CN107755727B - A kind of processing method of helicopter filling block insert drilling - Google Patents

A kind of processing method of helicopter filling block insert drilling Download PDF

Info

Publication number
CN107755727B
CN107755727B CN201610709405.1A CN201610709405A CN107755727B CN 107755727 B CN107755727 B CN 107755727B CN 201610709405 A CN201610709405 A CN 201610709405A CN 107755727 B CN107755727 B CN 107755727B
Authority
CN
China
Prior art keywords
hole
numerical control
filling block
block insert
filler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610709405.1A
Other languages
Chinese (zh)
Other versions
CN107755727A (en
Inventor
于立波
武子珺
郭正君
时红丹
李乾玥
刘楠
姜吉明
孙坐瑞
崔宝东
高宏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Aircraft Industry Group Co Ltd
Original Assignee
Harbin Aircraft Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Aircraft Industry Group Co Ltd filed Critical Harbin Aircraft Industry Group Co Ltd
Priority to CN201610709405.1A priority Critical patent/CN107755727B/en
Publication of CN107755727A publication Critical patent/CN107755727A/en
Application granted granted Critical
Publication of CN107755727B publication Critical patent/CN107755727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B35/00Methods for boring or drilling, or for working essentially requiring the use of boring or drilling machines; Use of auxiliary equipment in connection with such methods

Abstract

The invention belongs to technical fields of mechanical processing.A kind of processing method of helicopter filling block insert drilling bores just hole using locating auricle positioning numerical control processing, injects filler, after solidification, uses the secondary positioning of locating auricle, numerical control processing filling block insert hole position processing method again.Metal decking sandwich of the present invention and composite honeycomb sandwich structures filling block insert drilling processing, as floor level drilling is processed.Product quality can be improved, be avoided the size in hole and position degree overproof with filling block insert drilling processing by inventing this process.

Description

A kind of processing method of helicopter filling block insert drilling
Technical field
The invention belongs to technical fields of mechanical processing.
The prior art
Metal decking sandwich and the drilling of composite honeycomb sandwich structures filling block insert, existing method is using brill Mould positions hand drill, and the size and position degree in bring hole are overproof, cannot meet porous required precision simultaneously, and meet Product, which does not exchange, requires.Product quality requirement: bore dia tolerance+0.05mm, hole site tolerance+0.05mm, pore size essence Degree should be down to less than H8.
The purpose of invention
Inventing one kind can be improved product quality, improve the process of the qualification rate of product.Other types are mentioned simultaneously Experience for reference is supplied.
The content of invention
Just hole is bored using locating auricle positioning numerical control processing, injects filler, after solidification, uses locating ear again The secondary positioning of piece, numerical control processing filling block insert hole position processing method.
A kind of processing method of helicopter filling block insert drilling, comprising the following steps:
The part for installing filling block insert is put into numerical control tooling and is positioned for the first time by step 1, using technical lug standard Determine position, it is desirable that positioning process auricle quantity is no less than at 2;
Step 2 processes just hole by numerical control program numerical control on part, and aperture φ 3mm, alloy bit is by being lower than 5000r/ The revolving speed of min, the speed feed lower than 2m/s;
Step 3 expands the diameter in first hole to insert diameter with stroke hole drill by guide hole of the first hole of φ 3mm, with " hook-type " Tool takes out the honeycomb core between two layers of covering of part.The gas vent of 1.5mm diameter is bored near first hole simultaneously;
Step 4, injection filler: being sealed at first hole using adhesive tape, protection hole edge skin, is marked just hole with tool, is filled out The casting of material is carried out with colloid-injecting gun.Filler is slowly injected into from first hole, is shown when filler is uniformly flowed out from gas vent tentatively It fills, the injecting glue again after 15 minutes shows to fill completely when filler uniformly flows out again;
Step 5, solidification
One of with the following method solidification:
A) solidify 8 hours at 18 DEG C of environment temperature > plus 1 hour at 65 DEG C.
B) part can be moved after 7 days, 24 hours in the case where 18 DEG C of environment temperature >.
Step 6, after curing of the glue removes band glue, clears up extra glue, forms filling block insert.
Part is placed into numerical control tooling second and positions by step 7, using with the consistent positioning of first time technical lug Auricle is accurately positioned;It is required that positioning process auricle quantity is no less than at 2;
Step 8 processes whole hole by numerical control program numerical control on first hole site, and aperture φ 5.5mm, alloy bit is by being lower than The revolving speed of 4000r/min, the speed feed lower than 3m/s;
Step 9 cleans out fifth wheel in whole hole, wipes borings with clean cloth or uses wind;
Step 11 checks: the angle of whole axially bored line and skin-surface should be 90 ± 2 °, and panel surface bumps limit deviation ± 0.30mm。
The effect of invention
Metal decking sandwich of the present invention and composite honeycomb sandwich structures filling block insert drilling processing, such as visitor Cabin floor drilling processing.Inventing this process can be used for filling block insert drilling processing, improves product quality, avoids hole Size and position degree it is overproof.
Detailed description of the invention
Fig. 1: the machining sketch chart of helicopter filling block insert drilling;
1, technical lug location hole;
2, filling block insert;
3, hole need to be processed.
Specific embodiment
Method of the invention is: hole at the beginning of part is placed into numerical control tooling positioning → numerical control processing for the first time → stroke honeycomb → It adjusts 17# filler → injection filler → solidification → extra glue cleaning → part to be placed into second of positioning → numerical control in numerical control tooling to add Filling block insert drilling processing is completed in work end hole → cleaning → inspection.The method is suitable for the composite wood of any curved surface, plane Flitch part filling block insert drilling processing.Fig. 1 is the machining sketch chart of helicopter filling block insert drilling, as shown in Figure 1, It is provided with technical lug location hole 1 on part, filling block insert 2, hole 3 need to be processed.
Step 1 will position for the first time on part to numerical control tooling, and technical lug is accurately positioned;It is required that positioning process auricle Quantity is no less than at 2;
Step 2, by numerical control program numerical control processing, just hole, aperture φ 3mm, alloy bit (are lower than 5000r/ by the slow-speed of revolution Min), low feeding (being lower than 2m/s);
The diameter in insert hole is expanded to insert diameter with stroke hole drill by guide hole of the hole of φ 3mm and uses " hook-type " by step 3 Tool takes out the honeycomb core between two layers of covering.Taken out honeycomb diameter answers the regulation of coincidence pattern.It nearby bores simultaneously The gas vent of 1.5mm diameter;
Note: taken out honeycomb diameter answers the regulation of coincidence pattern.It is especially careful not push away, draw exterior skin (otherwise to will lead to The layering of covering).Borings are wiped with clean cloth or with wind (wanting oil-free anhydrous).
Step 4 is provided to adjust 17# filler by technical papers, injects filler: being sealed at first hole using adhesive tape, protect hole edge Edge covering marks just hole, the casting of filler with tool and is carried out with colloid-injecting gun.Colloid-injecting gun is SEMCO type pneumatic type, and having can The packing element C250 and adhesive pouring nozzle of disassembly.Filler is slowly injected into from a hole (hole for injecting glue), equal from another hole (gas vent) to filler Show tentatively to fill when uniform flow goes out, the injecting glue again after about 15 minutes shows to infuse completely when filler uniformly flows out again It is full;
Note: colloid-injecting gun, adhesive pouring nozzle and various containers are cleaned with solvent immediately after use.
Step 5, solidification
One of with the following method solidification:
C) solidify 8 hours at 18 DEG C of environment temperature > plus 1 hour at 65 DEG C.
D) in the case where 18 DEG C of environment temperature > 7 days.Part can be moved after 24 hours.
Step 6, after curing of the glue removes band glue, clears up extra glue.It is removed if any extra glue knife or scraper plate, Zhi Houyong Dip in the cloth cleaning of alcohol.Before solvent volatilization, surface is wiped with dry cloth is cleaned.
Step 7, part are placed into numerical control tooling second and position, using with the consistent chucking lug of first time technical lug Piece is accurately positioned;It is required that positioning process auricle quantity is no less than at 2;
Step 8 presses numerical control program numerical control processing end hole, aperture φ 5.5mm, and alloy bit (is lower than by the slow-speed of revolution 4000r/min), low feeding (being lower than 3m/s);
Step 9, cleaning are portalled interior fifth wheel, wipe borings with clean cloth or with wind (wanting oil-free anhydrous).
Step 10 checks: the angle of insert axially bored line and skin-surface should be 90 ± 2 °.The panel surface bumps limit is inclined Difference ± 0.30mm.

Claims (1)

1. a kind of processing method of helicopter filling block insert drilling, characterized in that the following steps are included:
The part for installing filling block insert is put into numerical control tooling and is positioned for the first time by step 1, accurately fixed using technical lug Position, it is desirable that positioning process auricle quantity is no less than at 2;
Step 2 processes just hole, aperture by numerical control program numerical control on partAlloy bit is by being lower than 5000r/min Revolving speed, lower than 2m/s speed feed;
Step 3, with draw hole drill withFirst hole be guide hole the diameter in first hole is expanded to insert diameter, with " hook-type " tool Honeycomb core between two layers of covering of part is taken out;The gas vent of 1.5mm diameter is bored near first hole simultaneously;
Step 4, injection filler: being sealed at first hole using adhesive tape, protection hole edge skin, marks just hole with tool, filler Casting is carried out with colloid-injecting gun;Filler is slowly injected into from first hole, shows tentatively to fill when filler is uniformly flowed out from gas vent, The injecting glue again after 15 minutes shows to fill completely when filler uniformly flows out again;
Step 5, solidification
One of with the following method solidification:
A) solidify 8 hours at 18 DEG C of environment temperature > plus 1 hour at 65 DEG C;
B) part can be moved after 7 days, 24 hours in the case where 18 DEG C of environment temperature >;
Step 6, after curing of the glue removes band glue, clears up extra glue, forms filling block insert;
Part is placed into numerical control tooling second and positions by step 7, using with the consistent locator tabs of first time technical lug It is accurately positioned;It is required that positioning process auricle quantity is no less than at 2;
Step 8 processes whole hole, aperture by numerical control program numerical control on first hole siteAlloy bit is by being lower than The revolving speed of 4000r/min, the speed feed lower than 3m/s;
Step 9 cleans out fifth wheel in whole hole, wipes borings with clean cloth or uses wind;
Step 11 checks: the angle of whole axially bored line and skin-surface should be 90 ± 2 °, and panel surface bumps limit deviation ± 0.30mm。
CN201610709405.1A 2016-08-23 2016-08-23 A kind of processing method of helicopter filling block insert drilling Active CN107755727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610709405.1A CN107755727B (en) 2016-08-23 2016-08-23 A kind of processing method of helicopter filling block insert drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610709405.1A CN107755727B (en) 2016-08-23 2016-08-23 A kind of processing method of helicopter filling block insert drilling

Publications (2)

Publication Number Publication Date
CN107755727A CN107755727A (en) 2018-03-06
CN107755727B true CN107755727B (en) 2019-07-09

Family

ID=61263651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610709405.1A Active CN107755727B (en) 2016-08-23 2016-08-23 A kind of processing method of helicopter filling block insert drilling

Country Status (1)

Country Link
CN (1) CN107755727B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109591334B (en) * 2018-10-12 2021-04-30 江西昌河航空工业有限公司 Positioning method for punching honeycomb part
CN113579650B (en) * 2021-07-26 2022-11-18 成都飞机工业(集团)有限责任公司 Part machining method for improving one-time clamping success rate of numerically-controlled machining honeycomb

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5478700A (en) * 1993-12-21 1995-12-26 International Business Machines Corporation Method for applying bonding agents to pad and/or interconnection sites in the manufacture of electrical circuits using a bonding agent injection head
CN101596667A (en) * 2009-04-23 2009-12-09 贵州航天精工制造有限公司 A kind of on composite the method and the structure of embedding nut
CN106342038B (en) * 2011-01-04 2014-02-05 哈尔滨飞机工业集团有限责任公司 Composite tubular honeycomb sandwich construction preparation method
CN104551534A (en) * 2013-10-29 2015-04-29 青岛天恒机械有限公司 Numerical control machining method for large-size entire magnesium alloy casting
CN204937475U (en) * 2015-08-14 2016-01-06 中国航空工业集团公司西安飞机设计研究所 A kind of insert and there is its honeycomb structure and aircraft

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5478700A (en) * 1993-12-21 1995-12-26 International Business Machines Corporation Method for applying bonding agents to pad and/or interconnection sites in the manufacture of electrical circuits using a bonding agent injection head
CN101596667A (en) * 2009-04-23 2009-12-09 贵州航天精工制造有限公司 A kind of on composite the method and the structure of embedding nut
CN106342038B (en) * 2011-01-04 2014-02-05 哈尔滨飞机工业集团有限责任公司 Composite tubular honeycomb sandwich construction preparation method
CN104551534A (en) * 2013-10-29 2015-04-29 青岛天恒机械有限公司 Numerical control machining method for large-size entire magnesium alloy casting
CN204937475U (en) * 2015-08-14 2016-01-06 中国航空工业集团公司西安飞机设计研究所 A kind of insert and there is its honeycomb structure and aircraft

Also Published As

Publication number Publication date
CN107755727A (en) 2018-03-06

Similar Documents

Publication Publication Date Title
US8137607B2 (en) Process for making reusable tooling
CN1098152C (en) Dual purpose lay-up tool
US9238337B2 (en) Molding die and molding method
EP2222454B1 (en) A method of repairing a fibre composite solid member
CN107755727B (en) A kind of processing method of helicopter filling block insert drilling
CN103639101B (en) Method for coating abradable coating of composite containing ring of aircraft engine
US11220043B2 (en) Method for building three-dimensional cylindrical objects
US8815345B2 (en) Method for fabricating three dimensional models
CN107328316B (en) Preparation method of aerospace projectile body heat-proof structure
JP2015226935A (en) Ceramic casting core made by additive manufacturing
CN107096882B (en) Casting mold based on 3D printing and preparation method of casting mold
CN104020031A (en) Manufacturing method of PCB (Printed Circuit Board) section and microsection sample
CN112521130A (en) Preparation method of ceramic part based on 3D printing technology
TWI640419B (en) Rapid printing apparatus and printing method using the same
CA2891597A1 (en) Patternless sand mold and core formation for rapid casting
CN101750239B (en) Method for processing composite material test plate
CA3105870C (en) Systems, methods, and apparatus for flow media associated with the manufacture of components
CN109257885A (en) Wiring board method for plugging and wiring board hole plugging equipment
CN109604928A (en) A kind of composite material body structural member damage rehabilitation method
CN114054814B (en) Milling method for heat-proof layer
CN105235208A (en) Spray printing method for two-dimensional or three-dimensional article and rapid spray printing device
CN109849099A (en) A method of preventing carbon fiber component drilling defect
CN103394762A (en) Skin allowance cutting method for aircraft components or parts
CN105269814A (en) Rapid prototyping device
EP3733380B1 (en) Systems and methods for support material removal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant