CN107784601A - A kind of data acquisition of the electricity charge, accounting and the method for taking control - Google Patents
A kind of data acquisition of the electricity charge, accounting and the method for taking control Download PDFInfo
- Publication number
- CN107784601A CN107784601A CN201610780545.8A CN201610780545A CN107784601A CN 107784601 A CN107784601 A CN 107784601A CN 201610780545 A CN201610780545 A CN 201610780545A CN 107784601 A CN107784601 A CN 107784601A
- Authority
- CN
- China
- Prior art keywords
- electricity charge
- data
- electricity
- accounting
- rate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 20
- 230000002159 abnormal effect Effects 0.000 claims abstract description 15
- 238000012544 monitoring process Methods 0.000 claims abstract description 12
- 238000012795 verification Methods 0.000 claims abstract description 8
- 230000010354 integration Effects 0.000 claims abstract description 7
- 238000011084 recovery Methods 0.000 claims abstract description 6
- 230000032683 aging Effects 0.000 claims abstract description 4
- 230000007547 defect Effects 0.000 claims description 8
- 238000003379 elimination reaction Methods 0.000 claims description 8
- 230000008030 elimination Effects 0.000 claims description 7
- 230000005856 abnormality Effects 0.000 claims description 4
- 235000013399 edible fruits Nutrition 0.000 claims 1
- 230000008014 freezing Effects 0.000 abstract description 2
- 238000007710 freezing Methods 0.000 abstract description 2
- 230000007115 recruitment Effects 0.000 abstract description 2
- 238000012552 review Methods 0.000 abstract description 2
- 238000012216 screening Methods 0.000 abstract description 2
- 244000269722 Thea sinensis Species 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 241000209140 Triticum Species 0.000 description 1
- 235000021307 Triticum Nutrition 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003306 harvesting Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of data acquisition of the electricity charge, accounting and the method for taking control, methods described includes:(1) integral collecting electricity charge data;(2) integrated accounting is carried out to the electricity charge data collected, including:Industry is expanded, change work order presses the examination & verification that family carries out electricity price and base profile accuracy rate;(3) integration takes control, including monitoring day tariff recovery rate, real-time arrearage rate, pay dues channel and remaining sum aging.Of the invention all implementing agriculture supply integrated concentrated collection and various dimensions early warning monitoring, circulates automatically by obtaining freezing data meter reading example day, automatically generate abnormal review work order division;Intelligent screening abnormal data, intelligence adjust the distribution electricity charge.Low-voltage client meter reading example day is set to be foreshortened to 2 days by 11 days;Day tariff recovery rate brings up to 90% by 40%;Meter reading person, which pays for the electricity charge first and is reduced to " zero " by monthly thousands of members, to pay for first;Enterprise's arrears risk, staff labor intensity and operating risk, recruitment cost are greatly lowered.
Description
Technical field
The present invention relates to a kind of data acquisition of the electricity charge, accounting and the method for taking control, belongs to the data acquisition of the electricity charge, adjusts
With take control field.
Background technology
Disperseed in the data acquisition of the electricity charge by user, influenceed by many factors such as signal interferences, caused existing
Electricity charge data acquisition the relatively low and unstable phenomenon of success rate be present.Yan Bian companies share 15 confessions, rural power unit, wherein 9
Individual unit collection success rate is relatively low, the border area such as Dragon Well tea, Hunchun, because being disturbed all the year round by cbp signal, gathers success rate
It is relatively low.In addition, being found when the electricity charge data to collecting are adjusted, the proportion of existing abnormal data is higher.Taking
Have that monitor task is heavy to cause arrearage rate high during with monitoring, these above-mentioned problems demands need to be solved.
The content of the invention
The technical problems to be solved by the invention be overcome existing electricity charge data acquisition, accounting and expense control in the presence of
The problems such as data acquisition success rate is unstable, abnormal data proportion is high and arrearage rate is high, there is provided a kind of number of the new electricity charge
According to collection, the method for adjusting and taking control, the electricity charge data acquisition success rate that this method is gathered is high, and abnormal data occurs in accounting
Proportion is low, and arrearage is low when taking control.
Above-mentioned technical problem to be solved by this invention is achieved through the following technical solutions:
A kind of data acquisition of the electricity charge, accounting and the method for taking control, including:
(1) integral collecting electricity charge data:Daily to collection success rate, specially become and stop copying, public become situations such as not online and carry out
Monitoring, and collection success rate is monitored and sorted by unit, power supply station and collection attendant, note abnormalities pre- in time
It is alert, it is desirable to defect elimination to be carried out in three days, the process and result to defect elimination carry out the monitoring management of closed loop.
Collection success rate is to ensure the basis of marketing data strengthened research, using the collecting method of the present invention, it is ensured that
The stabilization of data acquisition success rate and steadily improve.
(2) integrated accounting is carried out to the electricity charge data collected, including:Industry is expanded, change work order carries out electricity price by family
And the examination & verification of base profile accuracy rate.Preferably, in order to which Intelligent Optimal copies core flow, 89 " auditing rules " have been worked out altogether, have been
System generates abnormal data according to rule automatically, divides and circulates according to management unit, and abnormal data arrives through possession collection attendant
Live core is copied, and is sent live core by wechat and copied situation, and automatic distribution link is gone to after data center personnel examination & verification passes through.
By the present invention integrated accounting method, at present the proportion of abnormal data decline steadily, dropped to by 6.48%
1.90%.
(3) integration takes control:The feelings such as main monitoring day tariff recovery rate, real-time arrearage rate, channel of paying dues, remaining sum aging
Condition.
Preferably, to most of Electricity customers are by short message sending " electricity electricity charge notice ", " urging expense to notify " and " arrearage stops
Electricity notice ";Pass through above-mentioned means so that real-time arrearage rate is maintained at 17.5%, minimum real-time arrearage rate be maintained at 5% with
It is interior;The family of amount about 4300 that monthly arrearage has a power failure, accounts for the 0.38% of total amount, realizes " to urge generation to stop " substantially, " do not have a power failure receipts
Take " target.
The present invention all implements agriculture and supplies integrated concentrated collection according to the design principle of " concentrated collection, possession are safeguarded "
With various dimensions early warning monitoring, realize copy, " two automatic " of core flow, " two intelligence ".Two are automatically:Automatically meter reading is pressed
Obtain freezing data example day, automatically generate abnormal review work order division circulation;Two intelligence are:Intelligent screening abnormal data, intelligence
The distribution electricity charge can be adjusted.The informationization of data center, automatically working pattern, low-voltage client meter reading example day is set to be foreshortened to by 11 days
2 days;Day tariff recovery rate brings up to 90% by 40%;Meter reading person, which pays for the electricity charge first and is reduced to " zero " by monthly thousands of members, to pay for first;Enterprise
Arrears risk, staff labor intensity and operating risk, recruitment cost are greatly lowered.
Situations such as being utilized according to each household electricity capacity, day peak valley ordinary telegram amount, load, to client provide optimization electricity consumption behavior,
" warmth is reminded " of electric cost is reduced, while mining data is analyzed, and finds client's potential risk early, prior involvement is taken pre-
Control measure, lift the management and control ability to material risk, key business and major fields.Effectiveness of operation is not only ensured, is lifted simultaneously
The ability of electric service society.
Brief description of the drawings
Fig. 1 is the system schematic of the method for data acquisition, accounting and the expense control of the electricity charge of the present invention.
Embodiment
The invention will now be further described with reference to specific embodiments, advantages of the present invention and feature will be with description and
It is apparent.It should be understood that the embodiment is only exemplary, any restrictions are not formed to the scope of the present invention.This area
Technical staff should be understood that without departing from the spirit and scope of the invention can to the details of technical solution of the present invention and
Form is modified or replaced, but these modifications or substitutions each fall within protection scope of the present invention.
Embodiment
Below with reference to Fig. 1, the method for data acquisition, accounting and the expense control of the electricity charge to the present invention is illustrated
1st, integrated electricity charge data acquisition
Collection success rate is to ensure the basis of marketing data strengthened research, to keep the stabilization of collection success rate and carrying steadily
Height, daily to collection success rate, specially become stop copying, it is public become situations such as not online and be monitored, and collection success rate by unit, supply
Electric institute and collection attendant are monitored and sorted, and note abnormalities timely early warning, it is desirable to defect elimination was carried out in three days, to defect elimination
Process and result carry out closed loop monitoring management.Yan Bian companies share 15 confessions, rural power unit, wherein 9 unit collections
Success rate be maintained at 99% and more than, the border area such as Dragon Well tea, Hunchun, because being disturbed all the year round by cbp signal, collection success rate protect
Hold in 96-98.5% or so.For cbp signal interference problem, Yan Bian companies with CHINAUNICOM's cooperation solution, test at present
Success, line to be spread finish replacing concentrator, so that it may thoroughly solve.
2nd, integration is adjusted
Industry is expanded, change work order presses the examination & verification that family carries out electricity price and base profile accuracy rate.In order to which Intelligent Optimal copies core stream
Journey, to work out altogether 89 " auditing rules ", system generates abnormal data according to rule automatically, divides and circulates according to management unit,
Abnormal data is copied through possession collection attendant to live core, and is sent live core by wechat and copied situation, through data center people
Member's examination & verification goes to automatic distribution link after passing through.Basic data rectification through 3 wheat harvesting periods, under the proportion of abnormal data is steady at present
Drop, drops to 1.90% by 6.48%.
3rd, integration takes control
Situations such as main monitoring day tariff recovery rate, real-time arrearage rate, channel of paying dues, remaining sum aging.Implement " control in full "
Afterwards, in addition to the old man and physical disabilities of personalized service, to most of Electricity customers by short message sending " electricity electricity charge notice ",
" urge expense notify " and " arrearage power off notifying ", at present the real-time arrearage rate in Quanzhou be maintained at 17.5%, dragon that first expense of reaching the standard grade is controlled
Unit, the real-time arrearage rates such as well, Hunchun power supply are maintained within 5%;The family of amount about 4300 that monthly arrearage has a power failure, accounts for total amount
0.38%, realize " to urge generation to stop ", the target of " do not have a power failure charge " substantially.By the monitoring of " channel of paying dues ", find
49% Electricity customers get used to " convenience service point " and paid dues, and are interconnected using palm electric power APP, wechat, Alipay etc.
The pay dues user of channel of net accounts for 28.27%.Pay dues behavior to user and custom is analyzed, can preferably guide client utilization side
Just platform of, efficiently paying dues is paid dues.
Claims (5)
1. a kind of data acquisition of the electricity charge, accounting and the method for taking control, including:
(1) integral collecting electricity charge data;(2) integrated accounting is carried out to the electricity charge data collected, including:Industry is expanded, become
More work order is carried out the examination & verification of electricity price and base profile accuracy rate by family;(3) integration take control, including monitor day tariff recovery rate,
Real-time arrearage rate, pay dues channel and remaining sum aging.
2. in accordance with the method for claim 1, it is characterised in that:Described integral collecting electricity charge data are included daily to adopting
Integrated power, specially become stop copying, it is public become situations such as not online and be monitored, and collection success rate is pressed unit, power supply station and collection
Attendant is monitored and sorted, and note abnormalities timely early warning, it is desirable to defect elimination was carried out in three days, to the process and knot of defect elimination
Fruit carries out the monitoring management of closed loop.
3. in accordance with the method for claim 2, it is characterised in that:And collection success rate is tieed up by unit, power supply station and collection
Shield personnel are monitored and sorted, and note abnormalities timely early warning, it is desirable to defect elimination were carried out in three days, to the process and result of defect elimination
Carry out the monitoring management of closed loop.
4. in accordance with the method for claim 1, it is characterised in that:The integration, which is adjusted, also to be included having worked out 89 examination & verification rule
Then, system generates abnormal data according to rule automatically, divides and circulates according to management unit, and abnormal data safeguards people through possession collection
Member is copied to live core, and sends live core by wechat and copy situation, and automatic distribution is gone to after data center personnel examination & verification passes through
Link.
5. in accordance with the method for claim 1, it is characterised in that the integration takes control and also included to most of Electricity customers
Notified by the electricity charge of short message sending electricity, urge expense notice and arrearage power off notifying.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610780545.8A CN107784601A (en) | 2016-08-30 | 2016-08-30 | A kind of data acquisition of the electricity charge, accounting and the method for taking control |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610780545.8A CN107784601A (en) | 2016-08-30 | 2016-08-30 | A kind of data acquisition of the electricity charge, accounting and the method for taking control |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107784601A true CN107784601A (en) | 2018-03-09 |
Family
ID=61450109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610780545.8A Pending CN107784601A (en) | 2016-08-30 | 2016-08-30 | A kind of data acquisition of the electricity charge, accounting and the method for taking control |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107784601A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109035062A (en) * | 2018-06-25 | 2018-12-18 | 广东电网有限责任公司 | A kind of client's electricity charge anomaly analysis and tactful application system |
CN109858880A (en) * | 2019-01-28 | 2019-06-07 | 广州供电局有限公司 | A kind of integration operation method for power industry |
CN109886642A (en) * | 2019-01-28 | 2019-06-14 | 广州供电局有限公司 | A kind of electrically charge integral system |
CN110163522A (en) * | 2019-05-29 | 2019-08-23 | 广东电网有限责任公司 | A kind of review work order analysis method for big data of marketing |
CN112330320A (en) * | 2020-11-09 | 2021-02-05 | 烟台海颐软件股份有限公司 | Distributed computing-based automatic processing system and method for electricity charge copying and checking service |
CN116128542A (en) * | 2022-12-13 | 2023-05-16 | 国网山东省电力公司营销服务中心(计量中心) | Method and system for checking electricity fee line of electricity purchasing side |
-
2016
- 2016-08-30 CN CN201610780545.8A patent/CN107784601A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109035062A (en) * | 2018-06-25 | 2018-12-18 | 广东电网有限责任公司 | A kind of client's electricity charge anomaly analysis and tactful application system |
CN109858880A (en) * | 2019-01-28 | 2019-06-07 | 广州供电局有限公司 | A kind of integration operation method for power industry |
CN109886642A (en) * | 2019-01-28 | 2019-06-14 | 广州供电局有限公司 | A kind of electrically charge integral system |
CN110163522A (en) * | 2019-05-29 | 2019-08-23 | 广东电网有限责任公司 | A kind of review work order analysis method for big data of marketing |
CN112330320A (en) * | 2020-11-09 | 2021-02-05 | 烟台海颐软件股份有限公司 | Distributed computing-based automatic processing system and method for electricity charge copying and checking service |
CN116128542A (en) * | 2022-12-13 | 2023-05-16 | 国网山东省电力公司营销服务中心(计量中心) | Method and system for checking electricity fee line of electricity purchasing side |
CN116128542B (en) * | 2022-12-13 | 2024-04-19 | 国网山东省电力公司营销服务中心(计量中心) | Method and system for checking electricity fee line of electricity purchasing side |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107784601A (en) | A kind of data acquisition of the electricity charge, accounting and the method for taking control | |
CN104021454B (en) | Method and system for conglomerate's fund account data monitoring | |
Zekri | Using economic incentives and regulations to reduce seawater intrusion in the Batinah coastal area of Oman | |
CN103198420A (en) | Real-time interactive long-distance fee-control management system and method | |
CN106600114A (en) | Multi-dimensional quality evaluation method of collection operation and maintenance system | |
CN106845747A (en) | Electricity charge risk prevention system application process based on power customer label | |
CN104753068B (en) | Two-way interaction load scheduling system | |
CN106570055A (en) | Information early-warning platform based on financial big data | |
CN109270372A (en) | A kind of stealing identifying system and method based on line loss and user power consumption variation relation | |
CN102831551A (en) | Building energy management system | |
CN106355420A (en) | Customer data quality identification and automatic order distribution system | |
CN103186837A (en) | Marketing index dynamic benchmarking management method | |
CN108037343A (en) | A kind of voltage monitoring Management System Data deepens analysis method | |
CN110309945A (en) | Power distribution station project optimizing evaluation method based on G1- entropy assessment | |
Keck et al. | Drivers and benefits of shared demand-side battery storage–an Australian case study | |
CN104915895A (en) | Remote real-time power utilization charge control method | |
CN104574004A (en) | Auxiliary distribution network state maintenance system | |
CN108021117A (en) | Energy management system based on cloud platform | |
CN105117841A (en) | Distribution network load factor regional distribution assessment method | |
JP7011991B2 (en) | Power demand adjustment system and its method | |
CN107657399A (en) | A kind of online management-control method of transformer station's electric energy balance for cooperateing with defect elimination | |
CN106991579A (en) | A kind of electric power remote real-time fee control method | |
Klise et al. | Water use and supply concerns for utility-scale solar projects in the Southwestern United States. | |
CN107748954A (en) | A kind of transformer station's balancing monitor and control system | |
CN103279835A (en) | Energy management system for construction industry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180309 |