CN107724695A - Combine the accurate positioning device and its construction method of shape foundation bolt - Google Patents
Combine the accurate positioning device and its construction method of shape foundation bolt Download PDFInfo
- Publication number
- CN107724695A CN107724695A CN201711050576.9A CN201711050576A CN107724695A CN 107724695 A CN107724695 A CN 107724695A CN 201711050576 A CN201711050576 A CN 201711050576A CN 107724695 A CN107724695 A CN 107724695A
- Authority
- CN
- China
- Prior art keywords
- location
- plate
- foundation bolt
- shape
- plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title description 3
- 239000000725 suspension Substances 0.000 claims abstract description 20
- 238000009826 distribution Methods 0.000 claims abstract description 10
- 125000006850 spacer group Chemical group 0.000 claims abstract description 10
- 238000005266 casting Methods 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 210000003205 muscle Anatomy 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000005520 cutting process Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4157—Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to the realm of building construction, specifically a kind of accurate positioning device for combining shape foundation bolt;It is characterized in that:A pair of location-plates and location-plate spacer bar;The shape of location-plate is identical with all foundation bolt distribution shapes of single suspension column, on the location-plate perforate is carried out by foundation bolt distributed point, two pieces of location-plates are distributed in a manner of one on the other and connected with location-plate spacer bar, and foundation bolt is set in perforate corresponding to upper and lower two pieces of location-plates.This positioner uses above-mentioned design, all holds all foundation bolts of single suspension column using the general frame of copying type and fixes, no matter in this way, what shape foundation bolt distribution is in, in casting concrete it can be avoided to be subjected to displacement.
Description
Technical field
The present invention relates to the realm of building construction, specifically a kind of accurate positioning device for combining shape foundation bolt and its construction
Method.
Background technology
Common column bolt arrangement is more based on the single cross sectional shape such as rectangle or circle, the suspension column of such a single shape
Bolt fixation is relatively simple, but the combination tee section foundation bolt of complicated shape then lacks reliable fixed form.
The content of the invention
It is an object of the invention to overcome drawbacks described above, there is provided a kind of fixing device for combining shape foundation bolt, so as to really
Protect the accurate positioning in operation process of this kind of foundation bolt.
In order to achieve the above object, the present invention is realized in:
A kind of accurate positioning device for combining shape foundation bolt, a pair of location-plates and location-plate spacer bar;The shape of location-plate
It is identical with all foundation bolt distribution shapes of single suspension column, perforate is carried out by foundation bolt distributed point on the location-plate,
Two pieces of location-plates are distributed in a manner of one on the other and connected with location-plate spacer bar, perforate corresponding to upper and lower two pieces of location-plates
Middle setting foundation bolt.
The accurate positioning device of described combination shape foundation bolt, the aperture of the through hole on location-plate are more than foundation bolt
Diameter 2mm-5mm.
The accurate positioning device of described combination shape foundation bolt, with welding between location-plate and location-plate spacer bar
Mode is connected.
The application method of the accurate positioning device of the combination shape foundation bolt, including
Step 1, the drawing according to the distribution shape drafting location-plate of all foundation bolts of single suspension column in design drawing, specifically
It is all foundation bolt distributed points of single suspension column to be connected one by one so as to obtain the shape of location-plate and accordingly expand so as to obtain
To the width of location-plate;
Step 2, the drawing cutting location-plate according to location-plate,
In step 3, the design drawing according to single suspension column, the location point of all foundation bolts punches on location-plate;
Step 4, with two pieces of location-plates all foundation bolts are connected respectively, the welding location-plate supporting steel between two pieces of location-plates
Muscle is so as to obtaining interim positioning casing and the positioning casing is placed into suspension column position;
Step 5, casting concrete.
The application method of the accurate positioning device of described combination shape foundation bolt, during casting concrete, it should be ensured that upper strata
Location-plate eminence concrete plane, after completion and concrete setting is poured, remove upper strata location-plate and reuse.
This positioner uses above-mentioned design, using the general frame of copying type that all foundation bolts of single suspension column are complete
Portion hold fix, no matter in this way, foundation bolt distribution be in what shape, in casting concrete it can be avoided to be subjected to displacement.
Brief description of the drawings
Fig. 1 is the structural representation of the present apparatus.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in figure 1, a kind of accurate positioning device for combining shape foundation bolt, a pair of location-plates 1 and location-plate supporting steel
Muscle 2;The shape of location-plate 1 is identical with all foundation bolt distribution shapes of single suspension column, and lower margin spiral shell is pressed on the location-plate 1
Bolt distributed point carries out perforate, and two pieces of location-plates 1 are distributed in a manner of one on the other and connected with location-plate spacer bar 2, up and down
Foundation bolt is set in perforate corresponding to two pieces of location-plates 1.
The accurate positioning device of described combination shape foundation bolt, the aperture of the through hole on location-plate 1 are more than foundation bolt
Diameter 2mm-5mm.
The accurate positioning device of described combination shape foundation bolt, with welding between location-plate 1 and location-plate spacer bar 2
Mode be connected.
The application method of the accurate positioning device of the combination shape foundation bolt, including
Step 1, the drawing according to the distribution shape drafting location-plate of all foundation bolts of single suspension column in design drawing, specifically
It is all foundation bolt distributed points of single suspension column to be connected one by one so as to obtain the shape of location-plate and accordingly expand so as to obtain
To the width of location-plate;
Step 2, the drawing cutting location-plate according to location-plate,
In step 3, the design drawing according to single suspension column, the location point of all foundation bolts punches on location-plate;
Step 4, with two pieces of location-plates all foundation bolts are connected respectively, the welding location-plate supporting steel between two pieces of location-plates
Muscle is so as to obtaining interim positioning casing and the positioning casing is placed into suspension column position;
Step 5, casting concrete.
The application method of the accurate positioning device of described combination shape foundation bolt, during casting concrete, it should be ensured that upper strata
Location-plate eminence concrete plane, after completion and concrete setting is poured, remove upper strata location-plate and reuse.
This positioner uses above-mentioned design, using the general frame of copying type that all foundation bolts of single suspension column are complete
Portion hold fix, no matter in this way, foundation bolt distribution be in what shape, in casting concrete it can be avoided to be subjected to displacement.
Claims (5)
1. a kind of accurate positioning device for combining shape foundation bolt, it is characterized in that:A pair of location-plates and location-plate spacer bar;It is fixed
The shape of position plate is identical with all foundation bolt distribution shapes of single suspension column, and foundation bolt distributed point is pressed on the location-plate
Perforate is carried out, two pieces of location-plates are distributed in a manner of one on the other and connected with location-plate spacer bar, upper and lower two pieces of location-plates
Foundation bolt is set in corresponding perforate.
2. the accurate positioning device of combination shape foundation bolt according to claim 1, it is characterized in that:Through hole on location-plate
Aperture be more than foundation bolt diameter 2mm-5mm.
3. the accurate positioning device of combination shape foundation bolt according to claim 1, it is characterized in that:Location-plate and location-plate
It is connected between spacer bar with the mode of welding.
4. the application method of the accurate positioning device of shape foundation bolt is combined described in claim 1, it is characterized in that:Including
Step 1, the drawing according to the distribution shape drafting location-plate of all foundation bolts of single suspension column in design drawing, specifically
It is all foundation bolt distributed points of single suspension column to be connected one by one so as to obtain the shape of location-plate and accordingly expand so as to obtain
To the width of location-plate;
Step 2, the drawing cutting location-plate according to location-plate,
In step 3, the design drawing according to single suspension column, the location point of all foundation bolts punches on location-plate;
Step 4, with two pieces of location-plates all foundation bolts are connected respectively, the welding location-plate supporting steel between two pieces of location-plates
Muscle is so as to obtaining interim positioning casing and the positioning casing is placed into suspension column position;
Step 5, casting concrete.
5. the application method of the accurate positioning device of combination shape foundation bolt according to claim 4, it is characterized in that:Pour
During concrete, it should be ensured that upper strata location-plate eminence concrete plane, after completion and concrete setting is poured, remove upper strata and determine
Position plate is simultaneously reused.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711050576.9A CN107724695A (en) | 2017-10-31 | 2017-10-31 | Combine the accurate positioning device and its construction method of shape foundation bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711050576.9A CN107724695A (en) | 2017-10-31 | 2017-10-31 | Combine the accurate positioning device and its construction method of shape foundation bolt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107724695A true CN107724695A (en) | 2018-02-23 |
Family
ID=61202931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711050576.9A Pending CN107724695A (en) | 2017-10-31 | 2017-10-31 | Combine the accurate positioning device and its construction method of shape foundation bolt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107724695A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113293859A (en) * | 2021-04-21 | 2021-08-24 | 中国化学工程第三建设有限公司 | Recyclable foundation bolt group pre-embedding positioning device and method |
CN114293664A (en) * | 2022-01-21 | 2022-04-08 | 中国建筑第八工程局有限公司 | Quick installation process for ultrahigh-precision embedded part group |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10131291A (en) * | 1996-10-31 | 1998-05-19 | Nippon Steel Metal Prod Co Ltd | Column base fixing device and its method |
CN203247603U (en) * | 2013-05-29 | 2013-10-23 | 中国建筑第二工程局有限公司 | High-order rag bolt positioner |
CN204040056U (en) * | 2014-06-26 | 2014-12-24 | 中国建筑第八工程局有限公司 | A kind of location and installation support of pre-embedded anchoring bolts |
CN204326093U (en) * | 2014-12-06 | 2015-05-13 | 内蒙古兴泰建设集团有限公司 | A kind of rigid steel pile locating support |
CN104695557A (en) * | 2015-01-31 | 2015-06-10 | 陕西建工安装集团有限公司 | Steel structure building construction method for one-step pre-burying of foundation bolts |
CN104895101A (en) * | 2015-06-10 | 2015-09-09 | 杭州江润科技有限公司 | Construction method for raft plate basic high-precision overall pre-embedded large-diameter bolt group structure |
CN105525625A (en) * | 2016-01-19 | 2016-04-27 | 中建八局第三建设有限公司 | Construction method and device of pre-embedded bolts of fixed steel column base |
CN207568212U (en) * | 2017-10-31 | 2018-07-03 | 上海宝冶集团有限公司 | Combine the accurate positioning device of shape foundation bolt |
-
2017
- 2017-10-31 CN CN201711050576.9A patent/CN107724695A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10131291A (en) * | 1996-10-31 | 1998-05-19 | Nippon Steel Metal Prod Co Ltd | Column base fixing device and its method |
CN203247603U (en) * | 2013-05-29 | 2013-10-23 | 中国建筑第二工程局有限公司 | High-order rag bolt positioner |
CN204040056U (en) * | 2014-06-26 | 2014-12-24 | 中国建筑第八工程局有限公司 | A kind of location and installation support of pre-embedded anchoring bolts |
CN204326093U (en) * | 2014-12-06 | 2015-05-13 | 内蒙古兴泰建设集团有限公司 | A kind of rigid steel pile locating support |
CN104695557A (en) * | 2015-01-31 | 2015-06-10 | 陕西建工安装集团有限公司 | Steel structure building construction method for one-step pre-burying of foundation bolts |
CN104895101A (en) * | 2015-06-10 | 2015-09-09 | 杭州江润科技有限公司 | Construction method for raft plate basic high-precision overall pre-embedded large-diameter bolt group structure |
CN105525625A (en) * | 2016-01-19 | 2016-04-27 | 中建八局第三建设有限公司 | Construction method and device of pre-embedded bolts of fixed steel column base |
CN207568212U (en) * | 2017-10-31 | 2018-07-03 | 上海宝冶集团有限公司 | Combine the accurate positioning device of shape foundation bolt |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113293859A (en) * | 2021-04-21 | 2021-08-24 | 中国化学工程第三建设有限公司 | Recyclable foundation bolt group pre-embedding positioning device and method |
CN114293664A (en) * | 2022-01-21 | 2022-04-08 | 中国建筑第八工程局有限公司 | Quick installation process for ultrahigh-precision embedded part group |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107724695A (en) | Combine the accurate positioning device and its construction method of shape foundation bolt | |
CN205685510U (en) | A kind of fabricated shear wall model structure unitary mould | |
CN104070603B (en) | For producing the tensioning component of end-plate-free prestressed-concrete pile | |
CN107030450A (en) | A kind of flange form that carries is by the preparation method of the steel reinforcement cage of strong stirrup | |
CN107419854A (en) | A kind of tie hoop spacer pad and its application method | |
CN204960342U (en) | But height -adjusting's roof beam reinforcement supports instrument | |
CN207568212U (en) | Combine the accurate positioning device of shape foundation bolt | |
CN206752492U (en) | A kind of steel column positioning adjustment device | |
CN102619286B (en) | Connecting joint of steel pipe concrete column and profile steel concrete beam | |
CN104947853B (en) | A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method | |
CN104278798A (en) | Fastening process of steel structure column foot concrete and fixed connection device of steel structure column foot concrete | |
CN207436490U (en) | Wall post reinforcing apparatus | |
CN107030862A (en) | Pier shaft pinner embedded hole hole-forming device | |
CN206800800U (en) | Horizontal reinforcement distance piece | |
CN110046363A (en) | A kind of accurate pre-buried construction method of concrete structure interior conduit group | |
CN204112735U (en) | A kind of template fixator | |
CN203285056U (en) | Stair formwork supporting base | |
CN207314523U (en) | A kind of Novel steel-mixed bean column node constructing structure | |
CN113073789B (en) | Construction method of crotch column inclined column of swimming pool | |
CN105926933B (en) | For the template shaped steel purlin and construction technology of abnormity concrete member | |
CN109629719A (en) | Formwork moulding process | |
CN107503369A (en) | A kind of high precision apparatus foundation built-in bolt sleeve and its installation method | |
CN203891480U (en) | Reinforced concrete column main reinforcement positioning hoop | |
CN106592621A (en) | Steel column foundation bolt mounting method and positioning and fixing device | |
CN207295754U (en) | A kind of high precision apparatus foundation built-in bolt sleeve device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180223 |
|
RJ01 | Rejection of invention patent application after publication |