CN107720562A - A kind of crane gear with laying dust cleaning plant - Google Patents

A kind of crane gear with laying dust cleaning plant Download PDF

Info

Publication number
CN107720562A
CN107720562A CN201711108389.1A CN201711108389A CN107720562A CN 107720562 A CN107720562 A CN 107720562A CN 201711108389 A CN201711108389 A CN 201711108389A CN 107720562 A CN107720562 A CN 107720562A
Authority
CN
China
Prior art keywords
cleaning
laying dust
crossbeam
pedestal
cleaning plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711108389.1A
Other languages
Chinese (zh)
Other versions
CN107720562B (en
Inventor
苗则波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BORRIS HEAVY INDUSTRY CO., LTD.
Original Assignee
WUHU CHANGJIANG JACK-UP EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHU CHANGJIANG JACK-UP EQUIPMENT Co Ltd filed Critical WUHU CHANGJIANG JACK-UP EQUIPMENT Co Ltd
Priority to CN201711108389.1A priority Critical patent/CN107720562B/en
Publication of CN107720562A publication Critical patent/CN107720562A/en
Application granted granted Critical
Publication of CN107720562B publication Critical patent/CN107720562B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B08B1/50
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details

Abstract

The present invention relates to technical field of crane equipment, more particularly to a kind of crane gear with laying dust cleaning plant, a kind of crane gear with laying dust cleaning plant, including portal frame body body, load carrier, drive device and cleaning plant, the load carrier, what drive device and cleaning plant can move is arranged on portal frame body body, the load carrier includes the first travel mechanism, support mechanism and the first drive mechanism, the cleaning plant includes cleaning pedestal and is used for the cleaning mechanism cleared up the laying dust on portal frame body body on cleaning pedestal, the drive device includes the second drive mechanism and the second travel mechanism on cleaning pedestal, second drive mechanism is connected with the second travel mechanism.The present invention can realize the cleaning operation on portal frame body, and meeting support mechanism can smoothly move on portal frame body, improve the operating efficiency that support mechanism transports goods.

