CN105565145A - Rapid carrying device for large cylinder parts - Google Patents

Rapid carrying device for large cylinder parts Download PDF

Info

Publication number
CN105565145A
CN105565145A CN201610102008.8A CN201610102008A CN105565145A CN 105565145 A CN105565145 A CN 105565145A CN 201610102008 A CN201610102008 A CN 201610102008A CN 105565145 A CN105565145 A CN 105565145A
Authority
CN
China
Prior art keywords
sheave
cylinder
pipe link
iron chains
annulus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610102008.8A
Other languages
Chinese (zh)
Other versions
CN105565145B (en
Inventor
吴光武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Kechuang wisdom intellectual property services Co. Ltd.
Original Assignee
Chengdu Hengtong Zhaoye Precision Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hengtong Zhaoye Precision Machinery Co Ltd filed Critical Chengdu Hengtong Zhaoye Precision Machinery Co Ltd
Priority to CN201610102008.8A priority Critical patent/CN105565145B/en
Publication of CN105565145A publication Critical patent/CN105565145A/en
Application granted granted Critical
Publication of CN105565145B publication Critical patent/CN105565145B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • B66C1/445Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated
    • B66C1/447Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated by hydraulic or pneumatic motors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a rapid carrying device for large cylinder parts. The rapid carrying device comprises a connecting rod and a lifting ring; a first groove wheel can rotate around a first rotating shaft, and a second groove wheel can rotate around a second rotating shaft; a first iron chain is wound on the first groove wheel and then is connected with a first clamping structure, and one end of a second iron chain is wound on the second groove wheel and then is connected with a second clamping structure; and the first clamping structure and the second clamping structure each comprise a circular ring, a pressurizing pump and M cylinders. The technical effects that the rapid carrying device is reasonable in design, the large cylinder parts can be conveniently carried, and the carrying efficiency is high are achieved.

Description

Cylinder large fast removal equipment
Technical field
The present invention relates to Over-size transport field, particularly, relate to a kind of cylinder large fast removal equipment.
Background technology
Large of cylinder, as electric pole, steel column, because quality is comparatively large, is not easy carrying in the process of carrying, is generally to use manually to be wrapped on steel column by steel cable complexity, and then use crane to carry, then untiing steel cable, carrying trouble, efficiency is lower.
In sum, present inventor, in the process realizing invention technical scheme in the embodiment of the present application, finds that above-mentioned technology at least exists following technical matters:
In the prior art, there is carrying trouble in the carrying of large of existing cylinder, the technical matters that handling efficiency is lower.
Summary of the invention
The invention provides a kind of cylinder large fast removal equipment, solve the carrying of large of existing cylinder and there is carrying trouble, the technical matters that handling efficiency is lower, achieves equipment de-sign reasonable, be convenient to carry large of cylinder, the technique effect that handling efficiency is higher.
For solving the problems of the technologies described above, the embodiment of the present application provides a kind of cylinder large fast removal equipment, and described equipment comprises:
Pipe link, suspension ring, described suspension ring lower end is connected with in the middle part of described pipe link, described pipe link left end is connected with the first S. A., the right-hand member of described pipe link is connected with the second S. A., described first S. A. is through the wheel bore of the first sheave, and described first sheave can rotate around described first S. A., described second S. A. is through the wheel bore of the second sheave, and described second sheave can rotate around described second S. A., first iron chains one end is connected with described pipe link, and the described first iron chains other end is wrapped in after on described first sheave and is connected with the first clamping structure, second iron chains one end is connected with described pipe link, and the described second iron chains other end is wrapped in after on described second sheave and is connected with the second clamping structure, described first sheave and described second sheave side are equipped with an adapter plate, described first sheave, described second sheave, described adapter plate surface are equipped with N number of fixing threaded hole, with nut screw connection, described first sheave and described second sheave are fixed after N number of fix screw is each passed through described N number of fixing threaded hole, described adapter plate is fixedly connected with described pipe link, described N be more than or equal to 5 positive integer, described first clamping structure and described second clamping structure include: annulus, boost pump, M cylinder, described annulus is hollow structure, described boost pump is connected with described annulus, described annulus inner peripheral surface is provided with M circular hole, the open end of M cylinder is fixedly connected with a described M circular hole respectively, piston is provided with in described cylinder, cylindrical bar one end is connected with described piston through after the other end of described cylinder, the described cylindrical bar other end is connected with fixed plate, transfer tube one end is connected with described boost pump, the described transfer tube other end extends in described annulus, described M be more than or equal to 4 positive integer.
Wherein, described pipe link adopts angle steel to make, and described case surface scribbles anti-rust paint.
Wherein, described suspension ring and described pipe link adopt the connection mode of welding to be connected, described first iron chains and described second iron chains are connected with all adopting the connection mode of welding between described pipe link, adopt the connection mode of welding to be connected between described cylinder with described circular hole.
Wherein, the open end of described biography cylinder and described circular hole junction and described cylindrical bar and described cylinder junction are equipped with seal ring and packing seal.
Wherein, described fixed plate surface is profile of tooth.
Wherein, described first iron chains is specifically connected with described annulus with described second iron chains.
Wherein, described boost pump is specially Hydraulic Pump or air lift pump.
Wherein, a described M circular hole is evenly distributed on described annulus inner peripheral surface.
Wherein, described equipment is symmetrical along vertical bisector.
The one or more technical schemes provided in the embodiment of the present application, at least have following technique effect or advantage:
At carrying large of cylinder, during as steel column, first the first iron chains and the second iron chains are pulled out from sheave, after the length of the needs of pull-out, then fix screw is used to be fixed sheave through fixing threaded hole, anti-sliding stop, guarantee safety, then the annulus of two clamping structures is set in respectively the two ends of steel column, then open boost pump and carry out supercharging, the annulus internal pressure being increases, pressure is delivered in cylinder, promote piston movement, and then promote cylindrical bar advance, further drive fixed plate carries out extruding to steel column to be fixed, multiple fixed plate extrudes simultaneously from different directions simultaneously, fixing firm, then use crane to hang suspension ring to carry, after being transported to predeterminated position, close boost pump, pressure reduces, take off annulus, convenient in carrying is quick, adopt iron chains can bear more weight, sheave is adopted to store iron chains, conveniently regulate length according to actual needs, so, efficiently solve the carrying of large of existing cylinder and there is carrying trouble, the technical matters that handling efficiency is lower, and then it is reasonable to achieve equipment de-sign, be convenient to carry large of cylinder, the technique effect that handling efficiency is higher.
Accompanying drawing explanation
Fig. 1 is the structural representation of cylinder large fast removal equipment in the embodiment of the present application one;
Wherein, 1-pipe link, 2-suspension ring, 3-first S. A., 4-second S. A., 5-first sheave, 6-second sheave, 7-first iron chains, 8-second iron chains, 9-adapter plate, 10-fixing threaded hole, 11-annulus, 12-boost pump, 13-cylinder, 14-piston, 15-cylindrical bar, 16-fixed plate, 17-transfer tube.
Detailed description of the invention
The invention provides a kind of cylinder large fast removal equipment, solve the carrying of large of existing cylinder and there is carrying trouble, the technical matters that handling efficiency is lower, achieves equipment de-sign reasonable, be convenient to carry large of cylinder, the technique effect that handling efficiency is higher.
Technical scheme during the application implements is for solving the problems of the technologies described above.General thought is as follows:
At carrying large of cylinder, during as steel column, first the first iron chains and the second iron chains are pulled out from sheave, after the length of the needs of pull-out, then fix screw is used to be fixed sheave through fixing threaded hole, anti-sliding stop, guarantee safety, then the annulus of two clamping structures is set in respectively the two ends of steel column, then open boost pump and carry out supercharging, the annulus internal pressure being increases, pressure is delivered in cylinder, promote piston movement, and then promote cylindrical bar advance, further drive fixed plate carries out extruding to steel column to be fixed, multiple fixed plate extrudes simultaneously from different directions simultaneously, fixing firm, then use crane to hang suspension ring to carry, after being transported to predeterminated position, close boost pump, pressure reduces, take off annulus, convenient in carrying is quick, adopt iron chains can bear more weight, sheave is adopted to store iron chains, conveniently regulate length according to actual needs, so, efficiently solve the carrying of large of existing cylinder and there is carrying trouble, the technical matters that handling efficiency is lower, and then it is reasonable to achieve equipment de-sign, be convenient to carry large of cylinder, the technique effect that handling efficiency is higher.
In order to better understand technique scheme, below in conjunction with Figure of description and concrete embodiment, technique scheme is described in detail.
Embodiment one:
In embodiment one, provide a kind of cylinder large fast removal equipment, please refer to Fig. 1, described equipment comprises:
Pipe link 1, suspension ring 2, described suspension ring lower end is connected with in the middle part of described pipe link, described pipe link left end is connected with the first S. A. 3, the right-hand member of described pipe link is connected with the second S. A. 4, described first S. A. is through the wheel bore of the first sheave 5, and described first sheave can rotate around described first S. A., described second S. A. is through the wheel bore of the second sheave 6, and described second sheave can rotate around described second S. A., first iron chains 7 one end is connected with described pipe link, and the described first iron chains other end is wrapped in after on described first sheave and is connected with the first clamping structure, second iron chains 8 one end is connected with described pipe link, and the described second iron chains other end is wrapped in after on described second sheave and is connected with the second clamping structure, described first sheave and described second sheave side are equipped with an adapter plate 9, described first sheave, described second sheave, described adapter plate surface are equipped with N number of fixing threaded hole 10, with nut screw connection, described first sheave and described second sheave are fixed after N number of fix screw is each passed through described N number of fixing threaded hole, described adapter plate is fixedly connected with described pipe link, described N be more than or equal to 5 positive integer, described first clamping structure and described second clamping structure include: annulus 11, boost pump 12, M cylinder 13, described annulus is hollow structure, described boost pump is connected with described annulus, described annulus inner peripheral surface is provided with M circular hole, the open end of M cylinder is fixedly connected with a described M circular hole respectively, piston 14 is provided with in described cylinder, cylindrical bar 15 one end is connected with described piston through after the other end of described cylinder, the described cylindrical bar other end is connected with fixed plate 16, transfer tube 17 one end is connected with described boost pump, the described transfer tube other end extends in described annulus, described M be more than or equal to 4 positive integer.
Wherein, in the embodiment of the present application, described pipe link adopts angle steel to make, and described case surface scribbles anti-rust paint.Adopt angle steel can the intensity of support equipment, Tu anti-rust paint can prevent from getting rusty.
Wherein, in the embodiment of the present application, described suspension ring and described pipe link adopt the connection mode of welding to be connected, described first iron chains and described second iron chains are connected with all adopting the connection mode of welding between described pipe link, adopt the connection mode of welding to be connected between described cylinder with described circular hole.Adopt the connection mode of welding firm.
Wherein, in the embodiment of the present application, the open end of described biography cylinder and described circular hole junction and described cylindrical bar and described cylinder junction are equipped with seal ring and packing seal.
Wherein, in the embodiment of the present application, described fixed plate surface is profile of tooth.Adopt profile of tooth to increase friction, prevent from skidding, ensure that large of cylinder is fixing firm.
Wherein, in the embodiment of the present application, described first iron chains is specifically connected with described annulus with described second iron chains.
Wherein, in the embodiment of the present application, described boost pump is specially Hydraulic Pump or air lift pump.
Wherein, in the embodiment of the present application, a described M circular hole is evenly distributed on described annulus inner peripheral surface.
Wherein, in the embodiment of the present application, described equipment is symmetrical along vertical bisector.Symmetrical guarantee uniform force, ensure that carrying is firm, safety is higher.
Technical scheme in above-mentioned the embodiment of the present application, at least has following technique effect or advantage:
At carrying large of cylinder, during as steel column, first the first iron chains and the second iron chains are pulled out from sheave, after the length of the needs of pull-out, then fix screw is used to be fixed sheave through fixing threaded hole, anti-sliding stop, guarantee safety, then the annulus of two clamping structures is set in respectively the two ends of steel column, then open boost pump and carry out supercharging, the annulus internal pressure being increases, pressure is delivered in cylinder, promote piston movement, and then promote cylindrical bar advance, further drive fixed plate carries out extruding to steel column to be fixed, multiple fixed plate extrudes simultaneously from different directions simultaneously, fixing firm, then use crane to hang suspension ring to carry, after being transported to predeterminated position, close boost pump, pressure reduces, take off annulus, convenient in carrying is quick, adopt iron chains can bear more weight, sheave is adopted to store iron chains, conveniently regulate length according to actual needs, so, efficiently solve the carrying of large of existing cylinder and there is carrying trouble, the technical matters that handling efficiency is lower, and then it is reasonable to achieve equipment de-sign, be convenient to carry large of cylinder, the technique effect that handling efficiency is higher.
Although describe the preferred embodiments of the present invention, those skilled in the art once obtain the basic creative concept of cicada, then can make other change and amendment to these embodiments.So claims are intended to be interpreted as comprising preferred embodiment and falling into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various change and modification to the present invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (9)

1. cylinder large fast removal equipment, it is characterized in that, described equipment comprises:
Pipe link, suspension ring, described suspension ring lower end is connected with in the middle part of described pipe link, described pipe link left end is connected with the first S. A., the right-hand member of described pipe link is connected with the second S. A., described first S. A. is through the wheel bore of the first sheave, and described first sheave can rotate around described first S. A., described second S. A. is through the wheel bore of the second sheave, and described second sheave can rotate around described second S. A., first iron chains one end is connected with described pipe link, and the described first iron chains other end is wrapped in after on described first sheave and is connected with the first clamping structure, second iron chains one end is connected with described pipe link, and the described second iron chains other end is wrapped in after on described second sheave and is connected with the second clamping structure, described first sheave and described second sheave side are equipped with an adapter plate, described first sheave, described second sheave, described adapter plate surface are equipped with N number of fixing threaded hole, with nut screw connection, described first sheave and described second sheave are fixed after N number of fix screw is each passed through described N number of fixing threaded hole, described adapter plate is fixedly connected with described pipe link, described N be more than or equal to 5 positive integer, described first clamping structure and described second clamping structure include: annulus, boost pump, M cylinder, described annulus is hollow structure, described boost pump is connected with described annulus, described annulus inner peripheral surface is provided with M circular hole, the open end of M cylinder is fixedly connected with a described M circular hole respectively, piston is provided with in described cylinder, cylindrical bar one end is connected with described piston through after the other end of described cylinder, the described cylindrical bar other end is connected with fixed plate, transfer tube one end is connected with described boost pump, the described transfer tube other end extends in described annulus, described M be more than or equal to 4 positive integer.
2. cylinder according to claim 1 large fast removal equipment, is characterized in that, described pipe link adopts angle steel to make, and described case surface scribbles anti-rust paint.
3. cylinder according to claim 1 large fast removal equipment, it is characterized in that, described suspension ring and described pipe link adopt the connection mode of welding to be connected, described first iron chains and described second iron chains are connected with all adopting the connection mode of welding between described pipe link, adopt the connection mode of welding to be connected between described cylinder with described circular hole.
4. cylinder according to claim 1 large fast removal equipment, is characterized in that, the open end of described biography cylinder and described circular hole junction and described cylindrical bar and described cylinder junction are equipped with seal ring and packing seal.
5. cylinder according to claim 1 large fast removal equipment, is characterized in that, described fixed plate surface is profile of tooth.
6. cylinder according to claim 1 large fast removal equipment, is characterized in that, described first iron chains is specifically connected with described annulus with described second iron chains.
7. cylinder according to claim 1 large fast removal equipment, it is characterized in that, described boost pump is specially Hydraulic Pump or air lift pump.
8. cylinder according to claim 1 large fast removal equipment, is characterized in that, a described M circular hole is evenly distributed on described annulus inner peripheral surface.
9. cylinder according to claim 1 large fast removal equipment, it is characterized in that, described equipment is symmetrical along vertical bisector.
CN201610102008.8A 2016-02-25 2016-02-25 The big part fast removal equipment of cylinder Active CN105565145B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610102008.8A CN105565145B (en) 2016-02-25 2016-02-25 The big part fast removal equipment of cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610102008.8A CN105565145B (en) 2016-02-25 2016-02-25 The big part fast removal equipment of cylinder

Publications (2)

Publication Number Publication Date
CN105565145A true CN105565145A (en) 2016-05-11
CN105565145B CN105565145B (en) 2017-12-01

Family

ID=55875876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610102008.8A Active CN105565145B (en) 2016-02-25 2016-02-25 The big part fast removal equipment of cylinder

Country Status (1)

Country Link
CN (1) CN105565145B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792781A (en) * 2017-10-18 2018-03-13 惠安集睿信息科技有限公司 It is easy to the building steel tube of assembling to fix conveying arrangement
CN111924705A (en) * 2020-09-15 2020-11-13 青岛理工大学 Steel hoisting device for steel structure villa construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07285783A (en) * 1994-04-19 1995-10-31 Hitachi Ltd Suspension tool for electrically-operated hoist
CN201850045U (en) * 2010-11-16 2011-06-01 山东齐鲁电机制造有限公司 Hoisting ring
CN202527894U (en) * 2011-12-28 2012-11-14 中国石油天然气集团公司 Intelligent hydraulic type outer aligning device for pipeline
CN202967886U (en) * 2012-10-27 2013-06-05 江苏神马电力股份有限公司 Tooling for assembling and hoisting large-diameter tubular product
CN103395688A (en) * 2013-08-21 2013-11-20 河间市电力局 Method for hoisting self-release vertical upright rod and special lifting tool
CN205397848U (en) * 2016-02-25 2016-07-27 成都亨通兆业精密机械有限公司 Quick handling device of cylinder major possession

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07285783A (en) * 1994-04-19 1995-10-31 Hitachi Ltd Suspension tool for electrically-operated hoist
CN201850045U (en) * 2010-11-16 2011-06-01 山东齐鲁电机制造有限公司 Hoisting ring
CN202527894U (en) * 2011-12-28 2012-11-14 中国石油天然气集团公司 Intelligent hydraulic type outer aligning device for pipeline
CN202967886U (en) * 2012-10-27 2013-06-05 江苏神马电力股份有限公司 Tooling for assembling and hoisting large-diameter tubular product
CN103395688A (en) * 2013-08-21 2013-11-20 河间市电力局 Method for hoisting self-release vertical upright rod and special lifting tool
CN205397848U (en) * 2016-02-25 2016-07-27 成都亨通兆业精密机械有限公司 Quick handling device of cylinder major possession

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792781A (en) * 2017-10-18 2018-03-13 惠安集睿信息科技有限公司 It is easy to the building steel tube of assembling to fix conveying arrangement
CN111924705A (en) * 2020-09-15 2020-11-13 青岛理工大学 Steel hoisting device for steel structure villa construction

Also Published As

Publication number Publication date
CN105565145B (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN203959639U (en) A kind of steel pipe hoisting fixture
CN203865840U (en) Steel pipe lifting device
CN106041903A (en) Pipeline moving device based on fastness improving
CN105565145A (en) Rapid carrying device for large cylinder parts
CN205397848U (en) Quick handling device of cylinder major possession
CN208849346U (en) Anticreep moves large-tonnage strain insulator more changing device
CN110862007A (en) Heavy clamp suitable for transferring cylindrical thin shell and application method thereof
CN103266610A (en) Continuous tube drawing device
CN204173759U (en) Convenient heavy panel device of transportation
CN204173764U (en) Light plate device convenient to transport
CN204369464U (en) 220kV transmission line of electricity cat-head transmission tower construction hanging apparatus
CN103879929B (en) A kind of auxiliary device for the transport of heavy caliber cable coil and using method thereof
CN103231775B (en) A kind of V shape shark jaw
CN105174156A (en) Hoisting assembling frame for electrical equipment
CN211078204U (en) Narrow space pipeline hoisting accessory
CN105645257A (en) Lifting tool for cylindrical workpieces
CN111017707B (en) Clamping mechanism for lifting vertical placing pipeline
CN211778512U (en) Novel limiting bearing
CN104495635A (en) Hoisting apparatus for construction of 220 KV power transmission line cat-head type tower
CN218201797U (en) Wind power tower cylinder hoisting device with stable butt joint function
CN219507466U (en) Pipeline installation lifting appliance
CN212712335U (en) PE pipe handling device
CN205170253U (en) Detachable removal hoist device
CN204661139U (en) A kind of soft coiled material hanging tool
CN220011873U (en) Circular tube-shape product lifting clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Deng Liping

Inventor before: Wu Guangwu

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171027

Address after: 236800 Bozhou Anhui Industrial Park East of West ring, north of Guanghua Road, south of Guangming West Road

Applicant after: Anhui Kechuang wisdom intellectual property services Co. Ltd.

Address before: 610000 Sichuan city of Chengdu province Chenghua District two East 3rd Ring Rd section of Longtan Industrial Park

Applicant before: CHENGDU HENGTONG ZHAOYE PRECISION MACHINERY CO., LTD.

GR01 Patent grant
GR01 Patent grant