CN107130521B - A kind of dell precipice section large-section beam Bailey truss hoisting die construction method - Google Patents
A kind of dell precipice section large-section beam Bailey truss hoisting die construction method Download PDFInfo
- Publication number
- CN107130521B CN107130521B CN201710385016.2A CN201710385016A CN107130521B CN 107130521 B CN107130521 B CN 107130521B CN 201710385016 A CN201710385016 A CN 201710385016A CN 107130521 B CN107130521 B CN 107130521B
- Authority
- CN
- China
- Prior art keywords
- steel
- double flute
- bailey truss
- flute steel
- sunpender
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of dell precipice section large-section beam Bailey truss hoisting die construction method, it in turn includes the following steps, splicing lifting beret slice, making and installation top double flute steel, installation lower part channel steel, are laid with distribution beam, seating side guard rail, laydown, template at installation sunpender, the present invention, which is one, can effectively solve that because with a varied topography, height is too high a kind of Bailey truss hoisting die construction method of landing support can not be laid, the present invention adapts to that all are with a varied topography, in large-span structure engineering.
Description
Technical field
The present invention relates to a kind of dell precipice section large-section beam Bailey truss hoisting die construction methods.
Background technology
With building trade development and meet complex building requirement.Bridges and culverts, large-span structure, larger high ordertransfer structure
Part is increasing.Used cast-in-situ steel reinforced concrete beam span is big in the construction process, height difference is big from the ground for these components.Branch
The selection of support form need to meet technically feasible, reasonable in economy, ensure in safety, condition optimal on the duration.However due to
Height is too high from the ground for structure, is limited by landform, geology and transportation condition, arrangement is complicated, and stress is larger, can not be by tradition
Mode is arranged.Therefore use which kind of support system particularly important in the construction process.
Invention content
In view of the deficiencies of the prior art, the present invention provides one kind can not set up landing support suitable for a varied topography,
The simple dell precipice section large-section beam Bailey truss hoisting die construction method of constructing operation simultaneously.
Including splicing lifting beret slice, making and top double flute steel is installed, installation sunpender, installation lower part double flute steel, is laid with
Distribution beam, seating side guard rail, laydown, template, it is characterised in that:Steps are as follows for Specific construction:
(1) splicing lifting beret slice,
A certain number of beret slices are chosen according to structural span in structure design drawing, and assembled formation is carried out by connecting pin
Bailey truss, Bailey truss are hung to the reinforced beam top of pouring molding by tower crane, and it is big that Bailey truss sets up length
In the deck-siding equal to reinforced beam, drilling installation expansion bolt, passes through U-shaped armful by Bailey truss on reinforced beam
Hoop and expansion bolt are fixed on reinforced beam;
(2) it makes and double flute steel is installed,
The making of top double flute steel and lower part double flute steel is carried out in material processing site while Bailey truss is set up, on
Portion's double flute steel and lower part double flute steel are made of two same size channel steels, and hole, channel steel and channel steel are reserved between two channel steels
Between using steel cushion block be welded to connect fixation, the steel cushion block of top double flute steel and lower part double flute steel be equipped with it is corresponding can
For the hole that sunpender passes through, after Bailey truss is set up, top double flute steel is hoisted to Bailey truss top, top double flute
It is welded and fixed between steel and Bailey truss top flange;
(3) sunpender is installed,
According to structural stress analysis, the high-strength bolt of appropriate diameter is chosen as sunpender, the length of sunpender is determined according to design
Degree, indicates the installation site of top double flute steel and lower part double flute steel on sunpender, and when installation, sunpender is between the double flute steel of top
Hole on steel cushion block passes through so that top double flute steel is placed in the installation marker location of sunpender, then by nut by sunpender with
Top double flute steel is fixed;
(4) lower part double flute steel is installed,
After the completion of hanger erection, safe steel cat ladder is installed from Bailey truss as easy operation platform, then carries out
Lower part double flute steel is transported to the lower part of Bailey truss by tower crane, using hawser so that sunpender is passed through by the installation of lower part double flute steel
Hole between the double flute steel of lower part on steel cushion block so that lower part double flute steel is placed in the installation marker location of sunpender, then passes through nut
Sunpender and lower part double flute steel are fixed;
(5) it is laid with distribution beam,
After all lower part double flute steel are installed in place, in lower part, the upside of double flute steel is laid with distribution beam;
(6) seating side guard rail,
On distribution beam top, scaffold is set up, and set up and go along with sb. to guard him, all go along with sb. to guard him is closed using Dense mesh screen, and is going along with sb. to guard him
Upper setting anti-drop net;
(7) laydown, template,
Cast-in-situ Beam position, laydown installation form are made in distribution beam.
In step (1), it is 3 meters long, 1.5 meters of height that Bailey truss, which uses 321 beret slices, beret slice sectional dimension,.
In step (2), the steel cushion block is laid along channel steel extending direction and arranges that spacing is 1m~1.5m.
In step (5), distribution beam is made up of the laying of I-steel, and the I-steel is welded and fixed with lower part double flute steel.
In step (6), sets up 1.2 meters high of skirt of facing and protect, steel pipe cat ladder is set up in scaffold, and be laid with step plate, foot
Hand cradle completely spreads bamboo fragrant plant piece, and one of anti-drop net vertically is being arranged every 10 meters as construction operation platform.
The present invention by using Bailey truss hoisting die construction technology solves that landing frame body can not be used due to a varied topography
The case where being.The Bailey truss that hoisting die construction is formed by connecting using beret slice by pin as upper support structure, adopt by substructure
With double flute steel.Up-down structure is attached using high-strength bolt as sunpender by bolt.Finally consolidate using steel plate as baffle plate is hung
It is scheduled on and constitutes stable Bailey truss on channel steel and hang mould support system.It is mainly characterized by reducing that lower support system, progress are fast, throw
Relatively small, guarantee construction quality is provided, is solved well because of the construction difficult problem with a varied topography that can not arrange landing support.Due to group
It is processed in factory floor at the accessory of Bailey truss, dimensional discrepancy very little, and itself has prodigious rigidity, is transported to construction
Scene, which carries out assembling, can become Bailey truss, and length is determined according to cast-in-place beam length.For this purpose, this hoisting die construction method safety
Reliably, easy for construction.
In conclusion the present invention is one can effectively solve that because with a varied topography, height is too high landing support can not be laid
A kind of Bailey truss hoisting die construction method, the present invention adapt to that all are with a varied topography, in large-span structure engineering.
Description of the drawings
Fig. 1 is the positive facade overall schematic of Bailey truss formed using this construction method.
Fig. 2 is the Bailey truss side elevation overall schematic formed using this construction method.
Fig. 3 is Bailey truss of the present invention, sunpender, double flute steel connection diagram.
Fig. 4 is screw rod of the present invention and double flute steel connection diagram.
Fig. 5 is double flute steel schematic diagram of the present invention;
Each label indicates in figure:1, high-strength bolt;2, nut;3, steel cushion block;4, double flute steel;5, Bailey truss;6, Bei Lei
Holder bearing;7, crosshead;8, distribution beam;9, template;10, cast-in-situ concrete beam;11, steel pipe frame column support system.
Specific implementation mode
The present invention will be further described with reference to the accompanying drawings and examples.Following circumferential directions refer to the week along tunnel
To, axially refer to along tunnel axial direction.
Fig. 1 to Fig. 5 shows the implementation figure of the dell precipice section large-section beam Bailey truss hoisting die construction method of the present invention,
It includes the following steps:
(1) splicing lifting beret slice,
It is 3 meters long, 1.5 meters of height that hoisting die construction, which uses 321 beret slices (reinforced), standard beret slice sectional dimension,.Foundation
Structural span chooses a certain number of beret slices and carries out assembly by connecting pin in structure design drawing.Referring to Fig. 1, will finally spell
The Bailey truss 5 installed is hung to 6 top of reinforced beam of pouring molding by tower crane, and reinforced beam 6 is supported on
On steel pipe frame column support system 11, Bailey truss sets up length and is more than or equal to deck-siding, in advance the drilling installation expanding screw on beam
Bailey truss is fixed on by U-shaped anchor ear and expansion bolt on beam by bolt.
(2) it makes and double flute steel 4 is installed,
The system of top double flute steel 41 and lower part double flute steel 42 is carried out in material processing site while Bailey truss is set up
Make, referring to Fig. 5, top double flute steel 41 and lower part double flute steel 42 are made of two same size channel steels, pre- between two channel steels
It boxes out gap, is reliably welded using steel cushion block 3 between channel steel and channel steel, steel cushion block arranges that spacing is 1m~1.5m.Steel cushion block
On reserve the hole passed through for sunpender in advance using drilling machine.It, will after Bailey truss erection finishes and double flute steel performs
Double flute steel is hoisted to Bailey truss top, and double flute steel 4 and Bailey truss are welded and fixed between 5 top flange.
(3) sunpender is installed,
According to structural stress analysis, the high-strength bolt 1 for choosing appropriate diameter is used as sunpender, field technician to measure
It calculates, determines the length of sunpender.The specific location for indicating upper and lower channel steel with red paint on sunpender in advance, is lifted later.
When installation, referring to Fig. 3, the hole that sunpender 1 is reserved across top double flute steel 41 in steel cushion block 3 uses on steel cushion block top
Nut 2 is fixed.
(4) lower part double flute steel 42 is installed,
Referring to Fig. 1, after installation is complete in sunpender 1, safe steel cat ladder is installed from the Bailey truss of top as easily applying
Work platform carries out the installation of lower part double flute steel 42, lower part double flute steel 42 is transported to 5 lower part of Bailey truss, work using tower crane first
Make personnel and double flute steel is fixed on technical staff by double flute steel both sides referring to Fig. 4 across screw rod by nut 2 using hawser
The position indicated in advance.
(5) it is laid with distribution beam,
Referring to Fig. 2, after all lower part double flute steel 42 are installed in place, it is allocated work as required on 4 top of double flute steel
The laying of word steel 8 is fixed between I-steel 8 and lower part double flute steel 42 in the form of welding.
(6) seating side guard rail,
Referring to Fig. 2, on 8 top of distribution beam, foot hand is set up in structural beams both sides, and 7, steel pipe cat ladder is set up in scaffold, and is spread
If step plate facilitates construction personnel to walk up and down, scaffold completely spreads bamboo fragrant plant piece, and take using steel pipe as construction operation platform
If 1.2 meters of height face skirt shield, all go along with sb. to guard him is closed using Dense mesh screen, and one of anti-drop net vertically is being arranged every 10 meters.
(7) laydown, laying template,
Referring to Fig. 2, unwrapping wire makes the position of Cast-in-situ Beam 10 in distribution beam 8, and laydown installation form 9 finally carries out
Beams of concrete 10 pours.
Claims (5)
1. a kind of dell precipice section large-section beam Bailey truss hoisting die construction method, including splicing lifting beret slice, making and peace
It loads onto portion's double flute steel, installation sunpender, installation lower part double flute steel, be laid with distribution beam, seating side guard rail, laydown, mould
Plate, it is characterised in that:Steps are as follows for Specific construction:
(1) splicing lifting beret slice,
A certain number of beret slices are chosen according to structural span in structure design drawing, and assembled formation shellfish thunder is carried out by connecting pin
Holder, Bailey truss are hung to the reinforced beam top of pouring molding by tower crane, and drill peace on reinforced beam
Expansion bolt is filled, Bailey truss is fixed on reinforced beam;
(2) it makes and double flute steel is installed,
The making of top double flute steel and lower part double flute steel is carried out in material processing site while Bailey truss is set up, top is double
Channel steel and lower part double flute steel are made of two same size channel steels, hole are reserved between two channel steels, between channel steel and channel steel
Be welded to connect fixation using steel cushion block, the steel cushion block of top double flute steel and lower part double flute steel is equipped with corresponding for hanging
Top double flute steel is hoisted to Bailey truss top by the hole that bar passes through after Bailey truss is set up, top double flute steel with
Bailey truss is welded and fixed between top flange;
(3) sunpender is installed,
According to structural stress analysis, the high-strength bolt of appropriate diameter is chosen as sunpender, the length of sunpender is determined according to design,
Indicate the installation site of top double flute steel and lower part double flute steel on sunpender, when installation, sunpender is from steel pad between the double flute steel of top
Hole on block passes through so that top double flute steel is placed in the installation marker location of sunpender, then by nut by sunpender and top
Double flute steel is fixed;
(4) lower part double flute steel is installed,
After the completion of hanger erection, safe steel cat ladder is installed from Bailey truss as easy operation platform, then carries out lower part
Lower part double flute steel is transported to the lower part of Bailey truss by tower crane by the installation of double flute steel, using hawser so that sunpender passes through lower part
Hole between double flute steel on steel cushion block so that lower part double flute steel is placed in the installation marker location of sunpender, then will be hung by nut
Bar is fixed with lower part double flute steel;
(5) it is laid with distribution beam,
After all lower part double flute steel are installed in place, in lower part, the upside of double flute steel is laid with distribution beam;
(6) seating side guard rail,
On distribution beam top, scaffold is set up, and set up and go along with sb. to guard him, all go along with sb. to guard him is closed using Dense mesh screen, and is set on going along with sb. to guard him
Set anti-drop net;
(7) laydown, template,
Cast-in-situ Beam position, laydown installation form are made in distribution beam.
2. dell precipice section large-section beam Bailey truss hoisting die construction method according to claim 1, it is characterised in that:Step
Suddenly in (1), it is 3 meters long, 1.5 meters of height that Bailey truss, which uses 321 beret slices, beret slice sectional dimension,.
3. dell precipice section large-section beam Bailey truss hoisting die construction method according to claim 1, it is characterised in that:Step
Suddenly in (2), the steel cushion block is laid along channel steel extending direction and arranges that spacing is 1m~1.5m.
4. dell precipice section large-section beam Bailey truss hoisting die construction method according to claim 1, it is characterised in that:Step
Suddenly in (5), distribution beam is made up of the laying of I-steel, and the I-steel is welded and fixed with lower part double flute steel.
5. dell precipice section large-section beam Bailey truss hoisting die construction method according to claim 1, it is characterised in that:Step
Suddenly it in (6), sets up 1.2 meters high of skirt of facing and protects, steel pipe cat ladder is set up in scaffold, and be laid with step plate, scaffold is used as and applies
Work operating platform completely spreads bamboo fragrant plant piece, and one of anti-drop net vertically is being arranged every 10 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710385016.2A CN107130521B (en) | 2017-05-26 | 2017-05-26 | A kind of dell precipice section large-section beam Bailey truss hoisting die construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710385016.2A CN107130521B (en) | 2017-05-26 | 2017-05-26 | A kind of dell precipice section large-section beam Bailey truss hoisting die construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107130521A CN107130521A (en) | 2017-09-05 |
CN107130521B true CN107130521B (en) | 2018-10-19 |
Family
ID=59734028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710385016.2A Active CN107130521B (en) | 2017-05-26 | 2017-05-26 | A kind of dell precipice section large-section beam Bailey truss hoisting die construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107130521B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108005114A (en) * | 2017-12-11 | 2018-05-08 | 贵州中昇东浩科技有限公司 | A kind of piping lane pours mould |
CN109457814B (en) * | 2018-11-15 | 2020-07-07 | 李延敏 | Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure |
CN112093704B (en) * | 2020-09-09 | 2021-11-16 | 厦门安科科技有限公司 | Hanging device for jacking formwork system |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080099543A (en) * | 2007-05-09 | 2008-11-13 | 동명공영건설(주) | Formwork assembly for a bridge |
CN202688888U (en) * | 2012-07-17 | 2013-01-23 | 中交第二公路工程局有限公司 | Deck type reversely hung template hanging frame |
CN103835238B (en) * | 2014-02-21 | 2015-11-18 | 中铁大桥局集团有限公司 | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing |
CN104141383B (en) * | 2014-07-16 | 2016-06-01 | 北京万兴建筑集团有限公司 | A kind of Bailey beam pendent form support system and construction thereof |
CN105133497B (en) * | 2015-07-21 | 2016-08-24 | 杭州江润科技有限公司 | A kind of construction method being inclined cross low clearance active service highway multi-azimuth adjustable cast-in-place box beam bracket system |
-
2017
- 2017-05-26 CN CN201710385016.2A patent/CN107130521B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107130521A (en) | 2017-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926448B (en) | A kind of construction method of the Cable stayed Bridge Main Tower in the double rope faces of the only tower of curve | |
CN106677070B (en) | A kind of high-altitude long-span heavy duty construction of beam bracket and construction method | |
CN101781879B (en) | Construction method of single-pylon cable-stayed bridge without dorsal cables | |
CN100545363C (en) | Structure conversion layer type steel concrete girder mould suspension construction method | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN106702910A (en) | Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes | |
CN106436573B (en) | Superelevation Sarasota large span upper beam bracket steel truss stand construction method | |
CN107130521B (en) | A kind of dell precipice section large-section beam Bailey truss hoisting die construction method | |
CN107090975A (en) | A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation | |
CN103498425A (en) | Full-dismounting combination type multifunctional bracket supporting structure and construction method thereof | |
CN109025295A (en) | A kind of high-altitude long-span steel reinforced concrete corridor construction method | |
CN103938875A (en) | Ground single body tensioning lifting construction method of single layer suspendome | |
CN113638304B (en) | Concrete beam type bridge hidden cover beam structure system and construction method thereof | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
CN109267493A (en) | A kind of construction method installed across river steel lid beam | |
CN103938871B (en) | A kind of construction method adopting the steel core concrete column bonded prestress frame beam structure of reinforced concrete ring beam joint | |
CN108643572A (en) | Concrete crossbeam support, shellfish thunder platform construction and steel strand wires combined installation method | |
CN102777044B (en) | Hoisting method of steel-structured spraying layer of urea prilling tower | |
CN110409624A (en) | A kind of installation of large scale equipment and main structure be inverse to be made to calculate and construction method | |
CN106381810B (en) | With the cast-in-place outstanding method for filling beam of beam-column type bracket | |
CN110616706B (en) | Construction method for layering binding in large-diameter pile foundation reinforcing steel bar hole | |
CN201714056U (en) | Truss-type operating platform | |
CN102635234A (en) | Construction method for controlling thickness of upper-layer steel bar protection layer and board thickness of floorboard | |
CN106245531B (en) | Steel structural bridge installation method is hung under bilateral derrick type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |