CN107701103B - A kind of convenient and fast road construction drilling machine - Google Patents

A kind of convenient and fast road construction drilling machine Download PDF

Info

Publication number
CN107701103B
CN107701103B CN201710415989.6A CN201710415989A CN107701103B CN 107701103 B CN107701103 B CN 107701103B CN 201710415989 A CN201710415989 A CN 201710415989A CN 107701103 B CN107701103 B CN 107701103B
Authority
CN
China
Prior art keywords
sliding block
chamber
sliding
ash
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710415989.6A
Other languages
Chinese (zh)
Other versions
CN107701103A (en
Inventor
周一戈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guigang Transportation Investment Construction Co ltd
Original Assignee
Guigang Traffic Investment Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guigang Traffic Investment Construction Co Ltd filed Critical Guigang Traffic Investment Construction Co Ltd
Priority to CN201710415989.6A priority Critical patent/CN107701103B/en
Publication of CN107701103A publication Critical patent/CN107701103A/en
Application granted granted Critical
Publication of CN107701103B publication Critical patent/CN107701103B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B12/00Accessories for drilling tools
    • E21B12/06Mechanical cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/023Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting the mast being foldable or telescopically retractable

Abstract

The invention discloses a kind of convenient and fast road construction drilling machines, including base and the borehole drill construction being arranged in above base, empty slot is equipped in borehole drill construction right side, the nose bar being fixedly connected equipped with left side with empty slot inner left wall in empty slot, the internal transmitting chamber for being equipped with left and right extension setting on the left of nose bar, open slot is equipped in nose bar right side, plate is equipped between open slot left end and transmitting chamber right end, the wheel chamber of the internal transmitting chamber left end perforation setting being equipped in right end and nose bar on the left of borehole drill construction, it takes turns intracavitary equipped with runner, front and back inner wall of the transmitting chamber away from plate side, which matches to be equipped with, penetrates through the through-hole being arranged with empty slot, the first sliding sleeve is equipped with outside nose bar, sliding chamber is equipped on the right side of first sliding sleeve, it is sliding intracavitary equipped with limited slip block;The configuration of the present invention is simple is moved easily and carries, and is able to achieve drilling and inhales the operation of powder ash, highly-safe, drilling effect is good.

Description

A kind of convenient and fast road construction drilling machine
Technical field
The present invention relates to technical field of road construction, specifically a kind of convenient and fast road construction drilling machine.
Background technique
During road construction, it is often necessary to drill to wall, what wall body hole generallyd use at present is artificial The mode of drilling, i.e. human hand held drilling machine drill to wall, and drilling efficiency is low, and the vibration generated in boring procedure can be to worker Hand and body generate damage, and noise and powder ash fouling can be also generated during drilling, though in addition, automatic hole drilling apparatus Drilling efficiency so is improved, but cost is high, security performance is low, is unsuitable for small unit or personal use.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of convenient and fast road construction drilling machines, are able to solve State the problems in present technology.
The present invention is achieved through the following technical solutions: a kind of convenient and fast road construction drilling machine of the invention, Including base and the borehole drill construction being arranged in above the base, empty slot, the sky are equipped in the borehole drill construction right side The nose bar being fixedly connected equipped with left side with the empty slot inner left wall in slot, the nose bar left side is internal to be set equipped with left and right extension The transmitting chamber set is equipped with open slot in the nose bar right side, is equipped between the open slot left end and the transmitting chamber right end Plate, the wheel chamber that the internal transmitting chamber left end perforation being equipped in right end and the nose bar in the borehole drill construction left side is arranged, Runner is equipped in the wheel cavity, front and back inner wall of the transmitting chamber away from the plate side matches to be equipped with to be penetrated through with the empty slot The through-hole of setting, the nose bar outside are equipped with the first sliding sleeve, and interior be equipped with slides chamber on the right side of first sliding sleeve, and the cunning is intracavitary to be equipped with Limited slip block, the limited slip block right side, which is equipped with, stretches to the right and penetrates through the second of the sliding chamber right side inner wall and neat fit connection Sliding sleeve, the transmitting is intracavitary to be equipped with the first sliding block, and the first sliding block right side is equipped with the second sliding block, and described second pushes away Sliding block penetrates through the plate and neat fit connects, and the first sliding block deviates from the front and rear sides of the second sliding block side Outer wall, which matches to be equipped with, to be penetrated through the through-hole and visits into the third sliding block in the empty slot, and the first sliding block left end, which is equipped with, to be visited Into the hinge head in the wheel cavity, transmitting is hingedly connected between the hinge head and runner medium position left side Bar is equipped with drill motor in the second sliding block right side, and the drill motor right end, which is connected with, to be visited into the opening Drill head in slot, the base middle part is interior to be equipped with cavity, and the cavity is internally provided with drawer, the drawer and the cavity Wall body neat fit connects, and is provided with kerve on the drawer, the borehole drill construction top surface is fixedly installed covering device.
Preferably technical solution, the borehole drill construction bottom are fixed with frame plate, the base top and the frame Height adjustment device is equipped between board bottom portion, base top and the drilling machine at left and right sides of the height adjustment device Match between structure bottom equipped with slide guide bar, the base bottom periphery is equipped with pulley.
Preferably technical solution, the runner bottom are connected with the first motor, and first motor is set to In the wheel cavity bottom interior wall and it is fixedly connected.
Preferably technical solution matches equipped with guide runner on the front and rear sides inner wall among the empty slot, described to lead Be equipped with slider guide in sliding slot, be equipped with the first spring part on the right side of the slider guide, the slider guide close on first sliding sleeve side with First sliding sleeve is fixedly connected.
Preferably technical solution, the cunning on the left of the limited slip block is intracavitary to be equipped with the second spring part.
Preferably technical solution, the second sliding sleeve right side extension section extend the right side of first sliding sleeve Outside.
Preferably technical solution, the first sliding block right side of the upper and lower two sides of the second sliding block, which matches, to be set There is power connection end, is equipped with power port in the opposite plate left side of the power connection end.
Preferably technical solution is equipped with collection powder ash chamber, institute in the second sliding block on the left of the drill motor It states to match to be equipped in the second sliding block of collection powder ash chamber front and rear sides and inhales powder apparatus for ash, at left and right sides of the suction powder apparatus for ash Extension, which is equipped with, inhales powder ash pipe, the suction powder ash pipe on the left of the suction powder apparatus for ash of front and rear sides with the collection powder ash chamber phase It connects, the suction powder ash pipe on the right side of the suction powder apparatus for ash of front and rear sides penetrates through the right side of the second sliding block, institute The suction powder apparatus for ash of the power connection end respectively with the drill motor and front and rear sides is stated to electrically connect.
Preferably technical solution, the covering device include the tubing string for being fixed at the borehole drill construction top surface, Movable chuck is provided on the tubing string inner sidewall, the umbrella column torn open can be pacified by being connected in the tubing string, the umbrella top end It is connected with covering umbrella.
The beneficial effects of the present invention are:
1. the internal left and right that sets is stretched on the left of nose bar by setting the nose bar that left side is fixedly connected with empty slot inner left wall in empty slot The extended transmitting chamber set sets open slot in nose bar right side, sets plate, borehole drill construction between open slot left end and transmitting chamber right end The wheel chamber of the transmitting chamber left end perforation setting in right end and nose bar is set inside left side, wheel is intracavitary to set runner, and transmitting chamber deviates from plate The front and back inner wall of side, which matches to set, penetrates through the through-hole being arranged with empty slot, and the first sliding sleeve, inner ring on the right side of the first sliding sleeve are set outside nose bar Shape sets sliding chamber, and cunning is intracavitary to set limited slip block, sets on the right side of limited slip block and stretches and penetrate through inner wall and neat fit company on the right side of sliding chamber to the right The second sliding sleeve connect, transmitting is intracavitary to set the first sliding block, and the first sliding block right side sets the second sliding block, the perforation of the second sliding block Plate and neat fit connect, front and rear sides outer wall of the first sliding block away from the second sliding block side match set perforation through-hole and Visit into the third sliding block in empty slot, the first sliding block left end, which is set, to be visited into taking turns intracavitary hinge head, hinge head be located in runner Hingedly be cooperatively connected transmission lever between above runner on the left of portion position, sets drill motor in the second sliding block right side, drilling The mating connection of motor right end is visited into the drill head in open slot, to realize the work that extends for automatically controlling drill head, is realized Automatic drilling and the operation of powder ash is inhaled, improved work efficiency and drilling effect.
2. setting frame plate by the way that borehole drill construction bottom is fixed, height adjustment device is set between frame plate bottom at the top of base, it is high Match between borehole drill construction bottom at the top of base at left and right sides of degree regulating device and set slide guide bar, base bottom periphery is all provided with cunning Wheel, to realize that present apparatus fast and easy is mobile and carries.
3. being matched by the first sliding block right side of two sides above and below the second sliding block sets power connection end, the opposite plate of power connection end Part sets out power port in left side, so that electrically connecting when realizing drilling automatically, improves device security
4. collecting the second sliding of powder ash chamber front and rear sides by setting collection powder ash chamber in the second sliding block on the left of drill motor Match to set in block and inhale powder apparatus for ash, inhales extension at left and right sides of powder apparatus for ash and set and inhale powder ash pipe, the suction powder apparatus for ash of front and rear sides is left The suction powder ash pipe of side is connected with collection powder ash chamber, and the suction powder ash pipe of front and rear sides inhaled on the right side of powder apparatus for ash penetrates through the second sliding The right side of block, suction powder apparatus for ash of the power connection end respectively with drill motor and front and rear sides electrically connect, to realize automatic control The operation of powder ash is inhaled in starting automatically while system drilling, is improved working efficiency and is prevented powder ash fouling construction environment.
5. the configuration of the present invention is simple is moved easily and carries, it is able to achieve drilling and inhales the operation of powder ash, meanwhile, when not drilling It waits and is in off-position, improve the safety that drilling uses, anti-powder ash effect and drilling effect are good.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is overall structure diagram outside a kind of convenient and fast road construction drilling machine of the invention;