Description

A kind of crane gear with laying dust cleaning plant
Technical field
The present invention relates to technical field of crane equipment, more particularly to a kind of crane gear with laying dust cleaning plant.
Background technology
Row is hung, also known as hanging, driving, crane, straddle truck, overhead traveling crane, is all the general call of people one to crane, Row hang with we alleged by gantry crane, bridge crane it is essentially the same.Also known as straddle truck, it is a kind of change of bridge crane Shape.At harbour, it is mainly used in the handling operation in the goods yard, stock ground goods, bulk goods of outdoor.Its metal structure is held as door-shaped frame Carry and two legs are installed under girder, directly can be walked on the track on ground, girder both ends there can be overhanging cantilever beam.Door Formula crane has the characteristics that utilization of area rate is high, job area is big, it is wide, versatile to adapt to, and is obtained extensively in harbour goods yard General use.
In the prior art, the use of straddle truck is prolonged, during the use of straddle truck, the steel of straddle truck Substantial amounts of laying dust is had on rail, these laying dusts may influence bearing truck and travel in orbit, and then influence whether to lead weight Draw, potential safety hazard may be produced during traveling, the operating efficiency transported goods can be reduced.
The content of the invention
Reseted in view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to provide a kind of rising with laying dust cleaning plant It is standby.
To solve the above problems, the present invention provides following technical scheme:
A kind of crane gear with laying dust cleaning plant, including portal frame body body, load carrier, drive device and Cleaning plant, what the load carrier, drive device and cleaning plant can move is arranged on portal frame body body, institute Stating load carrier includes the first travel mechanism, support mechanism and is moved on portal frame body body for driving travel mechanism First drive mechanism, the cleaning plant include the cleaning pedestal that can be moved on portal frame body body and installed in cleanings It is used for the cleaning mechanism cleared up the laying dust on portal frame body body on pedestal, the drive device includes the second driving Mechanism and the second travel mechanism on cleaning pedestal, second drive mechanism are connected with the second travel mechanism.
Further, the portal frame body includes crossbeam and two support frames, and the crossbeam is I-shaped structure, described The both sides of cross rail top, which are respectively equipped with along transverse width direction, to stretch out integrally formed first stretching board, the horizontal stroke The both sides of beam bottom, which are respectively equipped with along transverse width direction, to stretch out integrally formed second stretching board, and the two of the crossbeam End, which is respectively equipped with along the length direction of crossbeam, to stretch out integrally formed stretching, extension beam, and each support frame as described above is triangle Structure, the top of each support frame as described above are fixedly connected with the stretching, extension beam of beam-end, the top of each first stretching board Portion is provided with the first track being extended along crossbeam length direction, and each first track runs through the first stretching board, often The sidepiece of individual second stretching board is provided with the second track being extended along crossbeam length direction, each second track Through the second stretching board.
Further, first travel mechanism includes two the first movements for being separately positioned on crossbeam the latter half both sides Part, the support mechanism include the first support member being arranged between two the first moving parts and installed in the first supports The load-supporting part in part centre position, first drive mechanism include two the first driving parts, two first drivings Part is separately mounted on first moving parts.
Further, each first moving parts is including circular arc installing plate, two the first directive wheels and two First rotary shaft, what two first directive wheels can rotate is arranged in the first stretching board, and two described first are oriented to Wheel sets and is located on the same line along the length direction of the first stretching board, and each first directive wheel passes through first Rotary shaft is arranged on circular arc installing plate, and first support member includes first support bar and installed in first support bar both ends The first mounting seat, each first support base is arranged on circular arc installing plate by bolt, the first support bar Middle part be provided with for load-supporting part installation the first mounting groove.
Further, the load-supporting part includes link, and the top half of the link is provided with to be passed through for first support bar First through hole, the latter half of the link is provided with the second through hole, and the link is arranged in the first mounting groove and is set in In first support bar.
Further, each first driving part includes the second rotary shaft and rotating disk, and each described second rotates Axle is installed in the centre position of circular arc installing plate, and each rotating disk is fixedly connected with the second rotary shaft, two first Directive wheel is connected with the second rotary shaft, and each rotating disk is provided with the first channel groove, in each channel groove Provided with driving chain.
Further, the cleaning pedestal is arranged on crossbeam, and can be fastened on by being provided with the cleaning pedestal by two the The second mounting groove in one stretching board, the first receiving is equipped with corresponding to each first track on the roof of second mounting groove Groove, the latter half of the cleaning pedestal are provided with groove, and the groove is equal to crossbeam through cleaning pedestal, the width of the groove Thickness.
Further, the cleaning mechanism includes laying dust collecting part and two are separately mounted to clear up base bottom both ends Cleaning member, each cleaning member connect with laying dust collecting part, and each cleaning member includes two symmetrically It is arranged on the laying dust pumping components and two laying dusts for being symmetricly set on cleaning base bottom side of a first extension block bottom Component is cleaned, two laying dust pumping components are arranged between two laying dusts cleaning components.
Further, second drive mechanism is arranged on the top of cleaning pedestal, and second drive mechanism includes peace Moved mounted in the second positioning element cleared up at the top of pedestal and for driving length direction of second positioning element along crossbeam Second driving part, the second driving part and the second positioning element drive connection.
Further, second travel mechanism includes the first guiding parts and on the outside of cleaning pedestal and with first First linkage part of guiding parts drive connection, first guiding parts are arranged in cleaning pedestal, first linkage Part and the first positioning element are connected.
Beneficial effect:A kind of crane gear with laying dust cleaning plant of the present invention, cleaning plant are arranged on portal frame On body, drive device be arranged on cleaning plant on, when portal frame body need cleaning when, by control drive device move into And drive cleaning plant to be moved on portal frame body, by cleaning mechanism of the drive installation on cleaning pedestal, and then realize Prune job is carried out to portal frame body, the laying dust on portal frame body is cleared up and collected, realizes portal frame body On cleaning operation, meeting support mechanism can smoothly move on portal frame body, improve support mechanism carry goods The operating efficiency of thing.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of portal frame body;
Fig. 2 is the sectional view of portal frame body;
Fig. 3 is the sectional perspective structural representation of portal frame body;
Fig. 4 is the dimensional structure diagram of load carrier;
Fig. 5 is the front view of load carrier;
Fig. 6 is drive device and the dimensional structure diagram one for clearing up pedestal;
Fig. 7 is the top view of drive device and cleaning plant;
Fig. 8 is drive device and the dimensional structure diagram two for clearing up pedestal;
Fig. 9 is the dimensional structure diagram one of drive device;
Figure 10 is the dimensional structure diagram two of drive device;
Figure 11 is drive device and the dimensional structure diagram of cleaning plant;
Figure 12 is the front view of drive device and cleaning plant;
Figure 13 is along the sectional view of line A-A in Figure 12;
Figure 14 is the dimensional structure diagram of laying dust pumping components;
Figure 15 is the sectional view of laying dust pumping components;
Figure 16 is the assembling structure schematic diagram of laying dust pumping components;
Figure 17 is the dimensional structure diagram that laying dust cleans component;
Figure 18 is the assembling structure schematic diagram that laying dust cleans component;
Description of reference numerals:Portal frame body 1, crossbeam 1a, support frame 1b, the first stretching board 1c, the second stretching board 1d, stretch Exhibition beam 1e, the first track 1f, the second track 1g, load carrier 2, the first travel mechanism 2a, support mechanism 2b, the first drive mechanism 2c, the first moving parts 2d, circular arc installing plate 2d1, the first directive wheel 2d2, the first rotary shaft 2d3, the first support member 2e, load-supporting part 2f, the first driving part 2g, the second rotary shaft 2g1, rotating disk 2g2, drive device 3, the second drive mechanism 3a, Second travel mechanism 3b, the second positioning element 3c, the first location-plate 3c1, the second locating piece 3c2, rectangular through slot 3c3, second drives Dynamic component 3d, the first supporting plate 3d1, the second electric pushrod 3d2, the first guiding parts 3e, the first linkage part 3f, first connecting rod 3f1, second connecting rod 3f2, the second directive wheel 3g, the first drive 3h, the first connecting pole 3h1, the second drive 3i, the 3rd rotates Axle 3j, cleaning plant 4, cleaning pedestal 4a, the first extension block 4a1, cleaning mechanism 4b, laying dust collecting part 4c, disposable box 4c1, Cleaning member 4d, laying dust pumping components 4e, laying dust clean the hinged seat 4g1 of component 4f, cleaning part 4g, first, the first locating rod The first drive division of 4g2, cleaning head 4g3, universal ball end 4g4 4h, the second hinged seat 4h1, the first electric pushrod 4h2, rotating part 4i, First motor 4i1, the first installing plate 4i2, the first moving block 4i3, suction section 4j, the first pipe 4j1, the first expansion mouth 4j2, the Two holding tank 4j3.
Embodiment
With reference to Figure of description and embodiment, the specific embodiment of the present invention is described in further detail:
Referring to figs. 1 to a kind of crane gear with laying dust cleaning plant shown in Figure 18, including portal frame body 1, hold 2, drive device 3 and cleaning plant 4, the peace that the load carrier 2, drive device 3 and cleaning plant 4 can move are put in refitting On portal frame body 1, the load carrier 2 includes the first travel mechanism 2a, support mechanism 2b and for driving moving machine The first drive mechanism 2c that structure moves on portal frame body 1, the cleaning plant 4 include to move up in portal frame body 1 Dynamic cleaning pedestal 4a and the cleaning mechanism on cleaning pedestal 4a for being cleared up the laying dust on portal frame body 1 4b, the drive device 3 include the second drive mechanism 3a and the second travel mechanism 3b on cleaning pedestal 4a, and described the Two drive mechanism 3a and the second travel mechanism 3b are connected, by the cooperation of drive device 3 and cleaning plant 4 between the two, Realize and prune job is carried out to portal frame body 1, the second travel mechanism 3b is driven in portal frame sheet by the second drive mechanism 3a Moved on body 1, and then drive cleaning pedestal 4a and cleaning mechanism 4b to be moved on portal frame body 1, meet cleaning mechanism 4b Realize that laying dust handles operation to portal frame body 1.
It is I-shaped structure that the portal frame body 1, which includes crossbeam 1a and two support frames 1b, the crossbeam 1a, the horizontal stroke Both sides at the top of beam 1a, which are respectively equipped with along transverse width direction, to stretch out integrally formed first stretching board 1c, described The both sides of crossbeam 1a bottoms, which are respectively equipped with along transverse width direction, to stretch out integrally formed second stretching board 1d, the horizontal stroke Beam 1a both ends, which are respectively equipped with along crossbeam 1a length direction, to stretch out integrally formed stretching, extension beam 1e, each support Frame 1b is triangular structure, and each support frame as described above 1b top is fixedly connected with the stretching, extension beam 1e of crossbeam 1a ends, often Individual first stretching board 1c top is provided with the first track 1f being extended along crossbeam 1a length directions, and each described the One track 1f runs through the first stretching board 1c, and each second stretching board 1d sidepiece is provided with to be prolonged along crossbeam 1a length directions The second track 1g of setting is stretched, each second track 1g runs through the second stretching board 1d, crossbeam 1a and two support frame 1b's The installation for meeting crossbeam 1a is set, and upper two the first stretching board 1c and the second stretching board 1d of crossbeam 1a installation meets load-bearing machine Structure 2b and cleaning mechanism 4b can reciprocatingly moving in crossbeam 1a, can be realized to the second stretching board 1d in mobile process On laying dust carry out prune job, each support frame 1b is the structure of triangle, because triangle has stability, Neng Gouti High crossbeam 1a stable installation.
The first travel mechanism 2a includes two the first moving parts for being separately positioned on crossbeam 1a the latter half both sides 2d, the support mechanism 2b include the first support member 2e being arranged between two the first moving parts 2d and installed in first The load-supporting part 2f in support member 2e centre positions, the first drive mechanism 2c include two the first driving part 2g, two The first driving part 2g is separately mounted on a first moving parts 2d, and two are driven by two the first driving part 2g Individual first moving parts 2d is moved on crossbeam 1a, and then disclosure satisfy that to driving the first support member 2e and load-supporting part 2f to move It is dynamic, the carrying treated and load weight can be realized during movement.
Each first moving parts 2d include circular arc installing plate 2d1, two first directive wheel 2d2 and two the One rotary shaft 2d3, what two the first directive wheel 2d2 can be rotated is arranged on the first stretching board 1c, two described Length directions of the one directive wheel 2d2 along the first stretching board 1c sets and is located on the same line, and each described first is oriented to 2d2 is taken turns by the first rotary shaft 2d3 installed in circular arc installing plate 2d1, the first support member 2e includes the first support Bar and the first mounting seat installed in first support bar both ends, each first support base are arranged on circular arc by bolt On installing plate 2d1, the middle part of the first support bar is provided with the first mounting groove for load-supporting part 2f installations, circular arc peace Loading board 2d1 setting disclosure satisfy that two the first directive wheel 2d2 and the first rotary shaft 2d3 installation, can realize drive first Support bar moves on crossbeam 1a, and then disclosure satisfy that and drive the weight loaded to be moved on crossbeam 1a.
The load-supporting part 2f includes link, and the top half of the link is provided with first passed through for first support bar and led to Hole, the latter half of the link are provided with the second through hole, and the link is arranged in the first mounting groove and is set in the first support On bar, by the way that on link, and then weight carry to be handled is realized on crossbeam 1a into the movement process of weight, link is existing There is technology, be to mark in figure.
Each first driving part 2g includes the second rotary shaft 2g1 and rotating disk 2g2, each second rotary shaft 2g1 is installed in circular arc installing plate 2d1 centre position, and each rotating disk 2g2 fixes with the second rotary shaft 2g1 to be connected Connect, two the first directive wheel 2d2 are connected with the second rotary shaft 2g1, and each rotating disk 2g2 is provided with the first raceway groove Groove, driving chain each is equipped with the channel groove, can be driven and held by rotating disk 2g2 and the second rotary shaft 2g1 cooperation Heavy parts 2f is moved on crossbeam 1a, and then disclosure satisfy that the carrying to carrying weight.
The cleaning pedestal 4a is arranged on crossbeam 1a, and can be fastened on by being provided with the cleaning pedestal 4a by two first stretches The second mounting groove on panel 1c, the first receiving is equipped with corresponding to each first track 1f on the roof of second mounting groove Groove, the latter half of the cleaning pedestal 4a are provided with groove, and the groove is equal to through cleaning pedestal 4a, the width of the groove Crossbeam 1a thickness, cleaning pedestal 4a setting, which meets cleaning pedestal 4a, to be arranged on crossbeam 1a, two first stretching, extensions Plate 1c installation enables drive device 3 to be installed on crossbeam 1a and can realize support mechanism 2b in crossbeam 1a to move back It is dynamic.
The both ends of the cleaning pedestal 4a bottoms are respectively equipped with the first extension block 4a1 for extending downwardly setting, each described First extension block 4a1 length is equal to cleaning pedestal 4a total length, and the distance between two first extension block 4a1 are equal to horizontal stroke Beam 1a thickness, two the first extension block 4a1 setting disclosure satisfy that cleaning pedestal 4a is arranged on crossbeam 1a, disclosure satisfy that and hold Heavy-duty machine structure 2b is done on crossbeam 1a back and forth to be moved back and forth.
The cleaning mechanism 4b includes laying dust collecting part 4c and two are separately mounted to clear up pedestal 4a bottoms both ends Cleaning member 4d, each cleaning member 4d connect with laying dust collecting part 4c, and each cleaning member 4d includes two The individual laying dust pumping components 4e for being symmetricly set on first extension block 4a1 bottom and two are symmetricly set on cleaning pedestal 4a bottoms The laying dust of portion side cleans component 4f, and two laying dust pumping components 4e are arranged between two laying dusts cleaning component 4f, long-pending Dirt pumping components 4e and laying dust set while cleaning component 4f and disclosure satisfy that to clearing up upper two the first stretching board 1c of pedestal 4a On laying dust carry out prune job, laying dust pumping components 4e is connected with laying dust collecting part 4c, can be by the first stretching board 1c Laying dust be pumped on laying dust collecting part 4c, the collection to laying dust can be realized.
Each laying dust, which cleans component 4f, includes cleaning part 4g and the first drive division for driving cleaning part 4g to move 4h, the cleaning part 4g one end are hinged on cleaning pedestal 4a bottom, and the other end of the cleaning part 4g is along perpendicular to clear Reason pedestal 4a moving direction extends downwardly, and one end of the first drive division 4h is hinged on cleaning pedestal 4a bottom, described The first drive division 4h other end is acted on the 4g of cleaning part, and the cleaning part 4g includes the first hinged seat 4g1, the first locating rod The 4g2 and cleaning head 4g3 installed in the first locating rod 4g2 ends, the first hinged seat 4g1 are mounted by means of bolts on clearly Pedestal 4a bottom is managed, the axis direction of the first hinged seat 4g1 is identical with crossbeam 1a length direction, first positioning Bar 4g2 one end is hinged with the first hinged seat 4g1, and the one end of the first locating rod 4g2 away from the first hinged seat 4g1 is provided with Universal ball end 4g4, what the cleaning head 4g3 can be rotated is arranged on universal ball end 4g4, is driven by the first drive division 4h clear Sweep portion 4g to be rotated in cleaning pedestal 4a bottoms, and then the first stretching board 1c laying dust can be realized and sweep operation, by two Laying dust on individual first stretching board 1c is broken up, because the one end of the first locating rod 4g2 away from the first hinged seat 4g1 is provided with ten thousand To bulb 4g4, can be realized to regulation multi-faceted on the first stretching board 1c by universal ball end 4g4 regulation, and then can Satisfaction is cleared up the laying dust on the first stretching board 1c.
The first drive division 4h includes the second hinged seat 4h1 and the first electric pushrod 4h2, the second hinged seat 4h1 Cleaning pedestal 4a bottom is mounted by means of bolts on, the second hinged seat 4h1 and the first hinged seat 4g1 is arranged on same On bar straight line, the second hinged seat 4h1 is set close to cleaning pedestal 4a side, the end of the first electric pushrod 4h2 It is hinged on the second hinged seat 4h1, the expansion link of the first electric pushrod 4h2 and the first locating rod 4g2 top half are cut with scissors Connect, the first locating rod 4g2 motions are driven by the first electric pushrod 4h2, and then the clear of the first locating rod 4g2 ends can be driven A 4g3 motion is swept, and then can realize and prune job is realized to two the first stretching board 1c,
Each laying dust pumping components 4e includes rotating part 4i and suction section 4j, the peace that the suction section 4j can be dismantled Correspond to each suction section 4j mounted in the first extension block 4a1 bottom, on the first extension block 4a1 to be equipped with for its installation 3rd mounting groove, two suction section 4j of the cleaning pedestal 4a bottom ends are located on the same line, the rotating part 4i It is fixedly installed in suction section 4j and suction section 4j bottom can be driven to circle, each suction section 4j includes the One pipe 4j1 and the first expansion mouth 4j2, the first expansion mouth 4j2 can rotate installed in the first pipe 4j1 bottom, The top of the first expansion mouth 4j2 is provided with the second holding tank 4j3, the second holding tank 4j3 for the first pipe 4j1 grafting Madial wall be provided with the 3rd holding tank, each suction section 4j setting, which disclosure satisfy that, extracts the laying dust on the first stretching board 1c , can be at utmost on two the first stretching board 1c by the first expansion mouth 4j2 setting to laying dust collecting part 4c Laying dust is extracted, and the laying dust on two the first stretching board 1c is collected to laying dust collecting part 4c.
Each rotating part 4i includes the first motor 4i1, the first installing plate 4i2 and some is equidistantly arranged on first The first moving block 4i3 on the outer outer circle walls of pipe 4j1, each first moving block 4i3 can be in the 3rd holding tank Mobile, the first installing plate 4i2 is arranged in the first pipe 4j1, and the first motor 4i1 is arranged on the first installing plate 4i2 The center at top, the main shaft of the first motor 4i1 through the first installing plate 4i2 finally with the first expansion mouth 4j2 Heart position is fixedly connected, and drives the first expansion mouth 4j2 to be rotated on the first stretching board 1c by the first motor 4i1, and then can Laying dust on two the first stretching board 1c is extracted to laying dust collecting part 4c, the first pipe 4j1 is fixedly mounted on first and prolonged Stretch on block 4a1, realization can be stablized and collect the laying dust on two the first stretching board 1c to laying dust collecting part 4c.
The laying dust collecting part 4c includes disposable box 4c1, the disposable box 4c1 and is arranged on cleaning pedestal 4a lower section, Each first expansion mouth 4j2 connects with disposable box 4c1, is equipped with each first expansion mouth 4j2 lateral wall It is equipped with what is passed through for the first pipe 4j1 on the first pipe 4j1 connected with disposable box 4c1, each first expansion mouth 4j2 Through hole, one end at the top of each disposable box 4c1 are provided with the cover plate that can be opened, and disposable box 4c1 setting disclosure satisfy that peace On cleaning pedestal 4a, the first pipe 4j1 being installed on the first expansion mouth 4j2, the first pipe 4j1 connects with disposable box 4c1, Laying dust in being collected in first expansion mouth 4j2 can be extracted to disposable box 4c1.
The second drive mechanism 3a is arranged on cleaning pedestal 4a top, and the second drive mechanism 3a includes being arranged on The the second positioning element 3c cleared up at the top of pedestal 4a and the length direction shifting for driving the second positioning element 3c along crossbeam 1a Dynamic the second driving part 3d, the second driving part 3d and the second positioning element 3c drive connections, pass through the second drive division Part 3d drives top movements of the second positioning element 3c in cleaning pedestal 4a, and then can drive cleaning pedestal 4a on crossbeam 1a It is mobile, being moved on crossbeam 1a for the cleaning mechanism 4b on cleaning pedestal 4a can be driven, and then loads to be installed can be driven Moved on crossbeam 1a.
The second travel mechanism 3b includes the first guiding parts 3e and led on the outside of cleaning pedestal 4a and with first The first linkage part 3f being connected to part 3e, the first guiding parts 3e are arranged in cleaning pedestal 4a, and described the One linkage part 3f and the first positioning element are connected, and the first guiding parts 3e motions are driven by the first linkage part 3f, And then whole cleaning pedestal 4a can be driven to be moved on crossbeam 1a.
The second positioning element 3c includes the first location-plate 3c1 being arranged at the top of cleaning pedestal 4a and can be first The second locating piece 3c2, the second locating piece 3c2 that location-plate 3c1 reciprocatingly moves is frame-like structures, first positioning Plate 3c1 is rectangular configuration, and the length direction of the first location-plate 3c1 is identical with crossbeam 1a length, the second locating piece 3c2 energy It is enough to be moved on the first location-plate 3c1, and then can realize and drive the first linkage part 3f movements, and then first can be driven to lead Moved to part 3e, drive cleaning pedestal 4a to be moved on crossbeam 1a, disclosure satisfy that cleaning mechanism 4b is moved on crossbeam 1a.
Top half and the latter half on the first location-plate 3c1 are equipped with the length along the first location-plate 3c1 The rectangular through slot 3c3 that direction is set, each rectangular through slot 3c3 run through the first location-plate 3c1, second locating piece 3c2 is arranged in two rectangular through slot 3c3 and on the first location-plate 3c1, at the top and bottom of the first location-plate 3c1 Side be equipped with the 3rd track, the second locating piece 3c2 is equipped with first sliding block corresponding to each 3rd track, often The length of individual first sliding block is equal to the second locating piece 3c2 length, and the first location-plate 3c1 is provided with two first cunnings Block, each first sliding block can disclosure satisfy that and accurately moved on the first location-plate 3c1 in two the 3rd gliding in tracks It is dynamic.
The second driving part 3d includes the first supporting plate 3d1 and the second electric pushrod 3d2, second electric pushrod 3d2 expansion link is fixedly connected with sides of the second locating piece 3c2 away from the first linkage part 3f, the first supporting plate 3d1 The one end of cleaning pedestal 4a away from the first linkage part 3f is fixedly mounted on, the second electric pushrod 3d2 is arranged on first On fagging 3d1, the telescopic direction of the second electric pushrod 3d2 is identical with the length direction for clearing up pedestal 4a, passes through the second electricity Dynamic push rod 3d2 drive the second locating piece 3c2 moved on the first location-plate 3c1 so that can the first linkage part 3f rotate, enter And the first guiding parts 3e can be driven to move, and then cleaning pedestal 4a can be driven to be moved on crossbeam 1a, and then can expire Sufficient cleaning mechanism 4b followed by the 4a movements of cleaning pedestal.
The first guiding parts 3e includes being separately mounted to clear up in pedestal 4a and corresponding to two the first track 1f's First guide wheel group and the second guide wheel group, the first linkage part 3f include first connecting rod 3f1 groups and with the first directive wheel First linkage groups of group drive connection, one end of the first connecting rod 3f1 groups are connected with the second locating piece 3c2, the other end It is connected with the first linkage groups, because the first guide wheel group and the second guide wheel group are arranged in cleaning pedestal 4a, by the One linkage part 3f drives the movement of the first guide wheel group, and then cleaning pedestal 4a can be driven to be moved in crossbeam 1a.
First guide wheel group includes two the second directive wheel 3g, the center on each second directive wheel 3g It is equipped with the 3rd rotary shaft 3j, what one end of the 3rd rotary shaft 3j can rotate is arranged in cleaning pedestal 4a, and described the The three rotary shaft 3j other end through cleaning pedestal 4a and along perpendicular to the second electric pushrod 3d2 push direction to extension Stretch, drive the 3rd rotary shaft 3j to rotate by two directive wheels, and then disclosure satisfy that drive cleaning pedestal 4a movements, and then can Meet to drive cleaning mechanism 4b to move on crossbeam 1a.
First linkage groups include the first drive 3h and the second drive 3i, the first drive 3h and the second drive 3i is respectively and fixedly installed on the 3rd rotary shaft 3j of correspondence position, and skin is arranged with outside the first drive 3h and the second drive 3i Band, by driving the first drive 3h to rotate, and then belt can be driven to rotate, it is further to drive the second drive 3i to turn It is dynamic, and then can realize that two the second directive wheel 3g of drive are rotated.
The first connecting rod 3f1 groups include first connecting rod 3f1 and second connecting rod 3f2, the bias of the first drive 3h Place is provided with the first connecting pole 3h1, and one end of the first connecting rod 3f1 is hinged with the first connecting pole 3h1, the first connecting rod One end of the 3f1 other end and second connecting rod 3f2 is hinged, and the other end of the second connecting rod 3f2 and the second locating piece 3c2's is outer It is side walls hinged, drive the second locating piece 3c2 to be moved on the first location-plate 3c1 by the second electric pushrod 3d2, and then being capable of band Move the first drive 3h rotations and then first connecting rod 3f1 and second connecting rod 3f2 can be driven to rotate, and then cleaning base can be driven Seat 4a is moved on crossbeam 1a.
The above described is only a preferred embodiment of the present invention, any limit not is made to the technical scope of the present invention System, therefore any subtle modifications, equivalent variations and modifications that every technical spirit according to the present invention is made to above example, In the range of still falling within technical scheme.

Claims (10)

  1. A kind of 1. crane gear with laying dust cleaning plant, it is characterised in that:Including portal frame body (1), load carrier (2), drive device (3) and cleaning plant (4), the load carrier (2), drive device (3) and cleaning plant (4) can move It is dynamic to be arranged on portal frame body (1), the load carrier (2) include the first travel mechanism (2a), support mechanism (2b) and For the first drive mechanism (2c) for driving travel mechanism to be moved on portal frame body (1), the cleaning plant (4) includes energy Reach the cleaning pedestal (4a) moved on portal frame body (1) and be used on cleaning pedestal (4a) to portal frame body (1) cleaning mechanism (4b) that the laying dust on is cleared up, the drive device (3) include the second drive mechanism (3a) and are arranged on The second travel mechanism (3b) cleared up on pedestal (4a), second drive mechanism (3a) and transmission company of the second travel mechanism (3b) Connect.
  2. A kind of 2. crane gear with laying dust cleaning plant according to claim 1, it is characterised in that:The portal frame Body (1) includes crossbeam (1a) and two support frames (1b), and the crossbeam (1a) is I-shaped structure, at the top of the crossbeam (1a) Both sides be respectively equipped with along transverse width direction and stretch out integrally formed first stretching board (1c), the crossbeam The both sides of (1a) bottom, which are respectively equipped with along transverse width direction, to stretch out integrally formed second stretching board (1d), the horizontal stroke The both ends of beam (1a) be respectively equipped with along the length direction of crossbeam (1a) stretch out it is integrally formed stretching, extension beam (1e), Mei Gesuo It is triangular structure to state support frame (1b), the stretching, extension beam of the top of each support frame as described above (1b) with crossbeam (1a) end (1e) is fixedly connected, and the top of each first stretching board (1c) is provided with the be extended along crossbeam (1a) length direction One track (1f), each first track (1f) run through the first stretching board (1c), each second stretching board (1d) Sidepiece is provided with the second track (1g) being extended along crossbeam (1a) length direction, and each second track (1g) is through the Two stretching boards (1d).
  3. A kind of 3. crane gear with laying dust cleaning plant according to claim 2, it is characterised in that:Described first moves Motivation structure (2a) includes two the first moving parts (2d) for being separately positioned on crossbeam (1a) the latter half both sides, the load-bearing machine Structure (2b) includes the first support member (2e) being arranged between two the first moving parts (2d) and installed in the first supporting part The load-supporting part (2f) in part (2e) centre position, first drive mechanism (2c) include two the first driving parts (2g), and two Individual first driving part (2g) is separately mounted on first moving parts (2d).
  4. A kind of 4. crane gear with laying dust cleaning plant according to claim 3, it is characterised in that:Each described the One moving parts (2d) includes circular arc installing plate (2d1), two the first directive wheels (2d2) and two the first rotary shafts (2d3), what two first directive wheels (2d2) can rotate is arranged in the first stretching board (1c), two described first Length direction of the directive wheel (2d2) along the first stretching board (1c) sets and is located on the same line, and each described first leads Circular arc installing plate (2d1) is arranged on by the first rotary shaft (2d3) to wheel (2d2),
    First support member (2e) includes first support bar and the first mounting seat installed in first support bar both ends, each First support base is arranged on circular arc installing plate (2d1) by bolt, and the middle part of the first support bar is set There is the first mounting groove for load-supporting part (2f) installation.
  5. A kind of 5. crane gear with laying dust cleaning plant according to claim 4, it is characterised in that:The load receiving part Part (2f) includes link, and the top half of the link is provided with the first through hole passed through for first support bar, under the link Half part is provided with the second through hole, and the link is arranged in the first mounting groove and is set in first support bar.
  6. A kind of 6. crane gear with laying dust cleaning plant according to claim 5, it is characterised in that:Each described the One driving part (2g) includes the second rotary shaft (2g1) and rotating disk (2g2), and each second rotary shaft (2g1) is respectively mounted In circular arc installing plate (2d1) centre position, each rotating disk (2g2) is fixedly connected with the second rotary shaft (2g1), and two Individual first directive wheel (2d2) is connected with the second rotary shaft (2g1), and each rotating disk (2g2) is provided with the first raceway groove Groove, each it is equipped with driving chain in the channel groove.
  7. A kind of 7. crane gear with laying dust cleaning plant according to claim 6, it is characterised in that:The cleaning base Seat (4a) is arranged on crossbeam (1a), and being provided with the cleaning pedestal (4a) can be fastened on two the first stretching boards (1c) Second mounting groove, the first holding tank is equipped with corresponding to each first track (1f) on the roof of second mounting groove, it is described The latter half of cleaning pedestal (4a) is provided with groove, and the groove is equal to horizontal stroke through cleaning pedestal (4a), the width of the groove The thickness of beam (1a).
  8. A kind of 8. crane gear with laying dust cleaning plant according to claim 7, it is characterised in that:The descaling machine Structure (4b) includes laying dust collecting part (4c) and two cleaning members (4d) for being separately mounted to clear up pedestal (4a) bottom both ends, Each cleaning member (4d) connects with laying dust collecting part (4c), and each cleaning member (4d) includes two symmetrically It is arranged on the laying dust pumping components (4e) of the first extension block (4a1) bottom and two is symmetricly set on cleaning pedestal (4a) bottom The laying dust of portion side cleans component (4f), two laying dust pumping components (4e) be arranged on two laying dusts clean components (4f) it Between.
  9. A kind of 9. crane gear with laying dust cleaning plant according to claim 8, it is characterised in that:Described second drives Motivation structure (3a) is arranged on the top of cleaning pedestal (4a), and second drive mechanism (3a) includes being arranged on cleaning pedestal (4a) Second positioning element (3c) at top and for drive the second positioning element (3c) along crossbeam (1a) length direction movement Second driving part (3d), second driving part (3d) are connected with the second positioning element (3c).
  10. A kind of 10. crane gear with laying dust cleaning plant according to claim 9, it is characterised in that:Described second Travel mechanism (3b) include the first guiding parts (3e) and on the outside of cleaning pedestal (4a) and with the first guiding parts (3e) The first linkage part (3f) of drive connection, first guiding parts (3e) are arranged in cleaning pedestal (4a), and described first Linkage part (3f) is connected with the first positioning element.
CN201711108389.1A 2017-11-09 2017-11-09 A kind of lifting equipment with dust accumulation cleaning plant Active CN107720562B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711108389.1A CN107720562B (en) 2017-11-09 2017-11-09 A kind of lifting equipment with dust accumulation cleaning plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711108389.1A CN107720562B (en) 2017-11-09 2017-11-09 A kind of lifting equipment with dust accumulation cleaning plant

Publications (2)

Publication Number Publication Date
CN107720562A true CN107720562A (en) 2018-02-23
CN107720562B CN107720562B (en) 2019-07-26

Family

ID=61215011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711108389.1A Active CN107720562B (en) 2017-11-09 2017-11-09 A kind of lifting equipment with dust accumulation cleaning plant

Country Status (1)

Country Link
CN (1) CN107720562B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179219A (en) * 2018-10-31 2019-01-11 肖四杨 A kind of energy saving and environment friendly bridge crane
CN111017739A (en) * 2019-12-12 2020-04-17 江苏鹤钢重工有限公司 Hoisting and transporting equipment capable of preventing goods from swinging

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202138978U (en) * 2011-05-20 2012-02-08 禹州市百业隆电力工程有限公司 Movable hoisting equipment
KR101427347B1 (en) * 2012-12-20 2014-08-06 주식회사 포스코 Rail cleaning device for overhead crane
CN104995122A (en) * 2013-01-25 2015-10-21 三星重工业有限公司 Trolley
CN106429868A (en) * 2016-09-22 2017-02-22 安徽安凯华夏汽车配件(合肥)有限公司 Line separating device for turnover assembly workpiece
CN206240909U (en) * 2016-10-19 2017-06-13 四川沱江起重机有限公司 A kind of rail cleaning device for bridge crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202138978U (en) * 2011-05-20 2012-02-08 禹州市百业隆电力工程有限公司 Movable hoisting equipment
KR101427347B1 (en) * 2012-12-20 2014-08-06 주식회사 포스코 Rail cleaning device for overhead crane
CN104995122A (en) * 2013-01-25 2015-10-21 三星重工业有限公司 Trolley
CN106429868A (en) * 2016-09-22 2017-02-22 安徽安凯华夏汽车配件(合肥)有限公司 Line separating device for turnover assembly workpiece
CN206240909U (en) * 2016-10-19 2017-06-13 四川沱江起重机有限公司 A kind of rail cleaning device for bridge crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179219A (en) * 2018-10-31 2019-01-11 肖四杨 A kind of energy saving and environment friendly bridge crane
CN109179219B (en) * 2018-10-31 2019-10-22 金丽秋 A kind of energy saving and environment friendly bridge crane
CN111017739A (en) * 2019-12-12 2020-04-17 江苏鹤钢重工有限公司 Hoisting and transporting equipment capable of preventing goods from swinging

Also Published As

Publication number Publication date
CN107720562B (en) 2019-07-26

Similar Documents

Publication Publication Date Title
CN108706433B (en) Symmetrical displacement type doube bridge crane
CN107720562A (en) A kind of crane gear with laying dust cleaning plant
CN203866654U (en) Mobile assembly platform used for ballastless track laying construction
CN102366865A (en) Plate unit automatic welding device
CN208135446U (en) A kind of steel structure frame assembly profile transport device
CN107673236A (en) A kind of certainly walking cleaning vehicle of the laying dust cleaning plant of crane gear
CN203545497U (en) Horizontal travelling trolley device
CN108867388B (en) Multifunctional operation platform vehicle
CN107899987A (en) A kind of drive system of lifting equipment from cleaning vehicle of walking
CN208267346U (en) Can lateral displacement driven hanging basket
CN207844244U (en) A kind of double track intelligent grabbing device
CN207312972U (en) It is a kind of to rotate and traversing small-sized machine cantilever crane
CN202594657U (en) Portal crane
CN2419248Y (en) Horizontally moving isolated platform for steel beam maintaining vehicle
CN210341633U (en) Telescopic truss for bridge inspection vehicle
CN209554186U (en) Truss-like wine box floor truck
CN208413687U (en) The anti-pollution automatic feeding apparatus of Portable oil pipe
CN220200433U (en) Conveying line supporting and arranging structure
CN212895936U (en) Span-changing device for carrying and erecting integrated machine
CN218365467U (en) Chiseling equipment provided with multi-direction adjustment and used for prefabricated part
CN219362310U (en) Walking board structure with material conveying mechanism
CN210618293U (en) Intelligent robot running gear
CN220160316U (en) Spraying device
CN207771145U (en) A kind of manipulator
CN214988203U (en) Hidden track conveying system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190701

Address after: 201814 Shanghai Jiading District Huyi Highway 5999 3 1-storey C District

Applicant after: BORRIS HEAVY INDUSTRY CO., LTD.

Address before: 241080 No. 8 Eqiao Road, Sanshan Economic Development Zone, Wuhu City, Anhui Province

Applicant before: Wuhu Changjiang Jack-up Equipment Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 201800 1st Floor, 14 Blocks, No. 12, 258 Lane, Yinlong Road, Jiading District, Shanghai

Patentee after: BORRIS HEAVY INDUSTRY CO., LTD.

Address before: 201814 Shanghai Jiading District Huyi Highway 5999 3 1-storey C District

Patentee before: BORRIS HEAVY INDUSTRY CO., LTD.

CP02 Change in the address of a patent holder