CN107792781A - It is easy to the building steel tube of assembling to fix conveying arrangement - Google Patents
It is easy to the building steel tube of assembling to fix conveying arrangement Download PDFInfo
- Publication number
- CN107792781A CN107792781A CN201710968702.2A CN201710968702A CN107792781A CN 107792781 A CN107792781 A CN 107792781A CN 201710968702 A CN201710968702 A CN 201710968702A CN 107792781 A CN107792781 A CN 107792781A
- Authority
- CN
- China
- Prior art keywords
- clamping seats
- clamping
- arc
- rubber blanket
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/42—Gripping members engaging only the external or internal surfaces of the articles
- B66C1/44—Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
- B66C1/48—Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces to vertical edge portions of sheets, tubes, or like thin or thin-walled articles
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention provides a kind of building steel tube for being easy to assembling to fix conveying arrangement, belongs to building field.Rubber blanket, arc-shaped limit rubber blanket and holes for clamping are fixed including the first clamping seats, steel pipe, the second clamping seats, screw mandrel, arc;The holes for clamping is arranged in the first clamping seats and the second clamping seats;The arc-shaped limit rubber blanket is fixed using glue to be bonded on the inside of holes for clamping on arcwall;The screw mandrel is rotatably provided in holes for clamping by internal thread hole;The arc-shaped limit rubber blanket is fixed using glue and is bonded in limited block side wall;The steel pipe is arranged on the second clamping seats right-hand member by the holes for clamping in the first clamping seats and the second clamping seats, and steel pipe side wall is attached to arc and fixed on rubber blanket, moves the arc-shaped limit rubber blanket on limited block by rotary screw and is close to steel pipe.It is reasonable that apparatus of the present invention are set, and easy to assembly, secure, effectively the steel of different size, length can be transported, be not in the problem of steel pipe drops in transportation.
Description
Technical field
The present invention relates to a kind of apparatus for building, specifically a kind of building steel tube for being easy to assembling fixes conveying arrangement.
Background technology
In construction site, steel pipe be transported by tying up after, using lifting machine lift by crane transport, pass through steel wire in the prior art
Rope is bundled, but this mode, after bundling on the ground, is seemed and has been locked, but due to there is gap between steel pipe, it is past
Toward after being lifted in the air, all steel pipes will pass through Action of Gravity Field and push, and the steel for causing to bind originally unclamp, therefore often
The falling from high altitude situation for occurring in steel transport is easy to, it is abnormally dangerous.
The content of the invention
For above-mentioned the deficiencies in the prior art, the technical problem to be solved in the present invention is to provide a kind of easy to assembly, it is applicable
In different size, the steel pipe transmission of length, fixation transportation safety, be not in steel pipe drop accident be easy to building for assembling
Build steel pipe and fix conveying arrangement.
In order to solve the above technical problems, the invention provides following technical scheme:
A kind of building steel tube for being easy to assembling fixes conveying arrangement, including suspension ring, suspension ring fix bar, connecting rod, upper junction plate, the
One fastening bolt, the first clamping seats, steel pipe, rotating handle, lower connecting plate, the second fastening bolt, the second clamping seats, screw mandrel, bearing,
Limited block, arc fix rubber blanket, arc-shaped limit rubber blanket, holes for clamping, internal thread hole and bolt hole;The holes for clamping is arranged on
In first clamping seats and the second clamping seats, four holes for clamping are both provided with the first clamping seats and the second clamping seats;The arc
Spacing rubber blanket is fixed using glue to be bonded on the inside of holes for clamping on arcwall;The screw mandrel is rotatably provided in by internal thread hole
In holes for clamping;The rotating handle is welded on screw mandrel outer face;The bearing is fixedly installed in limited block side wall;It is described spacing
Block is fixedly installed in screw mandrel by bearing;The arc-shaped limit rubber blanket is fixed using glue and is bonded in limited block side wall;
The upper junction plate left end is arranged on the first clamping seats, and right-hand member is arranged on the second clamping seats, is revolved using the first fastening bolt
It is screwed in bolt hole, is fixedly installed on the first clamping seats and the second clamping seats;The lower connecting plate left end is arranged on the first folder
On tight seat, right-hand member is arranged on the second clamping seats upper end, is screwed in using the second fastening bolt in bolt hole, is fixedly installed on first
Clamping seats and the second clamping seats upper end;The connecting rod is provided with two, is welded on upper junction plate upper end;The fix bar welding
Two connecting rod upper ends;The suspension ring are welded on fix bar upper end;The steel pipe passes through the first clamping seats and the second clamping seats
In holes for clamping be arranged on the second clamping seats right-hand member, steel pipe side wall is attached to arc and fixed on rubber blanket, is moved by rotary screw
Arc-shaped limit rubber blanket on limited block is close to steel pipe, and fixing rubber blanket by arc-shaped limit rubber blanket and arc is matched for clamping tightly steel
Pipe.
As the further improvement project of the present invention:The holes for clamping is arranged to irregular cycle.
As the further improvement project of the present invention:The internal thread hole is arranged on the first clamping seats and the second clamping seats side
It is corresponding with holes for clamping center centre point in wall;.
As the further improvement project of the present invention:The bolt hole is arranged on above and below the first clamping seats and the second clamping seats
In end face, the first clamping seats and the second clamping seats upper and lower end face both sides are respectively arranged with two.
Compared with prior art, the beneficial effects of the invention are as follows:
Apparatus of the present invention can quickly assemble whole device according to each part, and steel pipe is clamped by the first clamping seats and second
Holes for clamping in seat is arranged on the second clamping seats right-hand member, and steel pipe side wall is attached to arc and fixed on rubber blanket, rotated by rotating handle
Arc-shaped limit rubber blanket on screw mandrel movement limited block is close to steel pipe, fixes rubber blanket by arc-shaped limit rubber blanket and arc and matches somebody with somebody
The tight steel pipe of co-clip, using quality of rubber materials, increase and the frictional force of steel pipe, make the fixed fastening of steel pipe, pull rope is firmly tied up to
In suspension ring, start loop wheel machine and conveniently sling steel pipe;It is reasonable that the device is set, easy to assembly, secure, can be effectively to different big
Small, length steel are transported, and are not in the problem of steel pipe drops in transportation.
Brief description of the drawings
Fig. 1 fixes the structural representation of conveying arrangement for ease of the building steel tube of assembling;
Fig. 2 fixes the left view of clamping device in conveying arrangement for ease of the building steel tube of assembling;
Fig. 3 fixes the sectional view of clamping seats in conveying arrangement for ease of the building steel tube of assembling;
In figure:1- suspension ring, 2- suspension ring fix bar, 3- connecting rods, 4- upper junction plates, the fastening bolts of 5- first, the clamping seats of 6- first,
7- steel pipes, 8- rotating handles, 9- lower connecting plates, the fastening bolts of 10- second, the clamping seats of 11- second, 12- screw mandrels, 13- bearings, 14-
Limited block, 15- arcs fix rubber blanket, 16- arc-shaped limits rubber blanket, 17- holes for clamping, 18- internal thread holes, 19- bolts hole.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
The embodiment of this patent is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, is only used for explaining this patent, and it is not intended that limitation to this patent.
In the description of this patent, it is to be understood that term " " center ", " on ", " under ", "front", "rear", " left side ",
The orientation or position relationship of the instruction such as " right side ", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are based on shown in the drawings
Orientation or position relationship, are for only for ease of description this patent and simplify and describe, rather than instruction or imply signified device or
Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to this patent.
, it is necessary to illustrate in the description of this patent, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection ", " setting " should be interpreted broadly, for example, it may be being fixedly linked, setting or being detachably connected, set
Put, or be integrally connected, set.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition
Concrete meaning in this patent.
Fig. 1-3 are referred to, a kind of building steel tube for being easy to assembling is present embodiments provided and fixes conveying arrangement, including suspension ring
1st, suspension ring fix bar 2, connecting rod 3, upper junction plate 4, the first fastening bolt 5, the first clamping seats 6, steel pipe 7, rotating handle 8, lower company
Fishplate bar 9, the second fastening bolt 10, the second clamping seats 11, screw mandrel 12, bearing 13, limited block 14, arc fix rubber blanket 15, arc
The spacing rubber blanket 16 of shape, holes for clamping 17, internal thread hole 18 and bolt hole 19;The holes for clamping 17 is arranged on the He of the first clamping seats 6
In second clamping seats 11, four holes for clamping 17 are both provided with the first clamping seats 6 and the second clamping seats 11, holes for clamping 17 is arranged to
Irregular cycle;The internal thread hole 18 is arranged in the first clamping seats 6 and the side wall of the second clamping seats 11, with the center of holes for clamping 17
Centre point is corresponding;The bolt hole 19 is arranged in the first clamping seats 6 and the upper and lower end face of the second clamping seats 11, the first clamping seats 6
Two are respectively arranged with the upper and lower end face both sides of the second clamping seats 11;The arc-shaped limit rubber blanket 16 is fixed using glue and bonded
On the inner side arcwall of holes for clamping 17;The screw mandrel 12 is rotatably provided in holes for clamping 17 by internal thread hole 18;The rotation
Handle 8 is welded on the outer face of screw mandrel 12;The bearing 13 is fixedly installed in the side wall of limited block 14;The limited block 14 passes through axle
13 are held to be fixedly installed in screw mandrel 12;The arc-shaped limit rubber blanket 16 is fixed using glue and is bonded in the side wall of limited block 14;
The left end of upper junction plate 4 is arranged on the first clamping seats 6, and right-hand member is arranged on the second clamping seats 11, using the first fastening spiral shell
Bolt 5 is screwed in bolt hole 19, is fixedly installed on the first clamping seats 6 and the second clamping seats 11;The left end of lower connecting plate 9 is set
Put on the first clamping seats 6, right-hand member is arranged on the upper end of the second clamping seats 11, and bolt hole 19 is screwed in using the second fastening bolt 10
In, it is fixedly installed on the first clamping seats 6 and the upper end of the second clamping seats 11;The connecting rod 3 is provided with two, is welded on connection
The upper end of plate 4;The fix bar 2 is welded on two upper ends of connecting rod 3;The suspension ring 1 are welded on the upper end of fix bar 2;The steel pipe 7
The right-hand member of second clamping seats 11 is arranged on by the holes for clamping 17 in the first clamping seats 6 and the second clamping seats 11, the side wall of steel pipe 7 is attached to
Arc is fixed on rubber blanket 15, is moved the arc-shaped limit rubber blanket 16 on limited block 14 by rotary screw 12 and is close to steel pipe 7, leads to
Cross arc-shaped limit rubber blanket 16 and arc fixes rubber blanket 15 and is matched for clamping tightly steel pipe 7;Suspension ring 1 can facilitate to be fixed with pull rope,
Conveniently sling;Upper junction plate 4 and lower connecting plate 9 are easy to assembling to fix the first clamping seats 6 and the second clamping seats 11;First clamping seats
6 and second clamping seats 11 steel pipe 7 two can be provided be fixedly clamped a little, stability is high;Screw mandrel 12 is easy to regulation limited block 14 to move
It is dynamic;Arc-shaped limit rubber blanket 16 and arc fix rubber blanket 15 and are matched for clamping tightly steel pipe 7, using quality of rubber materials, increase and steel pipe 7
Frictional force, make the fixed fastening of steel pipe 7.
The present invention operation principle be:Whole device can quickly have been assembled according to each part, steel pipe 7 is passed through into the first folder
Holes for clamping 17 in the tight clamping seats 11 of seat 6 and second is arranged on the right-hand member of the second clamping seats 11, and the side wall of steel pipe 7 is attached to arc and fixes rubber
On rubber cushion 15, the arc-shaped limit rubber blanket 16 on limited block 14 is moved by the rotary screw 12 of rotating handle 8 and is close to steel pipe 7, is passed through
Arc-shaped limit rubber blanket 16 and arc fix rubber blanket 15 and are matched for clamping tightly steel pipe 7, and using quality of rubber materials, increase rubs with steel pipe 7
Power is wiped, makes the fixed fastening of steel pipe 7, pull rope is firmly tied up in suspension ring 1, start loop wheel machine and conveniently sling steel pipe 7.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party
Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge
Make a variety of changes.
Claims (4)
1. a kind of building steel tube for being easy to assembling fixes conveying arrangement, including suspension ring(1), suspension ring fix bar(2), connecting rod(3)、
Upper junction plate(4), the first fastening bolt(5), the first clamping seats(6), steel pipe(7), rotating handle(8), lower connecting plate(9), second
Fastening bolt(10), the second clamping seats(11), screw mandrel(12), bearing(13), limited block(14), arc fix rubber blanket(15)、
Arc-shaped limit rubber blanket(16), holes for clamping(17), internal thread hole(18)And bolt hole(19);It is characterized in that the holes for clamping
(17)It is arranged on the first clamping seats(6)With the second clamping seats(11)In, the first clamping seats(6)With the second clamping seats(11)In all set
It is equipped with four holes for clamping(17);The arc-shaped limit rubber blanket(16)Fixed using glue and be bonded in holes for clamping(17)Inner side arc
On wall;The screw mandrel(12)Pass through internal thread hole(18)It is rotatably provided in holes for clamping(17)In;The rotating handle(8)It is welded on silk
Bar(12)On outer face;The bearing(13)It is fixedly installed on limited block(14)In side wall;The limited block(14)Pass through bearing
(13)It is fixedly installed on screw mandrel(12)In;The arc-shaped limit rubber blanket(16)Fixed using glue and be bonded in limited block(14)Side
On wall;The upper junction plate(4)Left end is arranged on the first clamping seats(6)On, right-hand member is arranged on the second clamping seats(11)On, use
First fastening bolt(5)It is screwed in bolt hole(19)In, it is fixedly installed on the first clamping seats(6)With the second clamping seats(11)On;
The lower connecting plate(9)Left end is arranged on the first clamping seats(6)On, right-hand member is arranged on the second clamping seats(11)Upper end, using
Two fastening bolts(10)It is screwed in bolt hole(19)In, it is fixedly installed on the first clamping seats(6)With the second clamping seats(11)Upper end;
The connecting rod(3)Two are provided with, is welded on upper junction plate(4)Upper end;The fix bar(2)It is welded on two connecting rods
(3)Upper end;The suspension ring(1)It is welded on fix bar(2)Upper end;The steel pipe(7)Pass through the first clamping seats(6)Clamped with second
Seat(11)In holes for clamping(17)It is arranged on the second clamping seats(11)Right-hand member, steel pipe(7)Side wall is attached to arc and fixes rubber blanket
(15)On, pass through rotary screw(12)Mobile limited block(14)On arc-shaped limit rubber blanket(16)It is close to steel pipe(7), pass through arc
The spacing rubber blanket of shape(16)Rubber blanket is fixed with arc(15)It is matched for clamping tightly steel pipe(7).
2. the building steel tube according to claim 1 for being easy to assembling fixes conveying arrangement, it is characterized in that, the holes for clamping
(17)It is arranged to irregular cycle.
3. the building steel tube according to claim 1 or 2 for being easy to assembling fixes conveying arrangement, it is characterized in that, the interior spiral shell
Pit(18)It is arranged on the first clamping seats(6)With the second clamping seats(11)In side wall, with holes for clamping(17)Central centre point is corresponding.
4. the building steel tube according to claim 1 or 2 for being easy to assembling fixes conveying arrangement, it is characterized in that, the bolt
Hole(19)It is arranged on the first clamping seats(6)With the second clamping seats(11)In upper and lower end face, the first clamping seats(6)With the second clamping seats
(11)Upper and lower end face both sides are respectively arranged with two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710968702.2A CN107792781A (en) | 2017-10-18 | 2017-10-18 | It is easy to the building steel tube of assembling to fix conveying arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710968702.2A CN107792781A (en) | 2017-10-18 | 2017-10-18 | It is easy to the building steel tube of assembling to fix conveying arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107792781A true CN107792781A (en) | 2018-03-13 |
Family
ID=61533352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710968702.2A Pending CN107792781A (en) | 2017-10-18 | 2017-10-18 | It is easy to the building steel tube of assembling to fix conveying arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107792781A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108726354A (en) * | 2018-08-01 | 2018-11-02 | 宁国市挚友合金钢材料有限公司 | A kind of steel lifting device |
CN112340598A (en) * | 2020-11-09 | 2021-02-09 | 湖南龙智新材料科技有限公司 | Copper bar locking structure of copper bar adding device for copper dissolving tank |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104118799A (en) * | 2014-07-30 | 2014-10-29 | 江苏国核管道系统工程技术研究院有限公司 | Steel tube lifting device |
CN204096925U (en) * | 2014-10-02 | 2015-01-14 | 黄河科技学院 | A kind of lifting steel pipes equipment |
CN204454254U (en) * | 2015-02-08 | 2015-07-08 | 张以良 | A kind of steel rolling tube suspender |
CN105565145A (en) * | 2016-02-25 | 2016-05-11 | 成都亨通兆业精密机械有限公司 | Rapid carrying device for large cylinder parts |
CN106915686A (en) * | 2017-03-29 | 2017-07-04 | 王颖莉 | A kind of device for auxiliary hanging lifting scaffold steel pipe |
CN106927359A (en) * | 2017-04-21 | 2017-07-07 | 成都来宝石油设备有限公司 | Petrochemical pipe installs boom hoisting |
CN207566736U (en) * | 2017-10-18 | 2018-07-03 | 方文彬 | Transport device is fixed convenient for the building steel tube of assembling |
-
2017
- 2017-10-18 CN CN201710968702.2A patent/CN107792781A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104118799A (en) * | 2014-07-30 | 2014-10-29 | 江苏国核管道系统工程技术研究院有限公司 | Steel tube lifting device |
CN204096925U (en) * | 2014-10-02 | 2015-01-14 | 黄河科技学院 | A kind of lifting steel pipes equipment |
CN204454254U (en) * | 2015-02-08 | 2015-07-08 | 张以良 | A kind of steel rolling tube suspender |
CN105565145A (en) * | 2016-02-25 | 2016-05-11 | 成都亨通兆业精密机械有限公司 | Rapid carrying device for large cylinder parts |
CN106915686A (en) * | 2017-03-29 | 2017-07-04 | 王颖莉 | A kind of device for auxiliary hanging lifting scaffold steel pipe |
CN106927359A (en) * | 2017-04-21 | 2017-07-07 | 成都来宝石油设备有限公司 | Petrochemical pipe installs boom hoisting |
CN207566736U (en) * | 2017-10-18 | 2018-07-03 | 方文彬 | Transport device is fixed convenient for the building steel tube of assembling |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108726354A (en) * | 2018-08-01 | 2018-11-02 | 宁国市挚友合金钢材料有限公司 | A kind of steel lifting device |
CN112340598A (en) * | 2020-11-09 | 2021-02-09 | 湖南龙智新材料科技有限公司 | Copper bar locking structure of copper bar adding device for copper dissolving tank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107792781A (en) | It is easy to the building steel tube of assembling to fix conveying arrangement | |
CN207277817U (en) | Falsework rack connecting structure | |
CN203754331U (en) | Hoisting device applied to telegraph pole top end | |
CN110820563A (en) | Special beam lifting device for prefabricated track trough beam and using method thereof | |
CN207144540U (en) | A kind of bracing means of bolt-ball net frame pull bar and node | |
CN206722449U (en) | A kind of building iron support frame | |
CN207566736U (en) | Transport device is fixed convenient for the building steel tube of assembling | |
CN206359109U (en) | Tower hanging apparatus and tower hoisting structure | |
CN201158504Y (en) | Supporting construction for packing and stacking steel tube | |
WO2023160724A1 (en) | Integral hoisting device for beam transportation vehicle | |
CN111532973A (en) | Steel bar hoisting and clamping device for building engineering | |
CN218174383U (en) | Steel pipe hoisting device | |
CN206680096U (en) | One kind is used for restricted clearance hanging apparatus | |
CN212895925U (en) | Cable releasing device with variable cable releasing inner diameter | |
CN111119956B (en) | Support device for subway tunnel emergency | |
CN211897854U (en) | Special lifting beam device for prefabricated track groove beam | |
CN207160586U (en) | Falsework floor structure | |
JP6400557B2 (en) | Tube lifting device and tube lifting / lowering method | |
CN105869878B (en) | Novel and multifunctional coiling rack | |
CN208915190U (en) | A kind of transport device for construction site Secondary Transport large diameter pipeline | |
CN113638548B (en) | Construction steel reinforcement cage hoist and mount reinforced structure | |
CN215436497U (en) | Converter floor truck | |
CN215402538U (en) | Specially-made large-scale integral air separation equipment hoisting structure | |
CN211710914U (en) | Special vehicle for anchor cable rope | |
CN215326474U (en) | Detachable tubular shaft lifting lug for hoisting light equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180313 |
|
RJ01 | Rejection of invention patent application after publication |