CN107762110A - A kind of baseboard pre-installs equipment - Google Patents

A kind of baseboard pre-installs equipment Download PDF

Info

Publication number
CN107762110A
CN107762110A CN201711009041.7A CN201711009041A CN107762110A CN 107762110 A CN107762110 A CN 107762110A CN 201711009041 A CN201711009041 A CN 201711009041A CN 107762110 A CN107762110 A CN 107762110A
Authority
CN
China
Prior art keywords
glue
motor
pipe
connection
sufficient body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711009041.7A
Other languages
Chinese (zh)
Other versions
CN107762110B (en
Inventor
沈国兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xinsuyang Construction Co ltd
Original Assignee
Zhejiang Kun Hong New Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Kun Hong New Materials Co Ltd filed Critical Zhejiang Kun Hong New Materials Co Ltd
Priority to CN201711009041.7A priority Critical patent/CN107762110B/en
Publication of CN107762110A publication Critical patent/CN107762110A/en
Application granted granted Critical
Publication of CN107762110B publication Critical patent/CN107762110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/0053Implements for finishing work on buildings for installing edge-protecting borders

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Nozzles For Electric Vacuum Cleaners (AREA)

Abstract

The present invention relates to floor mounting technique field, specially a kind of baseboard pre-installation equipment.A kind of baseboard pre-installs equipment, including fuselage, it is arranged on the controller and power-equipment of the fuselage interior, the travel mechanism being connected with the fuselage one side, the position adjusting mechanism being connected with another opposite flank of the fuselage, and the metope brush coating mechanism being connected with the position adjusting mechanism, the travel mechanism, the position adjusting mechanism and the metope brush coating mechanism are electrically connected with the controller;The metope brush coating mechanism includes rubber-storing cylinder, the glue runner pipe being connected with the rubber-storing cylinder, and sponge brush chuck is connected with the glue runner pipe.The baseboard pre-installation equipment of the present invention, auxiliary floor mounted systems will be close on the wall brush on ground glue so as to the baseboard on subsequent installation floor automatically after being installed on floor, set-up time and the installation manpower on floor are saved, and improves the effect of floor installation.

Description

A kind of baseboard pre-installs equipment
Technical field
The present invention relates to floor mounting technique field, specially a kind of baseboard pre-installation equipment.
Background technology
The superficial layer on floor, i.e. house earth surface or flooring, is made by timber or other materials.Wherein, with strengthening wood composite Plate is earth material popular in recent years, and it is after log crushing, glue, preservative, additive is dosed, through hot press high temperature High pressure compression process forms, therefore it has broken the physical arrangement of log, overcomes the weakness of log stability difference.Composite floor board Intensity height, uniform specification, wearing coefficient height, anti-corrosion, mothproof and good decorating effect, overcome scar section, the worm on log surface Eye, aberration problem, therefore, application is most wide.
But floor needs artificial do-it-yourself in installation process, it is impossible to is carried out by the floor installation equipment of correlation straight Installation or auxiliary installation are connect, therefore, installation floor needs to take a substantial amount of time and manpower, and obtained floor installation effect is not It is highly desirable, it is desirable to the floor installation effect got well also needs to the skilled worker for asking floor mounting technique very consummate, so that The expense of floor installation is very expensive.
The content of the invention
The problem of present invention exists for prior art, it is proposed that a kind of baseboard pre-installs equipment, can pacify on floor Aid in floor mounted systems to will be close to glue on the wall brush on ground automatically after dress, so as to the baseboard on subsequent installation floor, to save Set-up time and the installation manpower on floor have been saved, and has improved the effect of floor installation.
The technical solution adopted for the present invention to solve the technical problems is:A kind of baseboard pre-installs equipment, including fuselage, The controller and power-equipment of the fuselage interior are arranged on, the travel mechanism being connected with the fuselage one side, with the machine The position adjusting mechanism of another opposite flank connection of body, and the metope brush coating mechanism being connected with the position adjusting mechanism, institute Travel mechanism is stated, the position adjusting mechanism and the metope brush coating mechanism are electrically connected with the controller;The wall Face brush coating mechanism includes rubber-storing cylinder, the glue runner pipe being connected with the rubber-storing cylinder, and sponge brush is connected with the glue runner pipe Chuck, the sponge brush with the sponge brush chuck dismantling connection, and the glue being arranged on the glue runner pipe take out pump, institute State and be provided with glue amount detector inside sponge brush, the glue runner pipe connects end with the sponge brush chuck and is provided with switching door, institute State glue amount detector and take out pump with the switching door and the glue and be electrically connected with.
Preferably, the sponge brush is provided with into glue macropore with the sponge brush chuck contact side, set with metope contact side There is plastic emitting aperture, some plastic emitting apertures converge to be connected with entering glue macropore described in one.
Preferably, the sponge brush bottom is provided with the glue collecting box with the sponge brush chuck dismantling connection, it is described The face that glue collecting box is provided with plastic emitting aperture side contacts with the sponge brush is glue guide face, and the glue guide face includes upper Portion's glue guide face and bottom glue guide face, the top glue guide face and the bottom glue guide face junction are to institute The setting of glue collecting box inner recess is stated, guiding gutter, the bottom glue are provided with from top to bottom on the outside of the top glue guide face Water guide face is provided with the Ji Jiaokou with the guiding gutter outlet.
Preferably, the travel mechanism includes the first sufficient body being connected with the sliding machine body and fixed with the fuselage Second sufficient body of connection;
The first sufficient body is provided with some first absorption pedal disks with metope contact side, and the first absorption pedal disk passes through inner hollow The first absorption pedal disk expansion link be connected with the described first sufficient body, portion is provided with first and adsorbs pedal disk vacuum and sends out first foot in vivo Raw device and the first absorption pedal disk expansion link motor, the first sufficient body are driven by the first sufficient body expansion link and the first sufficient body Motor connection, the first sufficient body motor are adsorbed by the first motor suction tray expansion link of inner hollow and the first motor Disk connects, and is provided with the first motor suction tray vacuum generator inside the first sufficient body motor and the first motor suction tray is stretched Contracting bar motor;
The second sufficient body is provided with some second absorption pedal disks with metope contact side, and the second absorption pedal disk passes through inner hollow The second absorption pedal disk expansion link be connected with the described second sufficient body, portion is provided with second and adsorbs pedal disk vacuum and sends out second foot in vivo Raw device and the second absorption pedal disk expansion link motor, the second sufficient body are driven by the second sufficient body expansion link and the second sufficient body Motor connection, the second sufficient body motor are adsorbed by the second motor suction tray expansion link of inner hollow and the second motor Disk connects, and is provided with the second motor suction tray vacuum generator inside the second sufficient body motor and the second motor suction tray is stretched Contracting bar motor.
The first absorption pedal disk and described is tightly connected preferably, being provided with inside the first absorption pedal disk expansion link The elasticity adapter of first absorption pedal disk vacuum generator, the first absorption pedal disk expansion link include fixing with the described first sufficient body The bar of fixed telescopic half of connection, one end is fixedly connected with the described first absorption pedal disk, the other end and the fixed telescopic half The slidingtype of bar internal slide connection stretches half bar, and flexible half bar of one end and the slidingtype is connected, the other end with it is described The mobile bar of first absorption pedal disk expansion link motor connection.
Preferably, the position adjusting mechanism includes the horizontal level fixing pipe being connected with the fuselage, with the wall The horizontal level regulation pipe of face brush coating mechanism connection, connect the height of the horizontal level fixing pipe and the horizontal level regulation pipe Spend position adjustments pipe.
Preferably, the height and position regulation pipe includes external height position adjustments pipe, internal height position adjustments pipe With height and position adjusting rod, described internal height position adjustments pipe one end is connected by threaded end and the horizontal level regulation pipe Connect, the inwall of the other end and the external height position adjustments pipe is slidably connected, height and position adjusting rod one end and the inside The connection of height and position regulation pipe, the other end and height and position adjusting rod motor connect.
Preferably, the horizontal level regulation pipe includes outer horizontal position adjustments pipe, inner horizontal position adjustments pipe With horizontal level adjusting rod, described inner horizontal position adjustments pipe one end is connected by threaded end and the metope brush coating mechanism Connect, the inwall of the other end and the outer horizontal position adjustments pipe is slidably connected, horizontal level adjusting rod one end and the inside The connection of horizontal level regulation pipe, the other end and horizontal level adjusting rod motor connect.
Preferably, the baseboard pre-installation equipment also includes the remote control with the controller wireless connection.
The invention has the advantages that the baseboard pre-installation equipment of the present invention, after being installed on floor auxiliarily Plate installation system will be close on the wall brush on ground glue so as to the baseboard on subsequent installation floor automatically, save the peace on floor ETL estimated time of loading and installation manpower, and improve the effect of floor installation.
Brief description of the drawings
Fig. 1 is the structural representation that a kind of baseboard of the present invention pre-installs equipment;
Fig. 2 is the structural representation of the sponge brush of metope brush coating mechanism in Fig. 1;
Fig. 3 is the structural representation of the glue collecting box of metope brush coating mechanism in Fig. 1;
Fig. 4 is the structural representation of Tu1Zhong travel mechanisms;
Fig. 5 is the structural representation of the first absorption pedal disk expansion link in Fig. 4;
Fig. 6 is the structural representation of position adjusting mechanism in Fig. 1;
Wherein, 1, fuselage, 81, rubber-storing cylinder, 82, glue runner pipe, 83, sponge brush chuck, 84, sponge brush, 841, enter glue macropore, 842nd, plastic emitting aperture, 85, glue take out pump, 86, glue collecting box, 861, guiding gutter, 862, Ji Jiaokou;
2nd, travel mechanism, the 21, first sufficient body, the 22, second sufficient body, the 23, first absorption pedal disk, the 231, first absorption pedal disk vacuum hair Raw device, the 232, first absorption pedal disk expansion link motor, 233, elasticity adapter, 234, the bar of fixed telescopic half, 235, slide Formula is stretched half bar, and 236, mobile bar, the 24, second absorption pedal disk, the 25, first sufficient body motor, the 26, second sufficient body driving electricity Machine, the 27, first motor suction tray, the 28, second motor suction tray;
3rd, position adjusting mechanism, 31, horizontal level fixing pipe, 32, horizontal level regulation pipe, 321, outer horizontal position adjustments Pipe, 322, inner horizontal position adjustments pipe, 323, horizontal level adjusting rod, 324, horizontal level adjusting rod motor, 33, high Spend position adjustments pipe, 331, external height position adjustments pipe, 332, internal height position adjustments pipe, 333, height and position regulation Bar, 334, height and position adjusting rod motor.
Embodiment
Further illustrate technical scheme below in conjunction with the accompanying drawings and by embodiment.
As shown in Figures 1 to 3, a kind of baseboard pre-installation equipment, including fuselage 1, the control being arranged on inside the fuselage 1 Device and power-equipment, the travel mechanism 2 being connected with the one side of fuselage 1, the position being connected with 1 another opposite flank of fuselage Put governor motion 3, and the metope brush coating mechanism being connected with the position adjusting mechanism 3, the travel mechanism 2, the position Governor motion 3 and the metope brush coating mechanism are electrically connected with the controller.The baseboard pre-installation equipment is also wrapped The remote control with the controller wireless connection is included, staff can pre-install equipment by remote control control baseboard and will lean on Glue is simple and convenient so as to the baseboard on subsequent installation floor on subaerial wall brush.
The metope brush coating mechanism includes rubber-storing cylinder 81, the glue runner pipe 82 being connected with the rubber-storing cylinder 81, and described Glue runner pipe 82 connects sponge brush chuck 83, the sponge brush 84 with the sponge brush chuck dismantling connection, and is arranged on institute State the glue on glue runner pipe 82 and take out pump 85, the inside of sponge brush 84 is provided with glue amount detector, the glue runner pipe 82 End is connected with the sponge brush chuck 83 and is provided with switching door, the glue amount detector takes out pump 85 with the switching door and the glue It is electrically connected with.Glue quantity inside sponge brush 84 can be detected by glue amount detector, when glue quantity deficiency, the detection of glue amount Device can send a signal to switching door and glue takes out pump 85 so that switching door is opened, and glue takes out pump 85 by the glue in rubber-storing cylinder 81 It is evacuated in sponge brush 84.When the glue in sponge brush 84 is enough, glue amount detector can send a signal to switching door and glue again Take out pump 85 so that switching door is closed, and glue is taken out pump 85 and is stopped.
The sponge brush 84 is provided with into glue macropore 841 with the contact side of sponge brush chuck 83, is provided with metope contact side Plastic emitting aperture 842, some plastic emitting apertures 842 converge to be connected with entering glue macropore 841 described in one.Enter the setting of glue macropore 841 It is easy to glue to enter in sponge brush 84, the setting of plastic emitting aperture 842 is easy to glue equably to flow to the surface of sponge brush 84, makes it more Contacted with metope well, avoid glue from overflow phenomena occur.
The bottom of sponge brush 84 is provided with the glue collecting box 86 with the dismantling connection of sponge brush chuck 83, the glue The face that collecting box 86 and the sponge brush 84 are provided with the side contacts of plastic emitting aperture 842 is glue guide face, the glue water conservancy diversion bread Include top glue guide face and bottom glue guide face, the top glue guide face and the bottom glue guide face junction Set to the inner recess of glue collecting box 86, guiding gutter 861, institute are provided with from top to bottom on the outside of the top glue guide face Bottom glue guide face is stated provided with the collection glue mouth 862 with the outlet of guiding gutter 861.When sponge brush 84 contact with wall into During row brush coating, have a certain amount of glue and flowed down from bottom, the glue flowed down from bottom can flow into collection glue by guiding gutter 861 In mouth 862, hence into being recycled in glue collecting box 86, the glue directly drippage flowed down is avoided on the ground.
As shown in figure 4, the travel mechanism 2 include the first sufficient body 21 for being slidably connected with the fuselage 1 and with the machine The second sufficient body 22 that body 1 is fixedly connected.The first sufficient body 21 is provided with some first absorption pedal disks 23 with metope contact side, described First absorption pedal disk 23 is connected by the first absorption pedal disk expansion link of inner hollow with the described first sufficient body 21, first foot The inside of body 21 is provided with the first absorption pedal disk vacuum generator 231 and the first absorption pedal disk expansion link motor 232, and described first Sufficient body 21 is connected by the first sufficient body expansion link with the first sufficient body motor 25, and the first sufficient body motor 25 is by interior The first hollow motor suction tray expansion link of portion is connected with the first motor suction tray 27, inside the first sufficient body motor 25 Provided with the first motor suction tray vacuum generator and the first motor suction tray expansion link motor.
The second sufficient body 22 is provided with some second absorption pedal disks 24 with metope contact side, and the second absorption pedal disk 24 is logical The the second absorption pedal disk expansion link for crossing inner hollow is connected with the described second sufficient body 22, and the second sufficient inside of body 22 is provided with second Pedal disk vacuum generator and the second absorption pedal disk expansion link motor are adsorbed, the second sufficient body 22 is stretched by the second sufficient body Bar is connected with the second sufficient body motor 26, the second motor suction tray that the second sufficient body motor 26 passes through inner hollow Expansion link is connected with the second motor suction tray 28, and the second sufficient inside of body motor 26 is provided with the second motor suction tray vacuum Generator and the second motor suction tray expansion link motor.
When travel mechanism 2 works, first pass through the second absorption pedal disk vacuum generator, the second motor suction tray vacuum hair respectively Raw device and the first motor suction tray vacuum generator cause the second absorption pedal disk 24, and the second motor suction tray 28 and the first motor are inhaled Attached disk 27 securely fixes with wall, and makes the first absorption pedal disk 23 and wall point by the first absorption pedal disk vacuum generator 231 Open, then the first absorption pedal disk expansion link is driven the first absorption pedal disk by the first absorption pedal disk expansion link motor 232 23 shrink, then by the first sufficient body motor 25 drive the first sufficient body expansion link make the first sufficient body 21 along rail plate forward Certain distance is moved to, then, passes through the first absorption pedal disk vacuum generator 231 and the first absorption pedal disk expansion link motor 232 make the first absorption pedal disk 23 be securely fixed with wall.
Then, the first motor suction tray 27 is made to be separated with wall by the first motor suction tray vacuum generator, Ran Houtong Crossing the first motor suction tray expansion link motor shrinks the first motor suction tray expansion link, and drives electricity by the first sufficient body Machine 25 drives the first sufficient body expansion link to reset the first sufficient body motor 25, is then occurred by the first motor suction tray vacuum Device and the first motor suction tray expansion link motor make the first motor suction tray 27 be securely fixed with wall.
Followed by making the second absorption pedal disk 24 be separated with wall by the second absorption pedal disk vacuum generator, and pass through the Two absorption pedal disk expansion link motors shrink the second absorption pedal disk expansion link, are then driven by the second sufficient body motor 26 Dynamic second sufficient body expansion link by the second sufficient body 22 drive whole fuselage 1 move forward to the first sufficient identical position of body 21, so The second absorption pedal disk 24 and wall are made by the second absorption pedal disk vacuum generator and the second absorption pedal disk expansion link motor afterwards Wall securely fixes.
Finally, the second motor suction tray 28 is made to be separated with wall by the second motor suction tray vacuum generator, Ran Houtong Crossing the second motor suction tray expansion link motor shrinks the second motor suction tray expansion link, and makes the second sufficient body motor 26 the second sufficient body expansion links of driving are resetted, and then pass through the second motor suction tray vacuum generator and the second motor suction tray Expansion link motor makes the second motor suction tray 28 be securely fixed with wall, to complete travel mechanism 2 movement pace.
The first absorption He of pedal disk 23 is tightly connected as shown in figure 5, being provided with inside the first absorption pedal disk expansion link The elastic adapter 233 of the first absorption pedal disk vacuum generator 231, elastic adapter 233 can stretch with the first absorption pedal disk The flexible carry out applicability of bar is stretched.The first absorption pedal disk expansion link includes consolidating with what the described first sufficient body 21 was fixedly connected Fixed pattern is stretched half bar 234, and one end is fixedly connected with the described first absorption pedal disk 23, the other end and the bar of fixed telescopic half Flexible half bar 235 of slidingtype of 234 internal slides connection, and one end is connected with flexible half bar 235 of the slidingtype, the other end The mobile bar 236 being connected with the described first absorption pedal disk expansion link motor 232.When first absorption pedal disk expansion link need into When row shrinks, the first absorption pedal disk expansion link motor 232 drives mobile bar 236 to move so that slidingtype to be stretched half bar 235 The first absorption pedal disk 23 is driven to be moved inward along the inside slide rail of half bar of fixed telescopic 234 to realize the receipts of the first absorption pedal disk 23 Contracting.When the first absorption pedal disk expansion link needs to be extended, the first absorption pedal disk expansion link motor 232 drives mobile bar 236 movements are to drive the first absorption pedal disk 23 outside along the inside slide rail of half bar of fixed telescopic 234 on slidingtype half bar 235 that stretches Move to realize the elongation of the first absorption pedal disk 23.
Wherein, the first motor suction tray expansion link, the second absorption pedal disk expansion link, the knot of the second motor suction tray expansion link Structure and operation principle are similar to the structure and operation principle of the first absorption pedal disk expansion link.
As shown in fig. 6, the position adjusting mechanism 3 includes the horizontal level fixing pipe 31 being connected with the fuselage 1, with institute The horizontal level regulation pipe 32 of metope brush coating mechanism connection is stated, the horizontal level fixing pipe 31 is connected and the horizontal level is adjusted Save the height and position regulation pipe 33 of pipe 32.
The height and position regulation pipe 33 includes external height position adjustments pipe 331, the He of internal height position adjustments pipe 332 Height and position adjusting rod 333, described one end of internal height position adjustments pipe 332 are adjusted by threaded end and the horizontal level Pipe 32 connects, the inwall of the other end and the external height position adjustments pipe 331 is slidably connected, height and position adjusting rod 333 1 End is connected with the internal height position adjustments pipe 332, the other end and height and position adjusting rod motor 334 connect.
The horizontal level regulation pipe 32 includes outer horizontal position adjustments pipe 321, the He of inner horizontal position adjustments pipe 322 Horizontal level adjusting rod 323, described one end of inner horizontal position adjustments pipe 322 pass through threaded end and the metope brush coating mechanism Connection, the inwall of the other end and the outer horizontal position adjustments pipe 321 be slidably connected, the one end of horizontal level adjusting rod 323 and The inner horizontal position adjustments pipe 322 connects, the other end and horizontal level adjusting rod motor 324 connect.
The horizontal level fixing pipe 31 of position adjusting mechanism 3 is fixed, the external height position of height and position regulation pipe 33 Put regulation pipe 331 to be fixedly connected with horizontal level fixing pipe 31, the internal height position adjustments pipe 332 of height and position regulation pipe 33 It is fixedly connected with the outer horizontal position adjustments pipe 321 of horizontal level regulation pipe 32, height and position adjusting rod motor 334 can Height and position adjusting rod is driven to be stretched about 333 to cause internal height position adjustments pipe 332 in outside height and position regulation pipe Slided up and down in 331, so as to reach the purpose of regulation metope brush coating mechanism height.
Horizontal level adjusting rod motor 324 can drive the horizontal extension of horizontal level adjusting rod 323 to cause internal water Prosposition puts the horizontal slip in outside horizontal level regulation pipe 321 of regulation pipe 322, so as to reach regulation metope brush coating mechanism and wall Identity distance from purpose.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the design of the present invention It is defined with scope.On the premise of design concept of the present invention is not departed from, technical side of the ordinary people in the field to the present invention The all variations and modifications that case is made, all should drop into protection scope of the present invention, the claimed technology contents of the present invention, Through all recording in detail in the claims.

Claims (9)

1. a kind of baseboard pre-installs equipment, it is characterised in that:Including fuselage(1), it is arranged on the fuselage(1)Internal control Device and power-equipment, with the fuselage(1)The travel mechanism of one side connection(2), with the fuselage(1)Another opposite flank connects The position adjusting mechanism connect(3), and with the position adjusting mechanism(3)The metope brush coating mechanism of connection, the travel mechanism (2), the position adjusting mechanism(3)And the metope brush coating mechanism is electrically connected with the controller;The wall brush Gluing mechanism includes rubber-storing cylinder(81), with the rubber-storing cylinder(81)The glue runner pipe of connection(82), with the glue runner pipe (82)Connect sponge brush chuck(83), the sponge brush with the sponge brush chuck dismantling connection(84), and it is arranged on the glue Current siphunculus(82)On glue take out pump(85), the sponge brush(84)Inside is provided with glue amount detector, the glue runner pipe (82)With the sponge brush chuck(83)Connection end is provided with switching door, the glue amount detector and the switching door and the glue Take out pump(85)It is electrically connected with.
A kind of 2. baseboard pre-installation equipment according to claim 1, it is characterised in that:The sponge brush(84)With it is described Sponge brush chuck(83)Contact side is provided with into glue macropore(841)And metope contact side is provided with plastic emitting aperture(842), it is some described Plastic emitting aperture(842)Converge with entering glue macropore described in one(841)Connection.
A kind of 3. baseboard pre-installation equipment according to claim 1, it is characterised in that:The sponge brush(84)Bottom is set Have and the sponge brush chuck(83)The glue collecting box of dismantling connection(86), the glue collecting box(86)With the sponge brush (84)Provided with plastic emitting aperture(842)The face of side contacts is glue guide face, and the glue guide face includes top glue guide face With bottom glue guide face, the top glue guide face and the bottom glue guide face junction are to the glue collecting box (86)Inner recess is set, and guiding gutter is provided with from top to bottom on the outside of the top glue guide face(861), the bottom glue leads Stream interface is provided with and the guiding gutter(861)The Ji Jiaokou of outlet(862).
A kind of 4. baseboard pre-installation equipment according to claim 1, it is characterised in that:The travel mechanism(2)Including With the fuselage(1)The first sufficient body being slidably connected(21)With with the fuselage(1)The second sufficient body being fixedly connected(22);
The first sufficient body(21)The some first absorption pedal disks are provided with metope contact side(23), the first absorption pedal disk(23) Pass through the first absorption pedal disk expansion link of inner hollow and the described first sufficient body(21)Connection, the first sufficient body(21)Inside is set There are the first absorption pedal disk vacuum generator (231) and the first absorption pedal disk expansion link motor (232), the first sufficient body (21)Pass through the first sufficient body expansion link and the first sufficient body motor(25)Connection, the first sufficient body motor(25)Pass through The the first motor suction tray expansion link and the first motor suction tray of inner hollow(27)Connection, the first sufficient body motor (25)Inside is provided with the first motor suction tray vacuum generator and the first motor suction tray expansion link motor;
The second sufficient body(22)The some second absorption pedal disks are provided with metope contact side(24), the second absorption pedal disk(24) Pass through the second absorption pedal disk expansion link of inner hollow and the described second sufficient body(22)Connection, the second sufficient body(22)Inside is set There are the second absorption pedal disk vacuum generator and the second absorption pedal disk expansion link motor, the second sufficient body(22)Pass through second Sufficient body expansion link and the second sufficient body motor(26)Connection, the second sufficient body motor(26)Pass through the of inner hollow Two motor suction tray expansion links and the second motor suction tray(28)Connection, the second sufficient body motor(26)Inside is provided with the Two motor suction tray vacuum generators and the second motor suction tray expansion link motor.
A kind of 5. baseboard pre-installation equipment according to claim 4, it is characterised in that:The first absorption pedal disk stretches It is provided with inside bar and is tightly connected the first absorption pedal disk(23)With the elasticity of the described first absorption pedal disk vacuum generator (231) Adapter(233), the first absorption pedal disk expansion link includes and the described first sufficient body(21)The fixed telescopic being fixedly connected half Bar(234), pedal disk is adsorbed in one end with described first(23)It is fixedly connected, the other end and the bar of fixed telescopic half(234)It is interior Flexible half bar of slidingtype that portion is slidably connected(235), and one end and flexible half bar of the slidingtype(235)Connection, the other end The mobile bar being connected with the described first absorption pedal disk expansion link motor (232)(236).
A kind of 6. baseboard pre-installation equipment according to claim 1, it is characterised in that:The position adjusting mechanism(3) Including with the fuselage(1)The horizontal level fixing pipe of connection(31), the horizontal level that is connected with the metope brush coating mechanism adjusts Section pipe(32), connect the horizontal level fixing pipe(31)With the horizontal level regulation pipe(32)Height and position regulation pipe (33).
A kind of 7. baseboard pre-installation equipment according to claim 6, it is characterised in that:The height and position regulation pipe (33)Including external height position adjustments pipe(331), internal height position adjustments pipe(332)With height and position adjusting rod(333), The internal height position adjustments pipe(332)One end passes through threaded end and the horizontal level regulation pipe(32)Connect, be another End and the external height position adjustments pipe(331)Inwall be slidably connected, height and position adjusting rod(333)One end with it is described interior Portion's height and position regulation pipe(332)Connection, the other end and height and position adjusting rod motor(334)Connection.
A kind of 8. baseboard pre-installation equipment according to claim 6, it is characterised in that:The horizontal level regulation pipe (32)Including outer horizontal position adjustments pipe(321), inner horizontal position adjustments pipe(322)With horizontal level adjusting rod(323), The inner horizontal position adjustments pipe(322)One end is connected by threaded end with the metope brush coating mechanism, the other end and institute State outer horizontal position adjustments pipe(321)Inwall be slidably connected, horizontal level adjusting rod(323)One end and the inner horizontal Position adjustments pipe(322)Connection, the other end and horizontal level adjusting rod motor(324)Connection.
A kind of 9. baseboard pre-installation equipment according to claim 1, it is characterised in that:The baseboard pre-installs equipment Also include the remote control with the controller wireless connection.
CN201711009041.7A 2017-10-25 2017-10-25 Baseboard preinstallation equipment Active CN107762110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711009041.7A CN107762110B (en) 2017-10-25 2017-10-25 Baseboard preinstallation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711009041.7A CN107762110B (en) 2017-10-25 2017-10-25 Baseboard preinstallation equipment

Publications (2)

Publication Number Publication Date
CN107762110A true CN107762110A (en) 2018-03-06
CN107762110B CN107762110B (en) 2023-06-23

Family

ID=61270577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711009041.7A Active CN107762110B (en) 2017-10-25 2017-10-25 Baseboard preinstallation equipment

Country Status (1)

Country Link
CN (1) CN107762110B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05163831A (en) * 1991-12-17 1993-06-29 Kyokuto Sanki Kk Wall paper sticking device
CN205199825U (en) * 2015-12-21 2016-05-04 杭州启澄科技有限公司 Wall paper rubberizing ware for decoration
CN205654051U (en) * 2016-08-23 2016-10-19 东亚装饰股份有限公司 Quick painting device of wall for interior decoration
CN205907989U (en) * 2016-07-11 2017-01-25 浙江启德新材料有限公司 Brush mucilage binding is put for wood -plastic wallboard
CN107100352A (en) * 2017-05-25 2017-08-29 韩登银 A kind of wall covering safeguards unmanned plane
CN206464149U (en) * 2017-05-02 2017-09-05 延锋彼欧(沈阳)汽车外饰系统有限公司 A kind of automatic adhesive application system
CN207377056U (en) * 2017-10-25 2018-05-18 浙江坤鸿新材料有限公司 A kind of baseboard pre-installs equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05163831A (en) * 1991-12-17 1993-06-29 Kyokuto Sanki Kk Wall paper sticking device
CN205199825U (en) * 2015-12-21 2016-05-04 杭州启澄科技有限公司 Wall paper rubberizing ware for decoration
CN205907989U (en) * 2016-07-11 2017-01-25 浙江启德新材料有限公司 Brush mucilage binding is put for wood -plastic wallboard
CN205654051U (en) * 2016-08-23 2016-10-19 东亚装饰股份有限公司 Quick painting device of wall for interior decoration
CN206464149U (en) * 2017-05-02 2017-09-05 延锋彼欧(沈阳)汽车外饰系统有限公司 A kind of automatic adhesive application system
CN107100352A (en) * 2017-05-25 2017-08-29 韩登银 A kind of wall covering safeguards unmanned plane
CN207377056U (en) * 2017-10-25 2018-05-18 浙江坤鸿新材料有限公司 A kind of baseboard pre-installs equipment

Also Published As

Publication number Publication date
CN107762110B (en) 2023-06-23

Similar Documents

Publication Publication Date Title
CN205756174U (en) A kind of solid soilless culturing intelligent robot
CN206119377U (en) Integrated device is air -dried in sole rubberizing for shoemaking
CN108577048B (en) Rubber spraying equipment for bonding soles of leather shoes
CN208643141U (en) A kind of woven carpet processing device of controllable glue amount
CN207377056U (en) A kind of baseboard pre-installs equipment
CN107762110A (en) A kind of baseboard pre-installs equipment
CN207377148U (en) A kind of baseboard installs pretreatment unit
CN106214082A (en) A kind of wallboard cleaning device
CN105133483B (en) A kind of cooling overline bridge
CN106940127A (en) A kind of manufacturing writing brush quick drying plant of nib
CN206718859U (en) Quick-drying Art Design art work colouring drying device
CN107806233A (en) A kind of composite floor board installation system
CN207377055U (en) A kind of baseboard erecting device for composite floor board
CN210316370U (en) Super wear-resisting solid wood floor
CN207377073U (en) A kind of floor is installed by damp-proof membrane laying apparatus
CN207377061U (en) A kind of composite floor board baseboard installation system
CN209534427U (en) A kind of synthetic leather surface treatment equipment for coating film
CN107620474A (en) A kind of baseboard installs pretreatment unit
CN207377074U (en) A kind of composite floor board installation system
CN207377149U (en) A kind of pretreatment floor installation equipment
CN107795101A (en) A kind of baseboard erecting device for composite floor board
CN107752912A (en) A kind of floor is installed by floor cleaning device
CN207022707U (en) A kind of automatically cleaning warmhouse booth
CN107740561A (en) A kind of composite floor board baseboard installation system
CN205743067U (en) A kind of finishing is with efficiently digging floor apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230531

Address after: 214000 No.9, Fangqian Fangxing Road, Xinwu District, Wuxi City, Jiangsu Province

Applicant after: Jiangsu xinsuyang Construction Co.,Ltd.

Address before: 313000 Anji County, Huzhou City, Zhejiang Province

Applicant before: ZHEJIANG KUN HONG NEW MATERIALS Co.,Ltd.

GR01 Patent grant
GR01 Patent grant