CN113293859A - Recyclable foundation bolt group pre-embedding positioning device and method - Google Patents

Recyclable foundation bolt group pre-embedding positioning device and method Download PDF

Info

Publication number
CN113293859A
CN113293859A CN202110430635.5A CN202110430635A CN113293859A CN 113293859 A CN113293859 A CN 113293859A CN 202110430635 A CN202110430635 A CN 202110430635A CN 113293859 A CN113293859 A CN 113293859A
Authority
CN
China
Prior art keywords
positioning
supporting
foundation
limiting
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110430635.5A
Other languages
Chinese (zh)
Inventor
王科
赵晓磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN202110430635.5A priority Critical patent/CN113293859A/en
Publication of CN113293859A publication Critical patent/CN113293859A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2463Connections to foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention relates to a recyclable foundation bolt group pre-embedding positioning device and method, which comprises a plurality of supporting vertical rods, a plurality of supporting cross rods and a plurality of limiting cross rods, wherein the supporting cross rods and the limiting cross rods are detachably connected to the supporting vertical rods, a lower positioning disc is arranged on the limiting cross rods, a plurality of middle layer protecting positioning pipes are connected to the upper end of the lower positioning disc, and an upper positioning disc is connected to the upper end of the middle layer protecting positioning pipes. The anchor bolt group pre-embedding positioning device and method capable of being recycled can achieve the effect of accurately positioning an anchor bolt group, meanwhile, the supporting section steel poured in concrete can be taken out, the supporting section steel can be detached for repeated use after construction is completed, material waste is reduced, grouting and filling can be performed on the hole after the supporting section steel is taken out, and foundation quality after pouring is not affected.

Description

Recyclable foundation bolt group pre-embedding positioning device and method
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to a positioning device and a positioning method for embedding a recyclable foundation bolt group.
Background
In the steel construction factory building work progress, rag bolt is the important connecting piece of connecting basis and superstructure, therefore rag bolt's position control is the key in the foundation construction, if rag bolt buries the position deviation underground too big, the rag bolt straightness that hangs down appears the deviation, will influence the position accuracy degree of the steel construction of connecting above, influence overall structure's stability to influence the quality of subsequent stage construction.
When many rag bolts are pre-buried simultaneously, need adopt the positioning disk to fix a position it simultaneously, can effectual reduction rag bolt the deviation appears, and positioning device such as positioning disk and locating support are the steel more, the input cost is higher, and because positioning disk and bolt are from great, need become required positioning disk support frame with shaped steel field welding, carry out concrete placement after waiting pre-buried bolt installation to accomplish, and the part shaped steel that is the support frame during concrete construction need pour in the concrete, lead to a large amount of shaped steel can't take out from the concrete, thereby lead to building input cost's increase, and caused unnecessary wasting of resources.
Disclosure of Invention
The invention aims to solve the problems and provide the embedding and positioning device for the foundation bolt group, which has a simple structure and reasonable design and can be recycled.
The invention realizes the purpose through the following technical scheme:
the utility model provides a pre-buried positioner of rag bolt crowd and method that can cyclic utilization, includes that a plurality of supports pole setting, detachable connection support horizontal pole and a plurality of spacing horizontal pole on supporting the pole setting, locate the lower positioning disk on a plurality of spacing horizontal pole, connect a plurality of middle level protection registration arm, connect the last spacing dish of connection in middle level protection registration arm upper end of positioning disk down, all be equipped with a plurality of perforation on positioning disk and the last spacing dish down, should perforate and middle level protection registration arm cooperation setting, supply rag bolt to pass, a plurality of the lower tip of supporting the pole setting all wraps up and has taken out from the parcel layer.
As a further optimization scheme of the invention, the embedded positioning device also comprises a plurality of limit nuts, and the limit nuts are detachably connected with the threaded parts on the foundation bolts and used for limiting the positions between the foundation bolts and the upper limit disc.
As a further optimization scheme of the invention, a plurality of through holes are uniformly and annularly distributed on the lower positioning disc and the upper positioning disc, and the through holes on the lower positioning disc and the through holes on the upper positioning disc are correspondingly arranged.
As a further optimization scheme of the invention, a plurality of the supporting cross rods are symmetrically distributed among a plurality of the supporting vertical rods, and a plurality of the limiting cross rods are symmetrically distributed among a plurality of the supporting vertical rods.
As a further optimization scheme of the invention, the supporting cross rods and the limiting cross rods are vertically and crosswise distributed, and the supporting cross rods are positioned below the limiting cross rods.
As a further optimization scheme of the invention, the extraction wrapping layer comprises a foam wrapping layer and an adhesive tape wrapping layer, the foam wrapping layer is wrapped on the outer wall of the lower end of the supporting vertical rod, and the adhesive tape wrapping layer is wrapped on the outer part of the foam wrapping layer.
A method for embedding an anchor bolt group by adopting the device comprises the following steps:
step S1, erecting an irrigation steel bar net rack on the foundation cushion, symmetrically inserting a plurality of supporting upright rods into the irrigation steel bar net rack, and then connecting a plurality of supporting cross rods and a plurality of limiting cross rods among the plurality of supporting upright rods to form a cross-type supporting frame structure;
step S2, a lower positioning disc is erected on the crossed support frame mechanism, a plurality of middle-layer protection positioning pipes are connected to corresponding positions on the lower positioning disc, and then the upper positioning disc is connected to the middle-layer protection positioning pipes;
step S3, connecting limit nuts on the upper threaded parts of the plurality of anchor bolts, and then inserting the plurality of anchor bolts along the through holes on the upper limiting disc until the limit nuts are contacted with the upper limiting disc;
step S4, pouring concrete slurry after a pouring template is built outside the pouring steel bar net rack;
step S5, removing the pouring template after the concrete slurry is formed, then removing the limit nut, the upper limit disc, the middle layer protection positioning pipe, the lower limit disc, the limit cross rod and the support cross rod in sequence, and finally pulling out the support upright rod from the formed foundation;
and step S6, after the support upright stanchion is pulled out, removing residues of a film wrapping layer and an adhesive tape wrapping layer in the hole formed on the foundation, and then filling the hole on the foundation with micro-expansion fine aggregate concrete with the same structural strength grade.
As a further optimization scheme of the invention, the height of the drawing-off wrapping layer is greater than that of the pouring template, so that the supporting upright stanchion can not be drawn off from the formed foundation.
The invention has the beneficial effects that:
1) the invention can achieve the effect of accurately positioning foundation bolt groups, simultaneously can take out the supporting section steel poured in concrete, can be disassembled for repeated use after construction is finished, reduces the waste of materials, can carry out grouting and filling on the hole again after being taken out, and does not influence the quality of the poured foundation;
2) the invention has simple structure, high stability, reasonable design and convenient realization.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic diagram of the anchor bolt group embedding process of the present invention.
In the figure: 1. a lower positioning plate; 2. the middle layer protects the positioning tube; 3. an upper limiting disc; 4. a limit nut; 5. supporting the upright stanchion; 6. a support rail; 7. and a limiting cross rod.
Detailed Description
The present application will now be described in further detail with reference to the drawings, it should be noted that the following detailed description is given for illustrative purposes only and is not to be construed as limiting the scope of the present application, as those skilled in the art will be able to make numerous insubstantial modifications and adaptations to the present application based on the above disclosure.
Example 1
As shown in fig. 1, a pre-buried positioner of rag bolt crowd that can cyclic utilization, including a plurality of support pole setting 5, detachable connection supports horizontal pole 6 and a plurality of spacing horizontal pole 7 at a plurality of support pole setting 5, locate lower positioning disk 1 on a plurality of spacing horizontal pole 7, connect a plurality of middle level protection registration arm 2 in the upper end of positioning disk 1 down, connect at the last positioning disk 3 of middle level protection registration arm 2 upper end, all be equipped with a plurality of on lower positioning disk 1 and the last positioning disk 3 and perforate, should perforate and middle level protection registration arm 2 cooperatees and sets up, supply rag bolt to pass, the lower tip of a plurality of support pole setting 5 all wraps up and has taken out from the parcel layer.
The drawing-off wrapping layer comprises a foam wrapping layer and an adhesive tape wrapping layer, the foam wrapping layer is wrapped on the outer wall of the lower end of the support vertical rod 5, and the adhesive tape wrapping layer is wrapped on the outer portion of the foam wrapping layer. Can make supporting pole setting 5 convenient taking out, make things convenient for recycle, greatly reduced the waste of shaped steel resource.
This pre-buried positioner still includes a plurality of stop nut 4, the detachable screw thread portion of connecting on rag bolt of stop nut 4, a position between be used for injecing rag bolt and the last spacing dish 3, a plurality of is perforated even ring and is distributed under on positioning disk 1 and last spacing dish 3, the perforation on the lower positioning disk 1 and the corresponding setting of perforation on last spacing dish 3, a plurality of supports 6 symmetric distribution of horizontal pole between 5 at a plurality of support pole setting, 7 symmetric distribution of a plurality of spacing horizontal pole support between 5 at a plurality of support pole setting, support perpendicular cross distribution between horizontal pole 6 and the spacing horizontal pole 7, and support horizontal pole 6 and be located the below of spacing horizontal pole 7.
The foundation bolt can be directly inserted from the through hole on the upper limiting disc 3 and is limited through the limiting nut 4. Wherein, the most of screw thread portion is located middle level protection registration arm 2 on the rag bolt, can effectually protect the screw thread on the rag bolt, prevents that the screw thread is impaired in the work progress and influence the connection in later stage.
As shown in fig. 2, the process of embedding the foundation bolt group by using the device is as follows:
erecting an irrigation steel bar net rack on a foundation cushion, symmetrically inserting a plurality of supporting upright rods 5 into the irrigation steel bar net rack, and then connecting a plurality of supporting cross rods 6 and a plurality of limiting cross rods 7 among the plurality of supporting upright rods 5 to form a cross type supporting frame structure;
a lower positioning disk 1 is erected on a crossed support frame mechanism, a plurality of middle-layer protection positioning pipes 2 are connected to corresponding positions on the lower positioning disk 1, and then an upper positioning disk 3 is connected to the middle-layer protection positioning pipes 2;
connecting a limiting nut 4 to the threaded part at the upper end of each foundation bolt, and then inserting the foundation bolts along the through holes on the upper limiting disc 3 until the limiting nuts 4 are contacted with the upper limiting disc 3;
pouring concrete slurry after a pouring template is built outside the pouring steel bar net rack;
after the concrete slurry is formed, the pouring template is removed, then the limit nut 4, the upper limit disc 3, the middle layer protection positioning pipe 2, the lower limit disc 1, the limit cross rod 7 and the support cross rod 6 are removed in sequence, and finally the support upright rod 5 is pulled out of the formed foundation;
after the supporting upright stanchion 5 is pulled out, the residues of the film wrapping layer and the adhesive tape wrapping layer in the hole formed on the foundation are removed, and then the micro-expansion fine stone concrete with the same structural strength grade is adopted to fill the hole on the foundation.
Wherein, it should be noted that the height of taking out from the parcel layer should be greater than the height of watering template, prevents that support pole setting 5 can't take out from the fashioned ground.
When the positioning disc is built, a scaffold can be built on the crossed support frame mechanism, and construction of workers is facilitated.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention.

Claims (8)

1. The utility model provides a pre-buried positioner of rag bolt crowd that can cyclic utilization which characterized in that: including a plurality of support pole setting (5), detachable a plurality of connection on supporting pole setting (5) support horizontal pole (6) and a plurality of spacing horizontal pole (7), locate lower positioning disk (1) on a plurality of spacing horizontal pole (7), connect a plurality of middle level protection registration arm (2) of positioning disk (1) upper end down, connect and protect positioning disk (3) on middle level protection registration arm (2) upper end down, all be equipped with a plurality of on lower positioning disk (1) and last positioning disk (3) and perforate, should perforate and middle level protection registration arm (2) cooperate the setting, supply rag bolt to pass, a plurality of the lower tip that supports pole setting (5) all wraps up has taken out from the parcel layer.
2. The anchor bolt group embedding and positioning device capable of being recycled according to claim 1, wherein: the embedded positioning device further comprises a plurality of limiting nuts (4), wherein the limiting nuts (4) are detachably connected to the threaded portions of the foundation bolts and used for limiting the positions between the foundation bolts and the upper limiting disc (3).
3. The anchor bolt group embedding and positioning device capable of being recycled according to claim 1, wherein: the through holes are uniformly and annularly distributed on the lower positioning disc (1) and the upper positioning disc (3), and the through holes on the lower positioning disc (1) and the through holes on the upper positioning disc (3) are correspondingly arranged.
4. The anchor bolt group embedding and positioning device capable of being recycled according to claim 1, wherein: the supporting cross rods (6) are symmetrically distributed among the supporting vertical rods (5), and the limiting cross rods (7) are symmetrically distributed among the supporting vertical rods (5).
5. The device and the method for pre-burying and positioning the recyclable foundation bolt group according to claim 4, wherein the device comprises: the supporting cross rods (6) and the limiting cross rods (7) are vertically distributed in a crossed mode, and the supporting cross rods (6) are located below the limiting cross rods (7).
6. The anchor bolt group embedding and positioning device capable of being recycled according to claim 1, wherein: the drawing and separating wrapping layer comprises a foam wrapping layer and an adhesive tape wrapping layer, the foam wrapping layer is wrapped on the outer wall of the lower end of the supporting vertical rod (5), and the adhesive tape wrapping layer is wrapped outside the foam wrapping layer.
7. A method of embedding groups of anchor bolts using the apparatus according to any one of claims 1 to 6, comprising the steps of:
step S1, erecting a casting steel bar net rack on a foundation bed, symmetrically inserting a plurality of supporting vertical rods (5) into the casting steel bar net rack, and then connecting a plurality of supporting cross rods (6) and a plurality of limiting cross rods (7) among the plurality of supporting vertical rods (5) to form a cross type supporting frame structure;
step S2, a lower positioning disc (1) is erected on the crossed support frame mechanism, a plurality of middle-layer protection positioning pipes (2) are connected to corresponding positions on the lower positioning disc (1), and then an upper positioning disc (3) is connected to the middle-layer protection positioning pipes (2);
step S3, connecting a limiting nut (4) on the upper threaded part of the plurality of foundation bolts, and then inserting the plurality of foundation bolts along the through holes on the upper limiting disc (3) until the limiting nut (4) is contacted with the upper limiting disc (3);
step S4, pouring concrete slurry after a pouring template is built outside the pouring steel bar net rack;
step S5, after the concrete slurry is formed, the pouring template is dismantled, then the limit nut (4), the upper limit disc (3), the middle layer protection positioning pipe (2), the lower positioning disc (1), the limit cross rod (7) and the support cross rod (6) are dismantled in sequence, and finally the support upright rod (5) is pulled out of the formed foundation;
and S6, after the support upright stanchion (5) is pulled out, removing residues of a film wrapping layer and an adhesive tape wrapping layer in the hole formed on the foundation, and then filling the hole on the foundation with micro-expansion fine aggregate concrete with the same structural strength grade.
8. The embedded positioning method for the embedded foundation bolt group according to claim 7, wherein: the height of the wrapping layer is larger than that of the pouring template, so that the supporting upright rod (5) is prevented from being pulled out from the formed foundation.
CN202110430635.5A 2021-04-21 2021-04-21 Recyclable foundation bolt group pre-embedding positioning device and method Pending CN113293859A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110430635.5A CN113293859A (en) 2021-04-21 2021-04-21 Recyclable foundation bolt group pre-embedding positioning device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110430635.5A CN113293859A (en) 2021-04-21 2021-04-21 Recyclable foundation bolt group pre-embedding positioning device and method

Publications (1)

Publication Number Publication Date
CN113293859A true CN113293859A (en) 2021-08-24

Family

ID=77320028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110430635.5A Pending CN113293859A (en) 2021-04-21 2021-04-21 Recyclable foundation bolt group pre-embedding positioning device and method

Country Status (1)

Country Link
CN (1) CN113293859A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809066A (en) * 2022-04-15 2022-07-29 北京建工集团有限责任公司 Annular positioning device and positioning method for mounting foundation bolt of large-diameter steel column

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09209503A (en) * 1996-02-01 1997-08-12 Toray Pefu Kakouhin Kk Reinforcing bar cover
CN204040056U (en) * 2014-06-26 2014-12-24 中国建筑第八工程局有限公司 A kind of location and installation support of pre-embedded anchoring bolts
CN104805862A (en) * 2015-04-30 2015-07-29 中国化学工程第三建设有限公司 Positioning plate for foundation bolt of round equipment foundation and positioning method
CN205224075U (en) * 2015-11-11 2016-05-11 中铁十四局集团有限公司 High -speed railway road bed contact net stand basis is buried bolt positioning disk in advance
CN205688456U (en) * 2016-06-26 2016-11-16 青岛一建集团有限公司 A kind of construction exclusively foot bolt location and fixing device
CN205954674U (en) * 2016-08-29 2017-02-15 中国电建集团河南工程公司 High accuracy built -in foundation bolt installation device
CN107724695A (en) * 2017-10-31 2018-02-23 上海宝冶集团有限公司 Combine the accurate positioning device and its construction method of shape foundation bolt
CN109235483A (en) * 2018-10-08 2019-01-18 中石化石油工程技术服务有限公司 A kind of large equipment base foundation bolt positioning device and its application method
CN109763572A (en) * 2019-01-23 2019-05-17 浙江省送变电工程有限公司 A kind of device and its operating method of the quick pre-buried verticality of adjustment foundation bolt group
CN109914462A (en) * 2019-04-03 2019-06-21 江铃汽车集团江西工程建设有限公司 A kind of locating support and construction method of steel column embedding anchor bolts
CN209144809U (en) * 2018-08-02 2019-07-23 山西省工业设备安装集团有限公司 A kind of bolt embedment positioning plate
CN209323390U (en) * 2018-12-27 2019-08-30 中铁六局集团天津铁路建设有限公司 Absolute altitude iron box beam catenary mast and the bracing wire pre-cast bolt positioning device that casts anchor
CN209468865U (en) * 2019-01-11 2019-10-08 山西省工业设备安装集团有限公司 A kind of isolated footing foundation bolt integral built-in positioning reinforcing device
CN110656657A (en) * 2019-11-01 2020-01-07 中化二建集团有限公司 Compressor foundation bolt installation method
CN110847445A (en) * 2019-11-25 2020-02-28 苏州二建建筑集团有限公司 Construction method for integrally forming outer wall and bottom plate of cast-in-place concrete structure of structure
CN210216479U (en) * 2019-05-15 2020-03-31 广西建工集团第二建筑工程有限责任公司 Positioning device for pre-embedding large foundation bolt group
CN210455592U (en) * 2019-08-13 2020-05-05 南通市金山货架有限公司 Storage cage convenient to inventory is checked
KR20200082544A (en) * 2018-12-30 2020-07-08 임종완 The device to fix and tie-up the PVC conduit which is erected inside the slab for vertical routing, or which is arrayed on the surface of wall
CN212104166U (en) * 2020-04-08 2020-12-08 中国建筑第二工程局有限公司 Accurate positioning device for embedded bolt of safety injection box of nuclear power station
CN112127637A (en) * 2020-09-22 2020-12-25 中国五冶集团有限公司 Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09209503A (en) * 1996-02-01 1997-08-12 Toray Pefu Kakouhin Kk Reinforcing bar cover
CN204040056U (en) * 2014-06-26 2014-12-24 中国建筑第八工程局有限公司 A kind of location and installation support of pre-embedded anchoring bolts
CN104805862A (en) * 2015-04-30 2015-07-29 中国化学工程第三建设有限公司 Positioning plate for foundation bolt of round equipment foundation and positioning method
CN205224075U (en) * 2015-11-11 2016-05-11 中铁十四局集团有限公司 High -speed railway road bed contact net stand basis is buried bolt positioning disk in advance
CN205688456U (en) * 2016-06-26 2016-11-16 青岛一建集团有限公司 A kind of construction exclusively foot bolt location and fixing device
CN205954674U (en) * 2016-08-29 2017-02-15 中国电建集团河南工程公司 High accuracy built -in foundation bolt installation device
CN107724695A (en) * 2017-10-31 2018-02-23 上海宝冶集团有限公司 Combine the accurate positioning device and its construction method of shape foundation bolt
CN209144809U (en) * 2018-08-02 2019-07-23 山西省工业设备安装集团有限公司 A kind of bolt embedment positioning plate
CN109235483A (en) * 2018-10-08 2019-01-18 中石化石油工程技术服务有限公司 A kind of large equipment base foundation bolt positioning device and its application method
CN209323390U (en) * 2018-12-27 2019-08-30 中铁六局集团天津铁路建设有限公司 Absolute altitude iron box beam catenary mast and the bracing wire pre-cast bolt positioning device that casts anchor
KR20200082544A (en) * 2018-12-30 2020-07-08 임종완 The device to fix and tie-up the PVC conduit which is erected inside the slab for vertical routing, or which is arrayed on the surface of wall
CN209468865U (en) * 2019-01-11 2019-10-08 山西省工业设备安装集团有限公司 A kind of isolated footing foundation bolt integral built-in positioning reinforcing device
CN109763572A (en) * 2019-01-23 2019-05-17 浙江省送变电工程有限公司 A kind of device and its operating method of the quick pre-buried verticality of adjustment foundation bolt group
CN109914462A (en) * 2019-04-03 2019-06-21 江铃汽车集团江西工程建设有限公司 A kind of locating support and construction method of steel column embedding anchor bolts
CN210216479U (en) * 2019-05-15 2020-03-31 广西建工集团第二建筑工程有限责任公司 Positioning device for pre-embedding large foundation bolt group
CN210455592U (en) * 2019-08-13 2020-05-05 南通市金山货架有限公司 Storage cage convenient to inventory is checked
CN110656657A (en) * 2019-11-01 2020-01-07 中化二建集团有限公司 Compressor foundation bolt installation method
CN110847445A (en) * 2019-11-25 2020-02-28 苏州二建建筑集团有限公司 Construction method for integrally forming outer wall and bottom plate of cast-in-place concrete structure of structure
CN212104166U (en) * 2020-04-08 2020-12-08 中国建筑第二工程局有限公司 Accurate positioning device for embedded bolt of safety injection box of nuclear power station
CN112127637A (en) * 2020-09-22 2020-12-25 中国五冶集团有限公司 Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809066A (en) * 2022-04-15 2022-07-29 北京建工集团有限责任公司 Annular positioning device and positioning method for mounting foundation bolt of large-diameter steel column

Similar Documents

Publication Publication Date Title
CN105220874B (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN102383628B (en) Construction device and construction method for post construction of depressing cone of silo structure
CN102864795B (en) Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN109944435B (en) Template support frame for silo cone shell construction and construction method
CN104295003A (en) Structural column construction method
CN105649213B (en) A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting
CN113293859A (en) Recyclable foundation bolt group pre-embedding positioning device and method
CN113863330A (en) Ultra-deep foundation pit narrow fertilizer groove concrete backfill structure and construction method
CN107130521B (en) A kind of dell precipice section large-section beam Bailey truss hoisting die construction method
CN110939261B (en) Double outer scaffold of dish knot formula structure of encorbelmenting
CN112227399A (en) Template mounting and dismounting device of large cup-shaped foundation and template supporting and dismounting method
CN202809636U (en) Light steel plant column foundation adapted to filling subgrade settlement
CN215717225U (en) Ladder step upright rod supporting device
CN209874467U (en) A template support frame for construction of silo awl shell
CN209162880U (en) A kind of photovoltaic bracket basis for heavy grade landform
CN211848965U (en) Cast-in-place box girder support
CN108240113A (en) Detachably across the support device at hole and method
CN211286573U (en) Scaffold foot supporting component capable of being recycled
CN208650088U (en) A kind of street lamp post installation armored concrete prefabricated foundation structure
CN108978697B (en) Terrace template system and construction method
CN111946036B (en) Reverse landing conversion construction method for section steel cantilever scaffold
CN220100639U (en) Large cantilever template for construction of water tower of pumped storage power station
CN220377344U (en) Hanging die supporting device for mixing tower fan foundation
CN114526078B (en) Assembly line type shaft inner wall pouring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210824

RJ01 Rejection of invention patent application after publication