CN107808237B - A real-time flood control risk analysis and calculation method for parallel reservoir groups - Google Patents

A real-time flood control risk analysis and calculation method for parallel reservoir groups Download PDF

Info

Publication number
CN107808237B
CN107808237B CN201710939063.7A CN201710939063A CN107808237B CN 107808237 B CN107808237 B CN 107808237B CN 201710939063 A CN201710939063 A CN 201710939063A CN 107808237 B CN107808237 B CN 107808237B
Authority
CN
China
Prior art keywords
reservoir
flood
random process
flood control
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710939063.7A
Other languages
Chinese (zh)
Other versions
CN107808237A (en
Inventor
陈娟
钟平安
徐斌
张宇
闫海滨
李映辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201710939063.7A priority Critical patent/CN107808237B/en
Publication of CN107808237A publication Critical patent/CN107808237A/en
Application granted granted Critical
Publication of CN107808237B publication Critical patent/CN107808237B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of parallel reservoir group Real time Flood risk Analytic Calculation Methods, the described method comprises the following steps: (1) establishing the mathematic(al) representation of uncertain factor, obtain the marginal distribution function of uncertain factor;(2) it is based on Copula function, solves the joint probability density distribution function of multidimensional uncertain factor;(3) multi-reservoir Technique for Real-time Joint Operation of Flood risk model is established, each moment multi-reservoir flood control operation risk is parsed;(4) calculating of multi-reservoir Technique for Real-time Joint Operation of Flood risk.The present invention considers influence of the correlation between uncertain factor to multi-reservoir Technique for Real-time Joint Operation of Flood risk, has acquired the analytic sensitivity of each moment multi-reservoir Technique for Real-time Joint Operation of Flood risk, and computational efficiency is high, is easily achieved, and has stronger versatility.

Description

一种并联水库群实时防洪风险解析计算方法A real-time flood control risk analysis and calculation method for parallel reservoir groups

技术领域technical field

本发明属于水库防洪调度风险评估,具体涉及一种并联水库群实时防洪风险解析计算方法。The invention belongs to the risk assessment of flood control dispatching of reservoirs, and in particular relates to a real-time flood control risk analysis and calculation method for parallel reservoir groups.

背景技术Background technique

水库群实时防洪调度是流域防洪减灾的重要技术手段之一,可以通过较小的投入来提高防洪工程的效益。但是现有的水库群实时防洪调度的过程中,存在很多的不确定性因素,包括水库群入库流量过程的不确定、水库群出流过程的不确定、区间洪水预报过程的不确性,这些不确定性因素导致了下游公共防洪点组合流量过程的不确定,给防洪决策带来了一定的影响,并且具有一定的风险。因此,水库群实时防洪调度风险评估具有重要的学术意义与实用价值,其主要目标是对水库群防洪调度过程的不确定性因素及其给水库群防洪调度结果带来的风险进行定性的分析和定量的计算。The real-time flood control scheduling of reservoir groups is one of the important technical means for flood control and disaster mitigation in the basin, which can improve the benefits of flood control projects with a small investment. However, there are many uncertain factors in the existing real-time flood control scheduling of reservoir groups, including the uncertainty of the inflow process of the reservoir group, the uncertainty of the outflow process of the reservoir group, and the uncertainty of the interval flood forecasting process. These uncertain factors lead to the uncertainty of the combined flow process of the downstream public flood control points, which has a certain impact on the flood control decision-making and has certain risks. Therefore, the real-time flood control scheduling risk assessment of reservoir groups has important academic significance and practical value. Quantitative calculations.

目前,现有的水库群实时防洪调度风险评估方法主要存在以下不足:(1)难以获取多维不确定性因素的联合概率密度分布函数;(2)随机模拟的方法计算水库群实时防洪调度风险,计算效率不高、通用性不够,对于不同的系统需要重新建模。At present, the existing real-time flood control scheduling risk assessment methods for reservoir groups mainly have the following shortcomings: (1) it is difficult to obtain the joint probability density distribution function of multi-dimensional uncertainty factors; (2) the stochastic simulation method calculates the real-time flood control scheduling risk of reservoir groups, The computational efficiency is not high and the versatility is not enough, and it needs to be remodeled for different systems.

发明内容SUMMARY OF THE INVENTION

发明目的:针对上述现有技术的不足,本发明提供一种并联水库群实时防洪风险解析计算方法,评估并联水库群实时防洪解析中不确定因素造成的风险问题。Purpose of the invention: Aiming at the above-mentioned deficiencies of the prior art, the present invention provides a real-time flood control risk analysis and calculation method for parallel reservoir groups to evaluate the risk problems caused by uncertain factors in the real-time flood control analysis of parallel reservoir groups.

技术方案:一种并联水库群实时防洪风险解析计算方法,包括以下步骤:Technical solution: a real-time flood control risk analysis and calculation method for parallel reservoir groups, comprising the following steps:

(1)建立不确定性因素的数学表达式,求解不确定性因素的边缘分布函数;(1) Establish the mathematical expression of the uncertainty factor, and solve the marginal distribution function of the uncertainty factor;

(2)基于Copula函数,求解多维不确定性因素的联合概率密度分布函数;(2) Based on the Copula function, solve the joint probability density distribution function of multi-dimensional uncertainty factors;

(3)建立水库群实时防洪调度风险模型,解析各时刻水库群防洪调度风险;(3) Establish a real-time flood control dispatch risk model for reservoir groups, and analyze the flood control dispatch risks of reservoir groups at each moment;

(4)水库群实时防洪调度风险的计算。(4) Calculation of real-time flood control dispatch risk for reservoir groups.

进一步的,步骤(1)中所述不确定性因素包含水库群入库流量、水库群出库流量和区间洪水预报的不确定性。Further, the uncertainty factors in step (1) include the inflow of the reservoir group, the outflow of the reservoir group and the uncertainty of interval flood forecasting.

进一步的,所述步骤(2)包括如下步骤:Further, described step (2) comprises the steps:

(2.1)定义H(q1(t),q2(t),q3(t))为水库1的出流随机过程、水库2出流随机过程、和区间洪水出流随机过程的联合概率分布函数,计算公式如下:(2.1) Define H(q 1 (t), q 2 (t), q 3 (t)) as the joint probability of the outflow random process of reservoir 1, the outflow random process of reservoir 2, and the interval flood outflow random process Distribution function, the calculation formula is as follows:

H(q1(t),q2(t),q3(t))=C(F(q1(t)),F(q2(t)),F(q3(t))) (1)H(q 1 (t),q 2 (t),q 3 (t))=C(F(q 1 (t)),F(q 2 (t)),F(q 3 (t))) (1)

式中,q1(t)为t时刻水库1的出库流量随机过程;q2(t)为t时刻水库2的出库流量随机过程;q3(t)为t时刻下游防洪控制断面的区间洪水随机过程;F(q1(t))、F(q2(t))、F(q3(t))分别为不确定性因素-水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的边缘分布函数;C为Copula函数;In the formula, q 1 (t) is the random process of the outflow flow of reservoir 1 at time t; q 2 (t) is the random process of outflow flow of reservoir 2 at time t; q 3 (t) is the flow of the downstream flood control section at time t. Interval flood stochastic process; F(q 1 (t)), F(q 2 (t)), F(q 3 (t)) are uncertainty factors respectively - the outflow stochastic process of reservoir 1 q 1 (t) , the marginal distribution function of the outflow random process q 2 (t) of reservoir 2, and the interval flood random process q 3 (t); C is the Copula function;

(2.2)定义h(q1(t),q2(t),q3(t))为水库1的出流随机过程、水库2出流随机过程、和区间洪水随机过程的联合概率密度函数,计算公式如下:(2.2) Define h(q 1 (t), q 2 (t), q 3 (t)) as the joint probability density function of the outflow random process of reservoir 1, the outflow random process of reservoir 2, and the interval flood random process ,Calculated as follows:

式中,f(qi(t))为不确定性因素qi(t),i=1,2,3的概率密度函数,c(F(q1(t)),F(q2(t)),F(q3(t))为Copula函数C(F(q1(t)),F(q2(t)),F(q3(t))的概率密度函数。In the formula, f(q i (t)) is the probability density function of the uncertainty factor q i (t), i=1, 2, 3, c(F(q 1 (t)), F(q 2 ( t)), F(q 3 (t)) is the probability density function of the Copula function C(F(q 1 (t)), F(q 2 (t)), F(q 3 (t)).

更进一步的,步骤(2)所述的Copula函数包括3种计算公式,表达式如下:Further, the Copula function described in step (2) includes 3 kinds of calculation formulas, and the expressions are as follows:

其中,α(t)为Copula函数的参数;Among them, α(t) is the parameter of Copula function;

进一步的,所述步骤(3)具体步骤如下:Further, the specific steps of the step (3) are as follows:

定义水库群实时防洪调度风险Risk(t)为t时刻公共防洪点组合流量过程超过防洪控制断面安全流量阈值的概率,通过Copula函数连接步骤(1)中的不确定性因素,得到水库群实时防洪调度风险Risk(t)的计算公式为:Define the real-time flood control dispatch risk Risk(t) of the reservoir group as the probability that the combined flow process of the public flood control points exceeds the safe flow threshold of the flood control section at time t, and connect the uncertain factors in step (1) through the Copula function to obtain the real-time flood control of the reservoir group. The calculation formula of scheduling risk Risk(t) is:

式中,Risk(t)表示t时刻水库群系统实时防洪调度风险;Q(t)表示t时刻公共防洪点的组合流量过程;QC(t)表示t时刻防洪控制断面的安全流量阈值,可取公共防洪点的安全泄量;Ω0={q1(t)+q2(t)+q3(t)>QC(t)},Ω1为相应于Ω0的积分转换区间。In the formula, Risk(t) represents the real-time flood control dispatch risk of the reservoir group system at time t; Q(t) represents the combined flow process of the public flood control points at time t; Q C (t) represents the safe flow threshold of the flood control section at time t, which is desirable Safe discharge of public flood control point; Ω 0 ={q 1 (t)+q 2 (t)+q 3 (t)>Q C (t)}, Ω 1 is the integral conversion interval corresponding to Ω 0 .

进一步的,所述步骤(4)包括如下步骤:Further, described step (4) comprises the steps:

(4.1)获取水库群的运行数据和实时预报入库流量均值过程及误差分布、区间洪水预报均值过程及误差分布;(4.1) Obtaining the operation data of the reservoir group and real-time forecasting of the mean value process and error distribution of inflow discharge, and the mean value process and error distribution of interval flood forecasting;

(4.2)根据水库防洪调度规则进行水库调洪演算,计算水库出库流量随机过程;(4.2) According to the flood control scheduling rules of the reservoir, carry out the flood adjustment calculation of the reservoir, and calculate the random process of the outflow flow of the reservoir;

(4.3)选择Copula函数作为不确定性因素-水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的联合概率分布函数。(4.3) Select Copula function as uncertainty factor - joint probability of outflow random process q 1 (t) of reservoir 1, outflow random process q 2 (t) of reservoir 2, and interval flood random process q 3 (t) Distribution function.

(4.4)根据选择的Copula函数,计算各时刻水库群实时防洪调度风险。(4.4) According to the selected Copula function, the real-time flood control dispatch risk of the reservoir group at each moment is calculated.

有益效果:本发明相比现有技术,其显著效果在于:1、考虑了不确定性因素之间的相关性对水库群实时防洪调度风险的影响,水库群实时防洪调度风险评估方法考虑因素更加全面;2、通过Copula函数建立了各时刻水库群实时防洪调度风险的解析计算公式;3、解析计算方法计算效率高、易于实现,具有较强的通用性。Beneficial effects: Compared with the prior art, the present invention has significant effects as follows: 1. Considering the impact of the correlation between uncertain factors on the risk of real-time flood control and dispatching of reservoir groups, the risk assessment method for real-time flood control and dispatching of reservoir groups considers more factors; Comprehensive; 2. The analytical calculation formula of the real-time flood control dispatch risk of reservoir groups at each moment is established by the Copula function; 3. The analytical calculation method has high calculation efficiency, is easy to implement, and has strong generality.

附图说明Description of drawings

图1为本发明方法的流程图;Fig. 1 is the flow chart of the inventive method;

图2为本发明并联水库群系统示意图;Fig. 2 is the schematic diagram of the parallel reservoir group system of the present invention;

图3为本发明计算步骤流程示意图。FIG. 3 is a schematic flow chart of calculation steps of the present invention.

具体实施方式Detailed ways

为了进一步的阐述本发明公开的技术方案,下面结合说明书附图和具体实施例做详细的说明。In order to further illustrate the technical solutions disclosed in the present invention, a detailed description is given below with reference to the accompanying drawings and specific embodiments of the description.

本发明综合考虑了水库群入库流量过程的不确定、水库群出流过程的不确定、区间洪水预报过程的不确性,考虑了不确定性因素之间的相关性,通过Copula函数理论建立了以上不确定性因素的联合概率密度分布函数,提出了水库群实时防洪调度风险的定义并求得了各时刻水库群实时防洪调度风险的解析计算公式。The method comprehensively considers the uncertainty of the inflow process of the reservoir group, the uncertainty of the outflow process of the reservoir group, and the uncertainty of the interval flood forecasting process, and considers the correlation between the uncertain factors, and is established by the Copula function theory. Based on the joint probability density distribution function of the above uncertainty factors, the definition of real-time flood control dispatch risk of reservoir groups is proposed, and the analytical calculation formula of real-time flood control dispatch risk of reservoir groups at each moment is obtained.

如图1所示,一种并联水库群实时防洪风险解析计算方法,包括以下步骤:As shown in Figure 1, a real-time flood control risk analysis and calculation method for parallel reservoir groups includes the following steps:

步骤1:提出不确定性因素的数学表达式,求解不确定性因素的边缘分布函数:Step 1: Propose the mathematical expression of the uncertainty factor, and solve the marginal distribution function of the uncertainty factor:

(1.1)定义Qi(t)为t时刻水库i的入库流量随机过程,计算公式如下:(1.1) Define Q i (t) as the random process of the inflow flow of reservoir i at time t, and the calculation formula is as follows:

其中,为t时刻水库i的入库流量随机过程的均值;ξi(t)为t时刻水库i的入库流量预报误差,ξi(t)服从正态分布,即分布参数为水库i的入库流量预报误差的均方差,其可以由水文预报模型获得。则t时刻水库i的入库流量随机过程qi(t)也服从正态分布,即 in, is the mean value of the random process of inflow flow of reservoir i at time t; ξ i (t) is the forecast error of inflow flow of reservoir i at time t, and ξ i (t) obeys a normal distribution, that is, Distribution parameters is the mean square error of the inflow forecast error of reservoir i, which can be obtained from the hydrological forecast model. Then the random process q i (t) of the inflow flow of reservoir i at time t also obeys a normal distribution, that is,

然后,定义q3(t)为t时刻下游防洪控制断面的区间洪水随机过程,计算公式计如下:Then, define q 3 (t) as the interval flood random process of the downstream flood control section at time t, and the calculation formula is as follows:

其中,为t时刻区间洪水随机过程的均值,即确定性水文预报结果;ξ3(t)为t时刻区间洪水预报误差,ξ3(t)服从正态分布,即分布参数为区间洪水预报误差的均方差,其可以由水文预报模型获得。则t时刻下游防洪控制断面的区间洪水随机过程q3(t)也服从正态分布,即in, is the mean value of the stochastic process of flood in the interval at time t, that is, the deterministic hydrological forecast result; ξ 3 (t) is the interval flood forecast error at time t, and ξ 3 (t) obeys a normal distribution, that is, Distribution parameters is the mean square error of interval flood forecast error, which can be obtained from the hydrological forecast model. Then the interval flood random process q 3 (t) of the downstream flood control section at time t also obeys the normal distribution, that is,

(1.2)定义qi(t)为t时刻水库i的出库流量随机过程,计算公式如下:(1.2) Define q i (t) as the random process of the outflow flow of reservoir i at time t, and the calculation formula is as follows:

其中,为t时刻水库i的出库流量随机过程的均值;ηi(t)为t时刻水库i的出库流量误差,ηi(t)服从正态分布,即则t时刻水库i的出库流量随机过程qi(t)也服从正态分布,即分布参数为水库i的出库流量误差的均方差,计算步骤如下:in, is the mean value of the random process of the outflow flow of reservoir i at time t; η i (t) is the outflow flow error of reservoir i at time t, and η i (t) obeys a normal distribution, that is, Then the random process q i (t) of the outflow flow of reservoir i at time t also obeys the normal distribution, that is, Distribution parameters is the mean square error of the outflow flow error of reservoir i, and the calculation steps are as follows:

1)按照水库i的入库流量随机过程和区间洪水随机过程的分布,这里优选拉丁超立方抽样生成M组入库流量过程的样本和区间洪水过程的样本 1) Random process according to the inflow flow of reservoir i and interval flood stochastic process distribution, here the Latin hypercube sampling is preferred to generate samples of M groups of inbound flow processes and a sample of interval flood processes

2)根据水库i的防洪调度规则,通过水量平衡原理进行水库调洪演算,计算得到水库i的出库流量过程样本 2) According to the flood control scheduling rules of the reservoir i, the flood regulation calculation of the reservoir is carried out through the principle of water balance, and the outflow flow process sample of the reservoir i is calculated.

3)根据水库i的出库流量过程样本拟合各时刻水库i出库流量随机过程的分布 3) Fitting the distribution of the random process of the outflow flow of reservoir i at each moment according to the sample of the outflow flow process of reservoir i

步骤2:基于Copula函数,求解多维不确定性因素的联合概率密度分布函数:Step 2: Based on the Copula function, solve the joint probability density distribution function of multi-dimensional uncertainty factors:

定义H(q1(t),q2(t),q3(t))为不确定性因素-水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的联合概率分布函数,根据Copula函数理论,采用以下公式计算:Define H(q 1 (t), q 2 (t), q 3 (t)) as the uncertainty factor - the outflow random process of reservoir 1 q 1 (t), the outflow random process of reservoir 2 q 2 (t ), and the joint probability distribution function of the interval flood random process q 3 (t), according to the Copula function theory, the following formula is used to calculate:

H(q1(t),q2(t),q3(t))=C(F(q1(t)),F(q2(t)),F(q3(t))) (9)H(q 1 (t),q 2 (t),q 3 (t))=C(F(q 1 (t)),F(q 2 (t)),F(q 3 (t))) (9)

其中,F(q1(t))、F(q2(t))、F(q3(t))分别为不确定性因素水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的边缘分布函数,C为Copula函数。Among them, F(q 1 (t)), F(q 2 (t)), and F(q 3 (t)) are the uncertainty factors of the outflow random process q 1 (t) of reservoir 1 and the outflow of reservoir 2, respectively. The marginal distribution functions of the flow random process q 2 (t) and the interval flood random process q 3 (t), C is the Copula function.

