CN103395688A - Method for hoisting self-release vertical upright rod and special lifting tool - Google Patents

Method for hoisting self-release vertical upright rod and special lifting tool Download PDF

Info

Publication number
CN103395688A
CN103395688A CN2013103652178A CN201310365217A CN103395688A CN 103395688 A CN103395688 A CN 103395688A CN 2013103652178 A CN2013103652178 A CN 2013103652178A CN 201310365217 A CN201310365217 A CN 201310365217A CN 103395688 A CN103395688 A CN 103395688A
Authority
CN
China
Prior art keywords
steady arm
pulley
special
suspension hook
snap close
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103652178A
Other languages
Chinese (zh)
Other versions
CN103395688B (en
Inventor
李建海
冯玉普
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEJIAN ELECTRIC POWER SUPPLY Co OF STATE GRID HEBEI ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
HEJIAN POWER ELECTRIC BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEJIAN POWER ELECTRIC BUREAU filed Critical HEJIAN POWER ELECTRIC BUREAU
Priority to CN201310365217.8A priority Critical patent/CN103395688B/en
Publication of CN103395688A publication Critical patent/CN103395688A/en
Application granted granted Critical
Publication of CN103395688B publication Critical patent/CN103395688B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to a method for hoisting a self-release vertical upright rod and a special lifting tool, and belongs to the technical field of electrical network construction. The special lifting tool comprises a positioner (6), a special suspension cable (1), a suspension hook, a pulley release (5), a release rope (3) and a lock catch (4); the pulley release consists of a pulley and a suspension ring connected together; each of the two ends of the special suspension cable is provided with a cable sleeve (8); the two ends of the suspension cable are put together to form a double suspension cable; the double suspension cable is connected with the cable sleeve via the lock catch; one end of the release rope is connected with the lock catch, and the other end of the release rope traverses the pulley of the pulley release; and the suspension ring of the pulley release is hung on the suspension hook. The hoisting method and the special lifting tool have the benefits of being low in risk, without need for manual rod-climbing release, safe, reliable, fast in rod erecting, reduced in processes of rod-climbing release, rod erecting, rod-position recalibration and the like, reduced by at least half time, high in quality, vertical in rod positioning, convenient to measure and calibrate, and improved in construction quality.

Description

Automatic trip vertical posts hanging method and special hanger
Technical field
The present invention relates to a kind of automatic trip vertical posts hanging method and special hanger, belong to the electrical network technical field of construction.
Background technology
In the electrical network construction, vertical posts adopts the individual wire rope sling, and during pole erecting, electric pole can not vertically erect, and must enter at a slant the bar hole, and electric pole also need to vertically, laterally be calibrated centering by manpower after standing well, and steel wire loop also needs manually to step on bar and trips.There is following problem in background technology: security risk is large, separates sling and need manually step on the bar operation, the dangerous point such as have falling from high altitude, the bar that falls is hurted sb.'s feelings; , there are 3 time-consuming links such as stepping on bar is triped, shaft vertical, recalibration bar position in vertical rod length consuming time; Construction quality is low, and shaft tilts position again in vertical process, and shaft can be made camber line along the bar base and roll, and cross travel occurs unavoidably, and the bar position is prone to relatively large deviation.
Summary of the invention
The object of the invention is to provide a kind of automatic trip vertical posts hanging method and special hanger, replaces the individual wire rope sling, the suspension rod vertical rod, can realize vertical suspension rod, accurately enter position, do not step on bar and trip, and safe and reliable, simple to operate, of many uses, solve the problems referred to above that exist in background technology.
the technical scheme of invention is: automatic trip vertical posts special hanger for hoisting, comprise steady arm, Special sling, suspension hook, the pulley buckle release, thread off and restrict and snap close, link together pulley and suspension ring of pulley buckle release form, steady arm is cylindric, flexible internal diameter and head of the mast external diameter are complementary, on the excircle of steady arm, interval 60 degree are provided with two grommets, Special sling first passes grommet on steady arm, hang over again on suspension hook, and then pass another grommet on steady arm, the two ends of Special sling are provided with noose, the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable and noose link together by snap close, the end of restricting of threading off connects snap close, the other end passes the pulley of pulley buckle release, the suspension ring of pulley buckle release also hang on suspension hook.
Described steady arm circumference is provided with a plurality of dowel bolts, and the head of the mast is positioned; On steady arm, also be provided with baffle plate, prevent that electric pole from passing steady arm.
Automatic trip vertical posts hanging method, use above-mentioned special hanger to carry out, comprise following steps: 1. steady arm is arranged on to the head of the mast, Special sling is passed to two grommets on steady arm, and the hoist cable between two grommets is hung on suspension hook, the two ends of Special sling are provided with noose, and the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable does not link together by snap close with noose after walking around electric pole; 2. the suspension ring of pulley buckle release are hung on suspension hook, an end of the rope of threading off connects snap close, and the other end passes the pulley of pulley buckle release; 3. lift by crane suspension hook, the triangle that Special sling becomes to change, the pull-up electric pole, leg-of-mutton three summits are respectively steady arm, snap close and suspension hook, along with standing up of electric pole, leg-of-mutton suspension hook summit is close to the extended line on steady arm, snap close two summits gradually; During to vertical position, steady arm, snap close and suspension hook are point-blank when electric pole; 4. after electric pole location, back fill, on ground, pull the rope of threading off, snap close and Special sling are moved to the head of the mast along electric pole, suspension hook simultaneously rises, snap close, Special sling break away from from the head of the mast together with steady arm, steady arm, snap close, Special sling and pulley buckle release are put back to ground with suspension hook, do not need to step on bar and trip, and realize separating on ground rope and thread off.
Described steady arm circumference is provided with a plurality of dowel bolts, and the head of the mast is positioned; On steady arm, also be provided with baffle plate, whole steady arm is cap sequence, is buckled in the head of the mast.
Steady arm of the present invention is arranged on the head of the mast while using, for the fixing angle of Special sling and electric pole, make the electric pole rear maintenance plumbness of slinging; It is isometrical bar type or the tapered pole type limits that Special sling is not subjected to electric pole, and lock ring is lived shaft safely and reliably, guarantees, in the suspension rod process, the slippage pole collapse accident does not occur.The pulley buckle release with steady arm, Special sling is ingenious coordinates, realize separating on ground rope and thread off.
Beneficial effect of the present invention is: risk is low, does not need manually to step on bar and trips, and is safe and reliable; Vertical rod is fast, reduces links such as stepping on bar is triped, shaft vertical, recalibration bar position, saves at least the time of half; Quality is high, and shaft vertically enters position, is convenient to Measurement and calibration, improves construction quality.
Each parts of the present invention are all by stressed design more than 10 tons, and 15 meters of rural power grids and following electric pole weight is all less than 3 tons, and safety factor is high.Special sling adopts the design of the single claim-reduction of duplex type cover, has increased the contact surface of Special sling and shaft, more firmly the banding electric pole.The rope of threading off is used nylon rope, by the pulley buckle release, on ground, carries out, and at utmost reduces the risk of operating personal.Steady arm uses the round steel welding of 8mm plate iron and φ 16, and pot galvanize is processed, and durability is preferably arranged.On steady arm of the present invention, dowel bolt is arranged, can adapt to the cement pole of different-diameter, can be used for the electric pole Overhaul site of most of rural power grids engineering concrete bar camp site and rural area distribution, Applicable scope is very large.
The accompanying drawing explanation
Fig. 1 is embodiment of the present invention special hanger schematic diagram;
Fig. 2 is embodiment of the present invention steady arm schematic diagram;
Fig. 3 is embodiment of the present invention steady arm, snap close, Special sling, suspension hook, pulley buckle release, threading off to restrict interconnects schematic diagram;
Fig. 4 is that embodiment of the present invention dropout rope passes pulley buckle release schematic diagram;
Fig. 5 is that embodiment of the present invention hoisting electric pole is to vertical schematic diagram;
Fig. 6 is that the embodiment of the present invention pulls rear, the steady arm disengaging electric pole schematic diagram of restricting of threading off;
In figure: Special sling 1, baffle plate 2, thread off rope 3, snap close 4, pulley buckle release 5, steady arm 6, grommet 7, noose 8, dowel bolt 9, suspension hook 10, electric pole 11.
The specific embodiment
The present invention will be further described by the following examples.
automatic trip vertical posts special hanger for hoisting, comprise steady arm 6, Special sling 1, suspension hook, pulley buckle release 5, dropout rope 3 and snap close 4, link together pulley and suspension ring of pulley buckle release form, steady arm is cylindric, flexible internal diameter and head of the mast external diameter are complementary, on the excircle of steady arm, interval 60 degree are provided with two grommets 7, Special sling first passes grommet on steady arm, hang over again on suspension hook, and then pass another grommet on steady arm, the two ends of Special sling are provided with noose 8, the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable and noose link together by snap close, the end of restricting of threading off connects snap close, the other end passes the pulley of pulley buckle release, the suspension ring of pulley buckle release also hang on suspension hook.
Described steady arm circumference is provided with a plurality of dowel bolts 9, and the head of the mast is positioned; On steady arm, also be provided with baffle plate 2, prevent that electric pole from passing steady arm.
Automatic trip vertical posts hanging method, use above-mentioned special hanger to carry out, comprise following steps: 1. steady arm is arranged on to the head of the mast, Special sling is passed to two grommets on steady arm, and the hoist cable between two grommets is hung on suspension hook, the two ends of Special sling are provided with noose, and the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable does not link together by snap close with noose after walking around electric pole; 2. the suspension ring of pulley buckle release are hung on suspension hook, an end of the rope of threading off connects snap close, and the other end passes the pulley of pulley buckle release; 3. lift by crane suspension hook, the triangle that Special sling becomes to change, the pull-up electric pole, leg-of-mutton three summits are respectively steady arm, snap close and suspension hook, along with standing up of electric pole, leg-of-mutton suspension hook summit is close to the extended line on steady arm, snap close two summits gradually; During to vertical position, steady arm, snap close and suspension hook are point-blank when electric pole; 4. after electric pole location, back fill, on ground, pull the rope of threading off, snap close and Special sling are moved to the head of the mast along electric pole, suspension hook simultaneously rises, snap close, Special sling break away from from the head of the mast together with steady arm, steady arm, snap close, Special sling and pulley buckle release are put back to ground with suspension hook, do not need to step on bar and trip, and realize separating on ground rope and thread off.
Described steady arm circumference is provided with a plurality of dowel bolts, and the head of the mast is positioned; On steady arm, also be provided with baffle plate, whole steady arm is cap sequence, is buckled in the head of the mast.
Steady arm of the present invention is arranged on the head of the mast while using, for the fixing angle of Special sling and electric pole, make the electric pole rear maintenance plumbness of slinging; It is isometrical bar type or the tapered pole type limits that Special sling is not subjected to electric pole, and lock ring is lived shaft safely and reliably, guarantees, in the suspension rod process, the slippage pole collapse accident does not occur.The pulley buckle release with steady arm, Special sling is ingenious coordinates, realize separating on ground rope and thread off.
Beneficial effect of the present invention is: risk is low, does not need manually to step on bar and trips, and is safe and reliable; Vertical rod is fast, reduces links such as stepping on bar is triped, shaft vertical, recalibration bar position, saves at least the time of half; Quality is high, and shaft vertically enters position, is convenient to Measurement and calibration, improves construction quality.

Claims (4)

1. automatic trip vertical posts special hanger for hoisting, it is characterized in that comprising steady arm (6), Special sling (1), suspension hook, pulley buckle release (5), dropout rope (3) and snap close (4), link together pulley and suspension ring of pulley buckle release form, steady arm is cylindric, flexible internal diameter and head of the mast external diameter are complementary, on the excircle of steady arm, interval 60 degree are provided with two grommets (7), Special sling first passes grommet on steady arm, hang over again on suspension hook, and then pass another grommet on steady arm, the two ends of Special sling are provided with noose (8), the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable and noose link together by snap close, the end of restricting of threading off connects snap close, the other end passes the pulley of pulley buckle release, the suspension ring of pulley buckle release also hang on suspension hook.
2. automatic trip vertical posts special hanger for hoisting according to claim 1, it is characterized in that: described steady arm circumference is provided with a plurality of dowel bolts (9), and the head of the mast is positioned; On steady arm, also be provided with baffle plate (2), prevent that electric pole from passing steady arm.
3. automatic trip vertical posts hanging method, right to use requires 1 special hanger that limits to carry out, it is characterized in that comprising following steps: 1. steady arm is arranged on to the head of the mast, Special sling is passed to two grommets on steady arm, and the hoist cable between two grommets is hung on suspension hook, the two ends of Special sling are provided with noose, and the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable does not link together by snap close with noose after walking around electric pole; 2. the suspension ring of pulley buckle release are hung on suspension hook, an end of the rope of threading off connects snap close, and the other end passes the pulley of pulley buckle release; 3. lift by crane suspension hook, the triangle that Special sling becomes to change, the pull-up electric pole, leg-of-mutton three summits are respectively steady arm, snap close and suspension hook, along with standing up of electric pole, leg-of-mutton suspension hook summit is close to the extended line on steady arm, snap close two summits gradually; During to vertical position, steady arm, snap close and suspension hook are point-blank when electric pole; 4. after electric pole location, back fill, on ground, pull the rope of threading off, snap close and Special sling are moved to the head of the mast along electric pole, suspension hook simultaneously rises, snap close, Special sling break away from from the head of the mast together with steady arm, steady arm, snap close, Special sling and pulley buckle release are put back to ground with suspension hook, do not need to step on bar and trip, and realize separating on ground rope and thread off.
4. automatic trip vertical posts hanging method according to claim 1, it is characterized in that: described steady arm circumference is provided with a plurality of dowel bolts, and the head of the mast is positioned; On steady arm, also be provided with baffle plate, whole steady arm is cap sequence, is buckled in the head of the mast.
CN201310365217.8A 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool Expired - Fee Related CN103395688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310365217.8A CN103395688B (en) 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310365217.8A CN103395688B (en) 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool

Publications (2)

Publication Number Publication Date
CN103395688A true CN103395688A (en) 2013-11-20
CN103395688B CN103395688B (en) 2015-04-01

Family

ID=49559489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310365217.8A Expired - Fee Related CN103395688B (en) 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool

Country Status (1)

Country Link
CN (1) CN103395688B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401778A (en) * 2015-11-20 2016-03-16 国家电网公司 Construction lifting tool for perpendicular vertical rod of electric pole
CN105565145A (en) * 2016-02-25 2016-05-11 成都亨通兆业精密机械有限公司 Rapid carrying device for large cylinder parts
CN107352381A (en) * 2017-09-05 2017-11-17 安徽晋煤中能化工股份有限公司 High-altitude solves rope device
CN107740630A (en) * 2017-10-17 2018-02-27 国网江苏省电力公司仪征市供电公司 A kind of electric pole fixed seat
CN113896088A (en) * 2021-09-01 2022-01-07 中国化学工程第三建设有限公司 Device and method for single-machine hoisting of climbing-free hook unloading of spherical shell plate with column legs

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2284193A (en) * 1993-11-24 1995-05-31 Peter Campbell Device for holding scaffolding poles
US6648570B2 (en) * 2001-06-15 2003-11-18 Progress Energy Carolinas, Inc. Lifting and installing streetlight poles
JP2008081305A (en) * 2006-09-29 2008-04-10 Takashi Fujimoto Long material vertically hanging apparatus
CN102367152A (en) * 2010-06-29 2012-03-07 西门子公司 Arrangement and method for lifting a tower wall portion of a wind turbine
JP2012209989A (en) * 2011-03-29 2012-10-25 Sanki Eng Co Ltd Lightning rod removing method and lightning rod removing jig
CN203419672U (en) * 2013-08-21 2014-02-05 河间市电力局 Self-tripping-type sling special for lifting vertical standing rod

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2284193A (en) * 1993-11-24 1995-05-31 Peter Campbell Device for holding scaffolding poles
US6648570B2 (en) * 2001-06-15 2003-11-18 Progress Energy Carolinas, Inc. Lifting and installing streetlight poles
JP2008081305A (en) * 2006-09-29 2008-04-10 Takashi Fujimoto Long material vertically hanging apparatus
CN102367152A (en) * 2010-06-29 2012-03-07 西门子公司 Arrangement and method for lifting a tower wall portion of a wind turbine
JP2012209989A (en) * 2011-03-29 2012-10-25 Sanki Eng Co Ltd Lightning rod removing method and lightning rod removing jig
CN203419672U (en) * 2013-08-21 2014-02-05 河间市电力局 Self-tripping-type sling special for lifting vertical standing rod

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401778A (en) * 2015-11-20 2016-03-16 国家电网公司 Construction lifting tool for perpendicular vertical rod of electric pole
CN105565145A (en) * 2016-02-25 2016-05-11 成都亨通兆业精密机械有限公司 Rapid carrying device for large cylinder parts
CN105565145B (en) * 2016-02-25 2017-12-01 安徽科创智慧知识产权服务有限公司 The big part fast removal equipment of cylinder
CN107352381A (en) * 2017-09-05 2017-11-17 安徽晋煤中能化工股份有限公司 High-altitude solves rope device
CN107740630A (en) * 2017-10-17 2018-02-27 国网江苏省电力公司仪征市供电公司 A kind of electric pole fixed seat
CN107740630B (en) * 2017-10-17 2022-11-22 国网江苏省电力公司仪征市供电公司 Pole fixing base
CN113896088A (en) * 2021-09-01 2022-01-07 中国化学工程第三建设有限公司 Device and method for single-machine hoisting of climbing-free hook unloading of spherical shell plate with column legs
CN113896088B (en) * 2021-09-01 2023-08-04 中国化学工程第三建设有限公司 Device and method for lifting spherical shell plate with column legs by single machine without ascending and unhooking

Also Published As

Publication number Publication date
CN103395688B (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN103395688B (en) Method for hoisting self-release vertical upright rod and special lifting tool
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN201821226U (en) Lifting device of large synchronous motor
CN109095343A (en) Assembled hanger
CN204848091U (en) Steel sheet cross arm hoisting accessory
CN103407872A (en) Self-balance type hoisting tool for steel containment module of nuclear power plant
CN207339088U (en) Transmission line of electricity straight line pole aerial earth wire overhauls stent
CN201334306Y (en) Hoisting machine for upright post member
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN203461680U (en) Self-balancing hanger for nuclear power plant steel containment module
CN202936092U (en) Lifting tool of wind power tower barrel
CN103708360B (en) Swing arm tower crane, standard knot introduction system thereof and standard knot introduction method
CN203419672U (en) Self-tripping-type sling special for lifting vertical standing rod
CN203998604U (en) The be threaded vertical reinforcement erecting equipment of form of employing
CN204454235U (en) A kind of novel many suspension centres equalizing bar device
CN206720558U (en) A kind of adjustable steel-reinforcement cage hanger
CN108217429A (en) A kind of assemble type hanger and hanging method
CN201678360U (en) Hoist for hoisting equipment
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN202429865U (en) Lift for mounting and demounting integral components of photoelectric radars
CN204569140U (en) A kind of blower fan tower barrel erect Current Collector Sleave
CN110171766B (en) Steel bar transportation lifting appliance
CN204416900U (en) A kind of transformer bushing lifting device
CN201536236U (en) Bracket for hoisting heavy objects on object like an electrical pole
CN103058083B (en) Bolt sphere truss gig

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CANGZHOU POWER SUPPLY BRANCH COMPANY, STATE GRID H

Effective date: 20141217

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HEJIAN ELECTRICITY BOARD

Effective date: 20141217

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 062450 CANGZHOU, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20141217

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Cangzhou Power Supply Branch Company, State Grid Hebei Electric Power Company

Applicant after: State Grid Hebei Electric Power Company

Applicant after: HEJIAN ELECTRIC POWER SUPPLY COMPANY OF STATE GRID HEBEI ELECTRIC POWER COMPANY

Address before: 062450 No. 8 Shuguang Road, Hejian City, Hebei, Cangzhou

Applicant before: Hejian Power Electric Bureau

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150401

Termination date: 20160821