CN106845747A - Electricity charge risk prevention system application process based on power customer label - Google Patents

Electricity charge risk prevention system application process based on power customer label Download PDF

Info

Publication number
CN106845747A
CN106845747A CN201610491629.XA CN201610491629A CN106845747A CN 106845747 A CN106845747 A CN 106845747A CN 201610491629 A CN201610491629 A CN 201610491629A CN 106845747 A CN106845747 A CN 106845747A
Authority
CN
China
Prior art keywords
risk
prevention system
label
customer
risk prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610491629.XA
Other languages
Chinese (zh)
Other versions
CN106845747B (en
Inventor
周斌
王州波
涂莹
罗飞鹏
侯素颖
欧阳柳
林森
林明河
马德荣
王庆娟
金慧颂
龙正雄
王海波
孔旭锋
丁学锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610491629.XA priority Critical patent/CN106845747B/en
Publication of CN106845747A publication Critical patent/CN106845747A/en
Application granted granted Critical
Publication of CN106845747B publication Critical patent/CN106845747B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of electricity charge risk prevention system application process based on power customer label, comprise the following steps:Step one, builds electricity charge risk prevention system platform;Step 2, and the customer information for completing will be divided plus power consumption data and the business datum output of payment data genaration;Step 3, forms Service Database;Step 4, is combined into theme label storehouse;Step 5, if being identified as low-voltage client, the strategy in regulative strategy storehouse is directly performed, and return to step two, if being identified as high pressure big customer, call big customer's risk prevention system flow that risk regulation and control output control achievements result is carried out to high pressure big customer, be then back to step 2.Electricity charge risk prevention system application process based on power customer label of the invention, by the setting of step one, step 2, step 3, step 4 and step 5, just can effectively realize classifying user, separately treatment, effectively ensure that the controllable effect of big customer's tariff recovery risk simultaneously.

Description

Electricity charge risk prevention system application process based on power customer label
Technical field
The present invention relates to a kind of power marketing field, more particularly to a kind of electricity charge based on power customer label Risk prevention system application process.
Background technology
As socio-economic development eases up in recent years, Utilities Electric Co.'s tariff recovery pressure increasingly increases, tariff recovery risk Prevention and control difficulty is continuously increased.Approached with sales market as new electricity changes, electric power enterprise needs the electricity improved for client badly Take risk prevention system strategy, while requiring electric power enterprise service theory urgently from " customer demand orientation " further to " customer experience It is oriented to " lifting, top-tier customer is excavated, the customer service of enterprise's precision, differentiation is realized, risk prevention system, drop are supported originally with this The long-range strategy of synergy.
In terms of electricity charge risk prevention system, Guo Wang companies electricity charge risk prevention system thinking uses " plan of a family one ", but in high pressure If can not equally be assessed by the way of " plan of a family one " and early warning big customer's electricity charge risk in user, it is impossible to enough actively To tariff recovery risk, thus cannot ensure that big customer's tariff recovery risk is controllable, can control, controlling, ensureing electricity bill control specification Efficiently.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of electricity that can realize high pressure big customer Take and reclaim the controllable electricity charge risk prevention system application process based on power customer label of risk.
To achieve the above object, the invention provides following technical scheme:A kind of electricity charge wind based on power customer label Dangerous prevention and control application process, it is characterised in that:Comprise the following steps:
Step one, builds electricity charge risk prevention system platform, and existing state's net tariff recovery policy library and big customer's wind are input into platform Dangerous prevention and control flow;
Step 2, the power consumption information of power customer is gathered using the sales service system in power department, and according to power consumption Customers are divided, the big client of power consumption is divided into high pressure big customer, the small client of power consumption is divided into low-voltage client, And the customer information for completing will be divided plus power consumption data and the business datum output of payment data genaration;
Step 3, the business datum exported using a database receiving step two forms Service Database;
Step 4, the business datum in Service Database in extraction and switch process three, to each visitor inside business datum Family sets corresponding basic label, is combined into theme label storehouse;
Step 5, the label inside theme label storehouse is input in electricity charge risk prevention system platform, electricity charge risk prevention system platform pair Label is identified, if being identified as low-voltage client, the strategy in regulative strategy storehouse is directly performed, and return to step two, if knowing Not Wei high pressure big customer, then call big customer's risk prevention system flow high pressure big customer is carried out risk regulation and control output control achievements knot Really, monthly high pressure big customer risk prevention system object range is produced according to control achievements result, is then back to step 2.
As a further improvement on the present invention, also have based on the life of basic label in the theme label storehouse in above-mentioned steps four Into complicated label, complicated label is input into electricity charge risk prevention system platform, low-voltage client then updates that complicated label is corresponding to be used The implementation strategy at family is simultaneously performed, and high pressure client then updates big customer's risk prevention system object range, the complicated label generation step It is as follows:
1st, be separately input to basic label in Customer Credit Risk Rating model and electricity charge risk evaluation model by theme label storehouse;
2nd, will enter into the credit signal group for drawing that the label in Customer Credit Risk Rating model is calculated plus customers' credit model Synthesis credit label is input in electricity charge risk evaluation model, forms client's electricity charge risk assessment data;
3rd, basic label is combined the complicated label of output to label master with the client's electricity charge risk assessment data obtained in step 2 In exam pool;
Wherein, the Customer Credit Risk Rating model in step 1 is set up by the power user consumption in business datum and payment situation And go out, electricity charge risk evaluation model is to be set up by the credit data of credit label and gone out.
As a further improvement on the present invention, the Customer Credit Risk Rating model in the step 1 is as follows:
Wherein, a is the numerical value of credit data, and b is the electricity consumption numerical quantity of corresponding label user, and c is the electricity charge numerical value of every degree electricity, d It is the actual numerical value of paying the fees of corresponding label user.
As a further improvement on the present invention, the electricity charge risk evaluation model in the step 1 is as follows:
Wherein, a is the numerical value of credit data, and f is electricity charge risk assessment data numerical value.
As a further improvement on the present invention, the risk prevention system flow in above-mentioned steps five includes:
(1), high pressure big customer is input into, and high pressure big customer is confirmed and is judged whether it is that provincial company is initiated, if not then Risk prevention system flow startup is examined by big customer chief of the office, if then by Section director of marketing to risk prevention system flow It is actuated for examination & approval;
(2), by step(1)After examination & approval are completed, the information to risk subscribers is collected, and is used according to the risk collected The information generation risk prevention system scheme at family, and risk prevention system scheme is carried out by Cui Fei teams and groups director and big customer chief of the office Examination & approval, continue if examination & approval if, if examination & approval do not pass through, return to adjustment risk prevention system scheme, are examined again after the completion of adjustment;
(3), in step(2)Risk prevention and control scheme examination & approval by later judge the fact risk whether 100,000 and more than, if so, Risk prevention system scheme then is sent into marketing Section director further to examine, if it is not, risk prevention system scheme is then performed, meanwhile, The examination & approval of marketing Section director are by judging whether that user's voltage of risk is 35KV and the above or the fact after risk prevention system scheme Risk 1,000,000 and more than, if so, then by scheme be sent to marketing leader with specific duties examination & approval, if it is not, then perform risk prevention system side Case, if marketing leader with specific duties's examination & approval pass through, performs risk prevention system scheme;
Wherein, when marketing Section director and marketing leader with specific duties's examination & approval do not pass through, equal return to step(2)After project setting Again examine;
(4), by step(2)And step(3)Risk prevention system scheme is examined after passing through and performing, it is negative by Cui Fei teams and groups Whether duty people performs to risk prevention system and is estimated, if assessment passes through, judges continuous three months excessive risks of the user and hopeless Execution is applied, if not then terminate to complete risk prevention system flow, if being then sent to big customer chief of the office assessment, if assessment if It is sent to marketing leader with specific duties to be estimated, terminates to complete risk prevention system flow if if assessment;
Wherein, when Cui Fei teams and groups director, big customer chief of the office and marketing leader with specific duties's assessment do not pass through, return to Step(4)Adjust and risk prevention system measure is performed again and be estimated.
Beneficial effects of the present invention, by the setting of step one, it is possible to effectively build a based process platform, lead to Cross the setting of step 2, it is possible to which the power consumption data and payment data message of effective collection power customer, are later stage client Divide and provide data basis, and pass through the setting of step 3, it is possible to which power consumption data and payment data message are integrated into shape Into Service Database, and pass through the setting of step 4, it is possible to integrated customer information, form the base with customer information This label, and pass through the setting of step 5, it is possible to different disposal is carried out to ready-portioned power customer, so just can be effective Assessment and early warning big customer's electricity charge risk, actively tackle tariff recovery risk, it is ensured that big customer's tariff recovery risk is controllable, energy Control, controlling, ensure that electricity bill control specification is efficient.
Brief description of the drawings
Fig. 1 is the general frame figure of the electricity charge risk prevention system application process based on power customer label of the invention;
Fig. 2 is the flow chart of the high pressure big customer's risk prevention system flow in Fig. 1.
Specific embodiment
The present invention is described in further detail below in conjunction with the embodiment given by accompanying drawing.
Referring to figs. 1 to shown in 2, a kind of electricity charge risk prevention system application process based on power customer label of the present embodiment, It is characterized in that:Comprise the following steps:
Step one, builds electricity charge risk prevention system platform, and existing state's net tariff recovery policy library and big customer's wind are input into platform Dangerous prevention and control flow;
Step 2, the power consumption information of power customer is gathered using the sales service system in power department, and according to power consumption Customers are divided, the big client of power consumption is divided into high pressure big customer, the small client of power consumption is divided into low-voltage client, And the customer information for completing will be divided plus power consumption data and the business datum output of payment data genaration;
Step 3, the business datum exported using a database receiving step two forms Service Database;
Step 4, the business datum in Service Database in extraction and switch process three, to each visitor inside business datum Family sets corresponding basic label, is combined into theme label storehouse;
Step 5, the label inside theme label storehouse is input in electricity charge risk prevention system platform, electricity charge risk prevention system platform pair Label is identified, if being identified as low-voltage client, the strategy in regulative strategy storehouse is directly performed, and return to step two, if knowing Not Wei high pressure big customer, then call big customer's risk prevention system flow high pressure big customer is carried out risk regulation and control output control achievements knot Really, monthly high pressure big customer risk prevention system object range is produced according to control achievements result, step 2 is then back to, by step First, the setting of step 2, step 3 and step 4, it is possible to effectively gather customer information, and client is divided into low pressure visitor Family and high pressure big customer, so just can carry out separate treatment by step 5 to voltage client and high pressure big customer, so that it may Effectively realizing to the monitoring between high pressure big customer, it is to avoid problems of the prior art, wherein, the present embodiment There is customer portrait panoramic view module, precision to urge channel on expense module, personalized billing module, line in sales service system Promotional module and value-added service module so that sales service system functional diversities, with bigger application space.
As a kind of improved specific embodiment, also have based on basic mark in the theme label storehouse in above-mentioned steps four The complicated label of generation is signed, complicated label is input into electricity charge risk prevention system platform, it is right that low-voltage client then updates complicated label institute Using family implementation strategy and perform, high pressure client then updates big customer's risk prevention system object range, the complicated label generation Step is as follows:
1st, be separately input to basic label in Customer Credit Risk Rating model and electricity charge risk evaluation model by theme label storehouse;
2nd, will enter into the credit signal group for drawing that the label in Customer Credit Risk Rating model is calculated plus customers' credit model Synthesis credit label is input in electricity charge risk evaluation model, forms client's electricity charge risk assessment data;
3rd, basic label is combined the complicated label of output to label master with the client's electricity charge risk assessment data obtained in step 2 In exam pool;
Wherein, the Customer Credit Risk Rating model in step 1 is set up by the power user consumption in business datum and payment situation And go out, electricity charge risk evaluation model is to be set up by the credit data of credit label and gone out, by step 1, step 2 and step Rapid 3 setting, it is possible to effective that complicated label is generated according to the daily behavior of user, and pass through complicated label and set, so that it may To realize the effect of real-time update to customer information from now on, keep contacting between label and client, it is to avoid because label The less caused problem that corresponding cannot separately process of relation between client.
Used as a kind of improved specific embodiment, the Customer Credit Risk Rating model in the step 1 is as follows:
Wherein, a is the numerical value of credit data, and b is the electricity consumption numerical quantity of corresponding label user, and c is the electricity charge numerical value of every degree electricity, d It is the actual numerical value of paying the fees of corresponding label user, the electricity charge numerical value that the electricity consumption numerical quantity of user is multiplied by every degree electricity is corresponding mark The electricity charge numerical value that user should pay is signed, by the numerical value except the actual payment numerical value in user just can effectively judge user's How is credit information, from formula, it is apparent that then representing that creditworthiness is lower when the value of a numerical value is smaller.
Used as a kind of improved specific embodiment, the electricity charge risk evaluation model in the step 1 is as follows:
Wherein, a is the numerical value of credit data, and f is electricity charge risk assessment data numerical value, from from the point of view of formula when the more big then f numbers of a numerical value Value is smaller, then it represents that electricity charge risk is lower, then represents that f numerical value is bigger when a numerical value is smaller, then it represents that electricity charge risk is higher.
Used as a kind of improved specific embodiment, the risk prevention system flow in above-mentioned steps five includes:
(1), high pressure big customer is input into, and high pressure big customer is confirmed and is judged whether it is that provincial company is initiated, if not then Risk prevention system flow startup is examined by big customer chief of the office, if then by Section director of marketing to risk prevention system flow It is actuated for examination & approval;
(2), by step(1)After examination & approval are completed, the information to risk subscribers is collected, and is used according to the risk collected The information generation risk prevention system scheme at family, and risk prevention system scheme is carried out by Cui Fei teams and groups director and big customer chief of the office Examination & approval, continue if examination & approval if, if examination & approval do not pass through, return to adjustment risk prevention system scheme, are examined again after the completion of adjustment;
(3), in step(2)Risk prevention and control scheme examination & approval by later judge the fact risk whether 100,000 and more than, if so, Risk prevention system scheme then is sent into marketing Section director further to examine, if it is not, risk prevention system scheme is then performed, meanwhile, The examination & approval of marketing Section director are by judging whether that user's voltage of risk is 35KV and the above or the fact after risk prevention system scheme Risk 1,000,000 and more than, if so, then by scheme be sent to marketing leader with specific duties examination & approval, if it is not, then perform risk prevention system side Case, if marketing leader with specific duties's examination & approval pass through, performs risk prevention system scheme;
Wherein, when marketing Section director and marketing leader with specific duties's examination & approval do not pass through, equal return to step(2)After project setting Again examine;
(4), by step(2)And step(3)Risk prevention system scheme is examined after passing through and performing, it is negative by Cui Fei teams and groups Whether duty people performs to risk prevention system and is estimated, if assessment passes through, judges continuous three months excessive risks of the user and hopeless Execution is applied, if not then terminate to complete risk prevention system flow, if being then sent to big customer chief of the office assessment, if assessment if It is sent to marketing leader with specific duties to be estimated, terminates to complete risk prevention system flow if if assessment;
Wherein, when Cui Fei teams and groups director, big customer chief of the office and marketing leader with specific duties's assessment do not pass through, return to Step(4)Adjust and risk prevention system measure is performed again and be estimated, by step(1), step(2), step(3)And step (4)Setting, it is possible to realize different stage high pressure client give different administrative staff examination & approval, realize correspondence examination & approval effect Really, so just can be good at carrying out risk prevention system to high pressure big customer.
In sum, by the setting of step one, step 2, step 3, step 4 and step 5, it is possible to effective real The effect that existing high pressure big customer is separately processed with low-voltage client, just can so realize the effect of the risk prevention system to high pressure big customer Really, so just can effectively assess with early warning big customer's electricity charge risk, actively tackle tariff recovery risk, it is ensured that big customer electricity Take recovery risk it is controllable, can control, controlling, guarantee electricity bill control specification it is efficient.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications Should be regarded as protection scope of the present invention.

Claims (5)

1. a kind of electricity charge risk prevention system application process based on power customer label, it is characterised in that:Comprise the following steps:
Step one, builds electricity charge risk prevention system platform, and existing state's net tariff recovery policy library and big customer's wind are input into platform Dangerous prevention and control flow;
Step 2, the power consumption information of power customer is gathered using the sales service system in power department, and according to power consumption Customers are divided, the big client of power consumption is divided into high pressure big customer, the small client of power consumption is divided into low-voltage client, And the customer information for completing will be divided plus power consumption data and the business datum output of payment data genaration;
Step 3, the business datum exported using a database receiving step two forms Service Database;
Step 4, the business datum in Service Database in extraction and switch process three, to each visitor inside business datum Family sets corresponding basic label, is combined into theme label storehouse;
Step 5, the label inside theme label storehouse is input in electricity charge risk prevention system platform, electricity charge risk prevention system platform pair Label is identified, if being identified as low-voltage client, the strategy in regulative strategy storehouse is directly performed, and return to step two, if knowing Not Wei high pressure big customer, then call big customer's risk prevention system flow high pressure big customer is carried out risk regulation and control output control achievements knot Really, monthly high pressure big customer risk prevention system object range is produced according to control achievements result, is then back to step 2.
2. the electricity charge risk prevention system application process based on power customer label according to claim 1, it is characterised in that:On Stating also has the complicated label based on the generation of basic label in the theme label storehouse in step 4, complicated label is input into electricity charge wind In dangerous prevention and control platform, low-voltage client then updates the implementation strategy of user corresponding to complicated label and performs, and high pressure client then update Big customer's risk prevention system object range, the complicated label generation step is as follows:
1st, be separately input to basic label in Customer Credit Risk Rating model and electricity charge risk evaluation model by theme label storehouse;
2nd, will enter into the credit signal group for drawing that the label in Customer Credit Risk Rating model is calculated plus customers' credit model Synthesis credit label is input in electricity charge risk evaluation model, forms client's electricity charge risk assessment data;
3rd, basic label is combined the complicated label of output to label master with the client's electricity charge risk assessment data obtained in step 2 In exam pool;
Wherein, the Customer Credit Risk Rating model in step 1 is set up by the power user consumption in business datum and payment situation And go out, electricity charge risk evaluation model is to be set up by the credit data of credit label and gone out.
3. the electricity charge risk prevention system application process based on power customer label according to claim 2, it is characterised in that:Institute The Customer Credit Risk Rating model stated in step 1 is as follows:
Wherein, a is the numerical value of credit data, and b is the electricity consumption numerical quantity of corresponding label user, and c is the electricity charge numerical value of every degree electricity, d It is the actual numerical value of paying the fees of corresponding label user.
4. the electricity charge risk prevention system application process based on power customer label according to claim 3, it is characterised in that:Institute The electricity charge risk evaluation model stated in step 1 is as follows:
Wherein, a is the numerical value of credit data, and f is electricity charge risk assessment data numerical value.
5. the electricity charge risk prevention system application process based on power customer label according to Claims 1-4 any one, its It is characterised by:Risk prevention system flow in above-mentioned steps five includes:
(1), high pressure big customer is input into, and high pressure big customer is confirmed and is judged whether it is that provincial company is initiated, if not then Risk prevention system flow startup is examined by big customer chief of the office, if then by Section director of marketing to risk prevention system flow It is actuated for examination & approval;
(2), by step(1)After examination & approval are completed, the information to risk subscribers is collected, and is used according to the risk collected The information generation risk prevention system scheme at family, and risk prevention system scheme is carried out by Cui Fei teams and groups director and big customer chief of the office Examination & approval, continue if examination & approval if, if examination & approval do not pass through, return to adjustment risk prevention system scheme, are examined again after the completion of adjustment;
(3), in step(2)Risk prevention and control scheme examination & approval by later judge the fact risk whether 100,000 and more than, if so, Risk prevention system scheme then is sent into marketing Section director further to examine, if it is not, risk prevention system scheme is then performed, meanwhile, The examination & approval of marketing Section director are by judging whether that user's voltage of risk is 35KV and the above or the fact after risk prevention system scheme Risk 1,000,000 and more than, if so, then by scheme be sent to marketing leader with specific duties examination & approval, if it is not, then perform risk prevention system side Case, if marketing leader with specific duties's examination & approval pass through, performs risk prevention system scheme;
Wherein, when marketing Section director and marketing leader with specific duties's examination & approval do not pass through, equal return to step(2)After project setting Again examine;
(4), by step(2)And step(3)Risk prevention system scheme is examined after passing through and performing, it is negative by Cui Fei teams and groups Whether duty people performs to risk prevention system and is estimated, if assessment passes through, judges continuous three months excessive risks of the user and hopeless Execution is applied, if not then terminate to complete risk prevention system flow, if being then sent to big customer chief of the office assessment, if assessment if It is sent to marketing leader with specific duties to be estimated, terminates to complete risk prevention system flow if if assessment;
Wherein, when Cui Fei teams and groups director, big customer chief of the office and marketing leader with specific duties's assessment do not pass through, return to Step(4)Adjust and risk prevention system measure is performed again and be estimated.
CN201610491629.XA 2016-06-29 2016-06-29 Electricity charge risk prevention and control application method based on electric power customer label Active CN106845747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610491629.XA CN106845747B (en) 2016-06-29 2016-06-29 Electricity charge risk prevention and control application method based on electric power customer label