本实例中采用的Copula函数包含以下3种:The Copula function used in this example includes the following three types:

其中,α(t)为Copula函数的参数,本实施例优选采用极大似然法进行Coupla函数的参数估计。Wherein, α(t) is a parameter of the Copula function. In this embodiment, the maximum likelihood method is preferably used to estimate the parameters of the Copula function.

对式(9)两边求偏导,得到不确定性因素-水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的联合概率密度函数如下:Take the partial derivatives on both sides of Equation (9) to obtain the uncertainty factors—the outflow random process q 1 (t) of reservoir 1, the outflow random process q 2 (t) of reservoir 2, and the interval flood random process q 3 (t) ), the joint probability density function is as follows:

其中,f(qi(t))为不确定性因素qi(t),i=1,2,3的概率密度函数;Among them, f(q i (t)) is the probability density function of the uncertainty factor q i (t), i=1, 2, 3;

h(q1(t),q2(t),q3(t))为不确定性因素水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的联合概率密度函数;h(q 1 (t), q 2 (t), q 3 (t)) is the uncertainty factor of the outflow random process of reservoir 1 q 1 (t), the outflow random process of reservoir 2 q 2 (t), and the joint probability density function of the interval flood stochastic process q 3 (t);

c(F(q1(t)),F(q2(t)),F(q3(t))为Copula函数C(F(q1(t)),F(q2(t)),F(q3(t))的概率密度函数。c(F(q 1 (t)), F(q 2 (t)), F(q 3 (t)) are Copula functions C(F(q 1 (t)), F(q 2 (t)) , the probability density function of F(q 3 (t)).

本实施例中采用K-S检验方法分别进行式(10)中三种Copula函数的检验,筛选不确定性因素的备用Copula函数,然后本实施例中采用OLS准则进行备用Copula函数的拟合优度评价,从而选出拟合度最好的Copula函数作为不确定性因素的联合概率分布,其中各Copula函数的OLS值采用以下公式计算:In this embodiment, the K-S test method is used to test the three types of Copula functions in formula (10) respectively, and the backup Copula functions of uncertain factors are screened, and then the OLS criterion is used in this embodiment to evaluate the goodness of fit of the backup Copula functions. , so that the Copula function with the best fit is selected as the joint probability distribution of uncertainty factors, where the OLS value of each Copula function is calculated by the following formula:

其中,为不确定性因素-水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的经验累积概率值;为不确定性因素-水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的理论累积概率值。in, is the uncertainty factor - the empirical cumulative probability value of the outflow random process q 1 (t) of reservoir 1, the outflow random process q 2 (t) of reservoir 2, and the interval flood random process q 3 (t); is the theoretical cumulative probability value of the uncertainty factor - the outflow random process q 1 (t) of reservoir 1, the outflow random process q 2 (t) of reservoir 2, and the interval flood random process q 3 (t).

步骤3,建立水库群实时防洪调度风险模型,解析各时刻水库群防洪调度风险。Step 3, establish a real-time flood control scheduling risk model of the reservoir group, and analyze the flood control scheduling risk of the reservoir group at each moment.

定义水库群实时防洪调度风险为公共防洪点组合流量过程超过防洪控制断面安全流量阈值的概率Risk(t),表示t时刻有Risk(t)的概率公共防洪点组合流量过程会超过防洪控制断面安全流量阈值,为决策者提供风险决策的风险信息。将式(11)代入式(1),整理得各时刻水库群实时防洪调度风险Risk(t)的解析计算公式:The real-time flood control dispatch risk of reservoir groups is defined as the probability Risk(t) that the combined flow process of public flood control points exceeds the safety flow threshold of the flood control control section, which means that there is a probability Risk(t) at time t that the combined flow process of public flood control points will exceed the safety of the flood control control section. Traffic thresholds provide decision makers with risk information for risk decisions. Substituting Equation (11) into Equation (1), the analytical calculation formula of Risk(t) for the real-time flood control dispatch risk of reservoir groups at each moment is obtained:

其中,QC(t)表示t时刻防洪控制断面的安全流量阈值,可取公共防洪点的安全泄量;Ω0={q1(t)+q2(t)+q3(t)>QC(t)},Ω1为相应于Ω0的积分转换区间。Among them, Q C (t) represents the safe flow threshold of the flood control control section at time t, which can be taken as the safe discharge of the public flood control point; Ω 0 ={q 1 (t)+q 2 (t)+q 3 (t)>Q C (t)}, Ω 1 is the integral conversion interval corresponding to Ω 0 .

步骤4,水库群实时防洪调度风险的计算。Step 4: Calculation of real-time flood control scheduling risk for reservoir groups.

进行水库群实时防洪调度风险模型的应用,本实施例采用递推算法计算得到各时刻水库群实时防洪调度风险,算法的流程如附图3所示,主要包括以下求解步骤:Carry out the application of the real-time flood control scheduling risk model of the reservoir group. In this embodiment, the recursive algorithm is used to calculate the real-time flood control scheduling risk of the reservoir group at each moment. The flow of the algorithm is shown in FIG. 3 and mainly includes the following solving steps:

(1)获取水库群的运行数据,包括水库的防洪调度规则,水位库容曲线、泄流能力曲线、起调水位、设计洪水位、校核洪水位以及水库坝顶高程等特征值;(1) Obtain the operation data of the reservoir group, including the flood control scheduling rules of the reservoir, the water level storage capacity curve, the discharge capacity curve, the starting water level, the design flood level, the check flood level, and the reservoir crest elevation and other characteristic values;

(2)获取水库群的实时预报入库流量均值过程区间洪水预报均值过程入库流量预报误差ξi(t),i=1,2、区间洪水预报误差ξ3(t);(2) The process of obtaining the mean value of real-time forecast inflow of reservoir groups Interval Flood Forecast Mean Process Inbound flow forecast error ξ i (t), i=1,2, interval flood forecast error ξ 3 (t);

(3)按照水库群的入库流量随机过程和区间洪水随机过程的分布,本实施例中采用拉丁超立方抽样生成M组入库流量过程的样本和区间洪水过程的样本 (3) According to the distribution of the random process of the inflow flow and the random process of the interval flood of the reservoir group, in this embodiment, Latin hypercube sampling is used to generate the samples of the M groups of inflow processes and a sample of interval flood processes

(4)根据水库i的防洪调度规则,通过水量平衡原理进行水库调洪演算,计算得到水库i的出库流量过程样本 (4) According to the flood control scheduling rules of the reservoir i, the flood regulation calculation of the reservoir is carried out through the principle of water balance, and the outflow flow process sample of the reservoir i is calculated.

(5)根据公式(8),计算水库i出库流量随机过程的分布参数 (5) According to formula (8), calculate the distribution parameters of the random process of the outflow flow of reservoir i and

(6)选择备用Copula函数,并进行K-S检验;(6) Select the backup Copula function and perform the K-S test;

(7)根据公式(12)计算此Copula函数的OLS值,比较各备用Copula函数的OLS值,选择OLS值最小的Copula函数作为不确定性因素-水库1的出流随机过程q1(t)、水库2出流随机过程q2(t)、和区间洪水随机过程q3(t)的联合概率分布函数;(7) Calculate the OLS value of this Copula function according to formula (12), compare the OLS values of the alternate Copula functions, and select the Copula function with the smallest OLS value as the uncertainty factor - the outflow random process of reservoir 1 q 1 (t) , the joint probability distribution function of the outflow random process q 2 (t) of reservoir 2, and the interval flood random process q 3 (t);

(8)根据选择的Copula函数和公式(13),设置公共防洪点安全流量阈值QC(t),计算各时刻水库群实时防洪调度风险。(8) According to the selected Copula function and formula (13), set the safe flow threshold Q C (t) of the public flood control point, and calculate the real-time flood control dispatch risk of the reservoir group at each moment.

Claims (5)

1. A parallel reservoir group real-time flood control risk analysis and calculation method is characterized by comprising the following steps: the method comprises the following steps:
(1) three uncertainty factors of the random process of the warehousing flow of each reservoir, the random process of the ex-warehouse flow of each reservoir and the random process of interval flood forecast are considered; establishing a mathematical expression of uncertainty factors, expressing each uncertainty factor random process as an error random process on which the mean value is superposed, and describing an edge distribution function of the uncertainty factors by adopting normal distribution;
(2) based on the flood control dispatching rules of all reservoirs, converting the inlet flow random process of all the reservoirs into the outlet flow random process of all the reservoirs through random simulation and reservoir flood regulation calculation; solving a joint probability density distribution function of multi-dimensional uncertainty factors comprising a random process of the warehouse-out flow of each reservoir and a random process of interval flood forecast based on a Copula function;
(3) defining the reservoir group real-time flood control scheduling risk as the probability that the combined flow process of public flood control points exceeds the safety flow threshold of a flood control section; analyzing and obtaining flood control scheduling risks of the reservoir groups at each moment through direct integration of joint probability density distribution functions of multi-dimensional uncertainty factors of the outflow process and interval flood process of each reservoir;
(4) acquiring real-time operation data of reservoirs, a process of forecasting warehousing flow of each reservoir and an error process thereof, and an interval flood process and an error process thereof; and establishing a joint probability density distribution function of multidimensional uncertainty factors in the random process of the warehouse-out flow of each reservoir and the random process of interval flood forecasting through a Copula function, and calculating the real-time flood control dispatching risk of the reservoir group.
2. The method for analyzing and calculating the risk of flood control in parallel of the reservoir groups according to claim 1, wherein the method comprises the following steps: the step (2) comprises the following steps:
(2.1) definition of H (q)1(t),q2(t),q3(t)) is a combined probability distribution function of the random process of the delivery flow of the reservoir 1, the random process of the delivery flow of the reservoir 2 and the random process of the interval flood forecast, and the calculation formula is as follows:
H(q1(t),q2(t),q3(t))=C(F(q1(t)),F(q2(t)),F(q3(t))) (1)
in the formula, q1(t) is a random process of the delivery flow of the reservoir 1 at the moment t; q. q.s2(t) is a random process of the delivery flow of the reservoir 2 at the moment t; q. q.s3(t) is an interval flood random process of a downstream flood control section at the time t; f (q)1(t))、F(q2(t))、F(q3(t)) random process q of discharge flow of reservoir 1, respectively, as uncertainty factor1(t) reservoir2 random process q of flow out of warehouse2(t) and Interval flood forecasting stochastic Process q3(t) an edge distribution function; c is a Copula function;
(2.2) definition of h (q)1(t),q2(t),q3(t)) is a combined probability density function of the random process of the delivery flow of the reservoir 1, the random process of the delivery flow of the reservoir 2 and the random process of the interval flood forecast, and the calculation formula is as follows:
in the formula, f (q)i(t)) is an uncertainty factor qi(t), i ═ 1,2,3 probability density function, c (F (q)1(t)),F(q2(t)),F(q3(t)) is the Copula function C (F (q)1(t)),F(q2(t)),F(q3(t)) probability density function.
3. The method for analyzing and calculating the risk of flood control in parallel of the reservoir groups according to claim 1, wherein the method comprises the following steps: the Copula function described in step (2) includes 3 calculation formulas, and the expression is as follows:
wherein α (t) is a parameter of Copula function, F (q)1(t)) is a random process (q) of the delivery flow of the reservoir 11(t)) edge distribution function, F (q)2(t)) is a random process (q) of the delivery flow of the reservoir 22(t)) edge distribution function, F (q)3(t)) random process (q) of flood forecasting for intervals3(t)) edge distribution function.
4. The method for analyzing and calculating the risk of flood control in parallel of the reservoir groups according to claim 1, wherein the method comprises the following steps: the step (3) comprises the following specific steps:
defining the real-time flood control scheduling risk Risk (t) of the reservoir group as the probability that the combined flow process of the public flood control points at the time t exceeds the safe flow threshold of the flood control section, and connecting uncertainty factors in the step (1) through a Copula function to obtain a calculation formula of the real-time flood control scheduling risk Risk (t) of the reservoir group, wherein the calculation formula is as follows:
in the formula, Risk (t) represents the real-time flood control scheduling risk of the reservoir group system at the time t; q (t) represents the combined flow process of the public flood control point at the time t; qC(t) the safe flow threshold of the flood control section at the moment t is shown, and the safe discharge of a public flood control point can be taken; omega0={q1(t)+q2(t)+q3(t)>QC(t)},Ω1Is corresponding to omega0The integral conversion interval of (1); f (q)1(t)) is a random process (q) of the delivery flow of the reservoir 11(t)) edge distribution function, F (q)2(t)) is a random process (q) of the delivery flow of the reservoir 22(t)) edge distribution function, F (q)3(t)) random process (q) of flood forecasting for intervals3(t)) an edge distribution function; h (q)1(t),q2(t),q3(t)) is a combined probability density function of the random process of the delivery flow of the reservoir 1, the random process of the delivery flow of the reservoir 2 and the random process of the interval flood forecast.
5. The method for analyzing and calculating the risk of flood control in parallel of the reservoir groups according to claim 1, wherein the method comprises the following steps: the step (4) comprises the following steps:
(4.1) acquiring operation data of a reservoir group, and forecasting the average value process and error distribution of the flow entering the reservoir group in real time, and forecasting the average value process and error distribution of the flood in an interval;
(4.2) carrying out reservoir flood regulation calculation according to the reservoir flood control regulation rule, and calculating the random process of the reservoir delivery flow;
(4.3) selecting Copula function as uncertainty factor-stochastic process q of outflow from reservoir 11(t) reservoir 2 outflow randomization procedure q2(t) and Interval flood randomization procedure q3(t) a joint probability distribution function;
and (4.4) calculating the real-time flood control scheduling risk of the reservoir group at each moment according to the selected Copula function.
CN201710939063.7A 2017-09-30 2017-09-30 A real-time flood control risk analysis and calculation method for parallel reservoir groups Active CN107808237B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710939063.7A CN107808237B (en) 2017-09-30 2017-09-30 A real-time flood control risk analysis and calculation method for parallel reservoir groups

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710939063.7A CN107808237B (en) 2017-09-30 2017-09-30 A real-time flood control risk analysis and calculation method for parallel reservoir groups

Publications (2)

Publication Number Publication Date
CN107808237A CN107808237A (en) 2018-03-16
CN107808237B true CN107808237B (en) 2019-04-30

Family

ID=61592660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710939063.7A Active CN107808237B (en) 2017-09-30 2017-09-30 A real-time flood control risk analysis and calculation method for parallel reservoir groups

Country Status (1)

Country Link
CN (1) CN107808237B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110033164B (en) * 2019-03-04 2021-07-02 华中科技大学 A risk assessment and decision-making method for joint flood control scheduling of reservoir groups
CN109902267B (en) * 2019-03-07 2022-09-23 江西省水利科学研究院 River channel safety discharge amount calculation method influenced by downstream lake jacking
CN109993372B (en) * 2019-04-12 2022-11-22 淮河水利委员会水文局(信息中心) Flood probability forecasting method based on multi-source uncertainty
CN110673230A (en) * 2019-07-12 2020-01-10 中山大学 Dynamic critical rainfall calculation method based on entropy decision method
CN116227800B (en) * 2022-11-09 2023-12-22 中国水利水电科学研究院 A method to generate optimal flood control scheduling plan for parallel reservoir groups based on flood control pressure values

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104615907A (en) * 2015-03-11 2015-05-13 武汉大学 Method for deriving and designing flood process line based on multi-variable most possible condition combination
CN104727264A (en) * 2015-04-07 2015-06-24 武汉大学 Damsite flood restoration method based on Copula function
CN105887751A (en) * 2016-04-28 2016-08-24 武汉大学 Multi-variable flood recurrence period calculating method considering reservoir flood routing calculation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7254564B2 (en) * 2001-10-22 2007-08-07 Coppola Jr Emery J Neural network based predication and optimization for groundwater/surface water system
CN107038151B (en) * 2017-03-22 2020-03-31 贵州乌江水电开发有限责任公司 Energy storage control-based cascade optimization scheduling graph drawing method and scheduling method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104615907A (en) * 2015-03-11 2015-05-13 武汉大学 Method for deriving and designing flood process line based on multi-variable most possible condition combination
CN104727264A (en) * 2015-04-07 2015-06-24 武汉大学 Damsite flood restoration method based on Copula function
CN105887751A (en) * 2016-04-28 2016-08-24 武汉大学 Multi-variable flood recurrence period calculating method considering reservoir flood routing calculation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于随机微分方程的水库防洪调度风险分析;陈娟 等;《河海大学学报(自然科学版)》;20130930;第41卷(第5期);第400-404页

Also Published As

Publication number Publication date
CN107808237A (en) 2018-03-16

Similar Documents

Publication Publication Date Title
CN107808237B (en) A real-time flood control risk analysis and calculation method for parallel reservoir groups
Jing et al. Distributed or centralized? Designing district-level urban energy systems by a hierarchical approach considering demand uncertainties
CN105678481B (en) A Pipeline Health Status Assessment Method Based on Random Forest Model
CN114580260B (en) Landslide interval prediction method based on machine learning and probability theory
CN103882827B (en) Based on flood control by reservoir regulation relative risk Forecasting Methodology and the reservoir regulation for flood control schemes evaluation method of runoff DATA PROCESSING IN ENSEMBLE PREDICTION SYSTEM
CN108416690A (en) Power Grid Load Forecasting Method Based on Deep LSTM Neural Network
CN112711840B (en) Watershed sudden water pollution tracing method based on cloud edge cooperation
CN110097223B (en) Early warning method for damage of power transmission line under typhoon disaster
CN106503840A (en) Parking stall Forecasting Methodology and system can be used in parking lot
CN114881381B (en) Method and system for predicting urban water level based on improved convolutional neural network
CN107526880B (en) Method for calculating upstream river-entering pollution flux based on river water quality observation
CN107818072B (en) Consider the reservoir Technique for Real-time Joint Operation of Flood risk Analytic Calculation Method of error correlation
CN102073785A (en) Daily gas load combination prediction method based on generalized dynamic fuzzy neural network
CN104299031A (en) Ultra-short-term load prediction method of BP neural network
CN108205713B (en) A method and device for determining the distribution of regional wind power prediction errors
CN109961160A (en) A method and system for predicting future operation trend of power grid based on power flow parameters
CN118313641A (en) A multi-objective coordinated balanced scheduling method, system and storage medium for a gate pump group
CN102109619A (en) System and method for predicting typhoon surge based on artificial intelligence
CN113361776A (en) Power load probability prediction method based on user power consumption behavior clustering
CN112100024B (en) Resource load abnormity detection method, device and equipment
CN103514488A (en) Electrical power system short-term load forecasting device and method based on combination forecasting model
CN107705014B (en) A kind of river Real time Flood risk Analytic Calculation Method considering advance of freshet error
CN104993966B (en) A kind of electric integrated service network method for predicting
CN114925923A (en) Method for improving depth prediction precision of ponding of non-monitoring unit
CN109039882A (en) Full fastener type steel pipe scaffold safety monitoring system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant