moved to the left, and then right flange disk is moved to the left Contact and docked with left side ring flange, you can stop movement.After the completion of two ring flanges dock, you can pass through fixing device 5 unclamp two ring flanges, then are removed, then drive right side riser 4 to move right by mobile device 6 and recover to original position i.e. Can.
Because fixing device 5 includes fixed block 51, the first nut 52, the first screw rod 53, first bearing seat 54 and arc Block 55, the leading flank top of riser 4 are provided with fixed block 51, and the leading flank bottom of riser 4 is provided with the first nut 52, the first nut 52 The first screw rod 53 is inside provided with, the top of the first screw rod 53 is provided with first bearing seat 54, and the top of first bearing seat 54 is provided with arc Block 55, arc block 55 are located at immediately below fixed block 51, and two ring flanges are individually positioned in the left and right sides admittedly by operating personnel first Determine between block 51 and arc block 55, then twist the first screw rod 53 of the left and right sides and move up, the left and right sides the first screw rod 53 is upward Mobile to drive left and right sides arc block 55 to move up, left and right sides arc block 55, which moves up to contact with ring flange, to be consolidated It is fixed, stop the first screw rod 53 of twisting, you can drive right flange disk to be moved to the left by mobile device 6 and docked.Similarly, when After the completion of ring flange docking, you can reversely the first screw rod 53 of the twisting left and right sides moves down, and then arc block 55 is by ring flange Unclamp, operating personnel can remove ring flange.
Because mobile device 6 includes guide pin bushing 61, the second screw rod 62, the second nut 63, second bearing seat 64 and first turn Block 65, the top of the first sliding block of left side 2 are provided with guide pin bushing 61, and the top left side of the first sliding block of right side 2 is provided with the second nut 63, and second The second screw rod 62 is provided with nut 63, the left part of the second screw rod 62 is located in guide pin bushing 61, and the right flank of the second nut 63 is provided with second Bearing block 64, the second screw rod 62 are located in second bearing seat 64, and the right-hand member of the second screw rod 62 is provided with the first switch block 65, works as ring flange When being fixed, operating personnel can twist the first switch block 65, and the first switch block 65, which rotates, drives the second screw rod 62 to rotate, the second screw rod 62, which rotate the second nut 63 of drive, is moved to the left, and the second nut 63 is moved to the left the first sliding block 2 of drive right side and is moved to the left, right side First sliding block 2 is moved to the left drive right side riser 4 and is moved to the left, and then drives right flange disk to be moved to the left and docked.When After the completion of ring flange docking, and when removing, you can reversely the first switch block 65 of twisting, and then it is extensive to drive right side riser 4 to move right It is multiple extremely in situ.
Because also including servicing unit 7, servicing unit 7 include arc 71, the second slide rail 72, the second sliding block 73, Transverse slat 74,3rd bearing seat 75, rubber cylinder 76, rotating shaft 77, the second switch block 78, L-type bar 79, ball 710 and fourth bearing seat 711, the right flank top of right side supporting leg 3 is provided with arc 71, and arc 71 is located on the right side of right side fixed block 51, in arc 71 Side is evenly spaced to be provided with ball 710, and the second slide rail 72, the second slide rail are provided with the right side of the leading flank bottom of right side supporting leg 3 72 in being vertically arranged, and the second slide rail 72 is provided with the second sliding block 73 coordinated with it, and the second sliding block 73 slides with the second slide rail 72 Coordinating, the right flank top of the second sliding block 73 is provided with transverse slat 74, and the top of transverse slat 74 left and right sides is fitted with 3rd bearing seat 75, Rotating shaft 77 is installed, the right-hand member of rotating shaft 77 is provided with the second switch block 78, the left part of rotating shaft 77 peace between left and right sides 3rd bearing seat 75 Equipped with rubber cylinder 76, the bottom right of right side arc block 55 is provided with fourth bearing seat 711, and L is provided with fourth bearing seat 711 Type bar 79, L-type bar 79 coordinate with the second sliding block 73, when ring flange is between fixed block 51 and arc block 55, operating personnel The first screw rod 53 of right side can be twisted to move up, and then arc block 55 moves up and drives L-type bar 79 to move up, L-type bar 79, which move up the second sliding block 73 of drive, moves up, and the second sliding block 73 moves up band motion plate 74 and moved up, transverse slat 74 Move up and moved up with the part on motion plate 74, and then rubber cylinder 76 contacts with ring flange, stop twisting right side the One screw rod 53, you can rotating right flange disk makes the mounting hole of right flange disk and left side ring flange to corresponding, and ball 710 makes Ring flange rotates more smooth.After the mounting hole of two ring flanges corresponds to, you can rotate L-type bar 79, and then work as L-type bar 79 not When being contacted with the second sliding block 73, you can the first screw rod 53 of twisting right side is moved up again, and right flange disk is fixed.Such as This, can make the ring flange after docking be more convenient follow-up processing installation.
Because also including inserted link 9, limited block 10 and rubber sleeve 11, the right part of the second screw rod 62 is provided with through hole 8, in through hole 8 Provided with inserted link 9, the bottom of inserted link 9 is provided with limited block 10, and the top of inserted link 9 covers rubber sleeve 11, after ring flange is fixed, operator Member can hold inserted link 9, be rotated further by inserted link 9, and inserted link 9, which rotates, drives the second screw rod 62 to rotate, so drive ring flange move into Row docking, and the increase of rubber sleeve 11 and the frictional force of water, and make the more firm rotation inserted link 9 of operating personnel.In this way, operation can be made Personnel more easily rotate the second screw rod 62.
Because also including lanyard 12 and fix bar 13, the leading flank of right side riser 4 is all connected with lanyard 12 in both sides up and down, hangs 12 tail ends of restricting are connected with fix bar 13, after ring flange is fixed, you can fix bar 13 is inserted in the mounting hole of ring flange, and then Fix bar 13 fixes two ring flanges, then two ring flanges are docked.After the completion of ring flange docking, by fix bar 13 from method Taken out in the mounting hole of blue disk.In this way, it can prevent from causing the mounting hole of ring flange not correspond to when ring flange from moving.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

1. a kind of Petroleum refining pipeline flanges docking facilities, it is characterised in that include the first slide rail (1), the first sliding block (2), supporting leg (3), riser (4), fixing device (5) and mobile device (6), the first slide rail (1) are provided with two the first sliding blocks (2), the first sliding block (2) is slidably matched with the first slide rail (1), and mobile device (6) is provided between two the first sliding blocks (2) tops, First slide rail (1) left surface is fitted with supporting leg (3) with right flank, and riser (4) is provided among the first sliding block (2) bottom, erects Plate (4) leading flank is provided with fixing device (5).
A kind of 2. Petroleum refining pipeline flanges docking facilities according to claim 1, it is characterised in that fixing device (5) fixed block (51), the first nut (52), the first screw rod (53), first bearing seat (54) and arc block (55), riser are included (4) leading flank top is provided with fixed block (51), and riser (4) leading flank bottom is provided with the first nut (52), the first nut (52) the first screw rod (53) is provided with, the first screw rod (53) top is provided with first bearing seat (54), first bearing seat (54) top End is provided with arc block (55), and arc block (55) is located at immediately below fixed block (51).
A kind of 3. Petroleum refining pipeline flanges docking facilities according to claim 2, it is characterised in that mobile device (6) guide pin bushing (61), the second screw rod (62), the second nut (63), second bearing seat (64) and the first switch block (65), left side are included Guide pin bushing (61) is installed at the top of the first sliding block (2), right side first sliding block (2) top left side is provided with the second nut (63), and second The second screw rod (62) is provided with nut (63), the second screw rod (62) left part is located in guide pin bushing (61), the second nut (63) right flank Second bearing seat (64) is installed, the second screw rod (62) is located in second bearing seat (64), and the second screw rod (62) right-hand member is provided with First switch block (65).
4. a kind of Petroleum refining pipeline flanges docking facilities according to claim 3, it is characterised in that also include Servicing unit (7), servicing unit (7) include arc (71), the second slide rail (72), the second sliding block (73), transverse slat (74), Three bearing blocks (75), rubber cylinder (76), rotating shaft (77), the second switch block (78), L-type bar (79), ball (710) and fourth bearing Seat (711), right side supporting leg (3) right flank top are provided with arc (71), and arc (71) is located at right side fixed block (51) right side Side, arc (71) medial surface is evenly spaced to be provided with ball (710), is provided with the right side of right side supporting leg (3) leading flank bottom Second slide rail (72), for the second slide rail (72) in being vertically arranged, the second slide rail (72) is provided with the second sliding block (73) coordinated with it, Second sliding block (73) is slidably matched with the second slide rail (72), and the second sliding block (73) right flank top is provided with transverse slat (74), transverse slat (74) the top left and right sides is fitted with 3rd bearing seat (75), and rotating shaft is provided between left and right sides 3rd bearing seat (75) (77), rotating shaft (77) right-hand member is provided with the second switch block (78), and rotating shaft (77) left part is provided with rubber cylinder (76), right side arc block (55) bottom right is provided with fourth bearing seat (711), and L-type bar (79), L-type bar (79) are provided with fourth bearing seat (711) Coordinate with the second sliding block (73).
5. a kind of Petroleum refining pipeline flanges docking facilities according to claim 4, it is characterised in that also include Inserted link (9), limited block (10) and rubber sleeve (11), the second screw rod (62) right part are provided with through hole (8), inserted link are provided with through hole (8) (9), inserted link (9) bottom is provided with limited block (10), inserted link (9) top set rubber sleeve (11).
6. a kind of Petroleum refining pipeline flanges docking facilities according to claim 5, it is characterised in that also include Lanyard (12) and fix bar (13), both sides are all connected with lanyard (12) to right side riser (4) leading flank up and down, and lanyard (12) tail end connects It is connected to fix bar (13).
CN201711211403.0A 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities Active CN107813263B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711211403.0A CN107813263B (en) 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711211403.0A CN107813263B (en) 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities

Publications (2)

Publication Number Publication Date
CN107813263A true CN107813263A (en) 2018-03-20
CN107813263B CN107813263B (en) 2019-07-05

Family

ID=61610508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711211403.0A Active CN107813263B (en) 2017-11-28 2017-11-28 A kind of Petroleum refining pipeline flanges docking facilities

Country Status (1)

Country Link
CN (1) CN107813263B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109955194A (en) * 2019-01-29 2019-07-02 东方电气集团东方汽轮机有限公司 A kind of steam turbine guide post pin and its assembly method
CN111571202A (en) * 2020-05-09 2020-08-25 海盐县法兰厂 Automatic assembling device for flange component
CN113334322A (en) * 2021-04-20 2021-09-03 王仁权 Pipeline flange plate butt joint equipment capable of avoiding abrasion dislocation for petroleum refining

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE718740C (en) * 1941-06-25 1942-03-19 Max Schuster Tool for dismantling pipelines
US4769889A (en) * 1985-10-16 1988-09-13 Michael J. Landman Apparatus for replacing pipe gaskets
CN2928396Y (en) * 2006-07-21 2007-08-01 将军烟草集团有限公司 Assembling and disassembling tool for flange
CN204772377U (en) * 2015-06-17 2015-11-18 中国石油天然气股份有限公司 A to hole device for flange
CN206072518U (en) * 2016-10-17 2017-04-05 重庆市久庆仪器仪表有限公司 gas pipeline flange mounting tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE718740C (en) * 1941-06-25 1942-03-19 Max Schuster Tool for dismantling pipelines
US4769889A (en) * 1985-10-16 1988-09-13 Michael J. Landman Apparatus for replacing pipe gaskets
CN2928396Y (en) * 2006-07-21 2007-08-01 将军烟草集团有限公司 Assembling and disassembling tool for flange
CN204772377U (en) * 2015-06-17 2015-11-18 中国石油天然气股份有限公司 A to hole device for flange
CN206072518U (en) * 2016-10-17 2017-04-05 重庆市久庆仪器仪表有限公司 gas pipeline flange mounting tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109955194A (en) * 2019-01-29 2019-07-02 东方电气集团东方汽轮机有限公司 A kind of steam turbine guide post pin and its assembly method
CN109955194B (en) * 2019-01-29 2020-11-03 东方电气集团东方汽轮机有限公司 Guide pin for steam turbine and steam turbine cylinder assembling method
CN111571202A (en) * 2020-05-09 2020-08-25 海盐县法兰厂 Automatic assembling device for flange component
CN113334322A (en) * 2021-04-20 2021-09-03 王仁权 Pipeline flange plate butt joint equipment capable of avoiding abrasion dislocation for petroleum refining

Also Published As

Publication number Publication date
CN107813263B (en) 2019-07-05

Similar Documents

Publication Publication Date Title
CN107813263A (en) A kind of Petroleum refining pipeline flanges docking facilities
CN108301794B (en) Petroleum workover robot
CN206028201U (en) Quick belt cleaning device of valve body spare part that crude oil promoted
CN104863528A (en) Drilling tool-lifting and height-adjustable power catwalk
CN105773359A (en) Outer surface force control type flexible polishing equipment of bearing outer ring
CN106944414A (en) A kind of computer teaching computer room desk and computer dust arrester
CN110159268A (en) A kind of deep-sea mining conveying hard tube clamping rocking equipment
CN103507051A (en) Rotation opening mechanism of rotary examining table
CN208587103U (en) Drilling floor surface manipulator and oil drilling and extracting equipment
CN107817440A (en) A kind of resistance to click test equipment of contactor detection
CN107520563A (en) A kind of petroleum pipeline auxiliary welding equipment
CN103867142B (en) A kind of self-powered cat road
CN102337729B (en) Safety support device for overturning dustbin and sanitation truck thereof
CN204238881U (en) A kind of pipe movement manipulator
CN108972740B (en) Wood cutting equipment convenient to equipment is changed
CN107983730A (en) A kind of Petroleum refining flange coil pipe pipeline joint cleaning equipment
CN204940116U (en) A kind of traveling wheel mechanism of bridge inspection vehicle
CN203842721U (en) Vertical type bag-pulling automatic discharging centrifugal machine
CN203284325U (en) Glass scratch restoring machine
CN103263996B (en) Waist rotating mechanism of column type oil tank spraying robot
CN215341491U (en) Electric power is electric power training device for power worker
CN105756580B (en) A kind of Full automatic oil pipe column comb shifting pipe device
CN202954756U (en) Self-powered catwalk
CN203213980U (en) Mechanized well repair lifting ring switching device
CN208132975U (en) A kind of telescoping mechanism of client information management robot

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190327

Address after: No. 1 Dongfeng Road, Yaxi Town, Gaochun District, Nanjing City, Jiangsu Province, 210000

Applicant after: Nanjing Gaoning Forging Flange Factory

Address before: 518000 Yucai Road, Nanshan District, Shenzhen, Guangdong Province

Applicant before: Nie Xinjie

GR01 Patent grant
GR01 Patent grant