CN107766312A - The update method and system of billboard data - Google Patents

The update method and system of billboard data Download PDF

Info

Publication number
CN107766312A
CN107766312A CN201710942011.5A CN201710942011A CN107766312A CN 107766312 A CN107766312 A CN 107766312A CN 201710942011 A CN201710942011 A CN 201710942011A CN 107766312 A CN107766312 A CN 107766312A
Authority
CN
China
Prior art keywords
data
billboard
updated
update method
basic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710942011.5A
Other languages
Chinese (zh)
Inventor
刘威葳
陈宇昇
朱信红
方伟豪
伍芸萱
蔡程媛
黄智聪
王幸
原毅青
王杰
尚明远
陈丽萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201710942011.5A priority Critical patent/CN107766312A/en
Publication of CN107766312A publication Critical patent/CN107766312A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Computational Linguistics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Marketing (AREA)
  • Fuzzy Systems (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Information Transfer Between Computers (AREA)

Abstract

The invention discloses a kind of update method of billboard data, including:Obtain the basic data that data monitoring platform returns and deposit collects form;Collect form up-regulation data converting function described, generation target data is changed according to the basic data;The target data is sent to billboard to be updated;Relevant position of the target data to the billboard is loaded, the billboard after being updated with generation.Accordingly, the invention also discloses a kind of more new system of billboard data.The update method and system of the billboard data of the present invention, by automatic data collection, collect and the technological means of data processing, realize the real-time quick renewal of billboard data, the problem of data and less efficient processing data are collected in traditional approach is avoided, has reached the effect for greatly improving billboard updating maintenance treatment effeciency.

Description

The update method and system of billboard data
Technical field
The present invention relates to the billboard data processing field in power supply technique, more particularly to a kind of renewal side of billboard data Method and system.
Background technology
In power supply enterprise, electric power networks system needs to carry out real-time data monitoring record, to grasp electric power at any time The operation conditions and recent statistics data of network system, it is ready for the report of daily data summarization and decision-making.Consequently, it is possible to for Electric enterprise just needs every day entry, the substantial amounts of technical data of renewal, for example, asset operation monitoring day billboard updating maintenance, it is necessary to Required technical data is obtained from real-time monitoring system or the operational data of manual record daily, to replace monitoring day billboard On legacy data so that production management personnel can grasp the traffic-operating period of electric power networks system in real time.However, looked forward in power supply In industry, the renewal processing mode of traditional billboard data, is usually collected by special staff and processing data is to enter The updating maintenance processing of row billboard data, in many power supply enterprises that supply district is wide, customer volume is big, daily power supply technique Data volume is huge, and staff's data update efficiency is low, it may be difficult to tackles.
The content of the invention
Based on this, it is necessary to for traditional in power supply field billboard updating maintenance treatment effeciency it is low the problem of, there is provided one The update method of kind billboard data, and a kind of more new system of billboard data.
A kind of update method of billboard data, including step:
Obtain the basic data that data monitoring platform returns and deposit collects form;
Collect form up-regulation data converting function described, generation target data is changed according to the basic data;
The target data is sent to billboard to be updated;
Relevant position of the target data to the billboard is loaded, the billboard after being updated with generation.
A kind of more new system of billboard data, including:
Data acquisition module, basic data and deposit for obtaining the return of data monitoring platform collect form;
Data conversion module, for collecting form up-regulation data converting function described, turned according to the basic data Change generation target data;
Data transmission blocks, for sending the target data to billboard to be updated;
Data load-on module, for loading relevant position of the target data to the billboard, after being updated with generation Billboard.
A kind of computer equipment, including memory, processor, it is stored with what can be run on a processor on the memory Computer program, it is characterised in that realize the renewal side of the billboard data described in the computing device during computer program The step of method.
A kind of readable storage medium storing program for executing, is stored thereon with computer program, it is characterised in that when the program is executed by processor The step of realizing the update method of the billboard data.
The update method and system of above-mentioned billboard data, by automatic data collection, collect and the technological means of data processing, it is real Existing billboard quickly updates in real time, avoids the problem of data and less efficient processing data are collected in traditional approach, reaches Greatly improve the effect of the updating maintenance treatment effeciency of billboard data.
Brief description of the drawings
Fig. 1 is the renewal process chart of the billboard data in one embodiment of the invention;
Fig. 2 is the renewal process chart of the billboard data in another embodiment of the present invention;
Fig. 3 is the renewal system construction drawing of the billboard data in one embodiment of the invention;
Fig. 4 is the renewal system construction drawing of the billboard data in another embodiment of the present invention.
Embodiment
The update method of billboard data and the embodiment of system of the present invention are made in detail below in conjunction with the accompanying drawings Description.The preferred embodiment of the present invention is given in accompanying drawing.But the present invention can realize in many different forms, and It is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is to make to the disclosure more Add thorough and comprehensive.
With the development of society, the scale in city it is continuous expand, the expansion of each enterprise, into the permanent population in city Amount is also rising, and every aspect requires that power supply department expands the scale of power service, to adapt to the change that social development is brought. However, the extension of power service scale necessarily supervene be all data volumes associated with power network increase, particularly The monitoring data of operation of power networks state.The data being associated to power network are managed, and being must can not in power supply department daily operation A few link, by the management to above-mentioned data effectively can manage and safeguard in supply network the running of each node and Its state.
Due to the extension for scale of powering, the increase of data volume is brought, and then add the intractability to these data. In the power service of conventional middle and small scale, some power supply departments, such as local power supply administration, merely by special data maintenance Personnel can complete the updating maintenance of data substantially, such as the asset operation of some power supply departments monitors day billboard data more Newly.But it is larger in power supply area instantly, under the huge actual conditions of customer group, past billboard data update mode The processing time for greatly increasing updating maintenance is needed to complete to update work, this is considerably increased for power supply department Cost, it is unfavorable for the high efficiency operation of power service, can not particularly meets the requirement for knowing operation of power networks truth in time.
Therefore, it is necessary to develop a kind of method for the renewal efficiency for improving billboard data.The present invention is for some power supplies The problem of billboard renewal efficiency is low in department provides a kind of update method of billboard data, below with assets monitoring operation day billboard Illustrated exemplified by the renewal of data.
Referring to Fig. 1, in one embodiment of the invention, the update method of billboard data of the invention includes following step Suddenly:
S140, obtains the basic data that data monitoring platform returns and deposit collects form.
Wherein, data monitoring platform typically can be corresponding DATA REASONING, storage and friendship in grid operating monitoring platform Mutual system, the real time data of operation of power networks can be collected.Basic data can be the power network prison that data monitoring platform collects Data are surveyed, include the service data of power network major network and distribution.Basic data for example can be the yesterday daily peak laod of power network, this year Maximum load, total electricity yesterday, this year add up the major network numeric data of electricity etc., and overload main transformer statistics, yesterday yesterday again The list data of the major network statistics class such as circuit statistics is overloaded again, be can also be that the overload again of power network is public and is become quantity statistics, overloads again The list data of the distribution statistics class such as feeder line quantity statistics, distribution network feeder station outlet switch trip condition statistics, in addition, basic number According to can also be defect statistics data.In an embodiment of the present invention, basic data can include all data of aforementioned exemplary Or partial data.It can be the tables of data on a data processing terminal to collect form, can be typically one or more Microsoft Excel, for receiving the aforementioned base data of data monitoring platform return.Basic data can be point on form is collected Region category storage, so as to more convenient accurate in follow-up data processing.
It is appreciated that in the present embodiment, by the way that the basic data got from data monitoring platform is stored in into summary sheet In lattice, the data for completing follow-up billboard data updating process prepare, and are used for without separately being obtained repeatedly from each data source again The data of billboard data renewal.Data are left concentratedly in form is collected, can also prevent different type or not same date Data occur it is chaotic, such as, when data are stored in the diverse location on data processing terminal, if run into system fault etc. it is accidental because Element, it is possible to the data for causing to read on diverse location make a mistake or even mess code and can not unify, accurate processing. In the present embodiment, basic data can also be the data file being stored in advance on data processing terminal, for example user deposits in advance Enter the Microsoft Excel contained for the basic data needed for billboard renewal onto data processing terminal.
S160, collecting form up-regulation data converting function, generation target data is changed according to basic data.
Wherein, data converting function typically can be the data converting function that some data processing toolses carry, typically Can be the numerical statistic function in Microsoft Excel, it is possible to achieve the data in form are subjected to type conversion or according to table Statistical graph corresponding to data generation in lattice.Data processing terminal only need by call instruction can adopting form carry Data converting function.Data converting function can also be that data processing terminal is called by the form of plug-in unit from the external world, this kind of number It is typically to be carried by a kind of data handling utility according to translation function, data processing terminal can pass through the forms such as hyperlink, plug-in unit It is called.Target data typically can be the visual data generated according to basic data, such as generated according to basic data Numerical value, statistical graph directly perceived etc..
Specifically, for example, pass through the numerical value class in instruction calls Microsoft Excel set in advance on data processing terminal Type translation function, the yesterday daily peak laod collected in form, this yearly maximum load, total electricity yesterday, this year accumulative electricity will be stored in Amount is converted into can be used for the numeric type data that billboard is shown.Pass through instruction calls set in advance on data processing terminal Statistical function in Microsoft Excel, will be placed on overloaded yesterday for collecting in form main transformer statistics again, yesterday overloads circuit system again Meter, again overload are public to be become quantity statistics, overloads feeder line quantity statistics, distribution network feeder station outlet switch trip condition statistics again and lack The Form data conversions such as statistics generation intuitively statistical graph is fallen into, so as to the exhibition directly perceived in a graphical form on billboard Show.In this way, target data can be quickly generated, even if data volume is huge, also target data can be automatically performed in the short time Conversion generation.
In another embodiment, data processing terminal can also pass through instruction set in advance or the side of hyperlink Formula, the data converting function of applications is called in the form of plug-in unit.Namely when data processing terminal has performed data acquisition After operation, automatic running instruction calls applications set in advance generate target data to carry out data conversion.In this way, can To handle increasingly complex data, especially for some special formats data when, can call in present embodiment Special disposal is carried out for the applications of the data mining of such special format, while improving data-handling efficiency, is ensured It is accurately finished data processing.
S180, the target data is sent to billboard to be updated.
It is appreciated that data processing terminal is after the conversion product process of target data is automatically performed, by the target of gained Data are sent to according to respective order on billboard to be updated, specifically, can be sent on the billboard of the renewal corresponding Data buffer storage part in.
S190, relevant position of the target data to the billboard is loaded, the billboard after being updated with generation.
Wherein, billboard can be the page of text shown in some data display terminals, such as can be specifically at some For the WORD document file pages or the data form page of the display screen display for producing displaying.Relevant position can refer to data exhibition Show the data storage part that each page of text is corresponded in terminal.
Specifically, after billboard to be updated receives the target data that data processing terminal sends over, automatically by mesh Mark data are loaded into from the caching of itself in memory unit corresponding to corresponding each page of text.Treat all target data loadings The billboard that renewal finishes can be obtained by finishing.In this way, when page of text is switched to the current display page, corresponding this article Data in the memory unit of this page are displayed on the current display page, and user can be visually seen the renewal of this billboard The content shown afterwards.
The update method of billboard data in previously described embodiments of the present invention, can be realized by step S140-S190 and seen The full-automatic renewal of plate data.For example, when a daily special time arrives, such as 24 o'clock sharps, data processing terminal is certainly The dynamic basic data that obtained from data monitoring platform calls data conversion work(to collecting in form according to the basic data newly obtained Target data can be generated, the target data of conversion generation, billboard to be updated caching are then sent to same day billboard to be updated It is loaded into after the target data that complete data processing terminal sends in the relevant position of each displayed page of billboard, so as to generate Billboard after renewal.So, it is possible to achieve billboard updates real-time, it is not necessary to take manpower.Improve number in billboard renewal While according to treatment effeciency, the accuracy of billboard renewal is also ensured, it also avoid because of data when the staff of maintenance is tired out Handle error-prone problem.
In one embodiment, the data processing terminal in previous embodiment can be computer or possess at data The electronic equipment of reason ability.Billboard can also be the display device being connected with data processing terminal data, for example, various sizes of Display screen.Billboard can also be the display device with data processing terminal one, such as the spelling of all-in-one or integrated host Connect wall display system.
Referring to Fig. 2, in one embodiment, before the update method step S140 of billboard data of the invention, may be used also With including step:
S110, the data more new command of input is received, according to data more new command, delete the current data for collecting form.
Wherein, data more new command can be inputted when user is on duty when triggering renewal on data processing terminal, It can be the data more new command by the timing automatic triggering input of timer.Such as user is on the computer of updating maintenance After mouse clicks on more new button, dragging, slide or gesture operation triggering update on screen, computer will receive To data more new command.Current data can be include the deposit of last renewal process collect basic data in form and according to The target data of basic data conversion generation.
Specifically, data more new command of the data processing terminal according to input, deletion collects in form after last renewal The old basic data and target data left, so as to depositing for the basic data newly obtained and the target data being subsequently generated Put and prepare space.The legacy data collected in form is deleted before renewal in advance, (data are few, take beneficial to data processing speed is improved Internal memory is few, and the speed of service of data processing terminal is accelerated) while, moreover it is possible to avoid data from sending unnecessary confusion.
In another embodiment, step S110 can also be arranged on after step S190, namely when previous billboard updates After the completion of delete collect basic data and target data in form immediately, so that new data is directly deposited when billboard updates next time Enter.The effect of this set is suitable with the setting at least effect of the step S110 in a upper embodiment.
S120, foundation collect form and are connected with the data of data monitoring platform, make described in the data monitoring platform generation Basic data.
Specifically, for example, when data processing terminal receives data more new command, this billboard data are initially entered more New technological process, after deletion collects the legacy data on form or simultaneously, it is established that collect the data of form and data monitoring platform Connection, namely during each renewal beginning, the equipment connected all in accordance with nearest matching searches the last basic data source automatically Data monitoring platform, foundation collects form and is connected with the data of data monitoring platform;Data monitoring platform automatically from itself Newest operation of power networks real time data generation is updated into required basic data in data saving part part, so that subsequent step performs When data monitoring platform directly return to basic data to data processing terminal and be deposited into and collect in form.Basic data deposit converges After total form, that is, disconnect and collect what form was connected with the data of data monitoring platform, to save system operation resource.
Optionally, data processing terminal can also be when receiving the data more new command of input for the first time, establish and converge Total form is connected with the data of data monitoring platform, and no longer needs foundation to collect form and data in each renewal afterwards The data connection of monitoring platform, namely only when former data monitoring platform changes over new data monitoring platform, just need weight Newly summary sheet lattice are established to be connected with the data of data monitoring platform.In this way, can be when each data update beginning more quickly Basic data is got, also can more effectively realize the real-time update of billboard data.
In some embodiments, foregoing data monitoring platform can also be another data processing terminal.Such as this On the computer for the basic data that the actual treatment computer of secondary billboard renewal is stored with needed for renewal from another or several, Foregoing basic data is directly obtained by data connection.Foregoing data monitoring platform can also be that some are stored with this more The data high in the clouds of new required basic data, it is responsible for the computer of this billboard renewal by being connected with the data in the data high in the clouds Directly download required basic data.In this way, can be with the basic data needed for more convenient gain to billboard data renewal.
In one embodiment, step S180, sending the target data to billboard to be updated can also include establishing The data for collecting form with billboard to be updated are connected, and make to collect the relevant position of form and the corresponding positions on billboard to be updated Put correspondingly.
Specifically, after basic data conversion generates target data, i.e., data processing terminal is being to collecting on form Foundation collects form and is connected with the data of billboard to be updated, so that collecting the position where each target data of form Put, the position correspondence with being used for depositing the target data that will be shown on the displayed page of billboard to be updated.In this way, can be true Protecting target data can be sent on the corresponding displayed page of billboard to be updated like clockwork, easy when avoiding transmitting unstable The data misinformation problem of appearance.The lifting effect of renewal efficiency can be also brought due to data order transfer on the whole.
Preferably, the billboard in previous embodiment can also be PPT documents, and the relevant position on billboard can include at least The PPT document file pages of one page.The present invention one is described in detail using PPT documents as foregoing asset operation monitoring day billboard, citing The update method of billboard data in individual specific embodiment:
When user, which triggers, to be updated, the computer for billboard renewal processing receives the data more new command of user's input When, computer obtains the major network data and distribution data that grid operating monitoring platform returns, and last billboard renewal process In caused defect statistics data.The defects of herein statistics can refer to including last time update the defects of statistics and on Once renewal is arrived when new caused defect statistics data between previous renewal.Computer by the newest major network data got, match somebody with somebody Network data and the unified deposit of defect statistics data collect the respective regions in form.
Computer collects data converting function or the calling outside in the form of plug-in unit that form carries using instruction calls The data converting function of application, to collect the major network data in form, distribution data and defect statistics data changed with The yesterday daily peak laod of visual data corresponding to generation, such as power network, this yearly maximum load, total electricity yesterday, this year add up electricity Major network numeric data;Overload main transformer statistics yesterday again, overload the data of the major network statistical graph forms such as circuit statistics yesterday again; Overload is public again becomes quantity statistics, overloads the distribution systems such as feeder line quantity statistics, distribution network feeder station outlet switch trip condition statistics again Count the data of graphic form;And the data of defect statistics graphic form.
Computer sends the numeric data of above-mentioned conversion generation and the number of statistical graph form to PPT documents to be updated According to.
In PPT documents to be updated, the yesterday daily peak laod, this yearly maximum load, yesterday of major network are loaded with numeric form Total electricity, this year add up electricity to the first page PPT pages;Loaded in the form of block diagram and overloaded main transformer statistics and yesterday yesterday again Day, overload circuit was counted on the first page PPT pages again;Overload public affairs become quantity statistics and again mistake again for loading in the form of block diagram Feeder line quantity statistics is carried to the second page PPT pages;Distribution network feeder station outlet switch trip condition is loaded in the form of block diagram Count on the PPT pages of page four;Defect statistics are loaded in the form of block diagram to the PPT pages of page seven.So just generate Asset operation monitoring day billboard after renewal.
Wherein, defect statistics can be tracked calibration for the renewal process each time of billboard and provide foundation.According to each time The defects of after renewal statistical result determine present in renewal process influence data renewal accuracy factor, updated next time Before, the factor that attendant can be directed to influence data renewal accuracy is calibrated to the process of computer progress billboard renewal With program reparation, to ensure the data accuracy of each billboard renewal.
By the update method of above-mentioned billboard data, traditional asset operation monitoring day billboard data can be greatly improved The efficiency of data processing during renewal, user only need triggering renewal to start to be involved in renewal process every time i.e. even without user The renewal of billboard can be automatically performed, while improving efficiency, also reduces the human cost of power grid operation.
In one embodiment, referring to Fig. 3, present invention also offers a kind of more new system of billboard data.This implementation Example in billboard data more new system can include data acquisition module 14, data conversion module 16, data transmission blocks 18, Data load-on module 19.
Specifically, data acquisition module 14, for obtaining the basic data of data monitoring platform return and being stored in summary sheet Lattice.Data conversion module 16, for collecting form up-regulation data converting function described, changed and given birth to according to the basic data Into target data.Data transmission blocks 18, for sending the target data to billboard to be updated.Data load-on module 19, For loading relevant position of the target data to the billboard, the billboard after being updated with generation.
Further, the present invention one is described in detail using PPT documents as foregoing asset operation monitoring day billboard, citing The course of work of the more new system of billboard data in specific embodiment:
When user, which triggers, to be updated, the computer for the renewal control of billboard data receives the data renewal of user's input During instruction, data acquisition module 14 obtains the major network data and distribution data that grid operating monitoring platform returns, and last Caused defect statistics data in billboard renewal process.The defects of herein statistics can refer to including last time update the defects of unite Count and last time renewal is arrived when new caused defect statistics data between previous renewal.Data acquisition module 14 will obtain To newest major network data, the unified deposit of distribution data and defect statistics data collect respective regions in form.
Data conversion module 16 collects data converting function that form carries or in the form of plug-in unit using instruction calls The data converting function of applications is called, is entered to collecting the major network data in form, distribution data and defect statistics data Row conversion is to generate corresponding visual data, as the yesterday daily peak laod of power network, this yearly maximum load, total electricity yesterday, this year tire out The major network numeric data of quantity calculation etc.;Overloaded main transformer statistics yesterday again, yesterday overloads the major network statistical graph shapes such as circuit statistics again The data of formula;Overload is public again becomes quantity statistics, overloads feeder line quantity statistics, distribution network feeder station outlet switch trip condition statistics again Deng the data of distribution statistical graph form;And the data of defect statistics graphic form.
Data transmission blocks 18 send the numeric data and statistical graph shape of above-mentioned conversion generation to PPT documents to be updated The data of formula.
In PPT documents to be updated, data load-on module 19 loads the yesterday daily peak laod of power network, this year with numeric form Maximum load, total electricity yesterday, this year add up electricity to the first page PPT pages;Data load-on module 19 is with the shape of block diagram Formula is loaded to overload main transformer statistics yesterday again and overload circuit again yesterday and counted on the first page PPT pages;Data load-on module 19 The public change quantity statistics of overload again is loaded in the form of block diagram and overloads feeder line quantity statistics again to the second page PPT pages;Number Distribution network feeder station outlet switch trip condition is loaded in the form of block diagram count on the PPT pages of page four according to load-on module 19 On;Data load-on module 19 loads defect statistics to the PPT pages of page seven in the form of block diagram.So just generate renewal Asset operation monitoring day billboard afterwards.
Referring to Fig. 4, in an optional embodiment, the more new system of billboard data of the invention can also include number According to removing module 11 and data match module 12.
Specifically, data removing module 11, for receiving data more new command, according to data more new command, deletion collects The current data of form.Data match module 12, collect form for foundation and be connected with the data of data monitoring platform, make data Monitoring platform generates basic data.
In one embodiment, present invention also offers a kind of computer equipment, the computer equipment includes memory, place Device is managed, the computer program that can be run on a processor is stored with the memory.Calculating on processor run memory During machine program, following steps are performed:Obtain the basic data that data monitoring platform returns and deposit collects form;Collecting form Upper calling data converting function, generation target data is changed according to basic data;The number of targets is sent to billboard to be updated According to;Relevant position of the target data to the billboard is loaded, the billboard after being updated with generation.
In another embodiment, during computer program on processor run memory, it can also carry out foregoing each reality Apply the processing step in example.
In one embodiment, present invention also offers a kind of computer-readable recording medium, the computer-readable storage Media storage has computer program, when computer program is run by processor, may be such that computing device following steps:Obtain number The basic data and deposit returned according to monitoring platform collects form;Collecting form up-regulation data converting function, according to basis Data conversion generates target data;The target data is sent to billboard to be updated;The target data is loaded to see described in Relevant position on plate, the billboard after being updated with generation.
In another embodiment, when computer program described in leading portion is run by processor, before may be such that computing device State the processing step in each embodiment.
It will appreciated by the skilled person that realizing all or part of flow in above-described embodiment method, being can To be completed by the related hardware of computer program instructions, described program can be stored in computer read/write memory medium In, as independent production marketing or use.Described program upon execution, can perform the whole of the embodiment such as above-mentioned each method Or part steps.Wherein, described storage medium can be magnetic disc, CD, read-only memory (Read-Only Memory, ) or random access memory (Random Access Memory, RAM) etc. ROM.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of update method of billboard data, it is characterised in that including step:
Obtain the basic data that data monitoring platform returns and deposit collects form;
Collect form up-regulation data converting function described, generation target data is changed according to the basic data;
The target data is sent to billboard to be updated;
Relevant position of the target data to the billboard is loaded, the billboard after being updated with generation.
2. the update method of billboard data according to claim 1, it is characterised in that obtain what data monitoring platform returned Basic data and before being stored in the step of collecting form, in addition to step:
Data more new command is received, according to the data more new command, deletes the current data for collecting form;Wherein, it is described to work as Preceding data include collecting the basic data in form in last renewal process described in deposit and being changed according to the basic data giving birth to Into target data.
3. the update method of billboard data according to claim 1 or 2, it is characterised in that obtain data monitoring platform and return Before the step of basic data and deposit returned collect form, in addition to step:Establish the number for collecting form and data monitoring platform According to connection, the data monitoring platform is set to generate the basic data.
4. the update method of billboard data according to claim 1, it is characterised in that to described in billboard transmission to be updated The step of target data, in addition to:
The data for collecting form described in foundation with the billboard to be updated are connected, and make relevant position and the institute for collecting form The relevant position stated on billboard to be updated is corresponding.
5. the update method of billboard data according to claim 1, it is characterised in that the basic data is supervised including power network Survey data and defect management data.
6. the update method of billboard data according to claim 5, it is characterised in that the target data include with it is described Power network peak information corresponding to power network monitoring data and power network statistical information, the target data also include and the defect management Defect statistics information corresponding to data.
7. the update method of billboard data according to claim 1, it is characterised in that the billboard includes PPT documents, institute Stating the relevant position on billboard includes the PPT document file pages of at least one page.
A kind of 8. more new system of billboard data, it is characterised in that including:
Data acquisition module, basic data and deposit for obtaining the return of data monitoring platform collect form;
Data conversion module, for collecting form up-regulation data converting function described, changed and given birth to according to the basic data Into target data;
Data transmission blocks, for sending the target data to billboard to be updated;
Data load-on module, for loading relevant position of the target data to the billboard, seeing after being updated with generation Plate.
9. a kind of computer equipment, it is characterised in that including memory, processor, being stored with the memory to be handled The computer program run on device, it is characterised in that realize claim 1-7 described in the computing device during computer program The step of update method of billboard data described in any one.
10. a kind of readable storage medium storing program for executing, is stored thereon with computer program, it is characterised in that when the program is executed by processor The step of realizing the update method of any one of the claim 1-7 billboard data.
CN201710942011.5A 2017-10-11 2017-10-11 The update method and system of billboard data Pending CN107766312A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710942011.5A CN107766312A (en) 2017-10-11 2017-10-11 The update method and system of billboard data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710942011.5A CN107766312A (en) 2017-10-11 2017-10-11 The update method and system of billboard data

Publications (1)

Publication Number Publication Date
CN107766312A true CN107766312A (en) 2018-03-06

Family

ID=61267442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710942011.5A Pending CN107766312A (en) 2017-10-11 2017-10-11 The update method and system of billboard data

Country Status (1)

Country Link
CN (1) CN107766312A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111814444A (en) * 2020-07-21 2020-10-23 四川爱联科技有限公司 Table data summarizing and analyzing method based on BS (browser/server) architecture
CN112839253A (en) * 2019-11-25 2021-05-25 英业达科技有限公司 Dynamic information display system and method thereof
CN112947879A (en) * 2021-03-10 2021-06-11 深圳市优擎信息科技有限公司 Billboard source data acquisition method and device, computer equipment and storage medium
CN112966037A (en) * 2021-03-10 2021-06-15 深圳市优擎信息科技有限公司 Billboard data maintenance method, device and system
CN113506037A (en) * 2021-07-29 2021-10-15 广东电网有限责任公司 Power distribution network construction project data processing method, system and storage medium
CN113867582A (en) * 2021-09-17 2021-12-31 北京易成时代科技有限公司 Billboard data changing method, device, equipment and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103714492A (en) * 2014-01-02 2014-04-09 广西电网公司电力科学研究院 Automatic report generating method capable of meeting power distribution network management specific data standards
US20150095145A1 (en) * 2009-03-25 2015-04-02 Matthew A. Shulman Advertisement effectiveness measurement
CN104820701A (en) * 2015-05-11 2015-08-05 北京瑞星信息技术有限公司 Method and system for recording and synchronizing data
CN204833270U (en) * 2015-02-11 2015-12-02 云南电网有限责任公司西双版纳供电局 Digital billboard of power supply enterprise's decision -making management
CN106933205A (en) * 2015-10-09 2017-07-07 费希尔-罗斯蒙特系统公司 Distributed industrial performance monitoring and analysis platform
CN106971432A (en) * 2017-04-11 2017-07-21 中国人民解放军海军航空工程学院青岛校区 A kind of airplane data management record system and data presentation technique
CN107122961A (en) * 2017-05-16 2017-09-01 上海斐晟企业管理有限公司 Excel nested report data processing methods based on SAP system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150095145A1 (en) * 2009-03-25 2015-04-02 Matthew A. Shulman Advertisement effectiveness measurement
CN103714492A (en) * 2014-01-02 2014-04-09 广西电网公司电力科学研究院 Automatic report generating method capable of meeting power distribution network management specific data standards
CN204833270U (en) * 2015-02-11 2015-12-02 云南电网有限责任公司西双版纳供电局 Digital billboard of power supply enterprise's decision -making management
CN104820701A (en) * 2015-05-11 2015-08-05 北京瑞星信息技术有限公司 Method and system for recording and synchronizing data
CN106933205A (en) * 2015-10-09 2017-07-07 费希尔-罗斯蒙特系统公司 Distributed industrial performance monitoring and analysis platform
CN106971432A (en) * 2017-04-11 2017-07-21 中国人民解放军海军航空工程学院青岛校区 A kind of airplane data management record system and data presentation technique
CN107122961A (en) * 2017-05-16 2017-09-01 上海斐晟企业管理有限公司 Excel nested report data processing methods based on SAP system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112839253A (en) * 2019-11-25 2021-05-25 英业达科技有限公司 Dynamic information display system and method thereof
CN111814444A (en) * 2020-07-21 2020-10-23 四川爱联科技有限公司 Table data summarizing and analyzing method based on BS (browser/server) architecture
CN112947879A (en) * 2021-03-10 2021-06-11 深圳市优擎信息科技有限公司 Billboard source data acquisition method and device, computer equipment and storage medium
CN112966037A (en) * 2021-03-10 2021-06-15 深圳市优擎信息科技有限公司 Billboard data maintenance method, device and system
CN112966037B (en) * 2021-03-10 2023-03-14 深圳市优擎信息科技有限公司 Billboard data maintenance method, device and system
CN113506037A (en) * 2021-07-29 2021-10-15 广东电网有限责任公司 Power distribution network construction project data processing method, system and storage medium
CN113867582A (en) * 2021-09-17 2021-12-31 北京易成时代科技有限公司 Billboard data changing method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN107766312A (en) The update method and system of billboard data
CN102545213A (en) System and method for managing line loss of power grid in real time
CN107038346A (en) A kind of equipment Department of Our Hospital life period of an equipment management system
CN110990391A (en) Integration method and system of multi-source heterogeneous data, computer equipment and storage medium
WO2019076001A1 (en) Information updating method and device
CN103679353A (en) Report processing method and system
CN112463807A (en) Data processing method, device, server and storage medium
CN115860694A (en) Business expansion process management and control method and system based on instant message technology
CN108876445A (en) A kind of data interoperation application based on battalion's distribution end-equipment common information model
CN116467087A (en) Intelligent digital operation management system based on multi-service module
CN115794804A (en) Engineering internal control data visualization processing system and method based on big data technology
CN115834625A (en) Operation and maintenance management system and management method based on Internet of things
CN112614017B (en) Power failure information management system, power failure information management method, and storage medium
CN109739719A (en) A kind of communications equipment room infrastructure management method and device
CN112446619B (en) Power distribution network rush-repair processing method and device
CN112686703A (en) Automatic generation and query method for national household industry price and electronic equipment
CN111047188A (en) Power failure plan generation method and system, computer equipment and storage medium
CN114282907A (en) Resident arrearage power-off and power-restoration management method and related device
Popov et al. Service Order extensions to the Outage Management System
JP2011118516A (en) Device, method and program for predicting working hour
CN108985601B (en) Integrated management system for main network and distribution network
CN114862619A (en) Basic electricity charge processing method and device, electronic equipment and medium
JP4007747B2 (en) Form data storage management system
CN113094027A (en) Calling method and device of public control, electronic equipment and storage medium
CN115983829A (en) Change order generation method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200927

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20180306

RJ01 Rejection of invention patent application after publication