CN107749841A - A kind of locomotive CIR equipment GIS database wireless upgrade systems and method - Google Patents

A kind of locomotive CIR equipment GIS database wireless upgrade systems and method Download PDF

Info

Publication number
CN107749841A
CN107749841A CN201710939936.4A CN201710939936A CN107749841A CN 107749841 A CN107749841 A CN 107749841A CN 201710939936 A CN201710939936 A CN 201710939936A CN 107749841 A CN107749841 A CN 107749841A
Authority
CN
China
Prior art keywords
upgrading
management server
cir equipment
cir
gis data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710939936.4A
Other languages
Chinese (zh)
Other versions
CN107749841B (en
Inventor
刘渭滨
郑伟
周波
孔祥远
吴宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING BEIJIAO XINKONG TECHNOLOGY Co.,Ltd.
Original Assignee
Beijing Beijiao Xinkong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Beijiao Xinkong Technology Co Ltd filed Critical Beijing Beijiao Xinkong Technology Co Ltd
Publication of CN107749841A publication Critical patent/CN107749841A/en
Application granted granted Critical
Publication of CN107749841B publication Critical patent/CN107749841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/04Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks
    • H04L63/0428Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks wherein the data content is protected, e.g. by encrypting or encapsulating the payload
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/06Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/104Peer-to-peer [P2P] networks
    • H04L67/1074Peer-to-peer [P2P] networks for supporting data block transmission mechanisms
    • H04L67/1078Resource delivery mechanisms
    • H04L67/108Resource delivery mechanisms characterised by resources being split in blocks or fragments

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Remote Sensing (AREA)
  • Computer Hardware Design (AREA)
  • Computing Systems (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a kind of locomotive CIR equipment GIS database wireless upgrade systems and method, including attribution server, multiple management servers, producer's client and CIR equipment, producer's client uploads GIS data file to the management server, and the server triggers upgrading plan automatically;The CIR equipment inquires about the management server IP address belonging to the CIR equipment to the attribution server, asks upgrading Summary file and GIS data upgrading renewal incremental data to the management server according to CIR equipment described in the address and upgrades.Invention significantly improves the quality that the operating efficiency of GIS data updating maintenance and GIS data version management control.

Description

A kind of locomotive CIR equipment GIS database wireless upgrade systems and method
Technical field
The present invention relates to communication technical field, more particularly to a kind of locomotive CIR equipment GIS database wireless upgrade system And method.
Background technology
GSM-R is a kind of based on common wireless communication system GSM platforms, is developed exclusively for railway applications are met Digital wireless communication system.The telecommunication service of its foundation structure and its offer based on GSM, there is provided the distinctive base of railway Plinth business, and in this, as an information-based platform so that user can develop various on this information platform Railway applications.With the horizontal continuous improvement of Information-based Railway, role of the data communication in terms of railway security with efficiency also becomes It must become more and more important, GPRS (GPRS) network is that one has been superimposed on the basis of existing GSM-R network newly Network, so as to meet the needs of railway development, improve rail service quality.
With the continuous development of the GSM-R network construction of China railways, the continuous improvement of technical merit, locomotive comprehensive wireless Communication equipment (CIR) is widely used, and CIR is integrated with the communication of GSM-R and 450MHz analog systems dispatching, wireless tune Order of dragging out a miserable existence transmits, wireless running number checks information transmission and other business functions, has become the main car of locomotive and EMUs Communication equipment is carried, all kinds of trains more than 20,000 is equipped and covers.
To realize the location-based callings of CIR, meet the utilization demand of CIR scheduling features, CIR equipment needs correct loading GIS-Geographic Information System (GIS) data.CIR equipment GIS data is used to provide running position, short codes, route selection prompting, mould to driver Formula conversion, name of station shows and the information such as station line telephone, is the foundation GSM-R network numbering data based on railway GIS database Make, be the basic data that CIR is normally used.
The management of CIR equipment GIS databases is related to railway GIS data, GSM-R numberings data, train routing and storage The many-sides such as maintenance, but open with new line, train operation demand is closely related, in CIR equipment GIS data safeguards more new management Run into following subject matter:
(1) CIR equipment GIS data uses artificial upgrade method substantially at present, because the CIR device interiors of different manufacturers are hard Part platform disunity, GIS database structure and analytical algorithm are different, and the method manually upgraded is different with using instrument, CIR The duration difference that equipment GIS data manually upgrades is very big, and very big difficulty is brought to CIR equipment GIS data upgrade maintenance management.
(2) as railway construction develops rapidly, CIR equipment GIS data becomes frequent, updates updating and management maintenance workload Greatly.The reasons such as new line is opened, name of station is changed, train routing changes, GSM-R numbering data point reuses can cause CIR equipment GIS numbers According to change, and existing CIR equipment GIS database, even if increase branch line or changing some name of station, whole CIR will be set Standby GIS database is upgraded.
(3) CIR number of devices is more, equips on all kinds of trains, and locomotive is under the jurisdiction of different locomotive depots, and motor-car is under the jurisdiction of not With MTU depot, it is big that train allots mobility, returns storehouse time disunity, cause GIS data upgrade maintenance difficulty and workload compared with Greatly.
(4) CIR equipment GIS data version number name disunity, version management inconvenience.To the mark of version number, Ge Gechang Version number of family naming rule is different, and inspection method in a device is also different.It is often preceding once to go back because upgrading is frequent Do not complete, upgrading next time starts again, particularly also locomotive and EMUs across office allocate and situations such as return repair in shop, cause CIR equipment GIS data version complexes, it is unfavorable for railway authorities and safeguards statistics.
(5) during GSM-R numberings data point reuse, the modification upgrading of CIR equipment GIS datas is difficult to synchronously complete.When GSM-R is compiled Number particularly short codes data point reuse when, the modification of GSM-R numbering data is generally in one or several skylight point cans Complete, and the modification of corresponding CIR equipment GIS datas upgrades because the train quantity of assembling is more, mobility is big, further relates to outer office The train of operation, upgrade job need time several weeks to complete, and the upgrading progress of external office's train is also difficult to control, to this phase Between dispatching communication function it is normal with bringing influence.
In view of the deficienciess of the prior art, propose a kind of locomotive CIR equipment GIS database wireless upgrade systems and side Method.
The content of the invention
It is an object of the invention to provide a kind of GIS database radio upgrade method based on GSM-R network, effectively solves The several frequently seen problem that the upgrading of CIR equipment GIS data runs into, as CIR equipment GIS datas version number names disunity, version pipe Reason inconvenience, data become frequent, and modification upgrade job amount is larger etc..
To reach above-mentioned purpose, the present invention uses following technical proposals:There is provided a kind of locomotive CIR equipment GIS database without Line upgrade-system, including attribution server, multiple management servers, producer's client and CIR equipment,
Producer's client uploads GIS data file and upgrading Summary file, the server to the management server Automatic triggering upgrading plan;
The CIR equipment inquires about the IP address of the management server belonging to the CIR equipment to the attribution server, according to The address, the CIR equipment ask upgrading Summary file and GIS data upgrading renewal incremental data simultaneously to the management server Upgrading.
Preferably, the locomotive CIR equipment GIS database includes the GIS data and address list data in CIR equipment.
Preferably, the attribution server is used to inquire about the management server IP address belonging to the CIR equipment, institute It is differentiated control to state attribution server and the management server;
The system sets the attribution server of two sets of redundancy backups, including the attribution server and standby home service Device, when the CIR equipment, to inquire about to the attribution server management server IP address belonging to the CIR equipment unresponsive When, turn to the standby attribution server and inquired about.
Preferably, the quantity of each Railway Bureau CIR equipment belonging to sets the management server of respective numbers, respectively Management server should be accessed in Gi interface networks by the GPRS core nets of each Railway Bureau, communicated with the CIR equipment;
The management server is used for the management to the GIS data file:
The GIS data file that producer's client uploads is received, integrality is carried out to the encrypted transmission of this document Verification;
Automatically the upgrading plan of the GIS data file is triggered;
The management server is used for the management to the CIR equipment:
Upgrade the download and breakpoint transmission of renewal incremental data to GIS data;And
The transmission data for receiving and sending in communication process are verified.
Preferably, producer's client is used by the CIR equipment manufacturers that have authorized, for the management server Pass the GIS data file and upgrading Summary file;
The username and password of the login user of producer's client is verified through the management server, passes through school Test the rear CIR equipment manufacturers and log in the management server using producer's client.
Preferably, the CIR equipment is taken by its internal GSM-R data module using railway GPRS network from the management Business device request upgrading summary info file and GIS data upgrading renewal incremental data;
The CIR equipment is communicated with the attribution server and the management server using udp protocol, described The attribution server and the data of management server transmission that CIR equipment interconnections receive are verified;
The CIR equipment is encoded using the engine number of affiliated locomotive and plant equipment type as identification, with the management service Device is corresponding.
A kind of locomotive CIR equipment GIS database radio upgrade method, is implemented in any of the above-described system, including:
S11:Producer's client uploads GIS data file and upgrading Summary file to the management server;
S13:The management server triggers upgrading plan automatically;
S15:The CIR equipment asks upgrading Summary file and GIS data by GSM-R network to the management server Upgrading renewal incremental data simultaneously upgrades.
Preferably, producer's client uploads GIS data file and upgrading Summary file, tool to the management server Body includes:
S101:The CIR equipment manufacturers log in the management server using producer's client;
S103:Producer's client checks the file type of the GIS data file and upgrading Summary file, and judgement is No to meet upload requirement, undesirable then terminate uploads;
S105:Producer's client uploads the GIS data file and upgrading Summary file, and Real time dynamic display text The progress that part uploads;
S107:After the GIS data file and upgrading Summary file upload, institute of the management server to upload To state GIS data file and upgrading Summary file carries out completeness check, producer's client receives check results and shown, Terminate this upload if failure is uploaded;
S109:The management server carries out in-stockroom operation to the GIS data file and upgrading Summary file and generated Storage record.
Preferably, the management server triggers upgrading plan automatically, specifically includes:
S201:Determine that this enters library file and triggers the CIR equipment to be upgraded;
S203:Each CIR equipment is screened, is marked to meeting promotion condition;
S205:Manually determined in response to planning management person so that the upgrading plan comes into force.
Preferably, the CIR equipment asks upgrading Summary file and GIS data upgrading more newly-increased to the management server Amount data simultaneously upgrade, and specifically include:
S301:The CIR equipment is with inquiring about the management server IP belonging to the CIR equipment to the attribution server Location;
S303:The CIR equipment judges the response of the attribution server whether is received in 5 seconds, turns if response is received To step S309;If not receiving the response, the management belonging to the CIR equipment is inquired about to the attribution server again Server ip address, step S305 is gone to if not receiving three times continuously;
S305:The CIR equipment inquires about the management server belonging to the CIR equipment to the standby attribution server IP address;
S307:The CIR equipment judges the response of the standby attribution server whether is received in 5 seconds, if receiving response Then go to step S309;If not receiving the response, inquired about again to the standby attribution server belonging to the CIR equipment The management server IP address, this upgrading is terminated if not receiving three times continuously;
S309:The CIR equipment sends GIS data upgrade request according to the IP address to the management server;
S311:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again Secondary transmission GIS data upgrade request, this upgrading is terminated if not receiving three times continuously;
S313:The validity checking knot of GIS data upgrade request in the response frame that the CIR equipment judgement receives Fruit, do not met if the validity checking result if upgrading requires and terminate this upgrading;
S315:The CIR equipment sends upgrading Summary file request to the management server;
S317:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again It is secondary to send upgrading Summary file request, terminate this upgrading if not receiving three times continuously;
S319:The CIR equipment repeats step S315, until the upgrading Summary file be all downloaded to it is described CIR equipment is local;
S321:The CIR equipment is analyzed the upgrading Summary file, judges whether to need from the management service Device obtain GIS data upgrading renewal incremental data, if need not if terminate this upgrading;
S323:The CIR equipment sends GIS data upgrading renewal incremental data request to the management server;
S325:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again Secondary transmission GIS data upgrading renewal incremental data request, this upgrading is terminated if not receiving three times continuously;
S327:The CIR equipment repeats step S323, until GIS data upgrading renewal incremental data is whole It is local to be downloaded to the CIR equipment;
S329:The GIS data upgrading renewal incremental data that the CIR equipment interconnections receive carries out correctness verification, The CIR equipment sends correctness check results to the management server, if check results are otherwise to terminate this upgrading;
S331:The CIR equipment judges that the management server whether is received in 5 seconds acknowledges receipt of CIR renewal of the equipment increasing The response frame of data correctness check results is measured, correctness check results are sent again if not receiving, if not receiving three times continuously To then terminating this upgrading;
S333:After the CIR equipment affiliated locomotive entering garage, after through storehouse, inspection personnel carry out storehouse inspection operation, the CIR equipment Inspection personnel in prompting storehouse have new GIS data upgrading renewal incremental data to have been downloaded into CIR equipment, and CIR equipment GIS datas Promotion condition is ready;
S335:Personnel's manual confirmation is examined in response to storehouse, the CIR equipment sends to the management server and risen if performing The GIS data request of level the machine;If cancelling the CIR equipment GIS data updating operation, this upgrading is terminated;
S337:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again It is secondary to send the GIS data request of upgrading the machine, terminate this upgrading if not receiving three times continuously;
S339:The CIR equipment judges to receive that the management server sends to described CIR device upgrades the machine The response frame of GIS data request, terminates this upgrading, otherwise if the management server does not allow the CIR device upgrades Carry out the machine GIS data upgrading;
S341:After the CIR equipment carries out the machine GIS data upgrading, the machine GIS data is sent to the management server Upgrade completion report;
S343:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again Secondary transmission the machine GIS data upgrading completion report, this upgrading is terminated if not receiving three times continuously;
S345:The CIR equipment receives the response frame, completes the upgrading of this GIS data.
Beneficial effects of the present invention are as follows:
The present invention is reliable and stable, simple and practical, with reference to the actual operation characteristic of railway, by GSM-R network, using from master contract Fixed communication message, realize the GIS database radio upgrade in locomotive CIR equipment.The present invention uses attribution server and pipe Manage upgrading renewal of the server to locomotive CIR equipment GIS databases and carry out differentiated control;The present invention uses producer's client and pipe Reason server is checked, uploaded and managed to the GIS data file of different CIR equipment manufacturers, it is ensured that GIS data meets wirelessly The requirement of upgrade-system, is easy to version management;The upgrading plan machine that the present invention is triggered automatically based on producer's upload GIS data file System, and support GIS data upgrade update the data incremental transmission, by upgrade renewal data volume control tens Kb even it is several Kb, the on the other hand present invention also support upgrading renewal incremental data breakpoint transmission, GPRS network is utilized so as to significantly improve Carry out the reliability of CIR equipment GIS datas online upgradings renewal transmission, reduce CIR equipment GIS data upgrade maintenance difficulty and Workload.
Brief description of the drawings
The embodiment of the present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 shows the structure chart of locomotive CIR equipment GIS database wireless upgrade system of the present invention;
Fig. 2 shows the flow chart of locomotive CIR equipment GIS database radio upgrade method of the present invention;
Fig. 3 shows that producer's client of the present invention uploads GIS data file and upgrading Summary file to management server Flow chart;
Fig. 4 shows that management server of the present invention triggers the flow chart of upgrading plan automatically;
Fig. 5 shows the air information interactive stream of locomotive CIR equipment GIS database radio upgrade method of the present invention Journey schematic diagram.
Embodiment
In order to illustrate more clearly of the present invention, the present invention is done further with reference to preferred embodiments and drawings It is bright.Similar part is indicated with identical reference in accompanying drawing.It will be appreciated by those skilled in the art that institute is specific below The content of description is illustrative and be not restrictive, and should not be limited the scope of the invention with this.
In a specific embodiment, Fig. 1 shows locomotive CIR equipment GIS database radio upgrade system of the present invention The structure chart of system, system include CIR equipment GIS databases radio upgrade management attribution server (hereinafter referred to as home service Device), road bureau CIR equipment GIS databases radio upgrade control management server (hereinafter referred to as management server), producer's client And the CIR equipment at scene.
A kind of locomotive CIR equipment GIS database wireless upgrade system, including attribution server, multiple management servers, factory Family's client and CIR equipment, producer's client upload GIS data file and upgrading summary text to the management server Part, the server trigger upgrading plan automatically;The CIR equipment inquires about the pipe belonging to the CIR equipment to the attribution server The IP address of server is managed, according to the address, the CIR equipment asks upgrading Summary file and GIS to the management server Data upgrading renewal incremental data simultaneously upgrades.The system uploads GIS data file by CIR equipment manufacturers using producer's client With upgrading Summary file, management server is verified to upper transmitting file, screening is carried out to affiliated each CIR equipment so as to touch automatically Upgrading plan is sent out, the CIR equipment asks upgrading Summary file and GIS data upgrading renewal incremental data simultaneously to management server Complete upgrading.
In another specific embodiment, the locomotive CIR equipment GIS database includes the GIS data in CIR equipment And address list data.
In another specific embodiment, the attribution server is used to inquire about the pipe belonging to the CIR equipment Server ip address is managed, the attribution server and the management server are differentiated control;
The system sets the attribution server of two sets of redundancy backups, including the attribution server and standby home service Device, when the CIR equipment, to inquire about to the attribution server management server IP address belonging to the CIR equipment unresponsive When, turn to the standby attribution server and inquired about.When CIR equipment initiate GIS data upgrading renewal request when, should first to Attribution server sends the management server IP address instruction inquired about belonging to the CIR equipment, and attribution server returns to the CIR Equipment should be responsible for the IP address of GIS data upgrading renewal affairs by which management server.In another specific embodiment, The quantity of each Railway Bureau CIR equipment belonging to sets the management server of respective numbers, and each management server should lead to In the GPRS core nets access Gi interface networks of Guo Ge Railway Bureaus, communicated with the CIR equipment;
The management server is used for the management to the GIS data file:
The GIS data file that producer's client uploads is received, integrality is carried out to the encrypted transmission of this document Verification;
Automatically the upgrading plan of the GIS data file is triggered;
The management server is used for the management to the CIR equipment:
Upgrade the download and breakpoint transmission of renewal incremental data to GIS data;And
The transmission data for receiving and sending in communication process are verified.
Wherein described management server can be managed to producer's client and wireless upgrade system user, it is possible to achieve The functions such as user management, rights management, Role Management, it is system manager, upgrading plan keeper, each CIR equipment vendors etc. Different user provides the related management function that user logs in and business function uses, in addition to can allow for multiple producer's clients Carry out upload operation simultaneously.
Upload for GIS data file and upgrading Summary file, the management server can provide special interface, connect Receive data file that each producer produces and generates according to railway geography information basic database, being adapted to CIR device requirement forms. The management server should be able to recording data files version, uplink time, upper successor, upload place (IP address), data text The contents such as part check information.And to all previous data file that any validated user uploads, long term archival should be provided, possessed 5 years It is interior to trace FileVersion sequence ability;After the success of CIR equipment GIS databases radio upgrade, server can also be realized to working as The filing of preceding version information and function for future reference.
In triggering upgrading plan management automatically, the management server should be able to provide upgrade service control strategy, such as Specify the functions such as scalable specific region, scalable CIR list of devices, planning management.
The management server can realize that CIR equipment transmits the breakpoint transmission in data procedures through GPRS.The management Server includes to CIR equipment transmission content:Upgrade summary info file and GIS data upgrading renewal incremental data, the pipe Reason server receives the GIS data file and upgrading Summary file that CIR equipment manufacturers upload from producer's client, CIR equipment Request upgrading Summary file after, on inspection contrast conting go out this upgrading need GIS data upgrading renewal incremental data, and to Management server makes requests on.The attribution server and management server can also be realized to receiving and sending in communication process The function that is verified of transmission data.
In another specific embodiment, producer's client is used by the CIR equipment manufacturers that have authorized, for The management server uploads GIS data file and upgrading Summary file;The management server is to producer's client The username and password of login user is verified, and is stepped on by the CIR equipment manufacturers after verification using producer's client Record the server.CIR equipment manufacturers are uploaded using producer's client, after inputting user name, password, are closed through management server Method inspection logs in management server after passing through.The GIS data file and upgrading Summary file of upload use encrypted transmission mode, Management server verifies to the integrality of file.
In another specific embodiment, the CIR equipment uses railway GPRS by its internal GSM-R data module Network asks upgrading Summary file and GIS data upgrading renewal incremental data from the management server.The CIR equipment and institute State attribution server and the management server is communicated using udp protocol, wherein attribution server serve port is UDP 20101, management server serve port is UDP 20102;The attribution server that the CIR equipment interconnections receive and described The data of management server transmission are verified.The CIR equipment is using the engine number of affiliated locomotive and plant equipment type as knowledge Do not encode, it is corresponding with the management server.
In another specific embodiment, Fig. 2 shows locomotive CIR equipment GIS database radio upgrade of the present invention A kind of flow chart of method, locomotive CIR equipment GIS database radio upgrade methods based on GSM-R network, is implemented in above-mentioned One system, including S11:Producer's client uploads GIS data file and upgrading Summary file to the management server; S13:The management server triggers upgrading plan automatically;S15:The CIR equipment is by GSM-R network to the management service Device request upgrading Summary file and GIS data upgrading renewal incremental data simultaneously upgrade.
In another specific embodiment, Fig. 3 shows that producer's client of the present invention uploads GIS to management server The flow chart of data file and upgrading Summary file, is specifically included:
S101:The CIR equipment manufacturers log in the management server using producer's client;CIR equipment manufacturers Using producer's client upload software, after inputting user name, password, management is logged in after through management server validity checking Server.
S103:Producer's client checks the file type of the GIS data file and upgrading Summary file, and judgement is No to meet upload requirement, undesirable then terminate uploads;Before startup file uploads, producer's client requirements, which provide, to be intended uploading text The relevant information of part, including version number, file total size (byte number), CIR equipment vendors, CIR device types etc..
S105:Producer's client uploads the GIS data file and upgrading Summary file, and Real time dynamic display text The progress that part uploads.
S107:After the GIS data file and upgrading Summary file upload, institute of the management server to upload To state GIS data file and upgrading Summary file carries out completeness check, producer's client receives check results and shown, Terminate this upload if failure is uploaded;File all upload finish and by completeness check after, server can be automatic by its The file path specified is stored in, " uploading successfully " information is sent from server to producer client, producer's client end interface " on Pass " mark and will show(being defaulted as blank).Such as because network failure, system processing time-out or other reasonses cause file to upload Failure, producer's client end interface " upload " mark will displays(being defaulted as blank), terminate this upload.
S109:The management server carries out version comparison to the GIS data file and upgrading Summary file of upload And daily record is generated, upper transmitting file is abandoned if undesirable and sends " storage, which checks, not to be passed through " letter to producer's client Breath, terminates this upload;After management server receives a upper transmitting file, checked before the automatic storage for performing upper transmitting file Processing operation:(1) inspection before server is put in storage to upper transmitting file compares (such as file size, version number etc.);(2) such as File checking is uploaded by the way that then server record correlation log, automatic to perform the operation of next step file warehousing;(3) as uploaded text Part is checked not by then server record relevant abnormalities daily record, generating corresponding alarm, returning " to enter to producer's client Storehouse, which checks, not to be passed through " information.The management server is carried out to the satisfactory GIS data file and upgrading Summary file In-stockroom operation simultaneously generates storage record.Storage record includes:Entry time (automatically generating), database version number are (automatic raw Into), upload file size (automatically generating), file storing directory and filename (automatically generating), upload user name, version number, The information such as CIR equipment vendors, CIR device types.
In another specific embodiment, Fig. 4 shows that management server of the present invention triggers upgrading plan automatically Flow chart, the management server trigger upgrading plan, specifically included automatically:
S201:Determine that this enters library file and triggers CIR equipment to be upgraded;According to " CIR equipment manufacturers " in database, The corresponding relation of " CIR device types " and " engine number " field, determine this FileVersion storage event trigger it is to be updated Engine number and CIR facility informations.
S203:Each CIR equipment is screened, is marked to meeting promotion condition.
S205:Manually determined in response to planning management person so that the upgrading plan comes into force.
In another specific embodiment, Fig. 5 shows the locomotive CIR equipment GIS of the present invention based on GSM-R network The air information interaction flow schematic diagram of database radio upgrade method, the CIR equipment please to the management server Ask upgrading Summary file and GIS data upgrading renewal incremental data and upgrade, specifically include:
S301:The CIR equipment is with inquiring about the management server IP belonging to the CIR equipment to the attribution server Location;
S303:The CIR equipment judges the response of the attribution server whether is received in 5 seconds, turns if response is received To step S309;If not receiving the response, the management belonging to the CIR equipment is inquired about to the attribution server again Server ip address, step S305 is gone to if not receiving three times continuously;
S305:The CIR equipment inquires about the management server belonging to the CIR equipment to the standby attribution server IP address;
S307:The CIR equipment judges the response of the standby attribution server whether is received in 5 seconds, if receiving response Then go to step S309;If not receiving the response, inquired about again to the standby attribution server belonging to the CIR equipment The management server IP address, this upgrading is terminated if not receiving three times continuously;
S309:The CIR equipment sends GIS data upgrade request according to the IP address to the management server;
S311:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again Secondary transmission GIS data upgrade request, this upgrading is terminated if not receiving three times continuously;
S313:The validity checking knot of GIS data upgrade request in the response frame that the CIR equipment judgement receives Fruit, do not met if the validity checking result if upgrading requires and terminate this upgrading;
S315:The CIR equipment sends upgrading Summary file request to the management server;
S317:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again It is secondary to send upgrading Summary file request, terminate this upgrading if not receiving three times continuously;
S319:The CIR equipment repeats step S315, until the upgrading Summary file be all downloaded to it is described CIR equipment is local;
S321:The CIR equipment is analyzed the upgrading Summary file, judges whether to need from the management service Device obtain GIS data upgrading renewal incremental data, if need not if terminate this upgrading;
S323:The CIR equipment sends GIS data upgrading renewal incremental data request to the management server;
S325:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again Secondary transmission GIS data upgrading renewal incremental data request, this upgrading is terminated if not receiving three times continuously;
S327:The CIR equipment repeats step S323, until GIS data upgrading renewal incremental data is whole It is local to be downloaded to the CIR equipment;
S329:The GIS data upgrading renewal incremental data that the CIR equipment interconnections receive carries out correctness verification, The CIR equipment sends correctness check results to the management server, if check results are otherwise to terminate this upgrading;
S331:The CIR equipment judges that the management server whether is received in 5 seconds acknowledges receipt of CIR renewal of the equipment increasing The response frame of data correctness check results is measured, correctness check results are sent again if not receiving, if not receiving three times continuously To then terminating this upgrading;
S333:After the CIR equipment affiliated locomotive entering garage, after through storehouse, inspection personnel carry out storehouse inspection operation, the CIR equipment Inspection personnel in prompting storehouse have new GIS data upgrading renewal incremental data to have been downloaded into CIR equipment, and CIR equipment GIS datas Promotion condition is ready;
S335:Personnel's manual confirmation is examined in response to storehouse, the CIR equipment sends to the management server and risen if performing The GIS data request of level the machine;If cancelling the CIR equipment GIS data updating operation, this upgrading is terminated;
S337:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again It is secondary to send the GIS data request of upgrading the machine, terminate this upgrading if not receiving three times continuously;
S339:The CIR equipment judges to receive that the management server sends to described CIR device upgrades the machine The response frame of GIS data request, terminates this upgrading, otherwise if the management server does not allow the CIR device upgrades Carry out the machine GIS data upgrading;
S341:After the CIR equipment carries out the machine GIS data upgrading, the machine GIS data is sent to the management server Upgrade completion report;
S343:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, if not receiving again Secondary transmission the machine GIS data upgrading completion report, this upgrading is terminated if not receiving three times continuously;
S345:The CIR equipment receives the response frame, completes the upgrading of this GIS data.
Obviously, the above embodiment of the present invention is only intended to clearly illustrate example of the present invention, and is not pair The restriction of embodiments of the present invention, for those of ordinary skill in the field, may be used also on the basis of the above description To make other changes in different forms, all embodiments can not be exhaustive here, it is every to belong to this hair Row of the obvious changes or variations that bright technical scheme is extended out still in protection scope of the present invention.

Claims (10)

1. a kind of locomotive CIR equipment GIS database wireless upgrade system, it is characterised in that including attribution server, multiple management Server, producer's client and CIR equipment,
Producer's client uploads GIS data file and upgrading Summary file to the management server, and the server is automatic Trigger upgrading plan;
The CIR equipment inquires about the IP address of the management server belonging to the CIR equipment to the attribution server, according to The address, the CIR equipment ask upgrading Summary file and GIS data upgrading renewal incremental data simultaneously to the management server Upgrading.
2. system according to claim 1, it is characterised in that the locomotive CIR equipment GIS database includes CIR equipment In GIS data and address list data.
3. system according to claim 1, it is characterised in that the attribution server is used to inquire about the CIR equipment institute The management server IP address of category, the attribution server and the management server are differentiated control;
The system sets the attribution server of two sets of redundancy backups, including the attribution server and standby attribution server, When the CIR equipment inquire about to the attribution server management server IP address belonging to the CIR equipment it is unresponsive when, The standby attribution server is turned to be inquired about.
4. system according to claim 1, it is characterised in that the quantity of each Railway Bureau CIR equipment belonging to is set The management server of respective numbers, each management server should access Gi interface networks by the GPRS core nets of each Railway Bureau In, communicated with the CIR equipment;
The management server is used for the management to the GIS data file:
The GIS data file that producer's client uploads is received, completeness check is carried out to the encrypted transmission of this document;
Automatically the upgrading plan of the GIS data file is triggered;
The management server is used for the management to the CIR equipment:
Upgrade the download and breakpoint transmission of renewal incremental data to GIS data;And
The transmission data for receiving and sending in communication process are verified.
5. system according to claim 1, it is characterised in that producer's client is by the CIR equipment manufacturers that have authorized Use, for uploading the GIS data file and upgrading Summary file to the management server;
The username and password of the login user of producer's client is verified through the management server, after verification The CIR equipment manufacturers log in the management server using producer's client.
6. system according to claim 1, it is characterised in that the CIR equipment is made by its internal GSM-R data module With railway GPRS network upgrading summary info file and GIS data upgrading renewal incremental data are asked from the management server;
The CIR equipment is communicated with the attribution server and the management server using udp protocol, and the CIR is set The standby data transmitted to the attribution server received and the management server verify;
The CIR equipment is encoded using the engine number of affiliated locomotive and plant equipment type as identification, with the management server pair Should.
7. a kind of locomotive CIR equipment GIS database radio upgrade method, it is characterised in that be implemented in described in claim 1 to 6 Any one system, including:
S11:Producer's client uploads GIS data file and upgrading Summary file to the management server;
S13:The management server triggers upgrading plan automatically;
S15:The CIR equipment asks upgrading Summary file and GIS data to upgrade by GSM-R network to the management server Renewal incremental data simultaneously upgrades.
8. according to the method for claim 7, it is characterised in that producer's client uploads to the management server GIS data file and upgrading Summary file, are specifically included:
S101:The CIR equipment manufacturers log in the management server using producer's client;
S103:Producer's client checks the file type of the GIS data file and upgrading Summary file, judges whether to accord with Close biography to require, undesirable then terminate uploads;
S105:Producer's client uploads the GIS data file and upgrading Summary file, and on Real time dynamic display file The progress of biography;
S107:After the GIS data file and upgrading Summary file upload, the management server is to described in upload GIS data file and upgrading Summary file carry out completeness check, and producer's client receives check results and shown, if Upload failure and then terminate this upload;
S109:The management server carries out in-stockroom operation to the GIS data file and upgrading Summary file and generates storage Record.
9. according to the method for claim 8, it is characterised in that the management server triggers upgrading plan automatically, specifically Including:
S201:Determine that this enters library file and triggers the CIR equipment to be upgraded;
S203:Each CIR equipment is screened, is marked to meeting promotion condition;
S205:Manually determined in response to planning management person so that the upgrading plan comes into force.
10. according to the method for claim 9, it is characterised in that the CIR equipment asks to upgrade to the management server Summary file and GIS data upgrading renewal incremental data simultaneously upgrade, and specifically include:
S301:The CIR equipment inquires about the management server IP address belonging to the CIR equipment to the attribution server;
S303:The CIR equipment judges the response of the attribution server whether is received in 5 seconds, and step is gone to if response is received Rapid S309;If not receiving the response, the management service belonging to the CIR equipment is inquired about to the attribution server again Device IP address, step S305 is gone to if not receiving three times continuously;
S305:The CIR equipment is with inquiring about the management server IP belonging to the CIR equipment to the standby attribution server Location;
S307:The CIR equipment judges the response of the standby attribution server whether is received in 5 seconds, turns if response is received To step S309;If not receiving the response, inquire about again belonging to the CIR equipment to the standby attribution server described in Management server IP address, this upgrading is terminated if not receiving three times continuously;
S309:The CIR equipment sends GIS data upgrade request according to the IP address to the management server;
S311:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, is sent out again if not receiving GIS data upgrade request is sent, this upgrading is terminated if not receiving three times continuously;
S313:The validity checking result of GIS data upgrade request in the response frame that the CIR equipment judgement receives, Do not met if the validity checking result if upgrading requires and terminate this upgrading;
S315:The CIR equipment sends upgrading Summary file request to the management server;
S317:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, is sent out again if not receiving Upgrading Summary file request is sent, this upgrading is terminated if not receiving three times continuously;
S319:The CIR equipment repeats step S315, until the upgrading Summary file is all downloaded to the CIR and set It is standby local;
S321:The CIR equipment is analyzed the upgrading Summary file, judges whether to need to obtain from the management server Take GIS data upgrading renewal incremental data, if need not if terminate this upgrading;
S323:The CIR equipment sends GIS data upgrading renewal incremental data request to the management server;
S325:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, is sent out again if not receiving GIS data upgrading renewal incremental data request is sent, this upgrading is terminated if not receiving three times continuously;
S327:The CIR equipment repeats step S323, until GIS data upgrading renewal incremental data is all downloaded It is local to the CIR equipment;
S329:The GIS data upgrading renewal incremental data that the CIR equipment interconnections receive carries out correctness verification, described CIR equipment sends correctness check results to the management server, if check results are otherwise to terminate this upgrading;
S331:The CIR equipment judges that the management server whether is received in 5 seconds acknowledges receipt of CIR renewal of the equipment incremental numbers According to the response frame of correctness check results, correctness check results are sent again if not receiving, if not receiving three times continuously Terminate this upgrading;
S333:After the CIR equipment affiliated locomotive entering garage, after through storehouse, inspection personnel carry out storehouse inspection operation, the CIR device prompts Storehouse inspection personnel have new GIS data upgrading renewal incremental data to have been downloaded into CIR equipment, and CIR equipment GIS data upgrades Condition is ready;
S335:Personnel's manual confirmation is examined in response to storehouse, the CIR equipment sends upgrading originally to the management server if performing Machine GIS data is asked;If cancelling the CIR equipment GIS data updating operation, this upgrading is terminated;
S337:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, is sent out again if not receiving The GIS data request of upgrading the machine is sent, this upgrading is terminated if not receiving three times continuously;
S339:The CIR equipment judges to receive that the management server sends to CIR device upgrades the machine GIS numbers According to the response frame of request, this upgrading is terminated if the management server does not allow the CIR device upgrades, otherwise carries out this Machine GIS data upgrades;
S341:After the CIR equipment carries out the machine GIS data upgrading, the upgrading of the machine GIS data is sent to the management server Completion report;
S343:The CIR equipment judges the response frame of the management server whether is received in 5 seconds, is sent out again if not receiving Send the machine GIS data to upgrade completion report, this upgrading is terminated if not receiving three times continuously;
S345:The CIR equipment receives the response frame, completes the upgrading of this GIS data.
CN201710939936.4A 2017-09-26 2017-10-11 A kind of locomotive CIR equipment GIS database wireless upgrade system and method Active CN107749841B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710883052 2017-09-26
CN2017108830521 2017-09-26

Publications (2)

Publication Number Publication Date
CN107749841A true CN107749841A (en) 2018-03-02
CN107749841B CN107749841B (en) 2019-05-17

Family

ID=61256060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710939936.4A Active CN107749841B (en) 2017-09-26 2017-10-11 A kind of locomotive CIR equipment GIS database wireless upgrade system and method

Country Status (1)

Country Link
CN (1) CN107749841B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111209017A (en) * 2019-10-23 2020-05-29 高新兴创联科技有限公司 CIR file remote upgrading method based on GMS
CN111294246A (en) * 2020-03-09 2020-06-16 天津七一二通信广播股份有限公司 CIR equipment remote upgrading system and remote upgrading implementation method
CN114936037A (en) * 2022-07-21 2022-08-23 天津七一二移动通信有限公司 Clamp implementation method compatible with multi-model railway CIR program upgrading
CN116980855A (en) * 2023-09-20 2023-10-31 天津七一二移动通信有限公司 Centralized railway CIR line positioning system based on network and implementation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101383770A (en) * 2008-09-27 2009-03-11 华为技术有限公司 Communication apparatus upgrading method, communication system and access network appliance thereof
CN103152446A (en) * 2013-04-07 2013-06-12 浙江中控技术股份有限公司 Realization method and system of field bus as well as equipment managing server
CN104002836A (en) * 2013-02-22 2014-08-27 中兴通讯股份有限公司 Method and device for acquiring and displaying traffic position information in real time
US20140365558A1 (en) * 2013-06-05 2014-12-11 Wolfgis, Llc System and method for visualizing complex gis location-based datasets
CN104704865A (en) * 2012-09-28 2015-06-10 高通股份有限公司 Controlling the transfer of telematics data using session related signaling
CN105577449A (en) * 2016-01-19 2016-05-11 江苏小牛电动科技有限公司 Automatic upgrading method and device based on center control system of electric vehicle
CN106059875A (en) * 2016-05-24 2016-10-26 中国铁道科学研究院通信信号研究所 Cab integrated radio communication equipment
CN206226459U (en) * 2016-12-01 2017-06-06 北京锦鸿希电信息技术股份有限公司 Ground installation, mobile unit and geographical location information data storehouse remote update system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101383770A (en) * 2008-09-27 2009-03-11 华为技术有限公司 Communication apparatus upgrading method, communication system and access network appliance thereof
CN104704865A (en) * 2012-09-28 2015-06-10 高通股份有限公司 Controlling the transfer of telematics data using session related signaling
CN104002836A (en) * 2013-02-22 2014-08-27 中兴通讯股份有限公司 Method and device for acquiring and displaying traffic position information in real time
CN103152446A (en) * 2013-04-07 2013-06-12 浙江中控技术股份有限公司 Realization method and system of field bus as well as equipment managing server
US20140365558A1 (en) * 2013-06-05 2014-12-11 Wolfgis, Llc System and method for visualizing complex gis location-based datasets
CN105577449A (en) * 2016-01-19 2016-05-11 江苏小牛电动科技有限公司 Automatic upgrading method and device based on center control system of electric vehicle
CN106059875A (en) * 2016-05-24 2016-10-26 中国铁道科学研究院通信信号研究所 Cab integrated radio communication equipment
CN206226459U (en) * 2016-12-01 2017-06-06 北京锦鸿希电信息技术股份有限公司 Ground installation, mobile unit and geographical location information data storehouse remote update system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111209017A (en) * 2019-10-23 2020-05-29 高新兴创联科技有限公司 CIR file remote upgrading method based on GMS
CN111209017B (en) * 2019-10-23 2023-09-22 高新兴创联科技股份有限公司 GMS-based CIR file remote upgrading method
CN111294246A (en) * 2020-03-09 2020-06-16 天津七一二通信广播股份有限公司 CIR equipment remote upgrading system and remote upgrading implementation method
CN114936037A (en) * 2022-07-21 2022-08-23 天津七一二移动通信有限公司 Clamp implementation method compatible with multi-model railway CIR program upgrading
CN116980855A (en) * 2023-09-20 2023-10-31 天津七一二移动通信有限公司 Centralized railway CIR line positioning system based on network and implementation method
CN116980855B (en) * 2023-09-20 2024-02-13 天津七一二移动通信有限公司 Centralized railway CIR line positioning system based on network and implementation method

Also Published As

Publication number Publication date
CN107749841B (en) 2019-05-17

Similar Documents

Publication Publication Date Title
CN107749841B (en) A kind of locomotive CIR equipment GIS database wireless upgrade system and method
CN107368898B (en) Intelligent fault reporting and maintenance monitoring method
US7636568B2 (en) Remote aircraft manufacturing, monitoring, maintenance and management system
US7376495B2 (en) Fuel information messaging system
CN105791388B (en) The long-range Activiation method of the vehicle device of car networking system
CN102624868B (en) Management of roadside service requests
CN101409726A (en) Captured test fleet
US20120284075A1 (en) System and Method For the Automated Dispatch of Fueling Operations
US20050090941A1 (en) Telematics based programming gateway
US20020125998A1 (en) System and method for monitoring and controlling remote devices
CN106897087A (en) Realize the remote maintenance update method and device of locomotive vehicle-mounted equipment application software
CN104794640A (en) Vehicle management method based on cloud server and cloud server thereof
CN105488646A (en) Intelligent supervision device and method of bottled liquefied gas supply based on Internet of Things
CN107943497B (en) ETC electronic tags bluetooth upgrade management system
KR101691125B1 (en) After-sales service system for apparatus in remote area
CN112566061A (en) Internet of vehicles data transmission method and system and vehicle service cloud
CN111882148A (en) Solid waste pollution prevention and control internet of things supervision system
CN112348250A (en) Truck scale unattended weighing system
CN105847359A (en) Method for registering intelligent garbage can through smart phone
CN106354863A (en) System and method for managing rail-transit electronic map
KR102189638B1 (en) System for maintenance of the electric multiple unit using device for technician and Method thereof
CN113110381A (en) Vehicle after-sale diagnostic system and method
CN117010764B (en) Fire control industry internet management platform
CN107749842A (en) A kind of train radio running number checks information data analysis system and method
CN107590869A (en) A kind of highway online charging method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200617

Address after: 100000 No. 8 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee after: Liu Weibin

Address before: 100038 Beijing city Haidian District North Sheng building, Room 903 No. 2 cellular

Patentee before: BEIJING BEIJIAO XINKONG TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210425

Address after: 734-1, 7 / F, building 2, 18 YANGFANGDIAN Road, Haidian District, Beijing

Patentee after: BEIJING BEIJIAO XINKONG TECHNOLOGY Co.,Ltd.

Address before: 100000 No. 8 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee before: Liu Weibin

TR01 Transfer of patent right