Fig. 2 is the cross-sectional view of " A-A " in Fig. 1 of the present invention;
Fig. 3 is structural schematic diagram when a kind of convenient and fast road construction of the invention extends adjusting with drilling machine;
Fig. 4 is structural schematic diagram when a kind of convenient and fast road construction of the invention is drilled with drilling machine;
Fig. 5 is the structural schematic diagram of the first sliding block of the invention.
Specific embodiment
As Figure 1-Figure 5, a kind of convenient and fast road construction drilling machine of the invention, including base 5 and setting exist The borehole drill construction 7 of 5 top of the base, is equipped with empty slot 73 in 7 right side of borehole drill construction, equipped with left side in the empty slot 73 The nose bar 77 that face is fixedly connected with 73 inner left wall of empty slot, the internal biography for being equipped with left and right extension setting in 77 left side of nose bar Chamber 76 is passed, open slot 75 is equipped in 77 right side of nose bar, between 75 left end of open slot and 76 right end of transmitting chamber Equipped with plate 771, internal 76 left end of transmitting chamber being equipped in right end and the nose bar 77 in 7 left side of borehole drill construction is penetrated through The wheel chamber 71 of setting, the wheel cavity 71 is interior to be equipped with runner 711, and the transmitting chamber 76 is in the front and back of 771 side of plate Wall matches the through-hole 72 being equipped with the empty slot 73 perforation setting, is equipped with the first sliding sleeve 731 outside the nose bar 77, and described first It is equipped with sliding chamber 732 in 731 right side of sliding sleeve, limited slip block 733 is equipped in the sliding chamber 732, is equipped with to the right on the right side of the limited slip block 733 Side stretches and penetrates through the 732 right side inner wall of sliding chamber and the second sliding sleeve 734 of neat fit connection, is equipped in the transmitting chamber 76 First sliding block 761,761 right side of the first sliding block are equipped with the second sliding block 78, and the second sliding block 78 penetrates through institute It states plate 771 and neat fit connects, the first sliding block 761 is outside the front and rear sides of 78 side of the second sliding block Wall, which matches to be equipped with, to be penetrated through the through-hole 72 and visits into the third sliding block 721 in the empty slot 73, and the first sliding block 761 is left End, which is equipped with, to be visited into the hinge head 712 in the wheel cavity 71, between the hinge head 712 and 711 medium position of runner left side It is hingedly connected with transmission lever 713, is equipped with drill motor 783, the drill motor in 78 right side of the second sliding block 783 right ends are connected with the drill head 751 visited into the open slot 75, are equipped with cavity 54 in 5 middle part of base, described Cavity 54 is internally provided with drawer 52, and the drawer 52 connect with the 54 wall body neat fit of cavity, sets on the drawer 52 It is equipped with kerve 53,7 top surface of borehole drill construction is fixedly installed covering device.
Wherein, 7 bottom of borehole drill construction is fixed with frame plate 6, between 5 top of base and 6 bottom of the frame plate Equipped with height adjustment device 62,5 top of the base and 7 bottom of borehole drill construction of 62 left and right sides of height adjustment device Match between portion equipped with slide guide bar 61,5 bottom periphery of base is equipped with pulley 51, to realize that present apparatus fast and easy is moved Dynamic and carrying.
Wherein, 711 bottom of runner is connected with the first motor, and first motor is set to 71 bottom of the wheel cavity It in portion's inner wall and is fixedly connected, to realize being visited automatically into controlling to adjust with extending of drill head.
Wherein, match on the front and rear sides inner wall among the empty slot 73 equipped with guide runner 74, set in the guide runner 74 There is slider guide 742, is equipped with the first spring part 741 on the right side of the slider guide 742, the slider guide 742 closes on first sliding sleeve 731 Side is fixedly connected with first sliding sleeve 731, to realize the work that automatically resets of the first sliding sleeve 731.
Wherein, it is equipped with the second spring part 735 in the sliding chamber 732 in 733 left side of limited slip block, to realize the second sliding sleeve 734 with the abutting of wall, improve obturation effect when drilling.
Wherein, section is stretched on the right side of second sliding sleeve 734 to extend outside the right side of first sliding sleeve 731.
Wherein, 761 right side of the first sliding block of about 78 two sides of the second sliding block matches equipped with power connection end 7611, be equipped with power port 762 in opposite 771 left side of the plate of the power connection end 7611, thus when realizing drilling from It is dynamic to electrically connect, improve device security.
Wherein, collection powder ash chamber 782, the collection powder are equipped in the second sliding block 78 in 783 left side of drill motor Match to be equipped in the second sliding block 78 of grey 782 front and rear sides of chamber and inhale powder apparatus for ash 781, the suction powder apparatus for ash 781 is left Right two sides extension, which is equipped with, inhales powder ash pipe 7811, the suction powder ash pipe 7811 in 781 left side of the suction powder apparatus for ash of front and rear sides It is connected with the collection powder ash chamber 782, the suction powder ash pipe 7811 on 781 right side of the suction powder apparatus for ash of front and rear sides passes through Lead to the right side of the second sliding block 78, the power connection end 7611 respectively with the drill motor 783 and front and rear sides The suction powder apparatus for ash 781 electrically connects, to realize that the operation of powder ash is inhaled in starting automatically while automatic control drilling, improves work Efficiency and prevent powder ash fouling construction environment.
Wherein, the covering device includes the tubing string 41 for being fixed at 7 top surface of borehole drill construction, in the tubing string 41 Movable chuck 411 is provided on side wall, the umbrella column 42 torn open can be pacified by being connected in the tubing string 41, and 42 top of umbrella column connects It is connected to covering umbrella 43.
When original state, the first sliding block 761 is located at the left-most position in transmitting chamber 76, at this point, the first sliding block 761 The hinge head 712 of left end is utmostly visited into wheel chamber 71, and 713 left end of transmission lever is made to be located at the directly to the left of 711 medium position of runner Position, at this point, transmission lever 713 is in horizontality, meanwhile, the first sliding block 761 deviates from the front and back of 78 side of the second sliding block The third sliding block 721 of setting of matching on the outer wall of two sides is located at left-most position in through-hole 72 and in empty slot 73, at this point, the Two sliding blocks, 78 left end is utmostly visited makes the drill head 751 on 78 right side of the second sliding block be fully located at opening into transmitting chamber 76 In slot 75, meanwhile, the power connection end 7611 on 761 right side of the first sliding block utmostly goes out power port 762, at this point, slider guide 742 By the pressure on top surface of the first spring part 741, slider guide 742 is made to be located at the left-most position in guide runner 74, at this point, slider guide 742 It drives the first sliding sleeve 731 utmostly to visit into empty slot 73 and left side and is located at 72 right side relative position of through-hole, meanwhile, limited slip block 733, by 735 pressure on top surface of the second spring part, extend the second sliding sleeve 734 utmostly outside 731 right side of the first sliding sleeve, at this point, The second sliding sleeve 734 extended outside 731 right side of the first sliding sleeve is fully located in empty slot 73.
When needing to drill on wall, borehole drill construction 7 is moved to by drilling by the pulley 51 of 5 bottom of base first Place, is moved easily and carries, and the lifting moving of borehole drill construction 7 is then controlled to adjust by height adjustment device 62, to realize Adjusting less than height drills, and improves working efficiency, then drives runner 711 mobile clockwise by the first motor, at this point, by Runner 711 drives 713 left end of transmission lever gradually to move along 711 left side rear of runner, meanwhile, hinge is gradually pushed away by 71 right end of transmission lever Right direction of the first sliding block 761 on 712 right side of chain head 712 and hinge head gradually in transmitting chamber 76 moves, at this point, by First sliding block 761 drives the gradually right direction shifting in through-hole 72 and empty slot 73 of third sliding block 721 of front and rear sides It is dynamic, meanwhile, the first sliding block 761 drives the second sliding block 78 of right end gradually mobile towards right side, makes 78 right end of the second sliding block It gradually visits into open slot 75, meanwhile, the right side of borehole drill construction 7 is gradually extended by the second sliding block 78 drive drill head 751 As shown in figure 3, continuing to control the movement clockwise of the first motor drive runner 711, until 71 left end of transmission lever as shown in Figure 4 outside face When setting positioned at the directly to the right orientation of 711 medium position of runner, transmission lever 71 is made to be in horizontality, at this point, the first motor of control It stops operating, meanwhile, 761 third of the first sliding block is shifted onto right-most position in transmitting chamber 76 by transmission lever 71, at this point, the Third sliding block 721 on one sliding block, 761 left side front and back outer wall is located at the right-most position in through-hole 72, meanwhile, by third Sliding block 721 drives the first sliding sleeve 731 to overcome the pressure on top surface of the second spring part 735, is moved to the first sliding sleeve 731 in empty slot 73 Right-most position, at this point, 731 right side of the first sliding sleeve be same vertical plane with 7 right side of borehole drill construction, meanwhile, first is sliding 7 right side of borehole drill construction is extended on the right side of the second sliding sleeve 734 in set 731 and is connect with wall elastic top press-fit, at this point, the One sliding block, 761 right side is abutted against with 771 left side of plate, is fully inserted into out power connection end 7611 in power port 762, is completed certainly It is cooperatively connected, meanwhile, the second sliding block 78 drive drill head 751 utmostly extends outside 7 right side of borehole drill construction and and wall Body abuts against, at this point, due to 781 Electricity Federation of suction powder apparatus for ash with drill motor 783 and front and rear sides respectively of power connection end 7611 It connects, to realize automatic drilling and inhale powder ash work.
The beneficial effects of the present invention are:
1. the internal left and right that sets is stretched on the left of nose bar by setting the nose bar that left side is fixedly connected with empty slot inner left wall in empty slot The extended transmitting chamber set sets open slot in nose bar right side, sets plate, borehole drill construction between open slot left end and transmitting chamber right end The wheel chamber of the transmitting chamber left end perforation setting in right end and nose bar is set inside left side, wheel is intracavitary to set runner, and transmitting chamber deviates from plate The front and back inner wall of side, which matches to set, penetrates through the through-hole being arranged with empty slot, and the first sliding sleeve, inner ring on the right side of the first sliding sleeve are set outside nose bar Shape sets sliding chamber, and cunning is intracavitary to set limited slip block, sets on the right side of limited slip block and stretches and penetrate through inner wall and neat fit company on the right side of sliding chamber to the right The second sliding sleeve connect, transmitting is intracavitary to set the first sliding block, and the first sliding block right side sets the second sliding block, the perforation of the second sliding block Plate and neat fit connect, front and rear sides outer wall of the first sliding block away from the second sliding block side match set perforation through-hole and Visit into the third sliding block in empty slot, the first sliding block left end, which is set, to be visited into taking turns intracavitary hinge head, hinge head be located in runner Hingedly be cooperatively connected transmission lever between above runner on the left of portion position, sets drill motor in the second sliding block right side, drilling The mating connection of motor right end is visited into the drill head in open slot, to realize the work that extends for automatically controlling drill head, is realized Automatic drilling and the operation of powder ash is inhaled, improved work efficiency and drilling effect.
2. setting frame plate by the way that borehole drill construction bottom is fixed, height adjustment device is set between frame plate bottom at the top of base, it is high Match between borehole drill construction bottom at the top of base at left and right sides of degree regulating device and set slide guide bar, base bottom periphery is all provided with cunning Wheel, to realize that present apparatus fast and easy is mobile and carries.
3. being matched by the first sliding block right side of two sides above and below the second sliding block sets power connection end, the opposite plate of power connection end Part sets out power port in left side, so that electrically connecting when realizing drilling automatically, improves device security
4. collecting the second sliding of powder ash chamber front and rear sides by setting collection powder ash chamber in the second sliding block on the left of drill motor Match to set in block and inhale powder apparatus for ash, inhales extension at left and right sides of powder apparatus for ash and set and inhale powder ash pipe, the suction powder apparatus for ash of front and rear sides is left The suction powder ash pipe of side is connected with collection powder ash chamber, and the suction powder ash pipe of front and rear sides inhaled on the right side of powder apparatus for ash penetrates through the second sliding The right side of block, suction powder apparatus for ash of the power connection end respectively with drill motor and front and rear sides electrically connect, to realize automatic control The operation of powder ash is inhaled in starting automatically while system drilling, is improved working efficiency and is prevented powder ash fouling construction environment.
5. the configuration of the present invention is simple is moved easily and carries, it is able to achieve drilling and inhales the operation of powder ash, meanwhile, when not drilling It waits and is in off-position, improve the safety that drilling uses, anti-powder ash effect and drilling effect are good.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection scope should be determined by the scope of protection defined in the claims.

Claims (9)

1. a kind of convenient and fast road construction drilling machine, including base and the borehole drill construction being arranged in above base, feature It is: is equipped with empty slot in borehole drill construction right side, the nose bar being fixedly connected equipped with left side with empty slot inner left wall in empty slot is convex The internal left and right that is equipped in bar left side stretches the transmitting chamber being arranged, and open slot, open slot left end and transmitting chamber are equipped in nose bar right side Plate is equipped between right end, the wheel chamber of the internal transmitting chamber left end perforation setting being equipped in right end and nose bar on the left of borehole drill construction, Take turns it is intracavitary be equipped with runner, transmitting chamber away from plate side front and back inner wall match be equipped with empty slot perforation setting through-hole, nose bar Outside is equipped with the first sliding sleeve, and the first sliding sleeve right side is interior to be equipped with sliding chamber, and sliding intracavitary equipped with limited slip block, limited slip block right side is equipped with to the right Inner wall and the second sliding sleeve of neat fit connection on the right side of sliding chamber are stretched and penetrate through, transmitting is intracavitary to be equipped with the first sliding block, and first pushes away Sliding block right side is equipped with the second sliding block, and the second sliding block penetrates through plate and neat fit connects, and the first sliding block deviates from second The front and rear sides outer wall of sliding block side, which matches, to be equipped with perforation through-hole and visits into the third sliding block in empty slot, and the first sliding block is left End, which is equipped with, to be visited into intracavitary hinge head is taken turns, and is hingedly connected with transmission lever between hinge head and runner medium position left side, the Drill motor is equipped in two sliding block right sides, drill motor right end is connected with the drill head visited into open slot, base Cavity is equipped in middle part, cavity is internally provided with drawer, and drawer is connect with cavity wall body neat fit, and drawing is provided on drawer Slot, borehole drill construction top surface are fixedly installed covering device.
2. a kind of convenient and fast road construction drilling machine according to claim 1, it is characterised in that: the borehole drill construction bottom Portion is fixed with frame plate, is equipped with height adjustment device, the height adjustment dress at the top of the base between the frame plate bottom It sets and matches between the borehole drill construction bottom equipped with slide guide bar, the base bottom periphery at the top of the base of the left and right sides It is equipped with pulley.
3. a kind of convenient and fast road construction drilling machine according to claim 1, it is characterised in that: match the runner bottom Conjunction is connected with the first motor, and first motor is set in the wheel cavity bottom interior wall and is fixedly connected.
4. a kind of convenient and fast road construction drilling machine according to claim 1, it is characterised in that: among the empty slot Match on the inner wall of front and rear sides equipped with guide runner, slider guide is equipped in the guide runner, is equipped with the first spring on the right side of the slider guide Part, the slider guide close on first sliding sleeve side and are fixedly connected with first sliding sleeve.
5. a kind of convenient and fast road construction drilling machine according to claim 1, it is characterised in that: on the left of the limited slip block The cunning intracavitary be equipped with the second spring part.
6. a kind of convenient and fast road construction drilling machine according to claim 1, it is characterised in that: second sliding sleeve is right Side extension section extends outside the right side of first sliding sleeve.
7. a kind of convenient and fast road construction drilling machine according to claim 1, it is characterised in that: the second sliding block The first sliding block right side of upper and lower two sides matches equipped with power connection end, in the opposite plate left side of the power connection end Equipped with power port out.
8. a kind of convenient and fast road construction drilling machine according to claim 7, it is characterised in that: the drill motor is left It is equipped with collection powder ash chamber in the second sliding block of side, matches in the second sliding block of the collection powder ash chamber front and rear sides and sets Have and inhale powder apparatus for ash, extension, which is equipped with, at left and right sides of the suction powder apparatus for ash inhales powder ash pipe, the suction powder apparatus for ash of front and rear sides The suction powder ash pipe in left side is connected with the collection powder ash chamber, the suction on the right side of the suction powder apparatus for ash of front and rear sides Powder ash pipe penetrates through the right side of the second sliding block, the power connection end institute with the drill motor and front and rear sides respectively Suction powder apparatus for ash is stated to electrically connect.
9. a kind of convenient and fast road construction drilling machine according to claim 1, it is characterised in that: the covering device packet The tubing string for being fixed at the borehole drill construction top surface is included, is provided with movable chuck on the tubing string inner sidewall, in the tubing string The umbrella column torn open can be pacified by being connected with, and the umbrella top end is connected with covering umbrella.
CN201710415989.6A 2017-06-06 2017-06-06 A kind of convenient and fast road construction drilling machine Expired - Fee Related CN107701103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710415989.6A CN107701103B (en) 2017-06-06 2017-06-06 A kind of convenient and fast road construction drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710415989.6A CN107701103B (en) 2017-06-06 2017-06-06 A kind of convenient and fast road construction drilling machine

Publications (2)

Publication Number Publication Date
CN107701103A CN107701103A (en) 2018-02-16
CN107701103B true CN107701103B (en) 2019-05-10

Family

ID=61169647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710415989.6A Expired - Fee Related CN107701103B (en) 2017-06-06 2017-06-06 A kind of convenient and fast road construction drilling machine

Country Status (1)

Country Link
CN (1) CN107701103B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0114146A2 (en) * 1983-01-14 1984-07-25 Miglietta, Mireille Lucie Ines Veuve Airaudo, Antonin Universal drilling apparatus equipped with means for rapid raising of the drill string
CN87107587A (en) * 1986-10-14 1988-10-26 格奥尔格.希尔曼 Drive unit
CN203230339U (en) * 2013-03-22 2013-10-09 俞威 Table type drilling machine for highways
CN105822226A (en) * 2016-06-08 2016-08-03 上海力阳道路加固科技股份有限公司 Efficient road drilling car

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0114146A2 (en) * 1983-01-14 1984-07-25 Miglietta, Mireille Lucie Ines Veuve Airaudo, Antonin Universal drilling apparatus equipped with means for rapid raising of the drill string
CN87107587A (en) * 1986-10-14 1988-10-26 格奥尔格.希尔曼 Drive unit
CN203230339U (en) * 2013-03-22 2013-10-09 俞威 Table type drilling machine for highways
CN105822226A (en) * 2016-06-08 2016-08-03 上海力阳道路加固科技股份有限公司 Efficient road drilling car

Also Published As

Publication number Publication date
CN107701103A (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN107020703B (en) A kind of road construction drilling machine
CN107816318A (en) A kind of winning equipment
CN107701103B (en) A kind of convenient and fast road construction drilling machine
CN107687318B (en) A kind of efficient road construction drilling machine
CN107816319B (en) A kind of massif mining apparatus
CN107048971B (en) A kind of stirred type cup
CN108789620A (en) A kind of integrated template preparation facilities
CN107780939B (en) A kind of mining apparatus
CN108437092B (en) A kind of firm cutting robot
CN108222828A (en) A kind of massif mining apparatus of practicality
CN108237403A (en) A kind of novel bridge equipment
CN108095486A (en) A kind of new cup
CN107140567B (en) A kind of water conservancy equipment
CN107016307B (en) A kind of information collection apparatus
CN213458453U (en) Road traffic device capable of relieving traffic pressure
CN108375229A (en) A kind of geothermal heating wetting system
CN215966451U (en) Portable drilling device for natural gas pipeline maintenance
CN108125526A (en) A kind of mailbox processing equipment
CN108098015B (en) It is a kind of quickly to extract electric drill component
CN107685358B (en) A kind of equidistant perforating device of construction plate
CN108023242A (en) A kind of new cleaner
CN107962200A (en) A kind of mailbox process equipment
CN207795052U (en) A kind of ground drilling rig
CN108222942A (en) A kind of novel mining apparatus
CN108206484A (en) A kind of follow-on power cable installation equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190409

Address after: 537100 Zhongshan North Road, Gangbei District, Guigang City, Guangxi Zhuang Autonomous Region (Community Complex Building)

Applicant after: GUIGANG TRANSPORTATION INVESTMENT CONSTRUCTION Co.,Ltd.

Address before: 610041 High-tech Incubation Park Building 6, Chengdu High-tech Zone, Sichuan Province

Applicant before: CHENGDU COPOO TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190510