CN111924705A - Steel hoisting device for steel structure villa construction - Google Patents
Steel hoisting device for steel structure villa construction Download PDFInfo
- Publication number
- CN111924705A CN111924705A CN202010968673.1A CN202010968673A CN111924705A CN 111924705 A CN111924705 A CN 111924705A CN 202010968673 A CN202010968673 A CN 202010968673A CN 111924705 A CN111924705 A CN 111924705A
- Authority
- CN
- China
- Prior art keywords
- steel
- placing
- groove
- rod
- hoisting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 82
- 239000010959 steel Substances 0.000 title claims abstract description 82
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 210000001503 joint Anatomy 0.000 claims abstract description 39
- 230000000149 penetrating effect Effects 0.000 claims abstract description 5
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 13
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 13
- 241001330002 Bambuseae Species 0.000 claims description 13
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 13
- 239000011425 bamboo Substances 0.000 claims description 13
- 238000009826 distribution Methods 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 2
- 239000000463 material Substances 0.000 description 11
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 210000003781 tooth socket Anatomy 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/42—Gripping members engaging only the external or internal surfaces of the articles
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a steel hoisting device for steel structure villa construction, which comprises a placing cylinder, a knob, a gear and a spring, wherein a placing cavity is formed in the placing cylinder in a penetrating manner, one end of the knob penetrates through the placing cavity and is connected with a screw rod, a movable rod is sleeved on the screw rod in a threaded manner, fixed sleeve frames are sleeved on the outer sides of two ends of the placing cylinder, a toothed ring is sleeved on the outer side of the placing cylinder, a positioning ring is fixed on the side of the toothed ring, an internal embedded shaft on the side of the fixed sleeve frame is connected with the gear, a butt joint rod is welded at one end of the placing cylinder, a first fixing seat and a second fixing seat are respectively welded at the bottom and the side of the two fixed sleeve frames sleeved on the placing cylinder, and the bottom of the second fixing seat is connected with. This steel hoisting device is used in construction of steel construction villa, it is fixed comparatively laborsaving to classify steel in batches, can carry out the aggregate erection according to the steel of different length simultaneously, keeps the stable hoist and mount of steel.
Description
Technical Field
The invention relates to the technical field of steel structures, in particular to a steel hoisting device for steel structure villa construction.
Background
In the construction process of modern buildings, especially villas, in order to improve the quality of the buildings, reduce the manpower and materials used in the buildings and improve the economic benefits, steel structures are generally adopted for construction, the steel structures are the building materials composed of steel materials, the steel structures have high construction strength, light overall quality and lower manufacturing cost, the steel hoisting device is widely used in buildings, steel is generally required to be hoisted in the process of building the steel structure villa, the steel hoisting device is used, for example, publication number is CN 108083087B's building steel lifting device, including anterior open-ended box, the vertical baffle of middle part fixed mounting in the box, the box both sides inner wall is equallyd divide with the both sides of baffle and is equipped with the first screw rod that has the motor of several vertical, the upper and lower both ends of first screw rod are equallyd divide and are do not pass through bearing and box upper and lower both ends inner wall swing joint, the motor fixed mounting of first screw rod is on the bottom inner wall of box. However, the construction steel hoisting tool still has the following problems when in use;
according to the building steel hoisting tool, steel is fixedly placed in a partitioned mode through the plurality of support plates, the support plates are lifted in use, the overall height is high, when the steel is placed in batches, the operation needs to consume great strength of workers, the workers are prone to being injured, and classified batch fixation of the steel in a labor-saving mode is inconvenient;
this construction steel lifting device fixes and supports steel through the backup pad, nevertheless because the villa is built and is often will use the steel of different length, when hoist to longer steel, the fixed mode of single backup pad has the unstable condition, inconvenient aggregate erection adjusting device's whole length that carries on, and then the hoist and mount operation that is not applicable to steel of different length.
To the above problems, innovative design is urgently needed on the basis of the original steel hoisting device.
Disclosure of Invention
The invention aims to provide a steel hoisting device for building a steel structure villa, which solves the problems that the existing steel hoisting device in the background art is inconvenient to classify and fix steel in batches in a labor-saving mode and is inconvenient to assemble and install the whole length of an adjusting device.
In order to achieve the purpose, the invention provides the following technical scheme: a steel hoisting device for steel structure villa construction comprises a placing barrel, a knob, a gear and a spring, wherein a placing cavity is formed in the placing barrel in a penetrating manner, the outer side of the middle part of the placing barrel is connected with the knob through a shaft, one end of the knob is connected with a screw rod through the placing cavity, the screw rod is connected in a movable groove through a shaft, the movable groove is formed in the inner wall of the placing cavity, a movable rod is sleeved on the screw rod in a threaded manner, a clamping rod is welded at one end of the movable rod through the movable groove, the clamping rod is positioned in the placing cavity, a fixed sleeve frame is sleeved on the outer sides of the two ends of the placing barrel, a rope pulling head is welded at the top of the fixed sleeve frame, a toothed ring is sleeved on the outer side of the placing barrel and positioned in a toothed groove, the toothed groove is formed in the inner wall of the fixed sleeve frame, a positioning ring is fixed on the side of the toothed ring, the inside embedded hub connection of fixed stock avris has the gear, and the gear is located the outside of ring gear, through connection has the guide arm on the gear, and the tip of guide arm has seted up the guide slot, the one end welding of placing a section of thick bamboo has the butt joint pole, and the other end of placing a section of thick bamboo has seted up the butt joint groove, the bottom and the avris of placing two fixed stock that the cover was established on a section of thick bamboo have welded first fixing base and second fixing base respectively, and the avris of first fixing base is integrative to be provided with the dead lever, and the avris that first fixing base was kept away from to the second fixing base has seted up the fixed slot, and the bottom of dead lever has the draw-in groove in advance, there is the arm-tie bottom of second fixing base through spring coupling, and the inboard of arm.
Preferably, the placing cavity is designed to be a fan-shaped structure, and 6 placing cavities are distributed at equal angles relative to the central axis of the placing cylinder.
Preferably, the section of the movable rod is designed to be a rectangular structure, and the outer side of the movable rod is attached to the inner wall of the movable groove.
Preferably, the toothed ring and the toothed groove rotate coaxially, and the toothed ring and the gear are meshed with each other.
Preferably, the number of the positioning rings is 2, the positioning rings are symmetrically arranged around the central axis of the toothed ring, the thickness of the positioning rings is equal to that of the positioning grooves, and the positioning rings and the positioning grooves share the central axis.
Preferably, the guide groove is formed in one end of the guide rod, the cross section of the guide groove is designed to be of a rectangular structure, and the guide groove and the other end of the guide rod are clamped with each other.
Preferably, the cross section of the butt joint rod is designed to be hexagonal structure, the butt joint rods are distributed at equal angles about the central axis of the placing barrel, the butt joint rods correspond to the distribution positions of the butt joint grooves, and the cross section areas of the butt joint rods and the butt joint grooves are equal.
Preferably, the fixing rods on the first fixing seat correspond to the fixing grooves on the second fixing seat in distribution positions, and the fixing rods are mutually clamped with the fixing grooves.
Preferably, the kelly is the design of right trapezoid structure, and mutual block between the tip of kelly and the draw-in groove to the kelly is provided with 2, and the kelly passes through to constitute elastic sliding structure between arm-tie and spring and the second fixing base moreover.
Compared with the prior art, the invention has the beneficial effects that: the steel hoisting device for building the steel structure villa;
1. through the movable rods and the clamping rods in the six placing cavities, when the knob drives the screw rod to rotate, the movable rods of the rectangular structure in threaded connection with the screw rod can slide in the movable grooves, the positions of the clamping rods in the placing cavities are adjusted, steel materials are clamped and fixed, the steel materials can be classified and fixed for storage through the six placing cavities, meanwhile, the gear ring and the placing cylinder are driven to rotate through the meshing of the gear and the gear ring, the positions of the placing cavities are convenient to adjust, the steel materials are convenient to place and take, and strength is saved;
2. butt joint pole and butt joint groove through the hexagon structure that sets up, through butt joint pole and butt joint groove's butt joint block, can place a section of thick bamboo to two and tentatively fix, dead lever butt joint card on the first fixing base is gone into in the fixed slot on the second fixing base after that, the slope limit contact of fixed rod tip and kelly, make the kelly atress shrink, go into in the fixed slot until the dead lever card completely, the power of kelly draw plate and spring is popped out and is gone into in the draw-in groove, the kelly of right trapezoid structure, fix the position of dead lever, and then realize two butt joints and the fixing of placing a section of thick bamboo, the convenience is fixed to longer steel and is deposited and hoist.
Drawings
FIG. 1 is a schematic front sectional view of the present invention;
FIG. 2 is a schematic side sectional view of the present invention;
FIG. 3 is a side sectional view of the gear ring of the present invention;
FIG. 4 is a schematic top sectional view of the active shaft of the present invention;
FIG. 5 is a schematic top sectional view of the fixing bracket of the present invention;
FIG. 6 is a schematic side sectional view of a guide rod according to the present invention;
FIG. 7 is a schematic top sectional view of the placement barrel assembly of the present invention;
FIG. 8 is an enlarged view of the structure at A in FIG. 7 according to the present invention.
In the figure: 1. placing the cylinder; 2. a placement chamber; 3. a knob; 4. a screw; 5. a movable groove; 6. a movable rod; 7. a clamping bar; 8. fixing the sleeve frame; 9. pulling the rope end; 10. a toothed ring; 11. a tooth socket; 12. a positioning ring; 13. positioning a groove; 14. a gear; 15. a guide bar; 16. a guide groove; 17. a docking rod; 18. a butt joint groove; 19. a first fixed seat; 20. a second fixed seat; 21. fixing the rod; 22. fixing grooves; 23. a spring; 24. pulling a plate; 25. a clamping rod; 26. a clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-8, the present invention provides a technical solution: a steel hoisting device for steel structure villa construction comprises a placing barrel 1, a placing cavity 2, a knob 3, a screw rod 4, a movable groove 5, a movable rod 6, a clamping rod 7, a fixed sleeve frame 8, a pull rope head 9, a toothed ring 10, a toothed groove 11, a positioning ring 12, a positioning groove 13, a gear 14, a guide rod 15, a guide groove 16, a butt joint rod 17, a butt joint groove 18, a first fixed seat 19, a second fixed seat 20, a fixed rod 21, a fixed groove 22, a spring 23, a pull plate 24, a clamping rod 25 and a clamping groove 26, wherein the placing cavity 2 is arranged in the placing barrel 1 in a penetrating manner, the knob 3 is connected to the outer side shaft in the middle of the placing barrel 1, one end of the knob 3 penetrates through the placing cavity 2 and is connected with the screw rod 4, the screw rod 4 is connected in the movable groove 5 in a shaft manner, the movable groove 5 is arranged on the inner wall of the placing cavity 2 in a sleeved manner, the movable rod 6, the clamping rod 7 is positioned in the placing cavity 2, the outer sides of two ends of the placing cylinder 1 are sleeved with fixed sleeve frames 8, the top of each fixed sleeve frame 8 is welded with a rope pulling head 9, the outer side of the placing cylinder 1 is sleeved with a toothed ring 10, the toothed ring 10 is positioned in a toothed groove 11, the toothed groove 11 is arranged on the inner wall of each fixed sleeve frame 8, the lateral side of each toothed ring 10 is fixed with a positioning ring 12, the positioning ring 12 is positioned in a positioning groove 13, the positioning groove 13 is arranged on the inner wall of the toothed groove 11, an internal embedded shaft of the lateral side of each fixed sleeve frame 8 is connected with a gear 14, the gear 14 is positioned on the outer side of the toothed ring 10, a guide rod 15 is connected onto the gear 14 in a penetrating manner, the end part of the guide rod 15 is provided with a guide groove 16, one end of the placing cylinder 1 is welded with a butt joint rod 17, the other end of the placing cylinder 1 is provided with a butt joint groove 18, the bottom, a fixing rod 21 is integrally arranged on the side of the first fixing seat 19, a fixing groove 22 is formed in the side of the second fixing seat 20 far away from the first fixing seat 19, a clamping groove 26 is reserved at the bottom of the fixing rod 21, the bottom of the second fixing seat 20 is connected with a pulling plate 24 through a spring 23, a clamping rod 25 is fixed on the inner side of the pulling plate 24, and one end of the clamping rod 25 penetrates through the second fixing seat 20 and is located in the fixing groove 22;
the placing cavity 2 is designed to be of a fan-shaped structure, 6 placing cavities 2 are distributed at equal angles relative to the central axis of the placing barrel 1, steel can be stored in a classified mode through the 6 placing cavities 2, the placing cavity 2 of the fan-shaped structure is increased in storage area, meanwhile, the position of the placing cavity 2 can be adjusted by rotating the placing barrel 1, the steel can be conveniently placed at a low position, and physical power consumption is avoided;
the section of the movable rod 6 is designed to be a rectangular structure, the outer side of the movable rod 6 is attached to the inner wall of the movable groove 5, after steel materials are stacked and placed in the placing cavity 2, the rotary knob 3 is rotated to drive the screw rod 4 to rotate in the movable groove 5, the movable rod 6 can be driven to slide in the movable groove 5, the steel materials in the placing cavity 2 are further clamped through the clamping rod 7 at the end part of the movable rod 6, and the situation that the steel materials in the placing cavity 2 shake when the placing cavity 2 rotates to the upper side is avoided;
the toothed ring 10 and the toothed groove 11 coaxially rotate, the toothed ring 10 and the gear 14 are meshed with each other, when the guide rod 15 is rotated, the guide rod 15 drives the gear 14 to rotate in the fixed sleeve frame 8, the toothed ring 10 is driven to rotate in the toothed groove 11 through the meshing of the gear 14 and the toothed ring 10, the toothed ring 10 drives the placing barrel 1 to rotate, the position of the placing cavity 2 is adjusted, and the strength is saved;
2 positioning rings 12 are symmetrically arranged about the central axis of the toothed ring 10, the thickness of each positioning ring 12 is equal to that of each positioning groove 13, the positioning rings 12 and the positioning grooves 13 share the central axis, and when the toothed ring 10 rotates in the tooth groove 11, the positioning rings 12 on the outer sides rotate along the positioning grooves 13 to keep the toothed ring 10 to rotate stably;
one end of the guide rod 15 is provided with a guide groove 16, the cross section of the guide groove 16 is designed to be a rectangular structure, the guide groove 16 and the other end of the guide rod 15 are mutually clamped, when 2 placing cylinders 1 are butted and installed, one end of the guide rod 15 is clamped into the guide groove 16 at the end part of the other guide rod 15, so that the gear 14 in the 2 groups of fixing sleeve frames 8 can be driven to rotate by rotating the single guide rod 15, and then the 2 placing cylinders 1 are driven to synchronously rotate;
the cross section of the butt joint rod 17 is designed into a hexagonal structure, the butt joint rod 17 is distributed at equal angles relative to the central axis of the placing barrel 1, the butt joint rod 17 corresponds to the distribution position of the butt joint groove 18, the cross section areas of the butt joint rod 17 and the butt joint groove 18 are equal, when long steel is hoisted, 2 placing barrels 1 can be assembled, the butt joint rod 17 is clamped into the butt joint groove 18, and the 2 placing barrels 1 are positioned and assembled;
the fixing rods 21 on the first fixing seat 19 correspond to the fixing grooves 22 on the second fixing seat 20 in distribution positions, the fixing rods 21 and the fixing grooves 22 are mutually clamped, when the 2 placing cylinders 1 are assembled, the fixing rods 21 on the first fixing seat 19 can be clamped into the fixing grooves 22 on the second fixing seat 20 in a butt joint mode, and the fixing sleeve frame 8 is installed in a butt joint mode;
the kelly 25 is the design of right trapezoid structure, and mutual block between the tip of kelly 25 and draw-in groove 26, and kelly 25 is provided with 2, and kelly 25 passes through and constitutes elastic sliding structure between arm-tie 24 and spring 23 and the second fixing base 20, when dead lever 21 card goes into in fixed slot 22, the inclined plane contact of dead lever 21 tip and kelly 25, make kelly 25 contract in second fixing base 20, go into fixed slot 22 until dead lever 21 card completely, kelly 25 pops out under arm-tie 24 and spring 23's effect, go into in draw-in groove 26 through kelly 25 card, carry out fixed mounting to dead lever 21, and then keep 2 fixed connection between the fixed set frame 8 on placing a section of thick bamboo 1, accomplish holistic combination, conveniently fix and hoist and mount the operation to longer steel.
The working principle is as follows: when the steel hoisting device for steel structure villa construction is used, as shown in fig. 1-5, firstly, the fixed sleeve frame 8 is arranged at a position corresponding to the ground, then steel is placed into the placing cavity 2 at the bottom of the placing cylinder 1, after a plurality of steel are stacked and placed into the placing cavity 2, the knob 3 is rotated, the knob 3 drives the screw rod 4 to rotate in the movable groove 5, the movable rod 6 can be driven to slide in the movable groove 5, the steel in the placing cavity 2 is further clamped and fixed through the clamping rod 7 at the end part of the movable rod 6, then the guide rod 15 is rotated, the guide rod 15 drives the gear 14 to rotate in the fixed sleeve frame 8, the toothed ring 10 is driven to rotate in the toothed groove 11 through the meshing of the gear 14 and the toothed ring 10, the position of the placing cavity 2 is adjusted, the empty placing cavity 2 is rotated to the bottom, and the steel can be conveniently placed, the strength is saved, meanwhile, when the toothed ring 10 rotates in the tooth groove 11, the positioning ring 12 on the outer side of the toothed ring rotates along with the positioning groove 13, the toothed ring 10 is kept to rotate stably, the placement and the fixation of steel materials in the six placement cavities 2 are completed in sequence according to the operation, the steel materials are stored in batches and in a classified manner, and then the fixing rope penetrates through the rope pulling head 9 and is matched with a hoisting device to hoist the fixing sleeve frame 8 and the placement barrel 1;
then, as shown in fig. 1-2 and 5-8, when a hoisting operation is performed on a longer steel material, two or more placing cylinders 1 may be assembled, an abutting rod 17 is clamped into an abutting groove 18, 2 placing cylinders 1 are positioned and assembled, a fixing rod 21 on a first fixing seat 19 may be abutted and clamped into a fixing groove 22 on a second fixing seat 20, a fixing sleeve frame 8 is abutted and assembled, when the fixing rod 21 is clamped into the fixing groove 22, an end portion of the fixing rod 21 contacts with an inclined surface of a clamping rod 25, so that the clamping rod 25 is contracted in the second fixing seat 20 until the fixing rod 21 is completely clamped into the fixing groove 22, the clamping rod 25 is ejected under the action of a pulling plate 24 and a spring 23, and is clamped into a clamping groove 26 through the clamping rod 25, the fixing rod 21 is fixedly assembled, and further the fixing connection between the fixing sleeve frames 8 on the 2 placing cylinders 1 is maintained, accomplish holistic combination, on the contrary, when placing a section of thick bamboo 1 to 2 and dismantle, can manual pulling arm-tie 24 downwards, make kelly 25 pulled out and separate with draw-in groove 26, then with dead lever 21 follow fixed slot 22 in take out can, simultaneously when placing a section of thick bamboo 1 with 2 and dock the installation, the one end card of guide arm 15 is gone into in the guide slot 16 of another guide arm 15 tip, make and rotate single guide arm 15, can drive 2 gears 14 that organize in the fixed cover frame 8 and rotate, and then drive 2 and place a section of thick bamboo 1 synchronous rotation.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.
Claims (9)
1. The utility model provides a steel hoisting device is used in construction of steel construction villa, is including placing a section of thick bamboo (1), knob (3), gear (14) and spring (23), its characterized in that: the device is characterized in that a placing cavity (2) penetrates through the placing cylinder (1), a knob (3) is connected to an outer side shaft in the middle of the placing cylinder (1), one end of the knob (3) penetrates through the placing cavity (2) and is connected with a screw rod (4), the screw rod (4) is connected to a movable groove (5) in a shaft mode, the movable groove (5) is formed in the inner wall of the placing cavity (2), a movable rod (6) is sleeved on the screw rod (4) in a threaded mode, a clamping rod (7) is welded to one end of the movable rod (6) penetrating through the movable groove (5), the clamping rod (7) is located in the placing cavity (2), fixed sleeve frames (8) are sleeved on the outer sides of the two ends of the placing cylinder (1), a rope pulling head (9) is welded to the top of each fixed sleeve frame (8), a toothed ring (10) is sleeved on the outer side of the placing cylinder (1), the toothed ring (10) is located in a toothed groove (11), and the toothed groove (11) is, the avris of ring gear (10) is fixed with holding ring (12), and holding ring (12) are located constant head tank (13), and constant head tank (13) are seted up on the inner wall of tooth's socket (11), the embedded hub connection in inside of fixed cover frame (8) avris has gear (14), and gear (14) are located the outside of ring gear (10), run through connection has guide arm (15) on gear (14), and the tip of guide arm (15) has seted up guide slot (16), the one end welding of placing a section of thick bamboo (1) has butt joint pole (17), and the other end of placing a section of thick bamboo (1) has seted up butt joint groove (18), the bottom and the avris of two fixed cover frames (8) of establishing on placing a section of thick bamboo (1) have welded first fixing base (19) and second fixing base (20) respectively, and the avris of first fixing base (19) is integrative to be provided with dead lever (21), and the avris that first fixing base (19) was kept away from to second fixing base, and the bottom of dead lever (21) is reserved has draw-in groove (26), the bottom of second fixing base (20) is connected with arm-tie (24) through spring (23), and the inboard of arm-tie (24) is fixed with kelly (25) to the one end of kelly (25) is run through second fixing base (20) and is located fixed slot (22).
2. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: the placing cavity (2) is designed to be a fan-shaped structure, and 6 placing cavities (2) are distributed at equal angles about the central axis of the placing barrel (1).
3. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: the cross section of the movable rod (6) is designed into a rectangular structure, and the outer side of the movable rod (6) is attached to the inner wall of the movable groove (5).
4. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: the toothed ring (10) and the toothed groove (11) rotate coaxially, and the toothed ring (10) and the gear (14) are meshed with each other.
5. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: the number of the positioning rings (12) is 2, the number of the positioning rings is symmetrical about the central axis of the gear ring (10), the thickness of each positioning ring (12) is equal to that of each positioning groove (13), and the positioning rings (12) and the positioning grooves (13) share the central axis.
6. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: guide slot (16) have been seted up to the one end of guide arm (15), and the cross-section of guide slot (16) is the design of rectangle structure to mutual block between the other end of guide slot (16) and guide arm (15).
7. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: the cross section of the butt joint rod (17) is designed into a hexagonal structure, the butt joint rod (17) is distributed at equal angles relative to the central axis of the placing barrel (1), the butt joint rod (17) corresponds to the distribution position of the butt joint groove (18), and the cross section areas of the butt joint rod (17) and the butt joint groove (18) are equal.
8. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: the fixing rods (21) on the first fixing seat (19) correspond to the fixing grooves (22) on the second fixing seat (20) in distribution positions, and the fixing rods (21) are mutually clamped with the fixing grooves (22).
9. The steel hoisting device for steel structure villa construction according to claim 1, characterized in that: the clamping rod (25) is designed to be of a right-angle trapezoid structure, the end portion of the clamping rod (25) is clamped with the clamping groove (26), the clamping rod (25) is provided with 2 clamping rods, and the clamping rod (25) forms an elastic sliding structure with the second fixing seat (20) through the pulling plate (24) and the spring (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010968673.1A CN111924705B (en) | 2020-09-15 | 2020-09-15 | Steel hoisting device for steel structure villa construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010968673.1A CN111924705B (en) | 2020-09-15 | 2020-09-15 | Steel hoisting device for steel structure villa construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111924705A true CN111924705A (en) | 2020-11-13 |
CN111924705B CN111924705B (en) | 2023-01-13 |
Family
ID=73334861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010968673.1A Active CN111924705B (en) | 2020-09-15 | 2020-09-15 | Steel hoisting device for steel structure villa construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111924705B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115947219A (en) * | 2023-02-24 | 2023-04-11 | 山东铭瑞纺织科技有限公司 | Spinning workshop hoist and mount transfer device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202245718U (en) * | 2011-09-14 | 2012-05-30 | 天津思为机器设备有限公司 | Special lifting appliance for circular shaft parts |
CN105565145A (en) * | 2016-02-25 | 2016-05-11 | 成都亨通兆业精密机械有限公司 | Rapid carrying device for large cylinder parts |
CN207998404U (en) * | 2018-03-26 | 2018-10-23 | 浙江辽汽汽轮机有限公司 | A kind of auxiliary hoisting device of turbine high-pressure valve assembly |
CN108894333A (en) * | 2018-06-28 | 2018-11-27 | 关军 | A kind of steel construction and concrete column connecting structure and its construction method |
CN209193380U (en) * | 2018-12-10 | 2019-08-02 | 新疆送变电有限公司 | Pre- arch tube type bus hoisting mechanism |
CN210531775U (en) * | 2019-09-03 | 2020-05-15 | 李春堂 | Pipeline fixing device for hydraulic engineering convenient to dismantle |
CN211034911U (en) * | 2019-12-09 | 2020-07-17 | 阳谷天马建筑材料有限公司 | Lifting appliance for PCCP (prestressed concrete cylinder pipe core) |
CN211078193U (en) * | 2019-08-09 | 2020-07-24 | 庆阳市前进机械制造有限公司 | Clamping and locking device for hoisting |
-
2020
- 2020-09-15 CN CN202010968673.1A patent/CN111924705B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202245718U (en) * | 2011-09-14 | 2012-05-30 | 天津思为机器设备有限公司 | Special lifting appliance for circular shaft parts |
CN105565145A (en) * | 2016-02-25 | 2016-05-11 | 成都亨通兆业精密机械有限公司 | Rapid carrying device for large cylinder parts |
CN207998404U (en) * | 2018-03-26 | 2018-10-23 | 浙江辽汽汽轮机有限公司 | A kind of auxiliary hoisting device of turbine high-pressure valve assembly |
CN108894333A (en) * | 2018-06-28 | 2018-11-27 | 关军 | A kind of steel construction and concrete column connecting structure and its construction method |
CN209193380U (en) * | 2018-12-10 | 2019-08-02 | 新疆送变电有限公司 | Pre- arch tube type bus hoisting mechanism |
CN211078193U (en) * | 2019-08-09 | 2020-07-24 | 庆阳市前进机械制造有限公司 | Clamping and locking device for hoisting |
CN210531775U (en) * | 2019-09-03 | 2020-05-15 | 李春堂 | Pipeline fixing device for hydraulic engineering convenient to dismantle |
CN211034911U (en) * | 2019-12-09 | 2020-07-17 | 阳谷天马建筑材料有限公司 | Lifting appliance for PCCP (prestressed concrete cylinder pipe core) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115947219A (en) * | 2023-02-24 | 2023-04-11 | 山东铭瑞纺织科技有限公司 | Spinning workshop hoist and mount transfer device |
Also Published As
Publication number | Publication date |
---|---|
CN111924705B (en) | 2023-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112942816B (en) | Building engineering roof template supporting component | |
CN111924705A (en) | Steel hoisting device for steel structure villa construction | |
CN112775646A (en) | Special assembly platform for special-shaped non-planar parts | |
CN110757443A (en) | Industrial robot presss from both sides and gets device | |
CN211003779U (en) | Winding device for glass fiber cloth | |
CN216553926U (en) | Screw conveyer dismantling frame for shield machine dismantling | |
CN111217288A (en) | A material hoisting device for daily life | |
CN214455774U (en) | Liftable cable drum device | |
CN212687380U (en) | Ring die hoisting tool | |
CN217516517U (en) | PC component that practicality is strong plays gallows | |
CN113090070A (en) | Top base of steel structure temporary support and installation and alignment method thereof | |
CN219632122U (en) | Cleaning device for cylinder sleeve of drilling pump | |
CN218909688U (en) | Continuous operation type casting mould overhead hoist | |
CN218057904U (en) | Cable production and processing equipment convenient to change take-up reel | |
CN219470695U (en) | Pier body top die supporting device | |
CN220990563U (en) | Mixing equipment for sewage treatment | |
CN214989651U (en) | Detachable equipment for hoisting water intake head | |
CN214322057U (en) | Be applied to bar automatic cutout equipment of building trade | |
CN211813154U (en) | Mounting mechanism for electric hoist | |
CN217400465U (en) | Environment-friendly green building structure | |
CN215947801U (en) | Concrete vibrating device for engineering | |
CN216181496U (en) | Glazing device for firing ceramic by solid waste | |
CN214732155U (en) | Height-adjustable carrier roller | |
CN215241631U (en) | Brushing device for concrete prefabricated part | |
CN215240732U (en) | Mechanical maintenance is with workstation convenient to adjust fixedly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20221214 Address after: 256600, No. five, 391 the Yellow River Road, Bincheng District, Shandong, Binzhou Applicant after: BINZHOU University Address before: No. 11, Fushun Road, North District, Qingdao, Shandong Applicant before: Qingdao University of Technology |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |