CN107808249A - Plant task management method, electronic equipment and computer-readable recording medium - Google Patents

Plant task management method, electronic equipment and computer-readable recording medium Download PDF

Info

Publication number
CN107808249A
CN107808249A CN201711035724.XA CN201711035724A CN107808249A CN 107808249 A CN107808249 A CN 107808249A CN 201711035724 A CN201711035724 A CN 201711035724A CN 107808249 A CN107808249 A CN 107808249A
Authority
CN
China
Prior art keywords
crops
task
plant personnel
prompt message
electronic equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711035724.XA
Other languages
Chinese (zh)
Inventor
杨琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Chunmuyuan Holdings Co Ltd
Original Assignee
Shenzhen Chunmuyuan Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Chunmuyuan Holdings Co Ltd filed Critical Shenzhen Chunmuyuan Holdings Co Ltd
Priority to CN201711035724.XA priority Critical patent/CN107808249A/en
Publication of CN107808249A publication Critical patent/CN107808249A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Animal Husbandry (AREA)
  • Agronomy & Crop Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Mining & Mineral Resources (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

One kind plantation task management method, methods described include:According to the timing node in the relevant crop growth stage pre-set, prompt message is exported, wherein the prompt message includes kind, planting area and the residing growth phase of crops;According to the prompt message, it is determined that the goal task to match with the growth phases of the crops;Export and show the goal task, so that plant personnel carries out task choosing;Based on the selection of the plant personnel, task is distributed for the plant personnel.The present invention can adapt to needed for large-scale plant production, improve the efficiency of Cultivate administration.

Description

Plant task management method, electronic equipment and computer-readable recording medium
Technical field
The present invention relates to planting technology field, more particularly to a kind of plantation task management method, electronic equipment and computer Readable storage medium storing program for executing.
Background technology
With the development of science and technology, greenhouse culture technique obtains constantly improving upgrading.Hothouse plants in the environment of closing, by People actively supplies moisture, nutrient and air of its suitable growth etc., enables free from the influence of the external environment, and then grows.
At present, on the Cultivate administration to hothouse plants, mainly using automation equipment, but when cultivated area compared with Greatly, when variety of crops is more, it is also desirable to be manually managed.Generally, plantation task, and manual record are distributed by artificial The plantation operational circumstances of each growth phase of crops.
It can be seen that this Cultivate administration mode can not be adapted to needed for large-scale plant production, and the efficiency of Cultivate administration It is relatively low.
The content of the invention
In view of the foregoing, it is necessary to which a kind of plantation task management method, electronic equipment and computer-readable storage are provided Medium, it can adapt to needed for large-scale plant production, improve the efficiency of Cultivate administration.
One kind plantation task management method, methods described include:
According to the timing node in the relevant crop growth stage pre-set, prompt message is exported, wherein the prompting Information includes kind, planting area and the residing growth phase of crops;
According to the prompt message, it is determined that the goal task to match with the growth phases of the crops;
Export and show the goal task, so that plant personnel carries out task choosing;
Based on the selection of the plant personnel, task is distributed for the plant personnel.
It is described according to the prompt message in a kind of possible implementation, it is determined that the growth step with the crops The goal task that section matches includes:
The pre-recorded multiple tasks matched with the crops are obtained from the memory of the electronic equipment;
From the multiple task, mesh that task corresponding with the prompt message is defined as matching with the crops Mark task.
It is described according to the prompt message in a kind of possible implementation, it is determined that the growth step with the crops The goal task that section matches includes:
The pre-recorded matching with the crops is obtained from the memory and corresponding with the prompt message is appointed Business;
Receive the actual planting information of the crops from scene feedback;
If the actual planting information is consistent with the prompt message, the task is defined as and the crops The goal task of matching.
In a kind of possible implementation, methods described also includes:
If the actual planting information and the prompt message are inconsistent, the current growth shape of the crops is determined State;
The current growth conditions of the crops are updated in the memory.
In a kind of possible implementation, the selection based on the plant personnel, distributed for the plant personnel Task includes:
Obtain the specialty plantation technical ability of each plant personnel;For each plant personnel, according to the plantation The specialty plantation technical ability of personnel, the goal task is distributed for the plant personnel;Or
Obtain the plantation authority of each plant personnel;For each plant personnel, according to the plant personnel Plantation authority, distribute the goal task for the plant personnel.
In a kind of possible implementation, methods described also includes:
Crops operation information is sent to the user equipment of each plant personnel;
When the confirmation that the user equipment for receiving each plant personnel returns for the crops operation information refers to When making, it is determined that each plant personnel gets Mission Success.
In a kind of possible implementation, the crops operation information includes crops identification information, crops are grasped Make content, crops operation standard and operation demonstration code, it is described according to the relevant crop growth stage pre-set when Intermediate node, prompt message is exported, wherein the prompt message includes kind, planting area and the residing growth phase of crops Before, methods described also includes:
It is marked according to the kind of crops, growth phase, region, generates the crops identification information.
In a kind of possible implementation, methods described also includes:
For each plant personnel, when the task operating for receiving the plant personnel completes instruction, institute is obtained State all task operatings that plant personnel is completed;
All task operatings and the crops operation standard are checked;
If all task operatings meet the requirement of the crops operation standard, it is determined that the plant personnel is examined Core passes through.
A kind of electronic equipment, the electronic equipment include processor and memory, and the processor is used to perform memory The computer program of middle storage is to realize described plantation task management method.
A kind of computer-readable recording medium, the computer-readable recording medium storage has at least one instruction, described At least one instruction realizes described plantation task management method when being executed by processor.
By above technical scheme, the present invention can set on an electronic device in advance the growth phase of each crops when Intermediate node, when reaching the growth phase timing node of some crops, electronic equipment can be according to the relevant agriculture pre-set The timing node of crop growth stage, prompt message is exported, wherein the prompt message includes the kind of crops, planting area With residing growth phase, and then electronic equipment can be and defeated according to prompt message, it is determined that the goal task matched with crops Go out and show the goal task, so that plant personnel carries out task choosing, shown by the task, plant personnel can be learnt The task definition operated is needed, planting area and planting plants kind etc., plant personnel is from there through electronic equipment to choose State goal task, it is not necessary to it is artificial to distribute plantation task, and also plant personnel has certain autonomous selectivity, on the one hand may be used With the work of flexible arrangement plant personnel, on the other hand also can adapt to needed for large-scale plant production, meanwhile, improve plantation The efficiency of management.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of flow chart of preferred embodiment for planting task management method disclosed by the invention.
Fig. 2 is the flow chart of the preferred embodiment of another plantation task management method disclosed by the invention.
Fig. 3 is a kind of functional block diagram of the preferred embodiment of Cultivate administration system disclosed by the invention.
Fig. 4 is the functional block diagram of the preferred embodiment of another Cultivate administration system disclosed by the invention.
Fig. 5 is the structural representation of the electronic equipment for the preferred embodiment that the present invention realizes plantation task management method.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
In order to facilitate the understanding of the purposes, features and advantages of the present invention, it is below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is further detailed explanation.
Wherein, the electronic equipment is a kind of can to carry out numerical computations automatically according to the instruction for being previously set or storing And/or the equipment of information processing, its hardware include but is not limited to microprocessor, application specific integrated circuit (Application Specific Integrated Circuit, ASIC), programmable gate array (Field-Programmable Gate Array, FPGA), digital processing unit (Digital Signal Processor, DSP), embedded device etc..The electronics is set Standby including but not limited to any one can be carried out with user by modes such as keyboard, mouse, remote control, touch pad or voice-operated devices The electronic product of man-machine interaction, for example, personal computer, tablet personal computer, smart mobile phone, personal digital assistant (Personal Digital Assistant, PDA), IPTV (Internet Protocol Television, IPTV), intelligence Formula Wearable, digital camera etc..Above-mentioned user equipment is only citing, and non exhaustive, is set including but not limited to above-mentioned terminal It is standby.
Wherein, the user equipment is a kind of can to carry out numerical computations automatically according to the instruction for being previously set or storing And/or the equipment of information processing, its hardware include but is not limited to microprocessor, application specific integrated circuit (Application Specific Integrated Circuit, ASIC), programmable gate array (Field-Programmable Gate Array, FPGA), digital processing unit (Digital Signal Processor, DSP), embedded device etc..The user sets Standby including but not limited to any one can be carried out with user by modes such as keyboard, mouse, remote control, touch pad or voice-operated devices The electronic product of man-machine interaction, for example, personal computer, tablet personal computer, smart mobile phone, personal digital assistant (Personal Digital Assistant, PDA), IPTV (Internet Protocol Television, IPTV), intelligence Formula Wearable, digital camera etc..Above-mentioned user equipment is only citing, and non exhaustive, is set including but not limited to above-mentioned terminal It is standby.
Fig. 1 is referred to, Fig. 1 is a kind of flow chart of preferred embodiment for planting task management method disclosed by the invention. Wherein, according to different demands, the order of step can change in the flow chart, and some steps can be omitted.
S11, electronic equipment export prompt message according to the timing node in the relevant crop growth stage pre-set.
Wherein, the prompt message includes kind, planting area and the residing growth phase of crops.
In the present invention, in farm, kind is implanted with the crops of large area, numerous in variety, such as tomato, the soil of the crops Beans, cherry, apple etc..Every kind of crops have corresponding growth phase and the time needed for each growth phase, wherein, growth Stage such as sowing stage, nursery stage, the stage of ripeness, accordingly, time needed for each growth phase (i.e. growth phase when Between) such as sowing time, seedling raise period, maturation time etc..In addition, the planting area of different crops is also different.
In the present invention, after the seed purchase of crops, the growth of the crops can be recorded in Cultivate administration system Duration needed for stage, each growth phase, in the operation item needed for each growth phase and operation standard etc..
When the time reaching or being up to the timing node for the growth phase that some (or some) crops pre-sets, Electronic equipment can inquire about relevant information of the crops in the growth phase time from the database of Cultivate administration system, and Prompt message is exported, after the prompt message can prompt the growth operation of the crops in next step, the prompt message such as to spend 7 days The transplanting tomato.
S12, electronic equipment are according to the prompt message, it is determined that appointing with the target that the growth phases of the crops matches Business.
Optionally, electronic equipment is according to the prompt message, it is determined that the mesh to match with the growth phases of the crops The mode of mark task is specifically as follows:
The pre-recorded multiple tasks matched with the crops are obtained from the memory of the electronic equipment;
From the multiple task, mesh that task corresponding with the prompt message is defined as matching with the crops Mark task.
In the present invention, one or more databases are built with the memory of electronic equipment, are deposited in advance in each database Various types of data is stored up, such as:Crops and the one or more tasks corresponding with every kind of crops.For example, for kind For eggplant, the task of each growth phase is different, mainly has:Sowing, nursery, be colonized, hang it is climing, training prune, fall it is climing, harvesting And cleaning of changing crops.Optionally, electronic equipment can be obtained from the memory of the electronic equipment it is pre-recorded with it is described The multiple tasks of crops matching, and from the multiple task, task corresponding with the prompt message is defined as and institute State the goal task of crops matching.Such as:The transplanting tomato after prompt message was prompted 7 days, then electronic equipment can determine The goal task matched with the crops is field planting.
Optionally, electronic equipment is according to the prompt message, it is determined that the mesh to match with the growth phases of the crops The mode of mark task is specifically as follows:
The pre-recorded matching with the crops is obtained from the memory and corresponding with the prompt message is appointed Business;
Receive the actual planting information of the crops from scene feedback;
If the actual planting information is consistent with the prompt message, the task is defined as and the crops The goal task of matching.
In the optional embodiment, electronic equipment can also be obtained from the memory it is pre-recorded with it is described Crops match and task corresponding with the prompt message;Further, by being arranged on planting area and and electronic equipment Carry out communicate connection multiple cameras come obtain from scene feedback the crops actual planting information;If the reality Planting information is consistent with the prompt message, then the task is defined as to the goal task matched with the crops.Than Such as:The transplanting tomato after prompt message was prompted 7 days, then electronic equipment obtains from database pre-recorded matches with tomato And task corresponding with the prompt message is field planting, when the actual kind for tomato from scene feedback that electronic equipment receives When plant information shows that the current growth conditions of tomato need field planting after spending 7 days, electronic equipment can determine the mesh matched with tomato Mark task is field planting.
As an alternative embodiment, methods described also includes:
If the actual planting information and the prompt message are inconsistent, the current growth shape of the crops is determined State;
The current growth conditions of the crops are updated in the memory.
In the optional embodiment, when the actual planting information and the prompt message are inconsistent, show The actual growth conditions of the crops and the information recorded in Cultivate administration system are inconsistent, now need to grow shape with actual Based on state, such as:The transplanting tomato after prompt message was prompted 7 days, electronic equipment obtained from database it is pre-recorded with Tomato matches and task corresponding with the prompt message is field planting, and still, what electronic equipment received is directed to tomato from scene The actual planting information of feedback shows that the current growth conditions of tomato are not good enough, can't be colonized after 7 days, then needs to work as Based on the growth conditions of preceding tomato.
Electronic equipment can determine the current growth conditions of the crops, and by the current growth conditions of the crops It is updated in the memory.So, the relevant information of the crops in database and the actual growth shape of crops are advantageous to State keeps synchronous.
S13, electronic equipment export and show the goal task, so that plant personnel carries out task choosing.
In the present invention, each plant personnel can download Cultivate administration application APP, by binding personal contact number (such as hand Machine number), into Cultivate administration APP, Cultivate administration system may log into by Cultivate administration APP, in Cultivate administration system Interface on, it can be seen that goal task.Wherein, the goal task can be the tasks of crops or multiple The task of crops, the embodiment of the present invention do not limit.
Specifically, crops, the behaviour for needing to operate in the goal task can be exported on the interface of Cultivate administration system Make the information such as content.
The selection of S14, electronic equipment based on the plant personnel, task is distributed for the plant personnel.
Optionally, selection of the electronic equipment based on the plant personnel, distributing task for the plant personnel includes:
Obtain the specialty plantation technical ability of each plant personnel;For each plant personnel, according to the plantation The specialty plantation technical ability of personnel, the goal task is distributed for the plant personnel;Or
Obtain the plantation authority of each plant personnel;For each plant personnel, according to the plant personnel Plantation authority, distribute the goal task for the plant personnel.
In the present invention, electronic equipment can the selection based on the plant personnel, for the plant personnel distribute task.Tool Body, electronic equipment can distribute the goal task according to the specialty plantation technical ability of plant personnel for the plant personnel, with It is easy to plant personnel in professional domain known to oneself to perform task, gives full play to the professional advantage of plant personnel, realizes kind The specialization of plant.
Or optionally, electronic equipment can distribute according to the plantation authority of the plant personnel for the plant personnel The goal task.In this fashion, each plant personnel has corresponding plantation authority, than if any plant personnel can only Receive sowing operation, some plant personnels can only carry out transplanting operation etc., operation of some plant personnels to each growth phase All be familiar with etc., electronic equipment distributes goal task according to authority, helps to adjust in the ability extent of competence of plant personnel Operated with plant personnel.
Wherein, selection of the electronic equipment based on the plant personnel, it is each kind after the plant personnel distribution task Plant personnel can get task, click on " getting " button on the interface of Cultivate administration system, it is possible to get corresponding operation Task, for example, show tomato seedling, romaine lettuce irrigation water grades, and with the operating time limitation, such as require to complete in one day.Its In, same task can only be got by a plant personnel.
In the method flow described by Fig. 1, the growth phase of each crops can be set on an electronic device in advance Timing node, when reaching the timing node of growth phase of some crops, electronic equipment can be according to pre-setting Timing node about the crop growth stage, prompt message is exported, wherein the prompt message includes the kind of crops, kind Growing area domain and residing growth phase, and then electronic equipment can be according to prompt message, it is determined that the target matched with crops is appointed Business, and export and show the goal task, so that plant personnel carries out task choosing, shown by the task, plant personnel The task definition that needs operate can be learnt, planting area and planting plants kind etc., plant personnel is from there through electronic equipment To choose the goal task, it is not necessary to it is artificial to distribute plantation task, and also plant personnel has certain autonomous selectivity, On the one hand on the other hand can also be can adapt to needed for large-scale plant production with the work of flexible arrangement plant personnel, meanwhile, Improve the efficiency of Cultivate administration.
Fig. 2 is referred to, Fig. 2 is the flow of the preferred embodiment of another plantation task management method disclosed by the invention Figure.Wherein, according to different demands, the order of step can change in the flow chart, and some steps can be omitted.
S21, electronic equipment according to the relevant crop growth stage pre-set timing node, export prompt message, Wherein described prompt message includes kind, planting area and the residing growth phase of crops.
S22, electronic equipment are according to the prompt message, it is determined that appointing with the target that the growth phases of the crops matches Business.
Optionally, electronic equipment is according to the prompt message, it is determined that the mesh to match with the growth phases of the crops The mode of mark task is specifically as follows:
The pre-recorded multiple tasks matched with the crops are obtained from the memory of the electronic equipment;
From the multiple task, mesh that task corresponding with the prompt message is defined as matching with the crops Mark task.
Optionally, electronic equipment is according to the prompt message, it is determined that the mesh to match with the growth phases of the crops The mode of mark task is specifically as follows:
The pre-recorded matching with the crops is obtained from the memory and corresponding with the prompt message is appointed Business;
Receive the actual planting information of the crops from scene feedback;
If the actual planting information is consistent with the prompt message, the task is defined as and the crops The goal task of matching.
Optionally, methods described also includes:
If the actual planting information and the prompt message are inconsistent, the current growth shape of the crops is determined State;
The current growth conditions of the crops are updated in the memory.
S23, electronic equipment export and show the goal task, so that plant personnel carries out task choosing.
The selection of S24, electronic equipment based on the plant personnel, task is distributed for the plant personnel.
Optionally, selection of the electronic equipment based on the plant personnel, distributing task for the plant personnel includes:
Obtain the specialty plantation technical ability of each plant personnel;For each plant personnel, according to the plantation The specialty plantation technical ability of personnel, the goal task is distributed for the plant personnel;Or
Obtain the plantation authority of each plant personnel;For each plant personnel, according to the plant personnel Plantation authority, distribute the goal task for the plant personnel.
S25, electronic equipment send crops operation information to the user equipment of each plant personnel.
Wherein, the crops operation information includes crops identification information, crops operation content, crops operation mark Accurate and operation demonstration code.
Wherein, the crops identification information is used for the different crops for distinguishing different zones different growth phases.Crops Operation content is that crops need operation to be performed in some growth phase.Crops operation standard is according to scientific theory, agriculture The standard operation that crop needs to perform in some growth phase.Operation demonstration code is authentication code, is mainly used in plant personnel When entering planting area, by inputting corresponding operation demonstration code, the gate control system that planting area is set can just allow to plant Plant personnel enter, and to avoid other unrelated persons from entering, influence crop growth environment.
As an alternative embodiment, times of the step S21 according to the relevant crop growth stage pre-set Node, export prompt message, wherein kind, planting area and the residing growth phase of the prompt message including crops it Before, methods described also includes:
It is marked according to the kind of crops, growth phase, region, generates the crops identification information.
In the optional embodiment, by crops subregion, carry out subregion according to growth phase, variety of crops, divide Batch, and carry out mark, in growth phase, urge and C is used between seedling stage, Seedling Stage Y, the maturity period is with S etc..Such as A areas first batch No. 01 vegetables are in Seedling Stage, just mark A0101Y.
S26, returned really for the crops operation information when receiving the user equipment of each plant personnel When recognizing instruction, electronic equipment determines that each plant personnel gets Mission Success.
In the present invention, electronic equipment sends crops operation information to the user equipment of each plant personnel.Work as electricity When sub- equipment sends above-mentioned crops operation information success, the user equipment of plant personnel is directed to the crops operation information meeting Return and confirm instruction, now, electronic equipment can determine that plant personnel gets Mission Success.When electronic equipment sends above-mentioned farming When thing operation information is failed, i.e., when the user equipment of plant personnel does not receive inter-related task information alert, plant personnel User equipment will not make any response, and now, the giving tacit consent to the plant personnel of the task is got unsuccessful, and the task will be illustrated in again On the interface of Cultivate administration system, in Unclaimed state.
S27, for each plant personnel, when the task operating for receiving the plant personnel completes instruction, electricity Sub- equipment obtains all task operatings that the plant personnel is completed.
In the present invention, each plant personnel is after task is got, it will performs task into planting area.Operation After complete task, plant personnel can log in Cultivate administration APP, click on and complete to complete instruction, this kind to trigger generation task operating The mode of operation of plant personnel will enter pending nuclear state, and now, electronic equipment can obtain the kind from Cultivate administration system All task operatings that plant personnel are completed.It should be noted that any operation performed by each plant personnel can record In Cultivate administration system.
S28, electronic equipment are checked all task operatings and the crops operation standard.
In the present invention, every kind of crops have corresponding crops operation standard in each growth phase.By taking tomato as an example, such as It is crops operation standard of the tomato in each growth phase down.
1st, sow
1) substrate composition:Peat and perlite are pressed 4:1 volume ratio (i.e. peat:Perlite=4:1) it is well mixed.
2) hole tray is loaded:Matrix that will be well mixed loads full 32 hole disks, and with flat board by the base of hole tray excess surface Matter is erased, it is ensured that the base in each cavities is identical in quality.
3) program request seed:Tomato seeds are seeded into hole tray cavities, depth 1.0-1.5cm.
2nd, nursery
1) rich water quality management:In after planting 0-2 weeks, 3.5 are poured with EC=1.0ms/cm, pH=5.8 nutrient solution weekly It is secondary;In 3-7 weeks, poured 3 times with EC=2.0ms/cm, pH=5.8 nutrient solution weekly;Field planting (plant growth, development in 8th week Speed is mainly influenceed by summation of temperature.Temperature is far above 20 degree, then shortens the time required to growing;Temperature is far below 20 Degree, then extend the time required to growing).
2) prevention and control of plant diseases, pest control:Go through, find pest and disease damage in time, and science is prepared reagent combination and sprayed in time preventing and treating.
3rd, it is colonized
Of the right age strong sprout (5-6 pieces true leaf) is taken out into field planting into coconut palm chaff bar from hole tray, drop arrow is finally inserted in seedling root System side, it is careful not to drop arrow being inserted on root system substrate block.
4th, hang climing
Tomato seedling length is climing to that can carry out hanging during 25-35cm.It will hang to fasten on climing hook and hang climing rope, it is total about 11 meters to hang climing rope (tomato plant of growth 11 months can be grown to 18 meters), it is about 7 meters to be wound on and hang length on climing hook, about 4 meters of the length that hangs down.Utilize This is hung climing hook and hung over according to planting density on the steel wire rope pre-set by picking vehicle, then will be hung climing rope and be existed with Turkey's clone Tomato seedling basal part of stem.It is careful not to knot on stem, should be knotted on climing rope is hung and leave 1-2 finger between cane Space, prevent as young plant grows up, cane thickening strangles stem disconnected.
6th, training is pruned
Including:Prune, flower and fruit thinning, around climing.Branching need to be removed, unless planting scheme allows to leave more per square meter Branch.In general, we allow tomato to grow a branching every one plant.Except this purpose, others branching only has when them Need to be cut with scissors when 5cm to 15cm is long.Unnecessary side shoot is removed in time, extracts bottom old leaf, sick leaf.Pay attention to disappearing for instrument Malicious (75% alcohol).
7th, fall climing
Orlop fruit is harvested first, the blade under lower floor's fruit is cleared up, and then will be hung using picking vehicle It is climing to hook up down, unroll and release about 40cm rope, then will hang climing be hooked on poly- origin-location about 20-30cm position.
8th, harvest
Harvested in strict accordance with harvesting standard, in time harvesting, otherwise fruit is easy to overdone, does not reach shipment standard, And later stage yield can be influenceed.
9th, change crops and clear up
Before harvest cycle terminated for four weeks, we will remove at the top of plant and (pinch), suppress plant nutrition life It is long, all energy are converted into fruit again.After fruit is all ripe, following operate is performed:
1) tomato basal part of stem is cut, then cut the climing rope that hangs above tomato plant, you can by tomato seedling entrucking, fortune Walk.
2) the discarded coconut palm chaff bar for planting tomato plant is entrucked and carried away.
3) the production site prevention and control of plant diseases, pest control, science prepare reagent combination, in time by production site sterilizing, preventing and treating worm Evil.
If S29, all task operatings meet the requirement of the crops operation standard, electronic equipment determines the kind The examination & verification of plant personnel passes through.
In the present invention, electronic equipment is checked all task operatings and the crops operation standard, if institute There is the requirement that task operating meets the crops operation standard, then electronic equipment determines that the examination & verification of the plant personnel passes through, Corresponding performance bonus point will be had by auditing the plant personnel passed through.If all task operatings have any one to be unsatisfactory for the crops The requirement of operation standard, then electronic equipment the examination & verification of the plant personnel can be determined not by the way that further alternative, electronics is set Standby to send auditing result to the user equipment for auditing unsanctioned plant personnel, auditing unsanctioned plant personnel can be with pin Further remedial measure is done to auditing result, if irreversible wrong by other, then can carry out performance deduction of points, electronic equipment Task next time can be got and be operated the further limitation of work and supervision.
Meanwhile the related msu message of each plant personnel can be checked on the interface of Cultivate administration system.
Selection of the electronic equipment based on the plant personnel, it is the plant personnel in the method flow described by Fig. 2 After distribution task, crops operation information can also be sent to the user equipment of each plant personnel;It is every when receiving During the confirmation instruction that the user equipment of the individual plant personnel returns for the crops operation information, electronic equipment can It is determined that each plant personnel gets Mission Success.Further, for each plant personnel, when receiving the kind When the task operating of plant personnel completes instruction, electronic equipment can obtain all task operatings that the plant personnel is completed; All task operatings and the crops operation standard are checked;If all task operatings meet the farming The requirement of thing operation standard, then electronic equipment can determine that the examination & verification of the plant personnel passes through.It can be seen that whole planting process is all It is to be controlled by electronic equipment, and the examination of plant personnel is carried out by electronic equipment, what is manually participated in is less, so as to suitable Answer needed for large-scale plant production, meanwhile, improve the efficiency of Cultivate administration.
Fig. 3 is referred to, Fig. 3 is a kind of functional block diagram of the preferred embodiment of Cultivate administration system disclosed by the invention. Wherein, the Cultivate administration system of Fig. 3 descriptions is used to perform the part or all of step in the Cultivate administration method described by Fig. 1. Unit alleged by the present invention refers to a kind of performed by processor and can to complete the series of computation machine of fixing function Program segment, it is stored in memory.In the present embodiment, the function on each unit will be described in detail in follow-up embodiment.
The Cultivate administration system 11 of Fig. 3 descriptions includes:
Output unit 101, for the timing node according to the relevant crop growth stage pre-set, output prompting letter Breath, wherein the prompt message includes kind, planting area and the residing growth phase of crops;
In the present invention, in farm, kind is implanted with the crops of large area, numerous in variety, such as tomato, the soil of the crops Beans, cherry, apple etc..Every kind of crops have corresponding growth phase and the time needed for each growth phase, wherein, growth Stage such as sowing stage, nursery stage, the stage of ripeness, accordingly, time needed for each growth phase (i.e. growth phase when Between) such as sowing time, seedling raise period, maturation time etc..
In the present invention, after the seed purchase of crops, the growth of the crops can be recorded in Cultivate administration system Duration needed for stage, each growth phase, in the operation item needed for each growth phase and operation standard etc..
When the time reaching or being up to the node for the growth phase time that some (or some) crops pre-sets, Electronic equipment can inquire about relevant information of the crops in the growth phase time from the database of Cultivate administration system, and Prompt message is exported, after the prompt message can prompt the growth operation of the crops in next step, the prompt message such as to spend 7 days The transplanting tomato.
Determining unit 102, for according to the prompt message, it is determined that the mesh to match with the growth phases of the crops Mark task;
Specifically, the determining unit 102 is according to the prompt message, it is determined that the growth phase phase with the crops The goal task matched somebody with somebody includes:
The pre-recorded multiple tasks matched with the crops are obtained from the memory of the electronic equipment;
From the multiple task, mesh that task corresponding with the prompt message is defined as matching with the crops Mark task.
In the present invention, one or more databases are built with the memory of electronic equipment, are deposited in advance in each database Various types of data is stored up, such as:Crops and the one or more tasks corresponding with every kind of crops.For example, for kind For eggplant, the task of each growth phase is different, mainly has:Sowing, nursery, be colonized, hang it is climing, training prune, fall it is climing, harvesting And cleaning of changing crops.Optionally, electronic equipment can be obtained from the memory of the electronic equipment it is pre-recorded with it is described The multiple tasks of crops matching, and from the multiple task, task corresponding with the prompt message is defined as and institute State the goal task of crops matching.Such as:The transplanting tomato after prompt message was prompted 7 days, then electronic equipment can determine The goal task matched with the crops is field planting.
Specifically, the determining unit 102 is according to the prompt message, it is determined that the growth phase phase with the crops The goal task matched somebody with somebody includes:
The pre-recorded matching with the crops is obtained from the memory and corresponding with the prompt message is appointed Business;
Receive the actual planting information of the crops from scene feedback;
If the actual planting information is consistent with the prompt message, the task is defined as and the crops The goal task of matching.
Optionally, electronic equipment can also be obtained from the memory it is pre-recorded matched with the crops and with Task corresponding to the prompt message;Further, by being arranged on planting area and carrying out communicating connection with electronic equipment Multiple cameras come obtain from scene feedback the crops actual planting information;If the actual planting information with it is described Prompt message is consistent, then the task is defined as to the goal task matched with the crops.Such as:Prompt message is prompted The transplanting tomato after spending 7 days, then electronic equipment obtained from database it is pre-recorded matched with tomato and with it is described prompting believe Task corresponding to breath is field planting, when what electronic equipment received shows tomato for tomato from the actual planting information of scene feedback Current growth conditions need field planting after spending 7 days when, the goal task that electronic equipment can determine to match with tomato is field planting.
The output unit 101, it is additionally operable to export and shows the goal task, so that plant personnel carries out task choosing Select;
In the present invention, each plant personnel can download Cultivate administration application APP, by binding personal contact number (such as hand Machine number), into Cultivate administration APP, Cultivate administration system may log into by Cultivate administration APP, in Cultivate administration system Interface on, it can be seen that goal task.Wherein, the goal task can be the tasks of crops or multiple The task of crops, the embodiment of the present invention do not limit.
Specifically, crops, the behaviour for needing to operate in the goal task can be exported on the interface of Cultivate administration system Make the information such as content.
Allocation unit 103, for the selection based on the plant personnel, task is distributed for the plant personnel.
Specifically, the selection of the allocation unit 103 based on the plant personnel, task bag is distributed for the plant personnel Include:
Obtain the specialty plantation technical ability of each plant personnel;For each plant personnel, according to the plantation The specialty plantation technical ability of personnel, the goal task is distributed for the plant personnel;Or
Obtain the plantation authority of each plant personnel;For each plant personnel, according to the plant personnel Plantation authority, distribute the goal task for the plant personnel.
Optionally, if the determining unit 102 is additionally operable to the actual planting information and the prompt message is inconsistent, Determine the current growth conditions of the crops;The current growth conditions of the crops are updated in the memory.
In the present invention, electronic equipment can the selection based on the plant personnel, for the plant personnel distribute task.Tool Body, electronic equipment can distribute the goal task according to the specialty plantation technical ability of plant personnel for the plant personnel, with It is easy to plant personnel in professional domain known to oneself to perform task, gives full play to the professional advantage of plant personnel, realizes kind The specialization of plant.
Or optionally, electronic equipment can distribute according to the plantation authority of the plant personnel for the plant personnel The goal task.In this fashion, each plant personnel has corresponding plantation authority, than if any plant personnel can only Receive sowing operation, some plant personnels can only carry out transplanting operation etc., operation of some plant personnels to each growth phase All be familiar with etc., electronic equipment distributes goal task according to authority, helps to adjust in the ability extent of competence of plant personnel Operated with plant personnel.
Wherein, selection of the electronic equipment based on the plant personnel, it is each kind after the plant personnel distribution task Plant personnel can get task, click on " getting " button on the interface of Cultivate administration system, it is possible to get corresponding operation Task, for example, show tomato seedling, romaine lettuce irrigation water grades, and with the operating time limitation, such as require to complete in one day.Its In, same task can only be got by a plant personnel.
In the Cultivate administration system described by Fig. 3, the growth of each crops can be set on an electronic device in advance Phases-time, can be according to the relevant crop growth rank pre-set when reaching the growth phase time of some crops The timing node of section, prompt message is exported, wherein the prompt message includes kind, planting area and the residing life of crops The long stage, and then electronic equipment can be according to prompt message, it is determined that the goal task matched with crops, and export and show institute Goal task is stated, so that plant personnel carries out task choosing, further, by electronic equipment come the choosing based on the plant personnel Select, distribute task for the plant personnel, distribute plantation task without artificial, enable adaptation to large-scale plant Needed for production, meanwhile, improve the efficiency of Cultivate administration.
Fig. 4 is referred to, Fig. 4 is the functional module of the preferred embodiment of another Cultivate administration system disclosed by the invention Figure.Wherein, the Cultivate administration system of Fig. 4 descriptions is used to perform the part or all of step in the Cultivate administration method described by Fig. 2 Suddenly.Wherein, the Cultivate administration system shown in Fig. 4 is that further optimization obtains on the basis of the Cultivate administration system shown in Fig. 3 , compared with the Cultivate administration system shown in Fig. 3, the Cultivate administration system shown in Fig. 4 also includes transmitting element 104, generation list Member 105, acquiring unit 106 and verification unit 107.Wherein, the unit alleged by the present invention refers to that one kind can be by processor institute Perform and the series of computation machine program segment of fixing function can be completed, it is stored in memory.In the present embodiment, close It will be described in detail in the function of each unit in follow-up embodiment.
Transmitting element 104, for sending crops operation information to the user equipment of each plant personnel;
Wherein, the crops operation information includes crops identification information, crops operation content, crops operation mark Accurate and operation demonstration code.
Wherein, the crops identification information is used for the different crops for distinguishing different zones different growth phases.Crops Operation content is that crops need operation to be performed in some growth phase.Crops operation standard is according to scientific theory, agriculture The standard operation that crop needs to perform in some growth phase.Operation demonstration code is authentication code, is mainly used in plant personnel When entering planting area, by inputting corresponding operation demonstration code, the gate control system that planting area is set can just allow to plant Plant personnel enter, and to avoid other unrelated persons from entering, influence crop growth environment.
The determining unit 102, it is additionally operable to when the user equipment for receiving each plant personnel is directed to the farming During the confirmation instruction that thing operation information returns, it is determined that each plant personnel gets Mission Success.
In the present invention, electronic equipment sends crops operation information to the user equipment of each plant personnel.Work as electricity When sub- equipment sends above-mentioned crops operation information success, the user equipment of plant personnel is directed to the crops operation information meeting Return and confirm instruction, now, electronic equipment can determine that plant personnel gets Mission Success.When electronic equipment sends above-mentioned farming When thing operation information is failed, i.e., when the user equipment of plant personnel does not receive inter-related task information alert, plant personnel User equipment will not make any response, and now, the giving tacit consent to the plant personnel of the task is got unsuccessful, and the task will be illustrated in again On the interface of Cultivate administration system, in Unclaimed state.
Generation unit 105, the time for the output unit 101 according to the relevant crop growth stage pre-set Node, export prompt message, wherein kind, planting area and the residing growth phase of the prompt message including crops it Before, it is marked according to the kind of crops, growth phase, region, generates the crops identification information.
In this embodiment, by crops subregion, subregion, in batches is carried out according to growth phase, variety of crops, and Carry out mark, in growth phase, urge and C is used between seedling stage, Seedling Stage Y, the maturity period is with S etc..Such as No. 01 vegetables of A areas first batch In Seedling Stage, A0101Y is just marked.
Acquiring unit 106, for for each plant personnel, when the task operating for receiving the plant personnel is complete Into during instruction, all task operatings that the plant personnel is completed are obtained;
In the present invention, each plant personnel is after task is got, it will performs task into planting area.Operation After complete task, plant personnel can log in Cultivate administration APP, click on and complete to complete instruction, this kind to trigger generation task operating The mode of operation of plant personnel will enter pending nuclear state, and now, electronic equipment can obtain the kind from Cultivate administration system All task operatings that plant personnel are completed.It should be noted that any operation performed by each plant personnel can record In Cultivate administration system.
Unit 107 is checked, for all task operatings and the crops operation standard to be checked;
In the present invention, every kind of crops have corresponding crops operation standard in each growth phase.By taking tomato as an example, such as It is crops operation standard of the tomato in each growth phase down.
1st, sow
1) substrate composition:Peat and perlite are pressed 4:1 volume ratio (i.e. peat:Perlite=4:1) it is well mixed.
2) hole tray is loaded:Matrix that will be well mixed loads full 32 hole disks, and with flat board by the base of hole tray excess surface Matter is erased, it is ensured that the base in each cavities is identical in quality.
3) program request seed:Tomato seeds are seeded into hole tray cavities, depth 1.0-1.5cm.
2nd, nursery
1) rich water quality management:In after planting 0-2 weeks, 3.5 are poured with EC=1.0ms/cm, pH=5.8 nutrient solution weekly It is secondary;In 3-7 weeks, poured 3 times with EC=2.0ms/cm, pH=5.8 nutrient solution weekly;Field planting (plant growth, development in 8th week Speed is mainly influenceed by summation of temperature.Temperature is far above 20 degree, then shortens the time required to growing;Temperature is far below 20 Degree, then extend the time required to growing).
2) prevention and control of plant diseases, pest control:Go through, find pest and disease damage in time, and science is prepared reagent combination and sprayed in time preventing and treating.
3rd, it is colonized
Of the right age strong sprout (5-6 pieces true leaf) is taken out into field planting into coconut palm chaff bar from hole tray, drop arrow is finally inserted in seedling root System side, it is careful not to drop arrow being inserted on root system substrate block.
4th, hang climing
Tomato seedling length is climing to that can carry out hanging during 25-35cm.It will hang to fasten on climing hook and hang climing rope, it is total about 11 meters to hang climing rope (tomato plant of growth 11 months can be grown to 18 meters), it is about 7 meters to be wound on and hang length on climing hook, about 4 meters of the length that hangs down.Utilize This is hung climing hook and hung over according to planting density on the steel wire rope pre-set by picking vehicle, then will be hung climing rope and be existed with Turkey's clone Tomato seedling basal part of stem.It is careful not to knot on stem, should be knotted on climing rope is hung and leave 1-2 finger between cane Space, prevent as young plant grows up, cane thickening strangles stem disconnected.
6th, training is pruned
Including:Prune, flower and fruit thinning, around climing.Branching need to be removed, unless planting scheme allows to leave more per square meter Branch.In general, we allow tomato to grow a branching every one plant.Except this purpose, others branching only has when them Need to be cut with scissors when 5cm to 15cm is long.Unnecessary side shoot is removed in time, extracts bottom old leaf, sick leaf.Pay attention to disappearing for instrument Malicious (75% alcohol).
7th, fall climing
Orlop fruit is harvested first, the blade under lower floor's fruit is cleared up, and then will be hung using picking vehicle It is climing to hook up down, unroll and release about 40cm rope, then will hang climing be hooked on poly- origin-location about 20-30cm position.
8th, harvest
Harvested in strict accordance with harvesting standard, in time harvesting, otherwise fruit is easy to overdone, does not reach shipment standard, And later stage yield can be influenceed.
9th, change crops and clear up
Before harvest cycle terminated for four weeks, we will remove at the top of plant and (pinch), suppress plant nutrition life It is long, all energy are converted into fruit again.After fruit is all ripe, following operate is performed:
1) tomato basal part of stem is cut, then cut the climing rope that hangs above tomato plant, you can by tomato seedling entrucking, fortune Walk.
2) the discarded coconut palm chaff bar for planting tomato plant is entrucked and carried away.
3) the production site prevention and control of plant diseases, pest control, science prepare reagent combination, in time by production site sterilizing, preventing and treating worm Evil.
The determining unit 102, if being additionally operable to the requirement that all task operatings meet the crops operation standard, Then determine that the examination & verification of the plant personnel passes through.
In the present invention, electronic equipment is checked all task operatings and the crops operation standard, if institute There is the requirement that task operating meets the crops operation standard, then electronic equipment determines that the examination & verification of the plant personnel passes through, Corresponding performance bonus point will be had by auditing the plant personnel passed through.If all task operatings have any one to be unsatisfactory for the crops The requirement of operation standard, then electronic equipment the examination & verification of the plant personnel can be determined not by the way that further alternative, electronics is set Standby to send auditing result to the user equipment for auditing unsanctioned plant personnel, auditing unsanctioned plant personnel can be with pin Further remedial measure is done to auditing result, if irreversible wrong by other, then can carry out performance deduction of points, electronic equipment Task next time can be got and be operated the further limitation of work and supervision.
In the Cultivate administration system described by Fig. 4, based on the selection of the plant personnel, distributed for the plant personnel After task, crops operation information can also be sent to the user equipment of each plant personnel;When receiving each institute When stating the confirmation instruction that the user equipment of plant personnel returns for the crops operation information, electronic equipment is assured that Each plant personnel gets Mission Success.Further, for each plant personnel, when receiving the plantation people When the task operating of member completes instruction, all task operatings that the plant personnel is completed can be obtained;By described all Business operation is checked with the crops operation standard;If all task operatings meet the crops operation standard It is required that it can then determine that the examination & verification of the plant personnel passes through.It can be seen that whole planting process is controlled by electronic equipment, And the examination of plant personnel is carried out by electronic equipment, what is manually participated in is less, enables adaptation to large-scale plant production It is required, meanwhile, improve the efficiency of Cultivate administration.
The above-mentioned integrated unit realized in the form of software function module, can be stored in a computer-readable storage In medium.Wherein, the computer-readable recording medium can store computer program, and the computer program is being executed by processor When, can be achieved above-mentioned each embodiment of the method the step of.Wherein, the computer program includes computer program code, described Computer program code can be source code form, object identification code form, executable file or some intermediate forms etc..The meter Calculation machine readable storage medium storing program for executing can include:Can carry any entity or device of the computer program code, recording medium, USB flash disk, mobile hard disk, magnetic disc, CD, computer storage, read-only storage (ROM, Read-Only Memory), arbitrary access Memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..Need It is bright, the content that the computer-readable recording medium includes can according in jurisdiction legislation and patent practice will Ask and carry out appropriate increase and decrease, such as in some jurisdictions, do not included according to legislation and patent practice, computer-readable medium Electric carrier signal and telecommunication signal.
As shown in figure 5, Fig. 5 is the structure for the electronic equipment that the present invention realizes the preferred embodiment for planting task management method Schematic diagram.The electronic equipment 1 includes memory 12, processor 13 and display screen 14.It will be understood by those skilled in the art that Schematic diagram shown in described Fig. 5 is only the example of electronic equipment 1, does not form the restriction to electronic equipment 1, can include than More or less parts are illustrated, either combine some parts or different parts, such as the electronic equipment 1 can be with Including network access equipment, bus etc..
The electronic equipment 1, which also includes but is not limited to any one, to pass through keyboard, mouse, remote control, touch with user The mode such as plate or voice-operated device carries out the electronic product of man-machine interaction, for example, personal computer, tablet personal computer, smart mobile phone, individual Personal digital assistant (Personal Digital Assistant, PDA), game machine, IPTV (Internet Protocol Television, IPTV), intellectual Wearable etc..Network residing for the electronic equipment 1 is included but not It is limited to internet, wide area network, Metropolitan Area Network (MAN), LAN, VPN (Virtual Private Network, VPN) etc..
The memory 12 alternatively includes one or more computer-readable recording mediums, appoints for storing a kind of plantation The program and various data for management method of being engaged in, and realize high speed in the process of running, be automatically completed the access of program or data. The memory 12 alternatively includes high-speed random access memory, and also alternatively includes nonvolatile memory, such as One or more disk storage equipments, flash memory device or other non-volatile solid state memory equipment.
The processor 13 is also known as central processing unit (CPU, Central Processing Unit), is one piece of super large rule The integrated circuit of mould, it is the arithmetic core (Core) and control core (Control Unit) of electronic equipment 1.The processor 13 It can perform the operating system of the electronic equipment 1 and the types of applications program of installation, program code etc., such as Cultivate administration system System 11.
The display screen 14 is mainly used in realizing the input/output function of electronic equipment 1, for example, the numeral of transmitting-receiving input or Character information, or show the information inputted by user or be supplied to the information of user and the various menus of user equipment 1.Its In, optionally, the display screen 14 can be contact panel, the contact panel, also referred to as touch-screen, collect user thereon or Neighbouring touch operation (for example user on contact panel or is being touched using any suitable objects or annex such as finger, stylus Control the operation of nearby panels), and corresponding attachment means are driven according to formula set in advance.Optionally, the contact panel can So that including display panel, liquid crystal display (Liquid Crystal Display, LCD), Organic Light Emitting Diode can be used Forms such as (Organic Light-Emitting Diode, OLED) configures display panel.When contact panel is detected at it On or near touch operation after, send processor 13 to determine the type of touch event, be followed by subsequent processing device 13 according to touch The type of event provides corresponding visual output on a display panel.
With reference to Fig. 1 or 2, the memory 12 in the electronic equipment 1 stores multiple instruction to realize that a kind of plantation is appointed Business management method, the processor 13 can perform the multiple instruction so as to realize:
According to the timing node in the relevant crop growth stage pre-set, prompt message is exported, wherein the prompting Information includes kind, planting area and the residing growth phase of crops;
According to the prompt message, it is determined that the goal task to match with the growth phases of the crops;
Export and show the goal task, so that plant personnel carries out task choosing;
Based on the selection of the plant personnel, task is distributed for the plant personnel.
It is described according to the prompt message in a kind of optional embodiment, it is determined that the growth step with the crops The goal task that section matches includes:
The pre-recorded multiple tasks matched with the crops are obtained from the memory of the electronic equipment;
From the multiple task, mesh that task corresponding with the prompt message is defined as matching with the crops Mark task.
It is described according to the prompt message in a kind of optional embodiment, it is determined that the growth step with the crops The goal task that section matches includes:
The pre-recorded matching with the crops is obtained from the memory and corresponding with the prompt message is appointed Business;
Receive the actual planting information of the crops from scene feedback;
If the actual planting information is consistent with the prompt message, the task is defined as and the crops The goal task of matching.
In a kind of optional embodiment, the processor 13 can perform the multiple instruction so as to realize:
If the actual planting information and the prompt message are inconsistent, the current growth shape of the crops is determined State;
The current growth conditions of the crops are updated in the memory.
In a kind of optional embodiment, the selection based on the plant personnel, distributed for the plant personnel Task includes:
Obtain the specialty plantation technical ability of each plant personnel;For each plant personnel, according to the plantation The specialty plantation technical ability of personnel, the goal task is distributed for the plant personnel;Or
Obtain the plantation authority of each plant personnel;For each plant personnel, according to the plant personnel Plantation authority, distribute the goal task for the plant personnel.
In a kind of optional embodiment, the processor 13 can perform the multiple instruction so as to realize:
Crops operation information is sent to the user equipment of each plant personnel;
When the confirmation that the user equipment for receiving each plant personnel returns for the crops operation information refers to When making, it is determined that each plant personnel gets Mission Success.
In a kind of optional embodiment, the crops operation information includes crops identification information, crops are grasped Make content, crops operation standard and operation demonstration code, the processor 13 can perform the multiple instruction so as to realize:
For each plant personnel, when the task operating for receiving the plant personnel completes instruction, institute is obtained State all task operatings that plant personnel is completed;
All task operatings and the crops operation standard are checked;
If all task operatings meet the requirement of the crops operation standard, it is determined that the plant personnel is examined Core passes through.
Specifically, the processor 13 refers to Fig. 1 to the concrete methods of realizing of above-mentioned instruction or Fig. 2 is corresponded in embodiment The description of correlation step, will not be described here.
In the electronic equipment described by Fig. 5, the growth phase of each crops can be set on an electronic device in advance Time, when reaching the growth phase time of some crops, electronic equipment can give birth to according to the relevant crops pre-set The timing node in long stage, prompt message is exported, wherein the kind of the prompt message including crops, planting area and residing Growth phase, and then electronic equipment can be according to prompt message, it is determined that the goal task matched with crops, and exports and show Show the goal task, so that plant personnel carries out task choosing, further, the plant personnel is based on by electronic equipment Selection, distribute task for the plant personnel, plantation task distributed without artificial, enable adaptation to large-scale Needed for plant production, meanwhile, improve the efficiency of Cultivate administration.
In several embodiments provided by the present invention, it should be understood that disclosed system, apparatus and method can be with Realize by another way.For example, device embodiment described above is only schematical, for example, the module Division, only a kind of division of logic function, can there is other dividing mode when actually realizing.
The module illustrated as separating component can be or may not be physically separate, show as module The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of module therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional module in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of hardware adds software function module.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any attached associated diagram mark in claim should not be considered as into the involved right of limitation will Ask.Furthermore, it is to be understood that the word of " comprising " one is not excluded for other units or step, odd number is not excluded for plural number.Stated in system claims Multiple units or device can also be realized by a unit or device by software or hardware.Second grade word is used for table Show title, and be not offered as any specific order.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although reference The present invention is described in detail for preferred embodiment, it will be understood by those within the art that, can be to the present invention's Technical scheme is modified or equivalent substitution, without departing from the spirit and scope of technical solution of the present invention.

Claims (10)

1. one kind plantation task management method, applied in electronic equipment, it is characterised in that methods described includes:
According to the timing node in the relevant crop growth stage pre-set, prompt message is exported, wherein the prompt message Kind, planting area and residing growth phase including crops;
According to the prompt message, it is determined that the goal task to match with the growth phases of the crops;
Export and show the goal task, so that plant personnel carries out task choosing;
Based on the selection of the plant personnel, task is distributed for the plant personnel.
2. according to the method for claim 1, it is characterised in that it is described according to the prompt message, it is determined that with the farming The goal task that the growth phase of thing matches includes:
The pre-recorded multiple tasks matched with the crops are obtained from the memory of the electronic equipment;
From the multiple task, the target that task corresponding with the prompt message is defined as matching with the crops is appointed Business.
3. according to the method for claim 1, it is characterised in that it is described according to the prompt message, it is determined that with the farming The goal task that the growth phase of thing matches includes:
Pre-recorded matching and task corresponding with the prompt message with the crops are obtained from the memory;
Receive the actual planting information of the crops from scene feedback;
If the actual planting information is consistent with the prompt message, the task is defined as matching with the crops Goal task.
4. according to the method for claim 3, it is characterised in that methods described also includes:
If the actual planting information and the prompt message are inconsistent, the current growth conditions of the crops are determined;
The current growth conditions of the crops are updated in the memory.
5. according to the method for claim 1, it is characterised in that the selection based on the plant personnel, be the kind Planting personnel assignment task includes:
Obtain the specialty plantation technical ability of each plant personnel;For each plant personnel, according to the plant personnel Specialty plantation technical ability, distribute the goal task for the plant personnel;Or
Obtain the plantation authority of each plant personnel;For each plant personnel, according to the kind of the plant personnel Authority is planted, the goal task is distributed for the plant personnel.
6. according to the method described in any one of Claims 1-4, it is characterised in that methods described also includes:
Crops operation information is sent to the user equipment of each plant personnel;
When the confirmation instruction that the user equipment for receiving each plant personnel returns for the crops operation information, It is determined that each plant personnel gets Mission Success.
7. according to the method for claim 6, it is characterised in that the crops operation information includes crops mark letter Breath, crops operation content, crops operation standard and operation demonstration code, it is described to be given birth to according to the relevant crops pre-set The timing node in long stage, prompt message is exported, wherein the kind of the prompt message including crops, planting area and residing Growth phase before, methods described also includes:
It is marked according to the kind of crops, growth phase, region, generates the crops identification information.
8. according to the method for claim 7, it is characterised in that methods described also includes:
For each plant personnel, when the task operating for receiving the plant personnel completes instruction, the kind is obtained All task operatings that plant personnel are completed;
All task operatings and the crops operation standard are checked;
If all task operatings meet the requirement of the crops operation standard, it is determined that the examination & verification of the plant personnel is led to Cross.
9. a kind of electronic equipment, it is characterised in that the electronic equipment includes processor and memory, and the processor is used to hold The computer program stored in line storage plants task management side as claimed in any of claims 1 to 8 in one of claims to realize Method.
10. a kind of computer-readable recording medium, it is characterised in that the computer-readable recording medium storage has at least one Instruction, at least one instruction realize plantation task as claimed in any of claims 1 to 8 in one of claims when being executed by processor Management method.
CN201711035724.XA 2017-10-30 2017-10-30 Plant task management method, electronic equipment and computer-readable recording medium Pending CN107808249A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711035724.XA CN107808249A (en) 2017-10-30 2017-10-30 Plant task management method, electronic equipment and computer-readable recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711035724.XA CN107808249A (en) 2017-10-30 2017-10-30 Plant task management method, electronic equipment and computer-readable recording medium

Publications (1)

Publication Number Publication Date
CN107808249A true CN107808249A (en) 2018-03-16

Family

ID=61582301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711035724.XA Pending CN107808249A (en) 2017-10-30 2017-10-30 Plant task management method, electronic equipment and computer-readable recording medium

Country Status (1)

Country Link
CN (1) CN107808249A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109452164A (en) * 2018-12-01 2019-03-12 王湛 A kind of intelligence artificial pollination design method and intelligent artificial pollination system
CN109463150A (en) * 2018-09-27 2019-03-15 江西万雅生态旅游开发有限公司 Booth frame for yangtao and Kiwi berry grafting assessment system and its method
JP2020109588A (en) * 2019-01-07 2020-07-16 公立大学法人大阪 Crop production management system, server, information processing method, terminal, and program
WO2021156706A1 (en) * 2020-02-03 2021-08-12 International Business Machines Corporation Estimation of crop type and/or sowing date
WO2022227366A1 (en) * 2021-04-27 2022-11-03 海南青峰生物科技有限公司 Intelligent agricultural monitoring and management system based on 5g communication technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106331127A (en) * 2016-08-30 2017-01-11 深圳前海弘稼科技有限公司 Planting equipment and management method, device and system thereof and server
CN106447170A (en) * 2016-08-31 2017-02-22 深圳前海弘稼科技有限公司 Plantation box information display method, server, plantation box and plantation system
CN106576499A (en) * 2016-11-30 2017-04-26 深圳前海弘稼科技有限公司 Method and device for prompting plant germination, planting monitoring terminal and server
CN106774070A (en) * 2016-12-27 2017-05-31 蔡艾铿 One plant growth monitoring method, device and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106331127A (en) * 2016-08-30 2017-01-11 深圳前海弘稼科技有限公司 Planting equipment and management method, device and system thereof and server
CN106447170A (en) * 2016-08-31 2017-02-22 深圳前海弘稼科技有限公司 Plantation box information display method, server, plantation box and plantation system
CN106576499A (en) * 2016-11-30 2017-04-26 深圳前海弘稼科技有限公司 Method and device for prompting plant germination, planting monitoring terminal and server
CN106774070A (en) * 2016-12-27 2017-05-31 蔡艾铿 One plant growth monitoring method, device and system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109463150A (en) * 2018-09-27 2019-03-15 江西万雅生态旅游开发有限公司 Booth frame for yangtao and Kiwi berry grafting assessment system and its method
CN109452164A (en) * 2018-12-01 2019-03-12 王湛 A kind of intelligence artificial pollination design method and intelligent artificial pollination system
JP2020109588A (en) * 2019-01-07 2020-07-16 公立大学法人大阪 Crop production management system, server, information processing method, terminal, and program
WO2021156706A1 (en) * 2020-02-03 2021-08-12 International Business Machines Corporation Estimation of crop type and/or sowing date
US11382260B2 (en) 2020-02-03 2022-07-12 International Business Machines Corporation Estimation of crop type and/or sowing date
GB2608044A (en) * 2020-02-03 2022-12-21 Ibm Estimation of crop type and/or sowing date
WO2022227366A1 (en) * 2021-04-27 2022-11-03 海南青峰生物科技有限公司 Intelligent agricultural monitoring and management system based on 5g communication technology

Similar Documents

Publication Publication Date Title
CN107808249A (en) Plant task management method, electronic equipment and computer-readable recording medium
Heuvelink et al. Dry matter distribution in tomato and cucumber
Ross The plantation paradigm: colonial agronomy, African farmers, and the global cocoa boom, 1870s–1940s
JPWO2014119330A1 (en) Cultivation system, cultivation program, and cultivation method
JP6551943B2 (en) Growth management device, growth management method, and program
Yelapure et al. Literature review on expert system in agriculture
CN107455183A (en) Guide implant system, guiding implantation methods and cultivation box
Mithunesh et al. Aeroponic based controlled environment based farming system
Singh et al. Performance of soilless cucumbers in relation to differential fertigation under naturally ventilated greenhouse conditions
CN112997816A (en) Melon large-scale production management method
Brandenberger et al. Sweet potato production
Lindgren The role of tree breeding in reforestation
US20210161083A1 (en) Self-service modular plant cultivation and storage systems
CN114511161A (en) Method, device, equipment and storage medium for predicting opposita lepigone control due to right-time period
CN109597451A (en) Vegetable cultivation interactive approach
Rasmussen et al. Timing of a plant–herbivore interaction alters plant growth and reproduction
Salazar et al. Base temperature and simulation model for nodes appearance in cape gooseberry (Physalis peruviana L.)
CN106453252A (en) Internet crop customized cultivation method
KR20210078464A (en) The modular farming system and method for cultivating various plants
Sato et al. Self-discrimination in vine tendrils of different plant families
JP2016067346A (en) Method for harvesting sweet potatoes learned from pheasant
CN108703003A (en) A kind of grape claims breeding method
CN115471354A (en) Automatic plant planting system and method
CN106373021A (en) Customized crop network cultivation method
CN109729857A (en) A kind of construction method of Pterospermi Heterophylli cutting orchard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180316