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610491629.XA CN106845747B (en) 2016-06-29 2016-06-29 Electricity charge risk prevention and control application method based on electric power customer label

Publications (2)

Publication Number Publication Date
CN106845747A true CN106845747A (en) 2017-06-13
CN106845747B CN106845747B (en) 2020-12-04

Family

ID=59145274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610491629.XA Active CN106845747B (en) 2016-06-29 2016-06-29 Electricity charge risk prevention and control application method based on electric power customer label

Country Status (1)

Country Link
CN (1) CN106845747B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109658069A (en) * 2018-12-25 2019-04-19 广东电网有限责任公司 A kind of electricity charge electrovalence risk monitoring method and system
CN109949150A (en) * 2019-03-27 2019-06-28 深圳乐信软件技术有限公司 A kind of user's credit method, apparatus, server and storage medium based on scene
CN110163621A (en) * 2018-02-10 2019-08-23 广州供电局有限公司 A kind of electric power customer service big data DSS
CN110223030A (en) * 2019-05-07 2019-09-10 平安科技(深圳)有限公司 Remind strategy matching method, apparatus, computer equipment and storage medium
CN110309932A (en) * 2018-03-21 2019-10-08 国网浙江省电力公司湖州供电公司 A kind of power customer resource fine-grained management method based on TEM
CN110428091A (en) * 2019-07-10 2019-11-08 平安科技(深圳)有限公司 Risk Identification Method and relevant device based on data analysis
CN113487448A (en) * 2021-05-31 2021-10-08 国网上海市电力公司 Power credit labeling method and system based on power big data

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103530806A (en) * 2013-09-04 2014-01-22 深圳供电局有限公司 Early warning and forecasting method and system for credit of electric power customer and tariff recovery risk
CN105035613A (en) * 2015-07-23 2015-11-11 国网浙江省电力公司 Marketing file management system
CN105243609A (en) * 2015-11-04 2016-01-13 中国南方电网有限责任公司电网技术研究中心 Orderly power utilization decision method of user on the basis of fuzzy analytic hierarchy process
WO2016040842A1 (en) * 2014-09-11 2016-03-17 Sedky Herve System and method for reviewing and rating corporate travel and meeting sites
CN105701691A (en) * 2016-03-18 2016-06-22 广州佰聆数据股份有限公司 Client-feature-database-based real-time recommendation system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103530806A (en) * 2013-09-04 2014-01-22 深圳供电局有限公司 Early warning and forecasting method and system for credit of electric power customer and tariff recovery risk
WO2016040842A1 (en) * 2014-09-11 2016-03-17 Sedky Herve System and method for reviewing and rating corporate travel and meeting sites
CN105035613A (en) * 2015-07-23 2015-11-11 国网浙江省电力公司 Marketing file management system
CN105243609A (en) * 2015-11-04 2016-01-13 中国南方电网有限责任公司电网技术研究中心 Orderly power utilization decision method of user on the basis of fuzzy analytic hierarchy process
CN105701691A (en) * 2016-03-18 2016-06-22 广州佰聆数据股份有限公司 Client-feature-database-based real-time recommendation system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐俊钐等: "创新引领 转型发展 构建浙江能源互联网", 《国家电网报》 *
陈文宇: "低压预付费电能表在惠州供电局的应用研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110163621A (en) * 2018-02-10 2019-08-23 广州供电局有限公司 A kind of electric power customer service big data DSS
CN110309932A (en) * 2018-03-21 2019-10-08 国网浙江省电力公司湖州供电公司 A kind of power customer resource fine-grained management method based on TEM
CN109658069A (en) * 2018-12-25 2019-04-19 广东电网有限责任公司 A kind of electricity charge electrovalence risk monitoring method and system
CN109949150A (en) * 2019-03-27 2019-06-28 深圳乐信软件技术有限公司 A kind of user's credit method, apparatus, server and storage medium based on scene
CN110223030A (en) * 2019-05-07 2019-09-10 平安科技(深圳)有限公司 Remind strategy matching method, apparatus, computer equipment and storage medium
CN110428091A (en) * 2019-07-10 2019-11-08 平安科技(深圳)有限公司 Risk Identification Method and relevant device based on data analysis
CN113487448A (en) * 2021-05-31 2021-10-08 国网上海市电力公司 Power credit labeling method and system based on power big data

Also Published As

Publication number Publication date
CN106845747B (en) 2020-12-04

Similar Documents

Publication Publication Date Title
CN106845747A (en) Electricity charge risk prevention system application process based on power customer label
Xu et al. Optimal capacitor placement to distribution transformers for power loss reduction in radial distribution systems
CN105846423B (en) It is a kind of meter and demand response photovoltaic micro energy storage multiple target capacity collocation method
Comello et al. Enabling mini-grid development in rural India
Zaeim-Kohan et al. Multi-objective transmission congestion management considering demand response programs and generation rescheduling
Mwaura Adopting electricity prepayment billing system to reduce non-technical energy losses in Uganda: Lesson from Rwanda
CN109063945A (en) A kind of 360 degree of customer portrait construction methods of sale of electricity company based on Value accounting system
CN106204931A (en) A kind of keyholed back plate that takes the most in real time manages system and method
Mohammadi et al. Optimal placement of multitypes DG as independent private sector under pool/hybrid power market using GA-based Tabu Search method
CN101794424A (en) Self-adaptive unified power market transaction method
Gorman et al. Are coupled renewable-battery power plants more valuable than independently sited installations?
CN110110895A (en) The method and terminal device of electric car Optimized Operation
Shuai et al. Behind‐the‐meter energy storage in China: Lessons from California's approach
Junlakarn et al. A cross-country comparison of compensation mechanisms for distributed photovoltaics in the Philippines, Thailand, and Vietnam
Singh et al. Allocation of distributed generation using proposed DMSP approach based on utility and customers aspects under deregulated environment
CN110033307A (en) A kind of electric power top-tier customer screening technique based on machine learning model
Boulaire et al. Benefit assessment of battery plus solar for customers and the grid
de Jesus et al. Computational tool for technical-economic analysis of photovoltaic microgeneration in Brazil
CN105391060B (en) Power distribution network Optimization Scheduling containing micro-capacitance sensor
García-García et al. Evaluation of tax incentives on the financial viability of microgrids
CN109492905B (en) Controllable resource control method based on purchased electric quantity transfer
Maqelepo et al. Rural electrification subsidy estimation: a spatial model development and case study
CN112926811A (en) Load aggregation commercial power purchasing method considering renewable energy consumption responsibility weight
Kojima et al. Electricity tariffs for nonresidential customers in sub-saharan Africa
Silva et al. Allocating congestion management costs through use-based principle of equivalent bilateral exchanges

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant