CN206562933U - Soft soil layer shield grinds stake system - Google Patents

Soft soil layer shield grinds stake system Download PDF

Info

Publication number
CN206562933U
CN206562933U CN201720128729.6U CN201720128729U CN206562933U CN 206562933 U CN206562933 U CN 206562933U CN 201720128729 U CN201720128729 U CN 201720128729U CN 206562933 U CN206562933 U CN 206562933U
Authority
CN
China
Prior art keywords
soil layer
soft soil
layer shield
shield machine
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720128729.6U
Other languages
Chinese (zh)
Inventor
斯明勇
罗俊国
高崇
蒋应省
李玮
程先其
孟建乔
张超坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201720128729.6U priority Critical patent/CN206562933U/en
Application granted granted Critical
Publication of CN206562933U publication Critical patent/CN206562933U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Stake system is ground the utility model discloses a kind of soft soil layer shield, soft soil layer shield machine is solved when shield is ground the concrete reinforcement of the existing buildings pile foundation on shield interval, the reinforcing bar segment that exists it is difficult and to the stabilizing influence of existing buildings it is larger the problem of.Steel bar concrete pile including soft soil layer shield machine and existing buildings, speed-variable pump is configured with the propulsion system of soft soil layer shield machine;Characterized in that, in the output gas circuit of the speed-variable pump of the propulsion system of soft soil layer shield machine, being in series with a gas circuit change-over switch valve, constant speed flow pump being connected with another input port of the gas circuit change-over switch valve;The cutterhead of soft soil layer shield machine is grinding on the steel bar concrete pile of existing buildings.The perturbation action for reducing ground pile foundation as far as possible is served, pile foundation ground is reduced and the possibility significantly settled occurs.

Description

Soft soil layer shield grinds stake system
Technical field
The present invention relates to the system that a kind of soft soil layer shield machine shield is ground existing buildings concrete pipe base, especially relate to And one kind is in down town Tunnel Boring subway tunnel, the steel of existing buildings is ground come shield using soft soil layer shield machine The system and mill piling method of reinforced concrete pile foundation.
Background technology
When urban central zone carries out subway shield tunnel construction, due to depositing for existing building pile foundation and existing underground utilities Subway is set to plan that circuit needs the situation of shield crossing city existing pile foundation more and more.Because existing buildings carry How the critical function in city, make shield-tunneling construction process, does not influence the normal of existing buildings to use, is faced as shield-tunneling construction New problem.It is interval in subway tunnel shield, run into the situation for needing to be cut off to existing pile foundation sometimes, such situation, General use removes former structures, and carries out ground pile pulling, or the mode of stake is dug after excavating shaft, and obstacle pile is torn open in advance Remove, to ensure the normal construction of shield, but such construction method is present on surrounding enviroment influence greatly, and construction cost is high and long in time limit Defect, particularly in urban central zone, limited by environmental objective factors, such construction method can not be implemented.
Soft soil layer shield machine is a kind of equipment that constructing tunnel is carried out in soft soil layer, is come with respect to compound shield Say, low with equipment cost, cutter head structure is simple, safeguards easy advantage.During soft soil layer shield-tunneling construction, when running into During armored concrete existing buildings pile foundation, how using soft soil layer shield machine, to block run into existing buildings Concrete pipe base, is in the urgent need to address in constructing to ensure the stabilization of ground existing buildings, use safely and uninterruptedly Problem.What is be equipped with due to the propulsion system of soft soil layer shield machine is speed-variable pump propulsion system, speed-variable pump be cutter head of shield machine to The power source of preceding propulsion.Soft soil layer shield machine is in construction, during shield cut-out armored concrete existing buildings pile foundation, The forward thrust of cutter head of shield machine depends primarily on speed-variable pump, unstable due to speed-variable pump output gas flow, cause cutterhead to The preceding speed for promoting mill stake is also unstable, the mill stake operation of shield machine driver scene is not easy control.In addition, existing weak soil The cutterhead of layer shield machine, the configuration of ability, particularly central cutter without cutting armored concrete, it is impossible to competent Cutting Steel The task of muscle, its cutterhead is fixed a cutting tool the arrangement of track, and the concrete reinforcement that can not also cut ground stake be cut into segment, often hair Raw cutterhead is wound the phenomenon of clamping stagnation by reinforcing bar is ground.
The content of the invention
The invention provides a kind of soft soil layer shield mill stake system and its mill piling method, soft soil layer shield machine is solved When shield is ground the armored concrete of the existing buildings pile foundation on shield interval, the reinforcing bar segment existed is difficult and to existing The larger technical problem of the stabilizing influence of structures.
The present invention is to solve above technical problem by the following technical programs:
A kind of soft soil layer shield grinds stake system, includes the reinforced concrete pile of soft soil layer shield machine and existing buildings Base, speed-variable pump is configured with the propulsion system of soft soil layer shield machine;Characterized in that, in the propulsion of soft soil layer shield machine In the output gas circuit of the speed-variable pump of system, a gas circuit change-over switch valve is in series with, in the another defeated of the gas circuit change-over switch valve Constant speed flow pump is connected with entrance;The cutterhead of soft soil layer shield machine is steel bar concrete pile of the grinding in existing buildings On.
In-line is provided with six shell knives, adjacent two on the center tool rest of the cutterhead of soft soil layer shield machine Be 10 centimetres the spacing of shell knife, six every height shell knife in shell knife be from cutter head center to cutterhead edge according to Secondary reduction, the height of the shell knife nearest apart from cutterhead edge is higher by 20 centimetres of cutter head panel;In soft soil layer shield On the cutterhead plane domain of machine, knife spacing is 100 millimeters;On the cutterhead side circular arc sector of soft soil layer shield machine, knife spacing For 50 millimeters.
Wedge-shaped dual-pilot cutter is provided with cutterhead spoke;On the cutterhead of soft soil layer shield machine, cutter path radius is small In on 1985 millimeters of region, being provided with each cutter path line in two wedge-shaped dual-pilot cutters, this two wedge-shaped dual-pilot cutters The height of one wedge-shaped dual-pilot cutter is 200 millimeters, and another height wedge-shaped dual-pilot cutter in this two wedge-shaped dual-pilot cutters is 170 Millimeter;On the cutterhead of soft soil layer shield machine, it is more than in cutter path radius on 1985 millimeters of region, each cutter path Four wedge-shaped dual-pilot cutters are provided with line, this is wantonly 200 millimeters the height of wedge-shaped dual-pilot cutter one in wedge-shaped dual-pilot cutter, this It it is wantonly 170 millimeters the height of wedge-shaped dual-pilot cutter another three in wedge-shaped dual-pilot cutter.
Wedge-shaped dual-pilot cutter is welded type, and arc hard alloy blocks are provided at both ends with the wedge-shaped dual-pilot cutter of welded type, The centre of the wedge-shaped dual-pilot cutter of welded type is provided with hard alloy bar;It is additionally provided with and scrapes on the cutterhead of soft soil layer shield machine Knife, the height of scraper is 140 millimeters.
A kind of soft soil layer shield grinds piling method, it is characterised in that when the cutterhead distance of soft soil layer shield machine is precut Existing buildings 50 centimetres of steel bar concrete pile when, start speed-variable pump in the propulsion system of soft soil layer shield machine The gas circuit change-over switch valve connected on air delivering pipeline, the hydraulic speed-changing pump of Thrust System of Shield Tunneling Machines is replaced with constant speed flow pump, this When shield machine thrust provided by constant speed flow pump;The fltting speed for controlling cutterhead is 1-2 millimeters per minute, makes soft soil layer shield Machine pushes ahead the steel bar concrete pile of grinding existing buildings under constant speed, until by the reinforcing bar of existing buildings Untill concrete pipe base is cut off.
It is when shield machine fltting speed is constant, just small to the pile foundation disturbance that is ground, it is to avoid shield drilling depth is too fast, causes knife Disk is stuck.Up to 10 centimetres lower of reinforcing bar is cut simultaneously, it is to avoid reinforcing bar is wrapped on cutterhead, and then the influence later stage normally digs Enter, Tu Cang and screw machine, which are slagged tap, will not also produce catching phenomenon.
The present invention mainly replaces the hydraulic speed-changing pump of Thrust System of Shield Tunneling Machines by constant speed flow pump, to realize shield machine Grinding to the constant low speed of existing buildings pile foundation, instead of the mode for manually controlling shield machine radial grinding, reaches The purpose of stable grinding pile foundation, is blocked to existing pile foundation, and downward drag force will not be produced by making to be rubbed reinforcing bar, be played The perturbation action of ground pile foundation is reduced as far as possible, reduces pile foundation ground and the possibility significantly settled occurs.In shield once Property driving in, without changing cutter.
Brief description of the drawings
Fig. 1 is the structural representation of the soft soil layer cutter head of shield machine of the present invention;
Fig. 2 be the present invention set on the center tool rest 5 of cutter head of shield machine six shell knife 1 in overlook direction Structural representation;
Fig. 3 be the present invention set on the center tool rest 5 of cutter head of shield machine six shell knife 1 in side-looking direction Structural representation;
Fig. 4 is the structural representation of the shell knife of the present invention.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
In soft soil layer shield-tunneling construction under the riverbed of down town inland river, the bridge of a heavy traffic is provided with inland river Beam, the part pile foundation of the bridge is arranged on shield interval, how in the case where ensureing bridge normal pass, is completed on shield interval The problem of shield excision of Partial Bridges pile foundation is in the urgent need to address in constructing.Because the cutterhead of soft soil layer shield machine is in mill When cutting steel bar concrete pile, when cutterhead and bridge pier reinforcing bar are ground, the cutterhead power that is hampered can change, and the change of this resistance The speed-variable pump of propulsion system outfit can be delivered to by cutter-devices system by changing, and speed-variable pump is by changing gas output, to export more Big grinding force, whole process finally shows the jumping characteristic cutting bridge pier pile foundation reinforcing bar of shield cutter, to bridge pier pile foundation reinforcing bar Downward drag force can be produced, cause pontic at the top of bridge pier by fluctuation, and the body of a bridge rocks cracking.A kind of soft soil layer shield Stake system is ground, includes the steel bar concrete pile of soft soil layer shield machine and existing buildings, in pushing away for soft soil layer shield machine Enter and speed-variable pump is configured with system;In the output gas circuit of the speed-variable pump of the propulsion system of soft soil layer shield machine, one is in series with Individual gas circuit change-over switch valve, constant speed flow pump is connected with another input port of the gas circuit change-over switch valve;Soft soil layer shield The cutterhead of structure machine is grinding on the steel bar concrete pile of existing buildings.When the cutterhead of soft soil layer shield machine is ground to Before the existing bridge pile foundation cut off the need for shield interval is upper during 20 centimeters, by the liquid in soft soil layer Thrust System of Shield Tunneling Machines Pressure and speed pump is turned off, and is replaced with constant speed flow pump, then controls cutterhead at the uniform velocity to push ahead cutting bridge pile foundation;Although cutterhead is met Resistance can change after to reinforcing bar, but because the air-flow that constant speed flow pump is exported is constant, so can guarantee that cutterhead is basic Pile foundation reinforcing bar is at the uniform velocity cut, when making cutterhead cutting bridge pier reinforcing bar, the drag force of fluctuation will not be produced, it is ensured that the base of the body of a bridge This stabilization.
In-line is provided with six shell knives 1 on the center tool rest 5 of the cutterhead of soft soil layer shield machine, it is adjacent The spacing of two shell knives is 10 centimetres, and six be from cutter head center to cutterhead side every height shell knife in shell knife 1 What edge was reduced successively, the height of the shell knife nearest apart from cutterhead edge is higher by 20 centimetres of cutter head panel;To strengthen weak soil Cutting power of the cutter head of shield machine to reinforcing bar;On the cutterhead plane domain of soft soil layer shield machine, knife spacing is 100 millimeters; On the cutterhead side circular arc sector of soft soil layer shield machine, knife spacing is 50 millimeters;Make shield cut under bridge pier reinforcing bar into For segment, to prevent from winding on cutterhead, and be conducive to the conveying deslagging of conveying worm.
Wedge-shaped dual-pilot cutter 2 is provided with cutterhead spoke 3;On the cutterhead of soft soil layer shield machine, cutter path radius On region less than 1985 millimeters, two wedge-shaped dual-pilot cutters 2, this two wedge-shaped dual-pilot cutters 2 are provided with each cutter path line In one the height of wedge-shaped dual-pilot cutter be 200 millimeters, another height wedge-shaped dual-pilot cutter in this two wedge-shaped dual-pilot cutters 2 For 170 millimeters;On the cutterhead of soft soil layer shield machine, it is more than in cutter path radius on 1985 millimeters of region, each knife Four wedge-shaped dual-pilot cutters 2 are provided with tool trajectory, this is wantonly the height of wedge-shaped dual-pilot cutter one in wedge-shaped dual-pilot cutter 2 200 millimeters, this is wantonly 170 millimeters the height of wedge-shaped dual-pilot cutter another three in wedge-shaped dual-pilot cutter.
Wedge-shaped dual-pilot cutter 2 is welded type, and arc hard alloy blocks are provided at both ends with the wedge-shaped dual-pilot cutter 2 of welded type 6, the centre of the wedge-shaped dual-pilot cutter 2 of welded type is provided with hard alloy bar 7, to strengthen the cutting to reinforcing bar;In soft soil layer Scraper 4 is additionally provided with the cutterhead of shield machine, the height of scraper is 140 millimeters.
A kind of soft soil layer shield grinds piling method, when the precut existing buildings of the cutterhead distance of soft soil layer shield machine 50 centimetres of steel bar concrete pile when, start and gone here and there on the air delivering pipeline of the speed-variable pump in the propulsion system of soft soil layer shield machine The gas circuit change-over switch valve of connection, the hydraulic speed-changing pump of Thrust System of Shield Tunneling Machines is replaced with constant speed flow pump, now shield machine thrust There is provided by constant speed flow pump;The fltting speed for controlling cutterhead is 1-2 millimeters per minute, makes soft soil layer shield machine in constant speed Under, the steel bar concrete pile of grinding existing buildings is pushed ahead, until the steel bar concrete pile of existing buildings is cut Untill disconnected.

Claims (4)

1. a kind of soft soil layer shield grinds stake system, include the reinforced concrete pile of soft soil layer shield machine and existing buildings Base, speed-variable pump is configured with the propulsion system of soft soil layer shield machine;Characterized in that, in the propulsion of soft soil layer shield machine In the output gas circuit of the speed-variable pump of system, a gas circuit change-over switch valve is in series with, in the another defeated of the gas circuit change-over switch valve Constant speed flow pump is connected with entrance;The cutterhead of soft soil layer shield machine is steel bar concrete pile of the grinding in existing buildings On.
2. a kind of soft soil layer shield mill stake system according to claim 1, it is characterised in that in soft soil layer shield machine Cutterhead center tool rest(5)It is upper that in-line is provided with six shell knives(1), the spacing of two adjacent shell knives is 10 Centimetre, six shell knife(1)In every height shell knife reduced successively from cutter head center to cutterhead edge, apart from knife The height of the nearest shell knife of plate edge is higher by 20 centimetres of cutter head panel;In the cutterhead plane domain of soft soil layer shield machine On, knife spacing is 100 millimeters;On the cutterhead side circular arc sector of soft soil layer shield machine, knife spacing is 50 millimeters.
3. a kind of soft soil layer shield mill stake system according to claim 2, it is characterised in that in cutterhead spoke(3)On It is provided with wedge-shaped dual-pilot cutter(2);On the cutterhead of soft soil layer shield machine, cutter path radius is less than 1985 millimeters of region On, two wedge-shaped dual-pilot cutters are provided with each cutter path line(2), this two wedge-shaped dual-pilot cutters(2)In one wedge shape first The height of row knife is 200 millimeters, this two wedge-shaped dual-pilot cutters(2)In another height wedge-shaped dual-pilot cutter be 170 millimeters; On the cutterhead of soft soil layer shield machine, it is more than in cutter path radius on 1985 millimeters of region, is set on each cutter path line It is equipped with four wedge-shaped dual-pilot cutters(2), this four wedge-shaped dual-pilot cutters(2)In one the height of wedge-shaped dual-pilot cutter be 200 millimeters, this It it is wantonly 170 millimeters the height of wedge-shaped dual-pilot cutter another three in wedge-shaped dual-pilot cutter.
4. a kind of soft soil layer shield mill stake system according to claim 3, it is characterised in that wedge-shaped dual-pilot cutter(2)It is Welded type, in the wedge-shaped dual-pilot cutter of welded type(2)Be provided at both ends with arc hard alloy blocks(6), in the wedge shape of welded type Dual-pilot cutter(2)Centre be provided with hard alloy bar(7);Scraper is additionally provided with the cutterhead of soft soil layer shield machine(4), scrape The height of knife is 140 millimeters.
CN201720128729.6U 2017-02-13 2017-02-13 Soft soil layer shield grinds stake system Active CN206562933U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720128729.6U CN206562933U (en) 2017-02-13 2017-02-13 Soft soil layer shield grinds stake system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720128729.6U CN206562933U (en) 2017-02-13 2017-02-13 Soft soil layer shield grinds stake system

Publications (1)

Publication Number Publication Date
CN206562933U true CN206562933U (en) 2017-10-17

Family

ID=60031209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720128729.6U Active CN206562933U (en) 2017-02-13 2017-02-13 Soft soil layer shield grinds stake system

Country Status (1)

Country Link
CN (1) CN206562933U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640105A (en) * 2017-02-13 2017-05-10 中铁十九局集团轨道交通工程有限公司 Soft land layer shield pile grinding system and pile grinding method
CN112983446A (en) * 2021-04-22 2021-06-18 中铁一局集团第二工程有限公司 Construction method for shield cutting of existing station reinforced concrete fender post

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640105A (en) * 2017-02-13 2017-05-10 中铁十九局集团轨道交通工程有限公司 Soft land layer shield pile grinding system and pile grinding method
CN112983446A (en) * 2021-04-22 2021-06-18 中铁一局集团第二工程有限公司 Construction method for shield cutting of existing station reinforced concrete fender post

Similar Documents

Publication Publication Date Title
CN101936167B (en) Construction method for crossing bridge pile foundation by combining bridge underpinning with shield construction
CN102733816B (en) Deformation control method when shield traverse building within short distance
CN106284187B (en) The quick method for dismounting of Face Slab of Concrete of Rock-fill Dam destruction area
CN206487480U (en) A kind of big shape of a hoof slurry balance shield machine host
CN106640105A (en) Soft land layer shield pile grinding system and pile grinding method
CN103397891A (en) Cutting blade disc of muddy water balance push bench
CN206562933U (en) Soft soil layer shield grinds stake system
CN104747202A (en) Multi-cutter head combined type cutting system for rectangular pipe pushing machine
CN108301842A (en) A kind of fixing device and construction method for controlling duct pieces of shield tunnel floating
CN209686488U (en) Head is dug in milling for excavating side slope groove
CN109139028B (en) Arc-cutting shield tunneling machine cutterhead
CN105065011A (en) Construction method of soft soil shield tunneling cutting pile foundation
Bäppler New developments in TBM tunnelling for changing grounds
CN108005670A (en) A kind of shield cuts armored concrete clump of piles system
CN207934896U (en) A kind of fixing device for controlling duct pieces of shield tunnel floating
CN212689974U (en) Broken blade disc and entry driving machine of digging
CN108755719A (en) Seabed municipal tunnel over strait cofferdam open cutting construction method
CN102943676A (en) Concrete cutting advanced cutter for shield tunneling machine
CN112523767A (en) Construction method for shield pile grinding of expansion soil layer
CN102852527A (en) Cutter disc and cutter improving method for accelerating shield excavation in dense sand layer
CN202228785U (en) Jack type pipe-jacking head for long transmission pipeline
CN202810846U (en) Excavating equipment
CN209724346U (en) Mini-sized tunnelling machine
CN202467850U (en) Earth pressure balanced shield for large-grain diameter sandy cobble stratum
CN103277109A (en) Shield excavation construction method used for big-stickiness soil layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant