CN107780627A - A kind of exterior wall heat-insulating paint construction method - Google Patents

A kind of exterior wall heat-insulating paint construction method Download PDF

Info

Publication number
CN107780627A
CN107780627A CN201610807856.9A CN201610807856A CN107780627A CN 107780627 A CN107780627 A CN 107780627A CN 201610807856 A CN201610807856 A CN 201610807856A CN 107780627 A CN107780627 A CN 107780627A
Authority
CN
China
Prior art keywords
mortar
finishing mucilage
wall heat
exterior wall
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610807856.9A
Other languages
Chinese (zh)
Inventor
陈春来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610807856.9A priority Critical patent/CN107780627A/en
Publication of CN107780627A publication Critical patent/CN107780627A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Electromagnetism (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a kind of exterior wall heat-insulating paint construction method, it is related to the realm of building construction, comprises the following steps:(1) base treatment, (2) snap the line, (3) sticking heat-preservation plate, (4) finishing mucilage is applied, (5) paving pressure glass fiber mesh, (6) finishing mucilage is applied, (7) caulking compounds are filled out, the exterior wall heat-insulating paint construction method employs first sticking heat-preservation plate, finishing mucilage and paving pressure glass fiber mesh are applied again, the construction method of second time face rubber cement are finally smeared, while exterior-wall heat insulation performance has been ensured, the tensile strength of exterior wall heat-insulating paint is improved, coating cracking is prevented, peels off.

Description

A kind of exterior wall heat-insulating paint construction method
Technical field
The present invention relates to building material field, it is more particularly related to a kind of exterior wall heat-insulating paint construction method.
Background technology
The exterior wall of modern building often can all brush one layer of exterior wall heat-insulating paint, for improving the heat-insulating property of building. Exterior wall heat-insulating paint can also play a part of protecting building wall simultaneously, extend the service life of wall.Existing exterior wall is protected Thermo-paint construction method is fairly simple, because tack is bad after the completion of construction, it is often cracking, peel off the problems such as, lead Cause exterior wall heat-insulating paint can not be protected to skin.
The content of the invention
Problem to be solved by this invention is to provide a kind of exterior wall heat-insulating paint construction method.
To achieve these goals, the technical scheme taken of the present invention is:A kind of exterior wall heat-insulating paint construction method, it is special Sign is, comprises the following steps:
(1) base treatment:The dust that metope will be added thoroughly to remove substrate surface, ensure basic unit's vertically smooth protuberance Chisel is picked in position, and main body deviation≤10mm is levelling with 1: 3 cement mortar beyond position;
(2) snap the line:Horizontal outer door and window, orthogonal control lines and flexible suture, decoration suture are ejected in metope, in external wall Vertical reference steel wire is hung at big angle and other necessity, each floor hangs horizontal line in decoration line position, to control hanging down for styrofoam Straight degree and flatness;
(3) sticking heat-preservation plate:The finished product binding agent constructed using exterior-wall heat insulation, after binding agent is applied on extruded sheet, Extruded sheet should be pasted on the wall rapidly, then flatten operation with horizontal guiding ruler to ensure flatness and firm pasting again, plate with Jam-packed is wanted between plate, gap is not stayed between plate, seam crossing must not smear binding agent, and often having pasted one piece should remove what may be extruded in time Binding agent, if, into gap, when slit width exceeds 2mm, being filled in simultaneously using extrusion molding lath because extrusion molding plate face is not upright or cuts not straight It is polished flat, the piece discrepancy in elevation is not more than 1.5mm, is otherwise polished flat with mortar or special grinding equipment;
(4) finishing mucilage is applied:Aspect product is uniformly smeared in EPS polyphenyl plate surface be slightly larger than one piece of net with stainless steel trowel The finishing mucilage of cloth, thickness are about 2mm;
(5) paving pressure glass fiber mesh:Apply after finishing mucilage with tightening alkali resistant glass fibre open weave cloth in the horizontal direction, with smearing Son, by the wet finishing mucilage of the floating press-in of grid cloth, encloses laying along exterior wall one from top to bottom by middle both sides up and down Screen cloth, when running into door-window opening, one block of standard screen cloth, to prevent from ftractureing, grid cloth should be subsidized along 45 degree of directions in hole corner Left and right lap width is 150mm, and upper and lower lap width is 100mm, and local overlay 400mm grid cloths one are also needed at external corner Road, the grid cloth at all closing ins must return external corner compacting;
(6) finishing mucilage is applied:When first floor rubber cement slightly it is stiff can extremely touch when, then with trowel smear second finishing mucilage About 3mm, until alkali resistant glass fibre open weave cloth is all capped, such as before float coat mortar, bedding mortar has condensed, and should first brush one All over interfacial agents, in float coat mortar, first floor metope, recessed veranda(h), balcony should overlay one layer of grid cloth outside decorative mortar, and should be Mortar is carried out before condensing, and smears one layer of 2mm thickness surface layer decorative mortar again;
(7) caulking compounds are filled out:Inlayed at wall with window frame gap with sealing compound, sealing compound is inlayed closely knit, full.
Preferably, when the step (7) fills out expansion joint construction in caulking compounds, expansion joint position line first is ejected in basic unit, is applied Work in place when, grid cloth, which turns over, to be wrapped up in, and the bottom is filled out with foam plug, centre with foaming PEF pole, outermost layer sealing compound Filleting, sealing compound are inlayed closely knit, full.
Beneficial effect:The exterior wall heat-insulating paint construction method employs first sticking heat-preservation plate, then applies finishing mucilage and paving pressure Glass fiber mesh, the construction method of second time face rubber cement is finally smeared again, while exterior-wall heat insulation performance has been ensured, improve The tensile strength of exterior wall heat-insulating paint, prevent coating cracking, peel off.
Embodiment
The following detailed description of a kind of preferred embodiment of exterior wall heat-insulating paint construction method of the present invention.
The exterior wall heat-insulating paint construction method, it is characterised in that comprise the following steps:
(1) base treatment:The dust that metope will be added thoroughly to remove substrate surface, ensure basic unit's vertically smooth protuberance Chisel is picked in position, and main body deviation≤10mm is levelling with 1: 3 cement mortar beyond position;
(2) snap the line:Horizontal outer door and window, orthogonal control lines and flexible suture, decoration suture are ejected in metope, in external wall Vertical reference steel wire is hung at big angle and other necessity, each floor hangs horizontal line in decoration line position, to control hanging down for styrofoam Straight degree and flatness;
(3) sticking heat-preservation plate:The finished product binding agent constructed using exterior-wall heat insulation, after binding agent is applied on extruded sheet, Extruded sheet should be pasted on the wall rapidly, then flatten operation with horizontal guiding ruler to ensure flatness and firm pasting again, plate with Jam-packed is wanted between plate, gap is not stayed between plate, seam crossing must not smear binding agent, and often having pasted one piece should remove what may be extruded in time Binding agent, if, into gap, when slit width exceeds 2mm, being filled in simultaneously using extrusion molding lath because extrusion molding plate face is not upright or cuts not straight It is polished flat, the piece discrepancy in elevation is not more than 1.5mm, is otherwise polished flat with mortar or special grinding equipment;
(4) finishing mucilage is applied:Aspect product is uniformly smeared in EPS polyphenyl plate surface be slightly larger than one piece of net with stainless steel trowel The finishing mucilage of cloth, thickness are about 2mm;
(5) paving pressure glass fiber mesh:Apply after finishing mucilage with tightening alkali resistant glass fibre open weave cloth in the horizontal direction, with smearing Son, by the wet finishing mucilage of the floating press-in of grid cloth, encloses laying along exterior wall one from top to bottom by middle both sides up and down Screen cloth, when running into door-window opening, one block of standard screen cloth, to prevent from ftractureing, grid cloth should be subsidized along 45 degree of directions in hole corner Left and right lap width is 150mm, and upper and lower lap width is 100mm, and local overlay 400mm grid cloths one are also needed at external corner Road, the grid cloth at all closing ins must return external corner compacting;
(6) finishing mucilage is applied:When first floor rubber cement slightly it is stiff can extremely touch when, then with trowel smear second finishing mucilage About 3mm, until alkali resistant glass fibre open weave cloth is all capped, such as before float coat mortar, bedding mortar has condensed, and should first brush one All over interfacial agents, in float coat mortar, first floor metope, recessed veranda(h), balcony should overlay one layer of grid cloth outside decorative mortar, and should be Mortar is carried out before condensing, and smears one layer of 2mm thickness surface layer decorative mortar again;
(7) caulking compounds are filled out:Inlayed at wall with window frame gap with sealing compound, sealing compound is inlayed closely knit, full.Expansion joint During construction, expansion joint position line first is ejected in basic unit, when constructing in place, grid cloth, which turns over, to be wrapped up in, and the bottom is filled out with foam plug, in Between with foaming PEF pole, outermost layer sealing compound filleting, sealing compound is inlayed closely knit, full.
The exterior wall heat-insulating paint construction method employs first sticking heat-preservation plate, then applies finishing mucilage and paving pressure glass fibre Net, the construction method of second time face rubber cement is finally smeared again, while exterior-wall heat insulation performance has been ensured, improve exterior-wall heat insulation The tensile strength of coating, prevent coating cracking, peel off.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks Domain, it is included within the scope of the present invention.

Claims (2)

1. a kind of exterior wall heat-insulating paint construction method, it is characterised in that comprise the following steps:
(1) base treatment:The dust that metope will be added thoroughly to remove substrate surface, ensure that basic unit vertically picks smooth protruding parts Chisel, main body deviation≤10mm are levelling with 1: 3 cement mortar beyond position;
(2) snap the line:Horizontal outer door and window, orthogonal control lines and flexible suture, decoration suture are ejected in metope, at external wall big angle And vertical reference steel wire is hung at other necessity, each floor hangs horizontal line in decoration line position, to control the perpendicularity of styrofoam And flatness;
(3) sticking heat-preservation plate:The finished product binding agent constructed using exterior-wall heat insulation, after binding agent is applied on extruded sheet, Ying Xun Speed pastes extruded sheet on the wall, then flattens operation with horizontal guiding ruler to ensure flatness and firm pasting again, plate and plate it Between want jam-packed, gap is not stayed between plate, seam crossing must not smear binding agent, often pasted one piece should remove in time may extrusion bonding Agent, if, into gap, when slit width exceeds 2mm, filling in and polishing using extrusion molding lath because extrusion molding plate face is not upright or cuts not straight Flat, the piece discrepancy in elevation is not more than 1.5mm, is otherwise polished flat with mortar or special grinding equipment;
(4) finishing mucilage is applied:Aspect product is uniformly smeared slightly larger than one block of screen cloth in EPS polyphenyl plate surface with stainless steel trowel Finishing mucilage, thickness are about 2mm;
(5) paving pressure glass fiber mesh:Apply after finishing mucilage with tightening alkali resistant glass fibre open weave cloth in the horizontal direction, with trowel by Laying screen cloth is enclosed in middle both sides up and down along exterior wall one from top to bottom by the wet finishing mucilage of the floating press-in of grid cloth, When running into door-window opening, one block of standard screen cloth should be subsidized along 45 degree of directions in hole corner, to prevent from ftractureing, grid cloth is left and right Lap width is 150mm, and upper and lower lap width is 100mm, and local overlay 400mm grid cloths are also needed at external corner together, are owned Grid cloth at closing in must return external corner compacting;
(6) finishing mucilage is applied:When first floor rubber cement slightly it is stiff can extremely touch when, then with trowel smear second finishing mucilage about 3mm, until alkali resistant glass fibre open weave cloth is all capped, such as before float coat mortar, bedding mortar has condensed, and should first apply and brush one times Interfacial agents, in float coat mortar, first floor metope, recessed veranda(h), balcony should overlay one layer of grid cloth outside decorative mortar, and should be in sand Slurry is carried out before condensing, and smears one layer of 2mm thickness surface layer decorative mortar again;
(7) caulking compounds are filled out:Inlayed at wall with window frame gap with sealing compound, sealing compound is inlayed closely knit, full.
2. according to a kind of exterior wall heat-insulating paint construction method described in claim 1, it is characterised in that:The step (7) is filled out embedding When stitching expansion joint construction in cream, expansion joint position line first is ejected in basic unit, when constructing in place, grid cloth, which turns over, to be wrapped up in, bottom bubble Foam plastic plug is filled out, and centre foaming PEF pole, outermost layer sealing compound filleting, sealing compound is inlayed closely knit, full.
CN201610807856.9A 2016-08-30 2016-08-30 A kind of exterior wall heat-insulating paint construction method Pending CN107780627A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610807856.9A CN107780627A (en) 2016-08-30 2016-08-30 A kind of exterior wall heat-insulating paint construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610807856.9A CN107780627A (en) 2016-08-30 2016-08-30 A kind of exterior wall heat-insulating paint construction method

Publications (1)

Publication Number Publication Date
CN107780627A true CN107780627A (en) 2018-03-09

Family

ID=61451984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610807856.9A Pending CN107780627A (en) 2016-08-30 2016-08-30 A kind of exterior wall heat-insulating paint construction method

Country Status (1)

Country Link
CN (1) CN107780627A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589942A (en) * 2018-05-08 2018-09-28 苏州言晴信息科技有限公司 A kind of residence heating energy-saving building technology
CN109083299A (en) * 2018-08-29 2018-12-25 嘉兴市开元建筑工程有限公司 Crack resistence infiltration wall and construction method
CN109372195A (en) * 2018-10-15 2019-02-22 重庆三原色节能建筑工程有限公司 A kind of technique of the narrow top surface crack and water leakage in anti-parapet top surface
CN109826404A (en) * 2019-01-29 2019-05-31 台州铭星装饰工程股份有限公司 A kind of wall decoration technique
CN110158796A (en) * 2019-06-13 2019-08-23 中国三冶集团有限公司 A kind of wall body heat insulating construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101333858A (en) * 2007-06-28 2008-12-31 王强强 Polyphenyl plate exterior wall outer heat insulation technological process
KR100928722B1 (en) * 2008-11-13 2009-11-27 대보하우징 주식회사 Carrying out method of outer wall insulation
CN102121279A (en) * 2011-01-19 2011-07-13 北京索利特新型建筑材料有限公司 Extruded polystyrene panel external thermal insulation system and manufacturing process thereof
CN203569708U (en) * 2013-07-26 2014-04-30 吉林科龙建筑节能科技股份有限公司 Novel building external thermal insulation system
CN104179263A (en) * 2014-09-01 2014-12-03 中启胶建集团有限公司 Building exterior wall external thermal insulation system waterproof and drainage construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101333858A (en) * 2007-06-28 2008-12-31 王强强 Polyphenyl plate exterior wall outer heat insulation technological process
KR100928722B1 (en) * 2008-11-13 2009-11-27 대보하우징 주식회사 Carrying out method of outer wall insulation
CN102121279A (en) * 2011-01-19 2011-07-13 北京索利特新型建筑材料有限公司 Extruded polystyrene panel external thermal insulation system and manufacturing process thereof
CN203569708U (en) * 2013-07-26 2014-04-30 吉林科龙建筑节能科技股份有限公司 Novel building external thermal insulation system
CN104179263A (en) * 2014-09-01 2014-12-03 中启胶建集团有限公司 Building exterior wall external thermal insulation system waterproof and drainage construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589942A (en) * 2018-05-08 2018-09-28 苏州言晴信息科技有限公司 A kind of residence heating energy-saving building technology
CN109083299A (en) * 2018-08-29 2018-12-25 嘉兴市开元建筑工程有限公司 Crack resistence infiltration wall and construction method
CN109372195A (en) * 2018-10-15 2019-02-22 重庆三原色节能建筑工程有限公司 A kind of technique of the narrow top surface crack and water leakage in anti-parapet top surface
CN109826404A (en) * 2019-01-29 2019-05-31 台州铭星装饰工程股份有限公司 A kind of wall decoration technique
CN110158796A (en) * 2019-06-13 2019-08-23 中国三冶集团有限公司 A kind of wall body heat insulating construction method

Similar Documents

Publication Publication Date Title
CN107237409A (en) Exterior wall heat-insulating paint construction method
CN107780627A (en) A kind of exterior wall heat-insulating paint construction method
CN104612261A (en) Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area
CN101333858A (en) Polyphenyl plate exterior wall outer heat insulation technological process
CN103343655B (en) Wall window construction method
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN103643754B (en) The waterproof treatment structure of building wall body interface seam crossing and processing method
CN209384414U (en) A kind of passive type insulation structure for a building exterior wall
CN104179263A (en) Building exterior wall external thermal insulation system waterproof and drainage construction method
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN106368338A (en) Construction method of external thermal insulation system of foam cement thermal insulation board outer wall
CN110273490A (en) A kind of embedded lightweight wall plate steel building construction and construction method
CN108590185A (en) Building exterior wall heat preserving construction technology
CN2929033Y (en) External wall heat insulation structure of building water-proof and anti-cracks
US20060123736A1 (en) System and method for filling joints between exterior cement panels
CN108915107A (en) A kind of inorganic infiltration heat preservation board construction method of EPS
CN111608280A (en) External wall heat insulation construction method
CN102121279B (en) Extruded polystyrene panel external thermal insulation system and manufacturing process thereof
CN105625650B (en) A kind of parapet of roofing flashing protective layer construction method
CN105155697A (en) Exterior wall composite insulation structure and construction method thereof
CN104652623B (en) A kind of composite thermal insulation mortar construction method
CN107574936A (en) A kind of heat preserving exterior wall construction technology
CN106639000A (en) Dry-wet-area separation water proof structure and construction method
CN206233389U (en) A kind of separating dry space from moist space waterproof construction
CN205976290U (en) Compound incubation intergral template anchor is held in palm and is hung structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180309

WD01 Invention patent application deemed withdrawn after publication