CN107747421A - 配重式楼顶通信基站抱杆支架 - Google Patents
配重式楼顶通信基站抱杆支架 Download PDFInfo
- Publication number
- CN107747421A CN107747421A CN201710763651.XA CN201710763651A CN107747421A CN 107747421 A CN107747421 A CN 107747421A CN 201710763651 A CN201710763651 A CN 201710763651A CN 107747421 A CN107747421 A CN 107747421A
- Authority
- CN
- China
- Prior art keywords
- pole
- base station
- communication base
- counter weight
- weight type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004891 communication Methods 0.000 title claims abstract description 9
- 230000001681 protective effect Effects 0.000 claims description 3
- 238000009408 flooring Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 abstract description 5
- 238000005553 drilling Methods 0.000 abstract description 4
- 238000009413 insulation Methods 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005246 galvanizing Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2238—Sockets or holders for poles or posts to be placed on the ground
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Details Of Aerials (AREA)
- Support Of Aerials (AREA)
Abstract
本发明提供了一种配重式楼顶通信基站抱杆支架,包括底盘支架,底盘支架上固定有基站设备和抱杆,抱杆上固定有避雷针和天线;所述的抱杆四周通过若干斜撑支撑。本发明结构合理,将原先需要三个天线三根抱杆集中到一根抱杆上进行安装固定,不需在楼顶楼面、墙面钻孔打膨胀螺丝影响楼面防水、保温等。
Description
技术领域
本发明涉及通信基站支架领域,具体是一种配重式楼顶通信基站抱杆支架。
背景技术
现有楼顶基站抱杆普遍采用钢管加支撑用膨胀螺丝打入墙体或楼面板的方式进行固定,随着年代久远和楼顶墙体、混凝土老化强度降低,存在极大的安全隐患和漏雨漏水风险,容易破坏楼顶保温层、防水层等缺陷;遇到业主不愿意因此影响楼顶防水、安全或者施工条件不具备时具有相当大的局限性。
由于普遍采用膨胀螺丝固定,螺栓与墙体、混凝土连接点随着时间长膨胀连接力会逐步降低,抱杆天线等从楼顶掉落伤人伤物的事故时有发生,连接点强度降低的安全风险极大,严重时甚至会出现严重安全事故和安全责任事故。
发明内容
本发明为了解决现有技术的问题,提供了一种配重式楼顶通信基站抱杆支架,结构合理,将原先需要三个天线三根抱杆集中到一根抱杆上进行安装固定,不需在楼顶楼面、墙面钻孔打膨胀螺丝影响楼面防水、保温等。
本发明包括底盘支架,底盘支架上固定有基站设备和抱杆,抱杆上固定有避雷针和天线;所述的抱杆四周通过若干斜撑支撑。
进一步改进,所述的底盘支架底部设有防护垫,所述的底盘支架四个角上设有配重块5。
本发明有益效果在于:
1、结构合理,将原先需要三个天线三根抱杆集中到一根抱杆上进行安装固定,而且对楼面、楼顶墙面没有损伤,增加了建成基站的可能性、减少建站矛盾,相对于传统建造形式和制作设计方式相比,可以提高安全性和可靠度,建站成功率提高30%以上,安全系数提高1倍以上,漏水风险降低90%以上;综合节约资源50%以上,具有很好的安全、生态、经济、社会效益。
2、采用配重混凝土块增加底盘重量,保证支架整体的稳定性且无需钻孔打膨胀螺丝影响房屋结构防水等。
3、现场安装方便安装工程没有噪音、不产生振动且少占地方;
4、采用标准化设计可以批量生产、备货方便,以后长期使用运行过程中维护工作量少运行使用成本低。
附图说明
图1为本发明主视图。
图2为本发明俯视图。
具体实施方式
下面结合附图对本发明作进一步说明。
本发明主视图和俯视图分别如图1和图2所示,包括底盘支架3,底盘支架3上固定有基站设备7和抱杆1,抱杆1上固定有避雷针2和天线6;所述的抱杆1四周通过若干斜撑4支撑。
进一步改进,所述的底盘支架3底部设有防护垫8,所述的底盘支架3四个角上设有配重块5。
本发明具体工艺流程如下:
1-型材钢板剪切、2-制孔冲孔、3-试组装、4、热镀锌处理、5-现场安装、配重块安装或浇灌。
本发明具体应用途径很多,以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以作出若干改进,这些改进也应视为本发明的保护范围。
Claims (3)
1.一种配重式楼顶通信基站抱杆支架,其特征在于:包括底盘支架(3),底盘支架(3)上固定有基站设备(7)和抱杆(1),抱杆(1)上固定有避雷针(2)和天线(6);所述的抱杆(1)四周通过若干斜撑(4)支撑。
2.根据权利要求1所述的配重式楼顶通信基站抱杆支架,其特征在于:所述的底盘支架(3)底部设有防护垫(8)。
3.根据权利要求1或2所述的配重式楼顶通信基站抱杆支架,其特征在于:所述的底盘支架(3)四个角上设有配重块(5)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710763651.XA CN107747421A (zh) | 2017-08-30 | 2017-08-30 | 配重式楼顶通信基站抱杆支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710763651.XA CN107747421A (zh) | 2017-08-30 | 2017-08-30 | 配重式楼顶通信基站抱杆支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107747421A true CN107747421A (zh) | 2018-03-02 |
Family
ID=61254826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710763651.XA Pending CN107747421A (zh) | 2017-08-30 | 2017-08-30 | 配重式楼顶通信基站抱杆支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107747421A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719930A (zh) * | 2019-03-19 | 2020-09-29 | 云南德普科技有限公司 | 一种配重式楼顶通信基站抱杆支架 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012159322A1 (zh) * | 2011-06-28 | 2012-11-29 | 华为技术有限公司 | 一体化基站支撑结构及基站 |
CN204558633U (zh) * | 2015-03-31 | 2015-08-12 | 南宁市向上玻璃钢制品厂 | 一种通信基站天线美化方柱的新型结构 |
CN204614918U (zh) * | 2015-05-21 | 2015-09-02 | 江苏健德铁塔有限公司 | 简易楼顶抱杆 |
CN204927485U (zh) * | 2015-08-12 | 2015-12-30 | 辽宁顺邦通信技术股份有限公司 | 楼顶配重式抱杆通信装置 |
CN205089028U (zh) * | 2015-07-20 | 2016-03-16 | 天津市芳华通讯工程有限公司 | 一种配重式四柱通信基站塔 |
CN206116598U (zh) * | 2016-10-21 | 2017-04-19 | 国脉科技股份有限公司 | 一种高度可调移动式天线抱杆装置 |
CN207332419U (zh) * | 2017-08-30 | 2018-05-08 | 江苏铭远杆塔有限公司 | 配重式楼顶通信基站抱杆支架 |
-
2017
- 2017-08-30 CN CN201710763651.XA patent/CN107747421A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012159322A1 (zh) * | 2011-06-28 | 2012-11-29 | 华为技术有限公司 | 一体化基站支撑结构及基站 |
CN204558633U (zh) * | 2015-03-31 | 2015-08-12 | 南宁市向上玻璃钢制品厂 | 一种通信基站天线美化方柱的新型结构 |
CN204614918U (zh) * | 2015-05-21 | 2015-09-02 | 江苏健德铁塔有限公司 | 简易楼顶抱杆 |
CN205089028U (zh) * | 2015-07-20 | 2016-03-16 | 天津市芳华通讯工程有限公司 | 一种配重式四柱通信基站塔 |
CN204927485U (zh) * | 2015-08-12 | 2015-12-30 | 辽宁顺邦通信技术股份有限公司 | 楼顶配重式抱杆通信装置 |
CN206116598U (zh) * | 2016-10-21 | 2017-04-19 | 国脉科技股份有限公司 | 一种高度可调移动式天线抱杆装置 |
CN207332419U (zh) * | 2017-08-30 | 2018-05-08 | 江苏铭远杆塔有限公司 | 配重式楼顶通信基站抱杆支架 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719930A (zh) * | 2019-03-19 | 2020-09-29 | 云南德普科技有限公司 | 一种配重式楼顶通信基站抱杆支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105064759B (zh) | 一种gfrp管钢筋混凝土组合构件多回路输电杆 | |
CN104563578A (zh) | 用于500kV变电站的组合式构架柱及其安装方法 | |
CN106013158A (zh) | 一种铝合金模板单边支模装置 | |
CN207332419U (zh) | 配重式楼顶通信基站抱杆支架 | |
CN107747421A (zh) | 配重式楼顶通信基站抱杆支架 | |
CN105298205B (zh) | 一种电网电线杆加固加高装置及其施工方法 | |
CN106013450B (zh) | 核心筒跳层施工方法 | |
CN204825919U (zh) | 支护基坑围檩抗剪结构 | |
KR102337771B1 (ko) | 강관전주 기초부 구조체 | |
CN107795133B (zh) | 一种整体式防护框架平台及其施工方法 | |
CN206116598U (zh) | 一种高度可调移动式天线抱杆装置 | |
CN214885380U (zh) | 一种便携式塔吊施工平台通道 | |
WO2017196809A1 (en) | Direct-anchorage termination for pole reinforcement | |
CN206942282U (zh) | 一种加固型电力杆塔 | |
CN206034458U (zh) | 一种smw工法桩围护结构基坑中钢支撑防坠落结构 | |
CN203201164U (zh) | 一种建筑施工现场用工具式护栏 | |
CN106438216A (zh) | 分段直塔筒预应力混凝土风机塔架及其安装方法 | |
CN206903371U (zh) | 一种建筑施工用安全护栏 | |
CN204959794U (zh) | 一种田字梁柱帽和无梁楼板结构体系 | |
CN206591894U (zh) | 一种新型电力杆塔 | |
CN205029186U (zh) | 一种户内变电站组合式双品字形架空出线结构 | |
CN204802886U (zh) | 一种工具式塔吊附着装置的安装操作与休息平台 | |
CN205276288U (zh) | 一种预应力型钢组合结构 | |
CN104563554A (zh) | 用于500kV变电站集成式构架的组合式格构梁 | |
CN203951109U (zh) | 高压电缆头的支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180302 |
|
RJ01 | Rejection of invention patent application after publication |