CN107762532B - Tunnel vault band mould grouting construction method - Google Patents

Tunnel vault band mould grouting construction method Download PDF

Info

Publication number
CN107762532B
CN107762532B CN201610706453.5A CN201610706453A CN107762532B CN 107762532 B CN107762532 B CN 107762532B CN 201610706453 A CN201610706453 A CN 201610706453A CN 107762532 B CN107762532 B CN 107762532B
Authority
CN
China
Prior art keywords
slip casting
concrete
grouting
circular hole
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610706453.5A
Other languages
Chinese (zh)
Other versions
CN107762532A (en
Inventor
朱嘉斌
傅俊
龚成明
夏明锬
孙浩林
曾理飞
宋建雷
王勃
吕彪
汪强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
China Railway 11th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
China Railway 11th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd, China Railway 11th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
Priority to CN201610706453.5A priority Critical patent/CN107762532B/en
Publication of CN107762532A publication Critical patent/CN107762532A/en
Application granted granted Critical
Publication of CN107762532B publication Critical patent/CN107762532B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Tunnel vault band is molded into slurry construction party, its construction method step of method is as follows: installation lining trolley → determine that coagulating the dedicated filling mortar of native slip casting → preparation → starting slip casting all-in-one machine slip casting → slip casting terminates → in the fixed Grouting Pipe → observation vault template of slip casting length of tube → installation lays down flange;Using band mould slurry injection technique and the microdilatancy, high-flowing concrete slip casting of the party, bonding force is strong, has to the section gap that concreting is formed and repairs, comprehensive performance is better than the performance of lining concrete;And the risk for reducing tunnel lining concrete cracking, coming to nothing and falling off, tunnel-liner is improved to the immunity of geologic risk, the risk of disaster occurs for tunnel-liner when reducing operation, can be primary full, the later period no longer spends more construction cost;Pass through the application of this method, it is ensured that tunnel-liner quality.

Description

Tunnel vault band mould grouting construction method
Technical field
The present invention relates to a kind of method for tunnel construction, specifically a kind of tunnel vault band mould grouting construction method.
Background technique
Lining construction due to the limitation of lining concrete, cause after two backings especially vault will appear hole, Interlayer etc. comes to nothing area, Concrete Filled leakiness, the strong influence integral strength of lining concrete.And general tunnel two Backing grouting behind shaft or drift lining is the secondary construction after lining cutting completion, and cement slurry injecting paste material is at low cost, but its brittleness is big, and intensity is low, It shrinks seriously, bleeding is more, and generally requires repeatedly drilling, slip casting and radar detection, and construction cost is higher, especially the later period two When secondary slip casting, the advantage that lining cutting overall mechanical properties are improved with the timely slip casting of mould is lost, slip casting forms " two layers of skin " again Structure.Meanwhile slip casting has the function of antiseepage to a certain extent, it therefore, must be next closely knit to backfill slip casting in constructing tunnel The area of coming to nothing of two lining concrete behinds, it is ensured that the integral strength of lining concrete enhances water-proof function.
Summary of the invention
In view of the deficiencies of the prior art, it is an object of the present invention to provide a kind of tunnel-liner vault band template mortar depositing construction sides Method, this method are that slip casting is served as a contrast using a template two, and the time controls in 2h or so, and are not take up the normal two lining mortar depositing construction time; Used Grouting Pipe and microdilatancy, slow setting, early strength mortar, the timely slip casting after lining cutting pours can effectively improve lining cutting coagulation Adhesive integrity between soil and grouting serous fluid;Meanwhile there is reduction material consumption, the investment of manpower is reduced, engineering cost is reduced The effect of, and can be applied in the constructing tunnels such as highway, subway, mine.
The technical scheme is that tunnel vault band mould grouting construction method, construction method step are as follows:
Step 1: assembling lining trolley is mounted on after being secured in position on the track of tunnel ground, by slip casting all-in-one machine processed It is placed in the ground surface platform of lining trolley bottom, the both ends of delivery hose are connected to reduction nipple and slip casting all-in-one machine processed goes out On expects pipe mouth;
Step 2: determining Grouting Pipe cutting length, ready first Grouting Pipe or exhaust pipe is passed through pre- at the top of trolley Place's progress " trying on " of boxing out measures;First line of label in the first Grouting Pipe of vault template outer, for detecting lining cutting thickness Whether degree meets the requirements;Article 2 graticule, i.e. the first Grouting Pipe are drawn from vault template outer+locating sleeve length 4.3cm+2cm Cutting length;
Step 3: fixed Grouting Pipe is installed: after the first Grouting Pipe of well cutting is penetrated the first circular hole in vault template, The first Grouting Pipe is fixed in the first circular hole in vault template with flange;
Step 4: observation judges vault template inner concrete slip casting or situation of rushing to summit: successively seeing according to the sequence of fill orifice The pulp situation of concrete grouting hole or peep hole, the concrete grouting checked in vault template or situation of rushing to summit are examined, judges to encircle Whether concrete grout is filled in top template;
Step 5: it prepares dedicated filling mortar: using dedicated slurrying slip casting all-in-one machine 8, prepare dedicated filling mortar and make For concrete grouting material, dedicated filling mortar is as grout material (in the ratio of water to material of configuration: water: filling mortar=18:100(weight Than), separately add 0.08% micro-expanding agent;Cement preferably uses portland cement;Injecting paste material requires continuous mixing, tight during mixing Lattice monitor every material utilization amount, it is ensured that grouting quality;
Step 6: slip casting: starting slip casting all-in-one machine processed successively observes the second circular hole, third circular hole and the 4th circular hole, simultaneously Make gas vent, for whether flowing out infused concrete grout, when other peep holes outflow concrete grouting reaches the mixed of equal densities When solidifying soil paste body, it is immediately finished note concrete grout, which is closed;When pressure gauge reaches 1.0MPa, aperture is not flowed yet Concrete grouting out should replace next injected hole and carry out concrete grouting again, until intermediate second circular hole, third circular hole and the Peephole on 12 end of four circular holes and template stops slip casting when flowing out concrete grout 3-5s;
Step 7: slip casting terminates, and unloads from the pulp nozzle and reduction nipple tail end nozzle of slip casting all-in-one machine processed mixed Solidifying soil slip casting delivery hose, blocks slip casting pore, after concrete grouting initial set, lays down locating flange, goes to next hole slip casting.
The beneficial effects of the present invention are: being infused using the band mould slurry injection technique of this method and microdilatancy, high-flowing concrete Slurry, bonding force is strong, has to the section gap that concreting is formed and repairs, comprehensive performance is better than the property of lining concrete Energy;And the risk for reducing tunnel lining concrete cracking, coming to nothing and falling off, it improves tunnel-liner and geologic risk is immunized Power, the risk of disaster occurs for tunnel-liner when reducing operation, can be primary full, and the later period no longer spends more be constructed into This;Pass through the application of this method, it is ensured that tunnel-liner quality.
Detailed description of the invention
The invention will be further described with embodiment with reference to the accompanying drawing.
Fig. 1 is lining trolley structural schematic diagram;
Fig. 2 is the skiagraph (i.e. A-A cross-sectional view) in Fig. 1;
Fig. 3 is B in Fig. 1 to enlarged drawing (connector scheme of installation);
Specific embodiment
In Fig. 1, Fig. 2, Fig. 3 embodiment that the present invention provides, it is welded into lining trolley frame with channel steel, metal plate, it is very heavy 15 difference of top, vault template 11, left side arch wall template 14, the combination of right side arch wall template 13 are mounted on lining trolley frame, vehicle frame The idler wheel of bottom end installation is located in tunnel on the track of ground surface platform, forms lining construction lining trolley a.By lining cutting platform Vehicle a is mounted on be secured in position in the tunnel of excavation after, slip casting all-in-one machine 8 processed is placed on the ground of the bottom lining trolley a, convey it is soft The both ends of pipe b are connected on reduction nipple 619 and slip casting all-in-one machine pulp nozzle processed.
It is longitudinal in vault template 11() it is equidistantly identical equipped with identical 3 filling concrete holes 5 and 4 structure of structure 4 circular holes;First filling concrete hole 51, the second filling concrete hole 52, third filling concrete hole 53;Tunnel-liner vault Peephole 121 is equipped with above the template 12 of one end;4 circular holes are equipped at 11 top (longitudinal direction) of vault template of lining trolley a Aperture is 40mm;
Identical 4 circular holes of the structure are as follows: the first circular hole 61, the second circular hole 62, third circular hole 63, the 4th circular hole 64 Or peep hole;First circular hole 61 is located at the closed end of two lining concrete;4th circular hole 64 is located at the opening of two lining concrete End;4th circular hole, 64 circular hole is apart from end mould 0.6-1.5m;The first filling concrete hole 51 and the second filling concrete hole 52 it Between be equipped with the second circular hole 62;Third circular hole 63 is equipped between second filling concrete hole 52 and third filling concrete hole 53.It will Flange 612 is fixed on the first circular hole 61, the second circular hole 62, third circular hole 63 and the 4th circular hole 64;In lining trolley a mono- The top peephole 121 of Side Template 12, peephole is for observing concrete perfusion slip casting situation.
It is wherein main injected hole close to construct first circular hole 61 at end of vault template 11, with flange 612 by the first Grouting Pipe 611 are fixed in the first circular hole 61;First circular hole 61 is main the second circular hole of injected hole 62, third circular hole 63, the 4th circular hole 64 are used as peep hole or spare injected hole.
It is solid by installation in time when two lining concrete constructions close to an end, and before two lining concrete blindings are not removed It is scheduled on the first Grouting Pipe 611 in the first circular hole, concrete is carried out to hole, interlayer and the position of coming to nothing on two lining concrete vaults Slip casting, while slip casting turgor is observed by the second circular hole 62, third circular hole 63, the 4th circular hole 64.
First Grouting Pipe: the first coagulation Grouting Pipe 611 being inserted into the flange 612 at 11 top of vault template, Make top set reeded first Grouting Pipe 611 tube head withstand splash guard 4 after, 11 outer of vault template the first coagulation infuse Starch on pipe 611 label first with outside vault template 11 along, for detecting whether lining thickness meets the requirements;Article 2 line is 11 outers of vault template+locating sleeve, 614 length 4.3cm+2cm, the i.e. cutting length of the first Grouting Pipe 611.
The Combined pipe adapter: 616 upper end of ball valve is mounted under the first pipe fitting 611 by connecting tube 615 The upper end of end, the first pipe fitting 611 is set as groove type cross piece;Second pipe fitting, 617 upper end is mounted on ball valve 616 On the tube head of lower end, pressure gauge C is mounted on the second pipe fitting 617, and reduction nipple 619 is mounted on 617 lower end of the second pipe fitting Head forms combined type conveying tube joint.
Tunnel vault band mould grouting construction method of the invention, steps are as follows for grouting construction method:
Step 1: lining trolley a being mounted on after being secured in position on the track of ground surface platform in the tunnel of excavation, and system is infused Slurry all-in-one machine 8 is placed in the ground surface platform of the bottom lining trolley a, and the both ends of delivery pipe b are connected to reduction nipple 619 and system Slip casting all-in-one machine 8 discharges on nozzle;
Step 2: ready first Grouting Pipe or exhaust pipe are measured by carrying out " trying on " at preformed hole at the top of trolley It surveys;First line of label in the first Grouting Pipe 611 of 11 outer of vault template, for detecting whether lining thickness conforms to It asks;Draw Article 2 graticule from 11 outers of vault template+614 length of locating sleeve (4.3cm)+2cm, i.e. the first Grouting Pipe 611 Cutting length;
Step 3: fixed Grouting Pipe is installed: the first Grouting Pipe of well cutting is penetrated to the first circular hole in vault template 11 Afterwards, first Grouting Pipe 611 is fixed in the first circular hole 61 in vault template 11 with flange 612;
Step 4: observation judges vault template inner concrete slip casting or situation of rushing to summit, and successively sees according to the sequence of fill orifice The pulp situation in concrete grouting hole (peep hole), the concrete grouting checked in vault template or situation of rushing to summit are examined, judges to encircle Whether concrete grout is filled in top template;
Step 5: it prepares dedicated filling mortar: using dedicated slurrying slip casting all-in-one machine 8, prepare dedicated filling mortar and make For concrete grouting material, dedicated filling mortar is as grout material (in the ratio of water to material of configuration: water: filling mortar=18:100(weight Than), separately add 0.08% micro-expanding agent;Cement preferably uses portland cement;Injecting paste material requires continuous mixing, tight during mixing Lattice monitor every material utilization amount, it is ensured that grouting quality;
Step 6: starting slip casting all-in-one machine slip casting processed starts slip casting one slip casting machine 8 processed, successively observe the second circular hole 62, Third circular hole 63 and the 4th circular hole 64(are used as gas vent simultaneously) infused concrete grouting whether is flowed out, when other peep holes flow out When concrete grouting reaches the concrete mortar of equal densities, it is immediately finished note concrete grout, which is closed.Work as pressure Power table 617 reaches 1.0MPa, and concrete grouting is not flowed out in aperture yet, should replace next injected hole and carry out slip casting, until in Between peephole 121 on 12 end of the second circular hole 62, third circular hole 63 and the 4th circular hole 64 and template flow out concrete grout 3-5s When stop slip casting;
Step 7: slip casting terminates, from the 619 tail end nozzle of pulp nozzle and reduction nipple of slip casting all-in-one machine slip casting 8 processed On unload concrete grouting delivery hose b, block slip casting pore, after concrete slurry initial set, lay down locating flange 613, turn To next hole slip casting.

Claims (1)

1. tunnel vault band mould grouting construction method, it is characterized in that: its method and step is as follows:
Step 1: assembling lining trolley is mounted on after being secured in position on the track of tunnel ground, slip casting all-in-one machine processed is placed on In the ground surface platform of lining trolley bottom, the both ends of delivery hose are connected to reduction nipple and slip casting all-in-one machine discharge nozzle processed On mouth;
Step 2: determining Grouting Pipe cutting length, and ready first Grouting Pipe or exhaust pipe are passed through preformed hole at the top of trolley Place carries out " trying on " and measures;First line of label in the first Grouting Pipe of vault template outer be for detecting lining thickness It is no to meet the requirements;Under vault template outer+locating sleeve length 4.3cm+2cm strokes of Article 2 graticules, i.e. the first Grouting Pipe Expect length;
Step 3: fixed Grouting Pipe is installed: after the first Grouting Pipe of well cutting is penetrated the first circular hole in vault template, usage First Grouting Pipe is fixed in the first circular hole in vault template by orchid;
Step 4: observation judges vault template inner concrete slip casting or situation of rushing to summit: mixed according to the sequential observation of fill orifice The pulp situation of solidifying soil injected hole or peep hole, the concrete grouting checked in vault template or situation of rushing to summit, judge vault mould Whether concrete grout is filled in plate;
Step 5: it prepares dedicated filling mortar: using dedicated slurrying slip casting all-in-one machine, prepare dedicated filling mortar as coagulation Native grout material, the concrete grouting material weight ratio of configuration are as follows: water: filling mortar=18:100 separately adds 0.08% micro-expanding agent;Cement Preferably use portland cement;Concrete grouting material requires continuous mixing, the stringent every material utilization amount of monitoring during mixing, it is ensured that Grouting quality;
Step 6: slip casting: starting slip casting all-in-one machine processed successively observes the second circular hole, third circular hole and the 4th circular hole, while arranging Stomata, for whether flowing out infused concrete grouting, when other peep holes outflow concrete grouting reaches the coagulation of equal densities When soil paste body, it is immediately finished note concrete grout, which is closed;When pressure gauge reaches 1.0MPa, aperture is not flowed out yet Concrete grouting should replace next injected hole and carry out concrete grouting again, until intermediate second circular hole, third circular hole and the 4th Peephole on circular hole and form stop stops slip casting when flowing out concrete grout 3-5s;
Step 7: slip casting terminates, and unloads concrete from the pulp nozzle and reduction nipple tail end nozzle of slip casting all-in-one machine processed Slip casting delivery hose blocks slip casting pore, after concrete grouting initial set, lays down locating flange, goes to next hole slip casting.
CN201610706453.5A 2016-08-23 2016-08-23 Tunnel vault band mould grouting construction method Active CN107762532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610706453.5A CN107762532B (en) 2016-08-23 2016-08-23 Tunnel vault band mould grouting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610706453.5A CN107762532B (en) 2016-08-23 2016-08-23 Tunnel vault band mould grouting construction method

Publications (2)

Publication Number Publication Date
CN107762532A CN107762532A (en) 2018-03-06
CN107762532B true CN107762532B (en) 2019-03-01

Family

ID=61264708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610706453.5A Active CN107762532B (en) 2016-08-23 2016-08-23 Tunnel vault band mould grouting construction method

Country Status (1)

Country Link
CN (1) CN107762532B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316950A (en) * 2018-03-18 2018-07-24 中铁十九局集团第三工程有限公司 Tunnel vault concrete belt mould backfills filling system and its grouting method
CN108625878A (en) * 2018-05-14 2018-10-09 北京铁科首钢轨道技术股份有限公司 A kind of technique for solving the problems, such as tunnel-liner vault and coming to nothing
CN108506028A (en) * 2018-05-30 2018-09-07 中铁十九局集团第六工程有限公司 A kind of tunnel lining trolley vault comprehensive grouting pipe device and its application method
CN109026069B (en) * 2018-08-17 2020-01-03 中铁隧道局集团建设有限公司 Tape mould slip casting system
CN109707401A (en) * 2018-11-13 2019-05-03 中铁隆工程集团有限公司 A kind of tunnel double-lining vault backfill grouting process and Grouting Pipe
CN109555538A (en) * 2019-01-04 2019-04-02 中铁十局集团第四工程有限公司 A kind of tunnel double-lining vault exhaust is excessive to starch grouting device and its application method
CN109798129A (en) * 2019-01-11 2019-05-24 中铁十一局集团第四工程有限公司 A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment
CN110130937B (en) * 2019-06-06 2024-02-20 涪特智能装备(重庆)有限公司 Tunnel construction trolley
CN110259449B (en) * 2019-07-16 2020-07-28 太原理工大学 Strip filling mining method for extra-thick coal seam by means of steel mould trolley
CN110439592A (en) * 2019-08-08 2019-11-12 广东水电二局股份有限公司 Shield tunnel two serves as a contrast concrete structure and construction method
CN111156029A (en) * 2019-09-21 2020-05-15 保定市宇航机械科技有限公司 Tunnel secondary lining vault pouring construction device and construction method
CN110966022B (en) * 2019-12-24 2022-03-11 中铁隧道局集团有限公司 Railway tunnel lining construction method based on medium-high fluidity concrete
CN111206942B (en) * 2020-02-11 2022-01-11 山西省交通建设工程质量检测中心(有限公司) Full-automatic construction structure and method for repairing tunnel crack by using biological slurry
CN113123810B (en) * 2021-05-12 2023-04-07 中交路桥建设有限公司 Construction method for improving grouting effect of arch crown with mold of tunnel
CN113374504B (en) * 2021-07-29 2023-11-17 中铁隧道集团一处有限公司 Tunnel arch prefabricated segment assembling construction method
CN113898381B (en) * 2021-10-09 2024-05-24 中铁二十三局集团第四工程有限公司 Grouting method for prestressed lining
CN114033431A (en) * 2021-11-16 2022-02-11 中铁十二局集团有限公司 Irregular structure concrete pouring construction method
CN114278339A (en) * 2021-12-06 2022-04-05 中铁十局集团第三建设有限公司 Tunnel strip mold grouting construction method and application
CN114033437B (en) * 2022-01-11 2022-03-25 中铁五局集团第一工程有限责任公司 Loess stratum formwork lining support trolley and support method thereof
CN114738000A (en) * 2022-04-23 2022-07-12 石家庄铁源工程咨询有限公司 Pouring construction method for secondary lining concrete of railway tunnel arch wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204098928U (en) * 2014-05-14 2015-01-14 中铁二十一局集团第三工程有限公司 Tunnel vault two serves as a contrast the location pre-embedded device of front Grouting Pipe
CN204386614U (en) * 2014-04-09 2015-06-10 齐洪军 Realize the lining trolley of lining cutting vault filling and injecting slurry and tunnel lining synchronization implementation
CN105137047A (en) * 2015-09-25 2015-12-09 中铁一局集团有限公司 On-site detection process for concrete filling compactness of arch crown of tunnel secondary lining
CN204877497U (en) * 2015-07-09 2015-12-16 中铁十二局集团有限公司 Positioner is reserved in tunnel lining slip casting pore

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204386614U (en) * 2014-04-09 2015-06-10 齐洪军 Realize the lining trolley of lining cutting vault filling and injecting slurry and tunnel lining synchronization implementation
CN204098928U (en) * 2014-05-14 2015-01-14 中铁二十一局集团第三工程有限公司 Tunnel vault two serves as a contrast the location pre-embedded device of front Grouting Pipe
CN204877497U (en) * 2015-07-09 2015-12-16 中铁十二局集团有限公司 Positioner is reserved in tunnel lining slip casting pore
CN105137047A (en) * 2015-09-25 2015-12-09 中铁一局集团有限公司 On-site detection process for concrete filling compactness of arch crown of tunnel secondary lining

Also Published As

Publication number Publication date
CN107762532A (en) 2018-03-06

Similar Documents

Publication Publication Date Title
CN107762532B (en) Tunnel vault band mould grouting construction method
CN105804758B (en) Across constructing metro tunnel method on the rectangular top pipe of the shallow small spacing of earthing big cross section
CN103195442B (en) A kind of uniform slip casting structure of coal mine roadway and construction technology thereof
CN107605498B (en) Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN104389623B (en) Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN102434194B (en) Gas drainage drill hole structure formed in coal layer and method for fabricating same
CN106761835B (en) A kind of Karst Tunnel leak segmenting slip casting construction method
CN105673044B (en) A kind of construction method and system that secondary grouting quality is improved for shield-tunneling construction
CN109594990B (en) Large-section jacking pipe construction method for complex stratum
CN101788082A (en) Construction method for abutting jack pipe underground
CN112879037A (en) Safe construction method for mine tunnel
CN103510964A (en) Method for performing backfill grouting on pea gravel by adoption of shield type TBM in construction process
CN103993902B (en) A kind of mash gas pumping drilling two step slip-casting hole-sealing method
CN207598243U (en) A kind of shield driving anti-spouting device
CN110080789A (en) A kind of shield sky, which pushes away, spells section of jurisdiction construction
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN108677943A (en) Repeatedly control slip casting pre-stressed steel anchor pipe anchor cable composite structure and its construction method
CN105926624A (en) Non-return type collecting hole grouting device and construction method thereof
CN109681214A (en) A kind of construction method of Full-face pouring strengthening stratum
CN202991051U (en) Reinforcing structure capable of realizing shield reception without using water-stopping cord fabric
CN113027483A (en) Shield tunnel broken zone stratum grouting reinforcement equipment and grouting reinforcement method thereof
CN204781973U (en) Antiseep plugging device in split bolt hole
CN104564105B (en) A kind of apparatus and method of two grades of sleeve pipes of seat earth grouting and reinforcing
CN202992424U (en) Reinforced concrete pipe with sealing rod for jacking construction method

Legal Events

Date Code Title Description