CN107804433A - Ice working ship is dug in a kind of navigation channel - Google Patents

Ice working ship is dug in a kind of navigation channel Download PDF

Info

Publication number
CN107804433A
CN107804433A CN201710960586.XA CN201710960586A CN107804433A CN 107804433 A CN107804433 A CN 107804433A CN 201710960586 A CN201710960586 A CN 201710960586A CN 107804433 A CN107804433 A CN 107804433A
Authority
CN
China
Prior art keywords
ice
navigation channel
push boat
drawn
dug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710960586.XA
Other languages
Chinese (zh)
Inventor
李广彬
陈飞
刘博�
潘志
马超良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cssc Heavy Equipment Co Ltd
Original Assignee
Cssc Heavy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cssc Heavy Equipment Co Ltd filed Critical Cssc Heavy Equipment Co Ltd
Priority to CN201710960586.XA priority Critical patent/CN107804433A/en
Publication of CN107804433A publication Critical patent/CN107804433A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/08Ice-breakers or other vessels or floating structures for operation in ice-infested waters; Ice-breakers, or other vessels or floating structures having equipment specially adapted therefor
    • B63B35/083Ice-breakers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/08Ice-breakers or other vessels or floating structures for operation in ice-infested waters; Ice-breakers, or other vessels or floating structures having equipment specially adapted therefor
    • B63B35/12Ice-breakers or other vessels or floating structures for operation in ice-infested waters; Ice-breakers, or other vessels or floating structures having equipment specially adapted therefor having ice-cutters

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

The invention discloses a kind of navigation channel to dig ice working ship, push boat is drawn including navigation channel, icebreaking device, ice discharge apparatus and crawler belt assist device, draw push boat and be used to provide power required during advance in the navigation channel, the icebreaking device is arranged on navigation channel and drawn on the fore of push boat, the ice sheet in front of fore for cutting dilatory push boat, the ice discharge apparatus is used to the ice slag that icebreaking device is cut draining into navigation channel both sides, the crawler belt assist device is arranged on navigation channel and drawn on the both sides of push boat front and rear, the crawler belt assist device is used for the ice face for being attached to both sides, to increase the onward impulse that push boat is drawn in navigation channel;Navigation channel pick ice working ship is drawn push boat by navigation channel and is combined with icebreaking device, ice discharge apparatus, compared to existing method can faster, it is more efficient complete river surface work of opening ice, the time about 40% is saved under equal conditions, river surface is without ice slag after the completion of opening ice, river surface is not easy to freeze again, accelerates the current progress in two sides.

Description

Ice working ship is dug in a kind of navigation channel
Technical field
The present invention relates to pick ice technical field, and ice working ship is dug more particularly to a kind of navigation channel.
Background technology
The river course frozen of winter northern area, when without bridge for lengthen riverbank both sides transit time need to set up it is floating Bridge.Setting up pontoon bridge needs first to abolish the ice sheet on river surface, and now universal navigation channel icebreaking method is to carry one respectively with two push boats The excavator and piling machine of platform engineering, piling machine are smashed the ice sheet of river surface with impact drill, and excavator is caught up with trash ice with bucket The river surface for preventing from having opened ice toward downstream freezes again.This kind of method equipment is high with artificial input cost, and the speed that opens ice is slow, opens ice The risk that equipment unstability is there is likely to be in journey and is fallen into water.
It is accordingly required in particular to a kind of speed that opens ice is fast, navigation channel pick ice working ship of efficiency high, to solve to deposit in the prior art The problem of.
The content of the invention
The defects of the invention aims to solve in the prior art, there is provided a kind of speed that opens ice is fast, the boat of efficiency high Ice working ship is dug in road, to solve problems of the prior art.
To achieve the above object, technical scheme is as follows:
Ice working ship is dug in a kind of navigation channel, including push boat, icebreaking device and ice discharge apparatus are drawn in navigation channel, and the navigation channel is drawn Push boat is used to provide power required during advance, and the icebreaking device is arranged on navigation channel and drawn on the fore of push boat, is used for The ice sheet in front of the fore of the dilatory push boat in navigation channel is cut, the ice slag that the ice discharge apparatus is used to cut icebreaking device is arranged To navigation channel both sides.
In order to further realize the present invention, in addition to crawler belt assist device, the crawler belt assist device is arranged on navigation channel and dragged On the both sides for drawing push boat front and rear, the crawler belt assist device is used for the ice face for being attached to both sides, to increase navigation channel The onward impulse of dilatory push boat.
In order to further realize the present invention, the icebreaking device includes fixed mount and several pick skates disks, the fixation Frame is fixedly installed on navigation channel and drawn on the fore of push boat, and the pick skates disk includes cutter plate driver and is arranged in cutter plate driver Cutterhead, non-cutting region between the two neighboring cutterhead and fixed mount edge forms collection material mouth, the cutterhead rear portion with Space between fixed mount bottom forms ice storehouse.
In order to further realize the present invention, several described pick skates disk horizontal homogeneous are arranged on fixed mount.
In order to further realize the present invention, the ice discharge apparatus includes aggregate pipe, Pulp pump and scum pipe, the aggregate pipe Arrival end connect setting with ice storehouse, the port of export of the aggregate pipe connects setting with Pulp pump, the scum pipe arrival end with Pulp pump connection is set.
Beneficial effect
(1) in use, drawing onward impulse when push boat provides cutting by navigation channel, the cutterhead of icebreaking device exists the present invention Rotary cutting motion is done under the driving of cutter plate driver, the ice sheet in front of the fore of dilatory push boat is cut into ice pellets, and pass through Ice pellets is deposited in ice storehouse by collection material mouth, and Pulp pump is sucked the ice pellets in ice storehouse in Pulp pump by aggregate pipe, and passes through row On the ice sheet that slag pipe inspection is not dug to navigation channel both sides, anti-stagnant ice slag freezes again;Push boat and the dress that opens ice are drawn by navigation channel Put, ice discharge apparatus is combined, form navigation channel pick ice working ship, compared to existing method can faster, more efficient river surface of completing opens ice Work, the time about 40% is saved under equal conditions, without ice slag, river surface is not easy to freeze again river surface after the completion of opening ice, and accelerates two sides Current progress;Meanwhile used device is reduced compared to conventional method during the pick ice working ship work of navigation channel, a navigation channel pick ice work is only needed Journey ship can complete work of opening ice, and equipment is low with artificial input cost.
Brief description of the drawings
Fig. 1 is the front view that ice working ship is dug in navigation channel of the present invention;
Fig. 2 is that top view in ice working ship is dug in navigation channel of the present invention;
Fig. 3 is the top view for the bow end that ice working ship is dug in navigation channel of the present invention;
Fig. 4 is the front view for the bow end that ice working ship is dug in navigation channel of the present invention;
Fig. 5 is the structural representation that icebreaking device in ice working ship is dug in navigation channel of the present invention.
Description of reference numerals:
1st, push boat is drawn in navigation channel;2nd, crawler belt assist device;3rd, icebreaking device;31st, fixed mount;32nd, skates disk is dug;321、 Cutter plate driver;322nd, cutterhead;33rd, material mouth is collected;34th, ice storehouse;4th, ice discharge apparatus;41st, aggregate pipe;42nd, Pulp pump;43rd, scum pipe.
Embodiment
The present invention is further described in detail below in conjunction with the accompanying drawings, these accompanying drawings are simplified schematic diagram, only Illustrate the basic structure of the present invention in a schematic way, the direction of this specific implementation is using Fig. 1 directions as standard.
Embodiment one
As Figure 1-Figure 5, navigation channel of the present invention pick ice working ship include navigation channel draw push boat 1, crawler belt assist device 2, Icebreaking device 3 and ice discharge apparatus 4, wherein:
Draw push boat 1 and be used to provide power required during advance in navigation channel.
Crawler belt assist device 2 is arranged on navigation channel and drawn on the both sides of the front and rear of push boat 1, and crawler belt assist device 2 is used In being attached in the ice face of both sides, the onward impulse of push boat 1 is drawn in increase navigation channel, improves the efficiency that opens ice of icebreaking device 3.
Icebreaking device 3 is arranged on navigation channel and drawn on the fore of push boat 1, and the fore of push boat 1 is drawn for cutting navigation channel The ice sheet in front, icebreaking device 3 include fixed mount 31 and several pick skates disks 32, and fixed mount 31 is fixedly installed on navigation channel and drawn On the fore of push boat 1, several horizontal homogeneous of pick skates disk 32 are arranged on fixed mount 31, and pick skates disk 32 includes cutterhead and driven Dynamic 321 and the cutterhead 322 that is arranged in cutter plate driver 321, it is non-cutting between two neighboring cutterhead 322 and fixed mount 31 edge Region forms collection material mouth 33, and the space between the rear portion of cutterhead 322 and the bottom of fixed mount 31 forms ice storehouse 34.
Ice discharge apparatus 4 is used to the ice slag that icebreaking device 3 is cut draining into navigation channel both sides, and anti-stagnant ice slag freezes again, Ice discharge apparatus 4 includes aggregate pipe 41, Pulp pump 42 and scum pipe 43, and the arrival end of aggregate pipe 41 connects setting with ice storehouse 34, collection The port of export of expects pipe 41 connects setting with Pulp pump 42, and the arrival end of scum pipe 43 connects setting, the work of Pulp pump 42 with Pulp pump 42 The ice cube in ice storehouse 34 is sucked into Pulp pump 42 by aggregate pipe 41 when making and sprayed by scum pipe 43 to navigation channel both sides.
In use, drawing onward impulse when push boat 1 provides cutting by navigation channel, the cutterhead 322 of icebreaking device 3 is in cutterhead Rotary cutting motion is done under the driving of driving 321, navigation channel is drawn to the ice sheet in front of the fore of push boat 1 and cuts into ice pellets, and Ice pellets is deposited in ice storehouse 34 by collecting material mouth 33, the ice pellets in ice storehouse 34 is sucked slurry by Pulp pump 42 by aggregate pipe 41 In pump 42, and sprayed by scum pipe 43 on the ice sheet do not dug to navigation channel both sides, anti-stagnant ice slag freezes again;
The present invention draws push boat 1 by navigation channel and is combined with icebreaking device 3, ice discharge apparatus 4, forms navigation channel pick ice engineering Ship, compared to existing method can faster, the more efficient work of opening ice for completing river surface, the time about 40% is saved under equal conditions, is opened ice After the completion of river surface without ice slag, river surface is not easy to freeze again, accelerate two sides pass through progress;Meanwhile during the pick ice working ship work of navigation channel Used device is reduced compared to conventional method, only needs a navigation channel pick ice working ship to complete work of opening ice, equipment is thrown with artificial It is low to enter cost.
The better embodiment of the present invention is the foregoing is only, the invention is not limited in above-mentioned embodiment, is implementing During there may be local small structural modification, if not departing from the essence of the present invention to the various changes or modifications of the present invention God and scope, and belong within the scope of the claim and equivalent technologies of the present invention, then the present invention is also intended to comprising these changes And modification.

Claims (5)

1. ice working ship is dug in a kind of navigation channel, it is characterised in that draws push boat, icebreaking device and ice discharge apparatus, institute including navigation channel State the dilatory push boat in navigation channel to be used to provide power required during advance, the icebreaking device is arranged on the ship that push boat is drawn in navigation channel On head, the ice sheet in front of the fore of push boat is drawn for cutting navigation channel, the ice discharge apparatus is used to cut down icebreaking device The ice slag come drains into navigation channel both sides.
2. ice working ship is dug in navigation channel according to claim 1, it is characterised in that also including crawler belt assist device, the shoe Navigation channel is arranged on assist device to draw on the both sides of push boat front and rear, the crawler belt assist device is used to be attached to two In the ice face of side, to increase the onward impulse that push boat is drawn in navigation channel.
3. ice working ship is dug in navigation channel according to claim 1, it is characterised in that if the icebreaking device include fixed mount and Dry pick skates disk, the fixed mount are fixedly installed on navigation channel and drawn on the fore of push boat, and the pick skates disk includes cutterhead The cutterhead in cutter plate driver is driven and is arranged on, the non-cutting region between the two neighboring cutterhead and fixed mount edge is formed Collect material mouth, the space between the cutterhead rear portion and fixed mount bottom forms ice storehouse.
4. ice working ship is dug in navigation channel according to claim 3, it is characterised in that several described pick skates disk horizontal homogeneous It is arranged on fixed mount.
5. ice working ship is dug in navigation channel according to claim 3, it is characterised in that the ice discharge apparatus includes aggregate pipe, slag Stock pump and scum pipe, the arrival end of the aggregate pipe connect setting with ice storehouse, and the port of export of the aggregate pipe connects with Pulp pump Set, the scum pipe arrival end connects setting with Pulp pump.
CN201710960586.XA 2017-10-16 2017-10-16 Ice working ship is dug in a kind of navigation channel Pending CN107804433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710960586.XA CN107804433A (en) 2017-10-16 2017-10-16 Ice working ship is dug in a kind of navigation channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710960586.XA CN107804433A (en) 2017-10-16 2017-10-16 Ice working ship is dug in a kind of navigation channel

Publications (1)

Publication Number Publication Date
CN107804433A true CN107804433A (en) 2018-03-16

Family

ID=61591502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710960586.XA Pending CN107804433A (en) 2017-10-16 2017-10-16 Ice working ship is dug in a kind of navigation channel

Country Status (1)

Country Link
CN (1) CN107804433A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108528646A (en) * 2018-04-20 2018-09-14 广州海荣实业有限公司 A kind of shield pick ice working ship
CN111152894A (en) * 2020-01-10 2020-05-15 宁波大学 Shield type icebreaker

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4409918A (en) * 1981-12-02 1983-10-18 Wagner Jacob C Ice-breaking and conveying system
DE19614495A1 (en) * 1996-04-12 1997-10-16 Moebius Josef Bau Device for breaking or crushing ice on waters
RU2168439C1 (en) * 1999-12-08 2001-06-10 Калининградский государственный технический университет Icebreaking craft
CN2853594Y (en) * 2005-12-05 2007-01-03 董兰田 Ice breaking ship
CN201264711Y (en) * 2008-09-22 2009-07-01 刘燕宁 Offshore oilfield winter conveying apparatus
KR20120036448A (en) * 2010-10-08 2012-04-18 현대중공업 주식회사 Ship with piezoelectric and ultrasonic ice breaking means
CN105691558A (en) * 2016-01-25 2016-06-22 张延林 Special icebreaker
CN205908294U (en) * 2016-08-22 2017-01-25 德阳宏源机电工程有限责任公司 Casting device suitable for shield constructs machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4409918A (en) * 1981-12-02 1983-10-18 Wagner Jacob C Ice-breaking and conveying system
DE19614495A1 (en) * 1996-04-12 1997-10-16 Moebius Josef Bau Device for breaking or crushing ice on waters
RU2168439C1 (en) * 1999-12-08 2001-06-10 Калининградский государственный технический университет Icebreaking craft
CN2853594Y (en) * 2005-12-05 2007-01-03 董兰田 Ice breaking ship
CN201264711Y (en) * 2008-09-22 2009-07-01 刘燕宁 Offshore oilfield winter conveying apparatus
KR20120036448A (en) * 2010-10-08 2012-04-18 현대중공업 주식회사 Ship with piezoelectric and ultrasonic ice breaking means
CN105691558A (en) * 2016-01-25 2016-06-22 张延林 Special icebreaker
CN205908294U (en) * 2016-08-22 2017-01-25 德阳宏源机电工程有限责任公司 Casting device suitable for shield constructs machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱述敏: "复合型土压平衡盾构机刀盘设计与应用", 《CNKI的中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108528646A (en) * 2018-04-20 2018-09-14 广州海荣实业有限公司 A kind of shield pick ice working ship
CN111152894A (en) * 2020-01-10 2020-05-15 宁波大学 Shield type icebreaker

Similar Documents

Publication Publication Date Title
CN107059970B (en) Lake sludge cleaning device and cleaning method thereof
CN106284187B (en) The quick method for dismounting of Face Slab of Concrete of Rock-fill Dam destruction area
CN105926701B (en) Harbour sludge treatment device and its processing method
CN106759602A (en) River course green ecological desilting processing system and its processing method
CN107804433A (en) Ice working ship is dug in a kind of navigation channel
CN207862900U (en) A kind of silt-cleaning vessel for river way being convenient to clean water plant
CN205712263U (en) Ploughshare underwater desilting equipment
CN205292995U (en) Water hyacinth harvesting ship
CN108086988A (en) A kind of normal pressure tool changing cutterhead auxiliary girder for having the function of to slip slag
CN105951908B (en) Wharf apron is deepened by dredging device
CN108797670B (en) Efficient mud suction drag head of river channel mud and sand drag suction ship
JP4263032B2 (en) Vacuum suction oil recovery system
CN201704717U (en) Underwater silt remover
CN106120922B (en) Mud scum cleaning plant
CN206562933U (en) Soft soil layer shield grinds stake system
CN108528646A (en) A kind of shield pick ice working ship
CN202809682U (en) Seawall silt remover
CN207685889U (en) A kind of latent mud rolling suction desilting system
CN102960088B (en) Arrow-shaped three-dimensional deep scarification and harvesting shovel
CN207331797U (en) A kind of band separated static ribbon silt dredging mud machine of rubbish
CN206237804U (en) A kind of water chestnut harvester
JP3871686B2 (en) Absorber construction equipment and construction method
CN204455973U (en) A kind of band opens ice and the deicing vehicle of trash ice gathering-device
CN217811292U (en) Efficient water conservancy construction sediment removal device
CN219100012U (en) Dredger fill vibration drainage device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180316