CN107763581A - 一种带活动式爬梯的灯杆 - Google Patents

一种带活动式爬梯的灯杆 Download PDF

Info

Publication number
CN107763581A
CN107763581A CN201610705262.7A CN201610705262A CN107763581A CN 107763581 A CN107763581 A CN 107763581A CN 201610705262 A CN201610705262 A CN 201610705262A CN 107763581 A CN107763581 A CN 107763581A
Authority
CN
China
Prior art keywords
connecting rod
rod
connecting tube
cat ladder
lamp stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610705262.7A
Other languages
English (en)
Inventor
邵赛军
周霖韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Milky Way Jiangsu Steel Co Ltd
Original Assignee
Milky Way Jiangsu Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Milky Way Jiangsu Steel Co Ltd filed Critical Milky Way Jiangsu Steel Co Ltd
Priority to CN201610705262.7A priority Critical patent/CN107763581A/zh
Publication of CN107763581A publication Critical patent/CN107763581A/zh
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V21/00Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
    • F21V21/10Pendants, arms, or standards; Fixing lighting devices to pendants, arms, or standards
    • F21V21/108Arms
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06CLADDERS
    • E06C1/00Ladders in general
    • E06C1/02Ladders in general with rigid longitudinal member or members
    • E06C1/14Ladders capable of standing by themselves
    • E06C1/24Non-hinged free-standing ladders
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V33/00Structural combinations of lighting devices with other articles, not otherwise provided for

Abstract

本发明涉及一种带活动式爬梯的灯杆,它包括杆体,在所述杆体侧壁设有连接管,在所述连接管内设置梯件,所述连接管共设两排,分别为左排和右排,两排连接管底部的两个连接管对称设置,其余连接管上下错位设置,所述梯件的截面为S形,所述梯件由连接杆Ⅰ、连接杆Ⅱ和连接杆Ⅲ组成。本发明可重复使用,结构轻便,使用成本低。

Description

一种带活动式爬梯的灯杆
技术领域
本发明涉及一种灯杆,具体涉及一种带爬梯的灯杆。
背景技术
现有的灯杆,大部分没有设置爬梯,在部分大型灯杆上设有焊接式爬梯,爬梯不能重复使用,使用成本较高,爬梯焊接在灯杆上,使整体较重,同时占用空间,不方便运输。
发明内容
发明目的:本发明的目的是为了克服现有技术中的不足,提供一种可重复使用,结构轻便,使用成本低的带活动式爬梯的灯杆。
技术方案:为了解决上述技术问题,本发明所述的一种带活动式爬梯的灯杆,它包括杆体,在所述杆体侧壁设有连接管,在所述连接管内设置梯件,所述连接管共设两排,分别为左排和右排,两排连接管底部的两个连接管对称设置,其余连接管上下错位设置,所述梯件的截面为S形,所述梯件由连接杆Ⅰ、连接杆Ⅱ和连接杆Ⅲ组成,所述连接杆Ⅰ和连接杆Ⅱ垂直设置,所述连接杆Ⅱ和连接杆Ⅲ垂直设置,所述连接杆Ⅱ设在水平方向,所述连接杆Ⅰ设在连接管内,设在杆体上的连接管的整体高度与杆体的整个高度比为(7/10-4/5):1。
所述连接杆Ⅰ、连接杆Ⅱ和连接杆Ⅲ一体成型。
所述左排和右排的连接管数量相同。
所述左排和右排管底部的两个连接管设在同一水平线上,左排其余连接管设在右排其余相邻连接管对面中部。
有益效果:本发明与现有技术相比,其显著优点是:本发明整体结构设置合理,采用连接管和S形梯件配合连接,结构轻便,可重复使用,采用高度比为(7/10-4/5):1的连接管和杆体,确保爬梯高度高,并且爬梯分成左右两边,方便爬行,梯件由连接杆Ⅰ、连接杆Ⅱ和连接杆Ⅲ一体成型,整体强度高,本产品使用成本低,符合实际使用要求。
附图说明
图1是本发明中所述杆体和连接管的连接结构示意图;
图2是本发明的整体结构示意图;
图3是本发明中所述梯件的结构示意图;
图4是图1中A处的局部放大图;
图5是图2中B处的局部放大图。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
如图1、图2、图3、图4和图5所示,本发明所述的一种带活动式爬梯的灯杆,它包括杆体1,在所述杆体1侧壁设有连接管2,在所述连接管2内设置梯件3,所述连接管2共设两排,分别为左排和右排,两排连接管2底部的两个连接管2对称设置,其余连接管2上下错位设置,所述梯件3的截面为S形,所述梯件3由连接杆Ⅰ4、连接杆Ⅱ5和连接杆Ⅲ6组成,所述连接杆Ⅰ4和连接杆Ⅱ5垂直设置,所述连接杆Ⅱ5和连接杆Ⅲ6垂直设置,所述连接杆Ⅱ5设在水平方向,所述连接杆Ⅰ4设在连接管2内,设在杆体1上的连接管2的整体高度与杆体1的整个高度比为(7/10-4/5):1;所述连接杆Ⅰ4、连接杆Ⅱ5和连接杆Ⅲ6一体成型;所述左排和右排的连接管2数量相同;所述左排和右排管底部的两个连接管2设在同一水平线上,左排其余连接管2设在右排其余相邻连接管2对面中部。本发明整体结构设置合理,采用连接管和S形梯件配合连接,结构轻便,可重复使用,采用高度比为(7/10-4/5):1的连接管和杆体,确保爬梯高度高,并且爬梯分成左右两边,方便爬行,梯件由连接杆Ⅰ、连接杆Ⅱ和连接杆Ⅲ一体成型,整体强度高,本产品使用成本低,符合实际使用要求。
本发明提供了一种思路及方法,具体实现该技术方案的方法和途径很多,以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围,本实施例中未明确的各组成部分均可用现有技术加以实现。

Claims (4)

1.一种带活动式爬梯的灯杆,其特征在于:它包括杆体(1),在所述杆体(1)侧壁设有连接管(2),在所述连接管(2)内设置梯件(3),所述连接管(2)共设两排,分别为左排和右排,两排连接管(2)底部的两个连接管(2)对称设置,其余连接管(2)上下错位设置,所述梯件(3)的截面为S形,所述梯件(3)由连接杆Ⅰ(4)、连接杆Ⅱ(5)和连接杆Ⅲ(6)组成,所述连接杆Ⅰ(4)和连接杆Ⅱ(5)垂直设置,所述连接杆Ⅱ(5)和连接杆Ⅲ(6)垂直设置,所述连接杆Ⅱ(5)设在水平方向,所述连接杆Ⅰ(4)设在连接管(2)内,设在杆体(1)上的连接管(2)的整体高度与杆体(1)的整个高度比为(7/10-4/5):1。
2.根据权利要求1所述的带活动式爬梯的灯杆,其特征在于:所述连接杆Ⅰ(4)、连接杆Ⅱ(5)和连接杆Ⅲ(6)一体成型。
3.根据权利要求1所述的带活动式爬梯的灯杆,其特征在于:所述左排和右排的连接管(2)数量相同。
4.根据权利要求1所述的带活动式爬梯的灯杆,其特征在于:所述左排和右排管底部的两个连接管(2)设在同一水平线上,左排其余连接管(2)设在右排其余相邻连接管(2)对面中部。
CN201610705262.7A 2016-08-23 2016-08-23 一种带活动式爬梯的灯杆 Pending CN107763581A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610705262.7A CN107763581A (zh) 2016-08-23 2016-08-23 一种带活动式爬梯的灯杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610705262.7A CN107763581A (zh) 2016-08-23 2016-08-23 一种带活动式爬梯的灯杆

Publications (1)

Publication Number Publication Date
CN107763581A true CN107763581A (zh) 2018-03-06

Family

ID=61264066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610705262.7A Pending CN107763581A (zh) 2016-08-23 2016-08-23 一种带活动式爬梯的灯杆

Country Status (1)

Country Link
CN (1) CN107763581A (zh)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4109761A (en) * 1975-12-04 1978-08-29 Matlock Selden W Portable climbing device
CN2716496Y (zh) * 2004-05-01 2005-08-10 姚经宇 新式防喷管
CN1916353A (zh) * 2005-08-21 2007-02-21 邢一 一种梯子
CN101956522A (zh) * 2010-06-04 2011-01-26 周佰兴 组合爬梯
CN202467298U (zh) * 2012-02-22 2012-10-03 成都福兰特电子技术有限公司 爬梯可拆卸的美化通信灯杆
CN203097694U (zh) * 2012-12-14 2013-07-31 金华电业局 全方位固定联接梯
CN103414124A (zh) * 2013-08-05 2013-11-27 国家电网公司 一种绝缘单柱梯
CN203669463U (zh) * 2013-12-18 2014-06-25 中国能源建设集团安徽省电力设计院 一种用于变电站钢管构架柱的分段插拔式爬梯
CN203841647U (zh) * 2013-11-16 2014-09-24 金杯电工衡阳电缆有限公司 一种拖把用挂架
CN104499754A (zh) * 2014-12-02 2015-04-08 成都远为天胜科技有限公司 具有可拆卸式爬杆的信号塔
CN205991458U (zh) * 2016-08-23 2017-03-01 江苏银河钢杆有限公司 一种带活动式爬梯的灯杆

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4109761A (en) * 1975-12-04 1978-08-29 Matlock Selden W Portable climbing device
CN2716496Y (zh) * 2004-05-01 2005-08-10 姚经宇 新式防喷管
CN1916353A (zh) * 2005-08-21 2007-02-21 邢一 一种梯子
CN101956522A (zh) * 2010-06-04 2011-01-26 周佰兴 组合爬梯
CN202467298U (zh) * 2012-02-22 2012-10-03 成都福兰特电子技术有限公司 爬梯可拆卸的美化通信灯杆
CN203097694U (zh) * 2012-12-14 2013-07-31 金华电业局 全方位固定联接梯
CN103414124A (zh) * 2013-08-05 2013-11-27 国家电网公司 一种绝缘单柱梯
CN203841647U (zh) * 2013-11-16 2014-09-24 金杯电工衡阳电缆有限公司 一种拖把用挂架
CN203669463U (zh) * 2013-12-18 2014-06-25 中国能源建设集团安徽省电力设计院 一种用于变电站钢管构架柱的分段插拔式爬梯
CN104499754A (zh) * 2014-12-02 2015-04-08 成都远为天胜科技有限公司 具有可拆卸式爬杆的信号塔
CN205991458U (zh) * 2016-08-23 2017-03-01 江苏银河钢杆有限公司 一种带活动式爬梯的灯杆

Similar Documents

Publication Publication Date Title
US10392937B2 (en) Construction layout for caverns of underground nuclear power plant
US20180003054A1 (en) Construction layout for underground caverns in nuclear island powerhouse of underground nuclear power plant
CN205991458U (zh) 一种带活动式爬梯的灯杆
CN107763581A (zh) 一种带活动式爬梯的灯杆
CN206784213U (zh) 一种组合式市政减速带
CN205282953U (zh) 变电站立体结构组装式货架
CN204826620U (zh) 一种建筑施工梁架
CN208873804U (zh) 一种电池组并联使用的可拼接框架
CN208470527U (zh) 一种钢管集束支架
CN201505481U (zh) 用于粘稠流体的过滤装置
US20180003055A1 (en) Construction layout for caverns of underground nuclear power plant
CN208856643U (zh) 一种便于搬运的电力用电缆
CN209684474U (zh) 一种防分级成品仓
CN104227293B (zh) 一种方涵承口环制作架
CN206798249U (zh) 一种运输用包装铁箱
CN206769048U (zh) 一种方管梁焊接预固定结构
CN205532707U (zh) 砂仓
CN206221865U (zh) 一种快速止水接头
CN214889395U (zh) 一种应用于小直径管道的枝杈式管架及利用其的输送管道
CN207246631U (zh) 一种对接式给水用pe三通管
CN206121469U (zh) 一种带尾部二次干燥分离的气液分离器
CN213597662U (zh) 一种地铁施工防护装置
CN208812057U (zh) 一种拼接式金属接头原料存放架
CN2776522Y (zh) 气体冷却塔用分酸装置
CN203343173U (zh) F型钢轧辊孔型

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination