CN106342038B - Composite tubular honeycomb sandwich construction preparation method - Google Patents

Composite tubular honeycomb sandwich construction preparation method

Info

Publication number
CN106342038B
CN106342038B CN201110010001.0A CN201110010001A CN106342038B CN 106342038 B CN106342038 B CN 106342038B CN 201110010001 A CN201110010001 A CN 201110010001A CN 106342038 B CN106342038 B CN 106342038B
Authority
CN
China
Prior art keywords
laying
frock
vacuum bag
vacuum
shaping mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110010001.0A
Other languages
Chinese (zh)
Inventor
王庆有
宋文娟
于宏伟
于立波
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Aircraft Industry Group Co Ltd
Original Assignee
Harbin Aircraft Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Aircraft Industry Group Co Ltd filed Critical Harbin Aircraft Industry Group Co Ltd
Priority to CN201110010001.0A priority Critical patent/CN106342038B/en
Application granted granted Critical
Publication of CN106342038B publication Critical patent/CN106342038B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to Composites Molding Techniques, relate to a kind of improvement to large-sized composite tubular honeycomb sandwich construction preparation method. The present invention increases a set of laying frock (this laying frock profile is shape in product), changes laying flow process and reaches the object that realizes laying, and laying step is as follows: paste vacuum bag; Paved inside panel, honeycomb, exterior skin; Laying frock is put into shaping mould; Vacuum bag in laying frock is oppositely made on shaping mould and vacuumized; Laying frock is taken out in shaping mould; Original vacuum bag is removed, again made vacuum bag. The present invention is by increasing laying frock, will on shaping mould, be difficult to the laying that realizes, transfers to and in laying frock, carries out laying, thereby solved the problem that is difficult to realize laying in large scale, honeycomb sandwich construction traditional operation.

Description

Composite tubular honeycomb sandwich construction preparation method
Technical field
The invention belongs to Composites Molding Techniques, relate to a kind of to large-sized composite tubularHoneycomb sandwich construction preparation method's improvement.
Background technology
The manufacture of existing honeycomb sandwich construction, all taking theoretical profile as forming frock profile, to cylinderThe honeycomb sandwich construction product of shape structure, theoretical profile is outer surface, so forming frock is tubularDie, the roofing that its inner surface is product, traditional laying method is: first on forming frockPaved exterior skin, repaves honeycomb processed, inside panel and finally makes vacuum bag. This tradition forming method existsShortcoming in large scale tubular honeycomb sandwich construction is: due to narrow space, and when structure is longer, peopleMember cannot enter shaping mould inner side, will be difficult to carry out laying.
Summary of the invention
The object of the invention is to propose the laying of a kind of adaptation and large scale, tubular honeycomb sandwich constructionMethod.
Technical scheme of the present invention is:
(1) prepare laying frock, the profile of laying frock is corresponding with shape in product, and laying frock isPunch structure;
(2) paste normal-temperature vacuum bag, in laying frock, paste normal-temperature vacuum with normal-temperature vacuum filmBag also vacuumizes all the time, vacuum 0.06~0.09Mpa, and vacuum bag is more than product circumferential direction staysAmount 100~150mm, vacuum bag is at product length direction two ends made allowance 200~250mm, and general is normalTemperature vacuum bag sticks in laying frock by adhesive tape;
(3) paved inside panel: 2~3 layers of inside panel laying of every paving on normal-temperature vacuum bag, carry outOnce vacuumize compacting, vacuum 0.06~0.09Mpa, last one deck laying is carried out once againVacuumize compacting, vacuum 0.06~0.09Mpa;
(4) place honeycomb;
(5) paved exterior skin: the paved one deck exterior skin on honeycomb, vacuumizes compacting, vacuumDegree 0.06~0.09Mpa, then, 2~3 layers of exterior skin laying of every paving, once vacuumize pressureReal, vacuum 0.06~0.09Mpa, last one deck laying once vacuumizes compacting again,Vacuum 0.06~0.09Mpa;
(6) preform that above-mentioned (1)~prepared by (5) is put into shaping mould, matched moulds;
(7) adhesive tape of the normal-temperature vacuum bag in laying frock is taken off, by normal-temperature vacuum bag adhesive tapeOppositely stick on shaping mould and vacuumize, vacuum 0.06~0.09Mpa;
(8) laying frock is taken out in shaping mould;
(9) normal-temperature vacuum bag is removed, again made high temperature resistant vacuum bag, enter stove and solidify.
Described shaping mould is upper and lower involutory die body, when moulding, first laying frock is put into mouldingIn the lower mold body of mould, then the upper die body that closes.
The advantage that the present invention has and beneficial effect, the present invention is by increasing laying frock and improving pavingThe means of layer order, have reduced the laying difficulty of product, have solved narrow space, and personnel cannot enterEnter shaping mould inner side, be difficult to carry out the difficult point of laying, and improve the operability of laying and ensure layingQuality.
Detailed description of the invention
Below the present invention is described in further details. Large scale tubular honeycomb sandwich construction laying sideMethod, is characterized in that, (this laying frock profile is shape in product, knot to increase a set of laying frockStructure is punch, can make operator carry out easily laying in the outside of frock), change laying order and reachTo the object that realizes laying. Concrete step is as follows:
1, paste vacuum bag: in laying frock, only have normal-temperature vacuum film to paste normal-temperature vacuum bag alsoAll the time vacuumize vacuum 0.06~0.09Mpa; To ensure the laminating of vacuum bag and laying frock,There is no large fold. Vacuum bag should reserve necessarily in product circumferential direction and product length direction two endsSurplus; Vacuum bag is at product circumferential direction made allowance 100~150mm, and vacuum bag is at product lengthDirection two ends made allowance 200~250mm,
2, paved inside panel: 2~3 layers of inside panel laying of every paving on vacuum bag, once take outVacuum debulk, last one deck laying will once vacuumize compacting, vacuum 0.06~ 0.09Mpa;
3, place honeycomb;
4, paved exterior skin: the ground floor on honeycomb vacuumizes compacting, vacuum 0.06~After 0.09Mpa, 2~3 layers of exterior skin laying of every paving, once vacuumize compacting, last one deckLaying once vacuumizes compacting, vacuum 0.06~0.09Mpa;
5, laying frock is put into shaping mould: for guarantee laying frock can be put into moulding smoothlyIn mould, this shaping mould need to carry out piecemeal, generally can be divided into upper and lower involutory die body, first by layingFrock is put into the lower mold body of shaping mould, then the upper die body that closes;
6, the normal-temperature vacuum bag in laying frock is oppositely made on shaping mould and vacuumized;
7, laying frock is taken out in shaping mould: generally produce haulage gear in laying frock,Adopt trailer that laying frock is extracted from shaping mould;
8, original normal-temperature vacuum bag is removed, (this place is for normal true again to make high temperature resistant vacuum bagThe preparation of empty bag, contains barrier film, ventilative station, vacuum film), enter stove and solidify.
The principle that the present invention realizes laying is: by increasing laying frock, and will be difficult on shaping mouldWith the laying realizing, transfer to and in laying frock, carry out laying, thereby solved large scale, honeycombIn sandwich traditional operation, be difficult to realize the problem of laying.
Embodiment
Tail boom diameter 1200mm, length 2300mm, preparation as follows,
(1) prepare laying frock, the profile of laying frock is corresponding with shape in product, and laying frock isPunch structure;
(2) paste normal-temperature vacuum bag, in laying frock, paste normal-temperature vacuum with normal-temperature vacuum filmBag also vacuumizes all the time, vacuum 0.06~0.09Mpa, and vacuum bag is more than product circumferential direction staysAmount 100mm, product length direction two ends made allowance 250mm, and normal-temperature vacuum bag is pasted by adhesive tapeIn laying frock;
(3) paved inside panel: 2~3 layers of inside panel laying of every paving on normal-temperature vacuum bag, carry outOnce vacuumize compacting, vacuum 0.06~0.09Mpa, last one deck laying is carried out once againVacuumize compacting, vacuum 0.06~0.09Mpa;
(4) place honeycomb;
(5) paved exterior skin: the paved one deck exterior skin on honeycomb, vacuumizes compacting, vacuumDegree 0.06~0.09Mpa, then, 2~3 layers of exterior skin laying of every paving, once vacuumize pressureReal, vacuum 0.06~0.09Mpa, last one deck laying once vacuumizes compacting again,Vacuum 0.06~0.09Mpa;
(6) preform that above-mentioned (1)~prepared by (5) is put into shaping mould, matched moulds;
(7) adhesive tape of the normal-temperature vacuum bag in laying frock is taken off, by normal-temperature vacuum bag adhesive tapeOppositely stick on shaping mould and vacuumize, vacuum 0.06~0.09Mpa;
(8) laying frock is taken out in shaping mould;
(9) normal-temperature vacuum bag is removed, again made high temperature resistant vacuum bag, transfer in shaping mouldSolidify, after size and Non-Destructive Testing inspection, properties of product meet design requirement.

Claims (2)

1. a composite tubular honeycomb sandwich construction preparation method, is characterized in that,
(1) prepare laying frock, the profile of laying frock is corresponding with shape in product, and laying frock isPunch structure;
(2) paste normal-temperature vacuum bag, in laying frock, paste normal-temperature vacuum with normal-temperature vacuum filmBag also vacuumizes all the time, vacuum 0.06~0.09MPa, and vacuum bag is more than product circumferential direction staysAmount 100~150mm, vacuum bag is at product length direction two ends made allowance 200~250mm, and general is normalTemperature vacuum bag sticks in laying frock by adhesive tape;
(3) paved inside panel: 2~3 layers of inside panel laying of every paving on normal-temperature vacuum bag, carry outOnce vacuumize compacting, vacuum 0.06~0.09MPa, last one deck laying is carried out once againVacuumize compacting, vacuum 0.06~0.09MPa;
(4) place honeycomb;
(5) paved exterior skin: paved one deck exterior skin on honeycomb, vacuumizes compacting, vacuum0.06~0.09MPa, then, 2~3 layers of exterior skin laying of every paving, once vacuumize compacting,Vacuum 0.06~0.09MPa, last one deck laying once vacuumizes compacting, vacuum againDegree 0.06~0.09MPa;
(6) preform that above-mentioned (1)~prepared by (5) is put into shaping mould, matched moulds;
(7) adhesive tape of the normal-temperature vacuum bag in laying frock is taken off, by normal-temperature vacuum bag adhesive tapeOppositely stick on shaping mould and vacuumize, vacuum 0.06~0.09MPa;
(8) laying frock is taken out in shaping mould;
(9) normal-temperature vacuum bag is removed, again made high temperature resistant vacuum bag, enter stove and solidify.
2. composite tubular honeycomb sandwich construction preparation method according to claim 1, itsBe characterised in that, described shaping mould is upper and lower involutory die body, when moulding, first laying frock is putEnter in the lower mold body of shaping mould, then the upper die body that closes.
CN201110010001.0A 2011-01-04 2011-01-04 Composite tubular honeycomb sandwich construction preparation method Expired - Fee Related CN106342038B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110010001.0A CN106342038B (en) 2011-01-04 2011-01-04 Composite tubular honeycomb sandwich construction preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110010001.0A CN106342038B (en) 2011-01-04 2011-01-04 Composite tubular honeycomb sandwich construction preparation method

Publications (1)

Publication Number Publication Date
CN106342038B true CN106342038B (en) 2014-02-05

Family

ID=58358293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110010001.0A Expired - Fee Related CN106342038B (en) 2011-01-04 2011-01-04 Composite tubular honeycomb sandwich construction preparation method

Country Status (1)

Country Link
CN (1) CN106342038B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107139503A (en) * 2017-01-20 2017-09-08 西南电子技术研究所(中国电子科技集团公司第十研究所) The forming method of composite cylinder component partial honeycomb sandwich construction
CN107755727A (en) * 2016-08-23 2018-03-06 哈尔滨飞机工业集团有限责任公司 A kind of processing method of helicopter filling block insert drilling

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107755727A (en) * 2016-08-23 2018-03-06 哈尔滨飞机工业集团有限责任公司 A kind of processing method of helicopter filling block insert drilling
CN107755727B (en) * 2016-08-23 2019-07-09 哈尔滨飞机工业集团有限责任公司 A kind of processing method of helicopter filling block insert drilling
CN107139503A (en) * 2017-01-20 2017-09-08 西南电子技术研究所(中国电子科技集团公司第十研究所) The forming method of composite cylinder component partial honeycomb sandwich construction
CN107139503B (en) * 2017-01-20 2019-03-19 西南电子技术研究所(中国电子科技集团公司第十研究所) The forming method of composite material cylinder component partial honeycomb sandwich construction

Similar Documents

Publication Publication Date Title
CN107738457A (en) A kind of integrated forming technique of unmanned aerial vehicle body
CN107199714B (en) A kind of variable curvature Composite Material Stiffened Panel moulding technique of co-curing
CN103341987B (en) Ω long purlin orthogonal stiffeners composites wallboard co-curing reaction
CN103963319B (en) A kind of matrix material adds prepreg/Resin Film Infusion curing molding method altogether of muscle wallboard
CN106608056B (en) A kind of phenolic aldehyde panel honeycomb sandwich construction part forming method
CN103213285B (en) A kind of forming method of variable cross-section enclosed cavity composite material element
CN105235237A (en) Molding technology and molding tool of composite material J-shaped stiffened wallboard
CN108407335B (en) Integral forming method for cap-shaped reinforced wall plate made of composite material
CN109367054B (en) Forming method of thick-wall narrow-cavity special-shaped tubular beam composite material component
CN106273542B (en) Composite material is straight empennage twin beams box section entirety co-curing forming method
CN104626607B (en) A kind of integral forming technique in light-duty carbon fiber compartment
CN102990940B (en) Composite stiffened liquid molding device and method
CN103407175A (en) Integrally-forming method of wing box made of fiber reinforced resin matrix composites
WO2021035941A1 (en) Wall plate structure for composite-material stringer in shape of chinese character "工", and forming mold and forming method
CN107199713A (en) A kind of high-quality forming method of composite material bracket
CN106799851A (en) The moulding manufacture method of the composite hat Material Stiffened Panel based on piddler technology
CN104015378A (en) Manufacture method of combined pressure-equalizing cover board suitable for molding C-shaped composite material parts
CN110439630A (en) A kind of Varying-thickness composite material stator blade and its forming method
CN105216345A (en) RTM global formation orthogonal stiffeners structure member (cover) and manufacture method thereof
CN108000895A (en) A kind of method for preventing from producing fold when honeycomb sandwich construction chamfering from curing
CN103273665A (en) Forming technology of square pipe part made of composite material
CN106342038B (en) Composite tubular honeycomb sandwich construction preparation method
CN103465480B (en) Forming method of resin matrix composite reinforcing ribs
CN103909659B (en) A kind of method of resin film infusion moulding resin based composites
CN106584881B (en) Full carbon fiber structural of a kind of hollow out hat shape rice word reinforcement and preparation method thereof

Legal Events

Date Code Title Description
GR03 Grant of secret patent right
GRSP Grant of secret patent right
DC01 Secret patent status has been lifted
DCSP Declassification of secret patent
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140205

Termination date: 20170104