CN107700523A - The prefabricated drainage system and construction method for facing upward inclined retaining wall - Google Patents

The prefabricated drainage system and construction method for facing upward inclined retaining wall Download PDF

Info

Publication number
CN107700523A
CN107700523A CN201710877668.8A CN201710877668A CN107700523A CN 107700523 A CN107700523 A CN 107700523A CN 201710877668 A CN201710877668 A CN 201710877668A CN 107700523 A CN107700523 A CN 107700523A
Authority
CN
China
Prior art keywords
wall
storehouse
material layer
drainage system
facing upward
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710877668.8A
Other languages
Chinese (zh)
Other versions
CN107700523B (en
Inventor
傅大宝
蔡叶澜
刘金福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Planning Design and Research Institute
Original Assignee
Fuzhou Planning Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Planning Design and Research Institute filed Critical Fuzhou Planning Design and Research Institute
Priority to CN201710877668.8A priority Critical patent/CN107700523B/en
Publication of CN107700523A publication Critical patent/CN107700523A/en
Application granted granted Critical
Publication of CN107700523B publication Critical patent/CN107700523B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The present invention relates to a kind of prefabricated drainage system for facing upward inclined retaining wall, including total wall, total wall includes the first wall being disposed on successively from front to back on the basis of retaining wall, second wall and the 3rd wall, the back side of 3rd wall is to be supported by the soil body, preceding storehouse is formed between first wall and the second wall, density material layer is filled with the preceding storehouse, storehouse after being formed between second wall and the 3rd wall, after described in storehouse, 3rd wall and it is supported by between the soil body being filled with dank material layer, the back side of 3rd wall is equipped with anti-filter earth working material layer, some osculums are offered on 3rd wall, if the bottom in the preceding storehouse is embedded with the tapping pipe of the water body discharge after capable person in storehouse;The invention further relates to a kind of construction method of the prefabricated drainage system for facing upward inclined retaining wall.Structure design of the present invention is simple, rationally, easy construction, safe, while avoids the metope in the first wall from forming mud trace, and visual effect is good.

Description

The prefabricated drainage system and construction method for facing upward inclined retaining wall
Technical field
The present invention relates to a kind of prefabricated drainage system and construction method for facing upward inclined retaining wall.
Background technology
It is a kind of conventional retaining structure to face upward inclined Form Gravity Breast Wall.Draw to avoid after retaining walls ponding from not discharging The safety problem risen, retaining wall are equipped with drainage system.Traditional retaining wall drainage system way is according to certain by spilled water hole Spacing arrangement be embedded in retaining wall, the soil body after retaining walls is stretched into the inner end of spilled water hole, and place's earth-retaining is stretched in the front end of spilled water hole Wall metope, the water released are dripped after metope along the free downstream of metope.The type retaining wall is primarily present problems with:
1st, construction quality is difficult to ensure that:Because drainage system is inconvenient to construct after retaining walls, and belong to concealed work, cause portion Divide retaining wall drainage system to be not provided with, directly affect the safety of retaining wall;
2nd, spilled water hole is easily blocked:The spilled water hole of retaining wall easily causes impeded drainage, while draining by sizeable stone The hole of anti-filter facility is easily blocked by fine particle after pipe, reduces its permeable effect;
3rd, urban landscape is influenceed:Upper strata spilled water hole directly stretches out surface of wall and easily forms mud trace, influences Urban Road Landscapes.
The content of the invention
In view of the deficiencies in the prior art, the technical problems to be solved by the invention, which are to provide, a kind of prefabricated faces upward inclined retaining wall Drainage system and construction method, it is not only reasonable in design, and efficiently it is convenient.
In order to solve the above-mentioned technical problem, the technical scheme is that:A kind of prefabricated draining system for facing upward inclined retaining wall System, including total wall, total wall include the first wall on the basis of being disposed on retaining wall successively from front to back, second Wall and the 3rd wall, the back side of the 3rd wall are to be supported by the soil body, shape between first wall and the second wall Cheng Qiancang, density material layer is filled with the preceding storehouse, storehouse after being formed between second wall and the 3rd wall, after described In storehouse, the 3rd wall and it is supported by between the soil body being filled with dank material layer, the back side of the 3rd wall is equipped with instead Earth working material layer is filtered, offers some osculums on the 3rd wall, if the bottom in the preceding storehouse is embedded with after capable person in storehouse Water body discharge tapping pipe.
Preferably, first wall, the second wall and the 3rd wall tilt backwards setting.
Preferably, by the prefabricated section in frame shape, fissure of displacement stacking forms total wall from below to up.
Preferably, the density material layer is concrete layer or slabstone concrete layer, and the dank material layer is thick Gravel bed or metalling.
Preferably, the anti-filter earth working material layer is pasted onto on the back side of the 3rd wall.
A kind of construction method of the prefabricated drainage system for facing upward inclined retaining wall, including prefabricated described in above-mentioned any one are faced upward The drainage system of inclined retaining wall, is comprised the steps of:
(1)Foundation trench is excavated, earth-retaining foundation of wall of constructing;
(2)The fissure of displacement stacks prefabricated section from below to up, and stack height of prefabricated section is not more than 1.5m;
(3)The bottom of the first wall, the second wall bury tapping pipe, tapping pipe apart from earth-retaining foundation of wall height >=500mm, Lateral separation between any two tapping pipe is 2 ~ 3m;
(4)The preceding storehouse formed between the first wall and the second wall is filled using density material layer, using dank material layer Fill the rear storehouse formed between the second wall and the 3rd wall;
(5)Anti-filter earth working material layer is pasted onto to the back side of the 3rd wall;
(6)3rd wall and the space being supported by between the soil body are backfilled using dank material layer;
(7)Repeat step(2)、(4)~(6), until construction finishes.
Compared with prior art, the invention has the advantages that:Structure design of the present invention is simple, reasonable, construction letter Just it is, safe, while avoid the metope in the first wall from forming mud trace, visual effect is good.
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Brief description of the drawings
Fig. 1 is the organigram of the embodiment of the present invention.
Fig. 2 is the organigram of the embodiment of the present invention.
In figure:1- earth-retaining foundations of wall, the walls of 2- first, the walls of 3- second, the walls of 4- the 3rd, 5- are supported by the soil body, before 6- Storehouse, 7- density material layers, storehouse after 8-, 9- dank material layers, 10- anti-filter earth working material layers, 11- osculums, 12- sluice Pipe.
Embodiment
For features described above of the invention and advantage can be become apparent, special embodiment below, and coordinate accompanying drawing, make detailed Carefully it is described as follows.
As shown in Figure 1 and 2, a kind of prefabricated drainage system for facing upward inclined retaining wall, including total wall, total wall include The first wall 2, the second wall 3 and the 3rd wall 4 being disposed on successively from front to back in earth-retaining foundation of wall 1, described The back side of three walls 4 forms preceding storehouse 6 to be supported by the soil body 5 between the wall 3 of first wall 2 and second, in the preceding storehouse 6 Filled with density material layer 7, storehouse 8 after being formed between the wall 4 of the second wall 3 and the 3rd, the rear storehouse 8 is interior, the 3rd wall Body 4 and it is supported by between the soil body 5 being filled with dank material layer 9, the back side of the 3rd wall 4 is equipped with anti-filter geotechnique's material The bed of material 10, some osculums 11 are offered on the 3rd wall 4, if the bottom in the preceding storehouse 6 is embedded with after capable person in storehouse 8 The tapping pipe 12 of water body discharge;Into the 3rd wall 4 and the water body being supported by between the soil body 5 through anti-filter earth working material layer 10th, osculum 11 enters preceding storehouse 6, is discharged into the water body in the preceding storehouse 6 through tapping pipe 12.
In embodiments of the present invention, first wall 2, the second wall 3 and the 3rd wall 4 tilt backwards setting.
In embodiments of the present invention, by the prefabricated section in frame shape, fissure of displacement stacking forms total wall from below to up.
In embodiments of the present invention, the density material layer 7 is concrete layer or slabstone concrete layer, the water penetration Material layer 9 is cobble layer or metalling.
In embodiments of the present invention, the anti-filter earth working material layer 10 is pasted onto on the back side of the 3rd wall 4, the anti-filter Earth working material layer 10 can use anti-filter geotextiles.
In embodiments of the present invention, a kind of construction method of the prefabricated drainage system for facing upward inclined retaining wall, including above-mentioned The prefabricated drainage system for facing upward inclined retaining wall described in meaning one, is comprised the steps of:
(1)Excavate foundation trench, construction earth-retaining foundation of wall 1;
(2)The fissure of displacement stacks prefabricated section from below to up, and stack height of prefabricated section is not more than 1.5m;
(3)Tapping pipe 12, height of the tapping pipe 12 apart from earth-retaining foundation of wall 1 are buried in the bottom of the first wall 2, the second wall 3 >=500mm, the lateral separation between any two tapping pipe 12 is 2 ~ 3m;
(4)The preceding storehouse 6 formed between the first wall 2 and the second wall 3 is filled using density material layer 7, using water penetration material The bed of material 9 fills the rear storehouse 8 formed between the second wall 3 and the 3rd wall 4;
(5)Anti-filter earth working material layer 10 is pasted onto to the back side of the 3rd wall 4;
(6)3rd wall 4 and the space being supported by between the soil body 5 are backfilled using dank material layer 9;
(7)Repeat step(2)、(4)~(6), until construction finishes.
The present invention is not limited to above-mentioned preferred forms, and anyone can show that other are each under the enlightenment of the present invention The prefabricated drainage system and construction method for facing upward inclined retaining wall of kind form.All equalizations done according to scope of the present invention patent Change and modification, it should all belong to the covering scope of the present invention.

Claims (6)

  1. A kind of 1. prefabricated drainage system for facing upward inclined retaining wall, it is characterised in that:Including total wall, total wall includes in the past The first wall, the second wall and the 3rd wall being disposed on successively after on the basis of retaining wall, the 3rd wall The back side forms preceding storehouse, density material is filled with the preceding storehouse to be supported by the soil body between first wall and the second wall The bed of material, storehouse after being formed between second wall and the 3rd wall, it is described after in storehouse, the 3rd wall and be supported by equal between the soil body Filled with dank material layer, the back side of the 3rd wall is equipped with anti-filter earth working material layer, is opened up on the 3rd wall There are some osculums, if the bottom in the preceding storehouse is embedded with the tapping pipe of the water body discharge after capable person in storehouse.
  2. 2. the prefabricated drainage system for facing upward inclined retaining wall according to claim 1, it is characterised in that:First wall, Second wall and the 3rd wall tilt backwards setting.
  3. 3. the prefabricated drainage system for facing upward inclined retaining wall according to claim 1, it is characterised in that:Total wall by Fissure of displacement stacking forms the prefabricated section of frame shape from below to up.
  4. 4. the prefabricated drainage system for facing upward inclined retaining wall according to claim 1, it is characterised in that:The density material Layer is concrete layer or slabstone concrete layer, and the dank material layer is cobble layer or metalling.
  5. 5. the prefabricated drainage system for facing upward inclined retaining wall according to claim 1, it is characterised in that:The anti-filter geotechnique material The bed of material is pasted onto on the back side of the 3rd wall.
  6. 6. a kind of construction method of the prefabricated drainage system for facing upward inclined retaining wall, it is characterised in that including such as claim 1 ~ 5 times The prefabricated drainage system for facing upward inclined retaining wall described in meaning one, is comprised the steps of:
    (1)Foundation trench is excavated, earth-retaining foundation of wall of constructing;
    (2)The fissure of displacement stacks prefabricated section from below to up, and stack height of prefabricated section is not more than 1.5m;
    (3)The bottom of the first wall, the second wall bury tapping pipe, tapping pipe apart from earth-retaining foundation of wall height >=500mm, Lateral separation between any two tapping pipe is 2 ~ 3m;
    (4)The preceding storehouse formed between the first wall and the second wall is filled using density material layer, using dank material layer Fill the rear storehouse formed between the second wall and the 3rd wall;
    (5)Anti-filter earth working material layer is pasted onto to the back side of the 3rd wall;
    (6)3rd wall and the space being supported by between the soil body are backfilled using dank material layer;
    (7)Repeat step(2)、(4)~(6), until construction finishes.
CN201710877668.8A 2017-09-26 2017-09-26 Drainage system of prefabricated upward inclined retaining wall and construction method Active CN107700523B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710877668.8A CN107700523B (en) 2017-09-26 2017-09-26 Drainage system of prefabricated upward inclined retaining wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710877668.8A CN107700523B (en) 2017-09-26 2017-09-26 Drainage system of prefabricated upward inclined retaining wall and construction method

Publications (2)

Publication Number Publication Date
CN107700523A true CN107700523A (en) 2018-02-16
CN107700523B CN107700523B (en) 2023-07-18

Family

ID=61176085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710877668.8A Active CN107700523B (en) 2017-09-26 2017-09-26 Drainage system of prefabricated upward inclined retaining wall and construction method

Country Status (1)

Country Link
CN (1) CN107700523B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208634A (en) * 2018-11-02 2019-01-15 佛山科学技术学院 A kind of soil polywater mud retaining wall
CN111456081A (en) * 2020-03-16 2020-07-28 中国电建集团华东勘测设计研究院有限公司 Pile foundation retaining wall structure and construction method
CN112832287A (en) * 2021-02-03 2021-05-25 江苏熙利建设有限公司 Inclined retaining wall

Citations (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM276059U (en) * 2005-01-18 2005-09-21 Yu-Luen Peng Assembled box type retaining wall
KR20050104758A (en) * 2004-04-29 2005-11-03 주식회사 피아이에이 Retaining wall used waste concrete and method to construct it
CN1752354A (en) * 2005-10-31 2006-03-29 程卫国 Methd for building retaining wall and retaining block therefor
RU2276230C1 (en) * 2004-12-08 2006-05-10 Открытое акционерное общество "Научно-исследовательский институт транспортного строительства" (ОАО ЦНИИС) Road embankment with retaining wall, method of retaining wall erection and reinforced concrete block for retaining wall erection
CN101100862A (en) * 2006-07-07 2008-01-09 贵阳铝镁设计研究院 Method for manufacturing road cutting type protecting wall and structure thereof
CN201158826Y (en) * 2008-02-25 2008-12-03 山东玮丰达建筑工程有限公司 Earth work grille reinforced retaining wall
CN101671985A (en) * 2009-07-29 2010-03-17 中铁二院工程集团有限责任公司 Quake-proof coverage-type reinforced fill structure
CN101787710A (en) * 2010-03-19 2010-07-28 黄靓 Integrally-assembled buttressed retaining wall and construction method thereof
CN102277874A (en) * 2011-04-28 2011-12-14 中国科学院水利部成都山地灾害与环境研究所 Assembled retaining wall and construction method thereof
KR20120021890A (en) * 2010-08-20 2012-03-09 민승기 Retaining wall block with tie
CN202416352U (en) * 2012-02-04 2012-09-05 朱维伟 Concrete retaining wall for artistic wall painting
CN203531007U (en) * 2013-07-10 2014-04-09 贵州省水利水电勘测设计研究院 Retaining wall structure
CN203625928U (en) * 2013-12-26 2014-06-04 中国水电顾问集团中南勘测设计研究院有限公司 Integrated cutting retaining wall
CN203834512U (en) * 2014-05-06 2014-09-17 昆明学院 Combined type gravity retaining wall
CN104652359A (en) * 2015-01-23 2015-05-27 安徽普氏生态环境工程有限公司 Multifunctional ecological concrete prefabricated retaining wall and manufacturing and constructing processes thereof
CN105104002A (en) * 2015-08-21 2015-12-02 中机中联工程有限公司 Concrete retaining wall drainage hole greening structure and method
CN205152982U (en) * 2015-11-23 2016-04-13 中冶赛迪工程技术股份有限公司 Barricade and structure of filling suitable for height is filled
CN105484286A (en) * 2015-12-15 2016-04-13 安徽理工大学 Green gravity type soil retaining structure
CN205205856U (en) * 2015-12-20 2016-05-04 刘刚 Hydraulic engineering retaining wall
CN105951875A (en) * 2016-06-27 2016-09-21 长沙学院 Adjustable assembly retaining wall with pressure reduction plate structures
CN106049352A (en) * 2016-08-03 2016-10-26 宋斌 Retaining wall device used for water conservancy engineering and provided with inverse filtering mechanisms and construction method of retaining wall device
CN205669211U (en) * 2016-04-11 2016-11-02 易朋莹 A kind of prefabricated Gravity Retaining Wall
KR101684399B1 (en) * 2016-07-27 2016-12-08 이상현 Retaining Wall using Precast Panels and PHC Piles, and Constructing Method of such Retaining Wall
CN205804401U (en) * 2016-06-28 2016-12-14 宇航交通建设集团有限公司 Retaining wall and the soil protection structure comprising this retaining wall
CN106351252A (en) * 2016-08-30 2017-01-25 中国冶集团有限公司 Rapid construction method for earth-retaining wall
CN206090612U (en) * 2016-10-13 2017-04-12 新疆维吾尔自治区交通规划勘察设计研究院 Quick assemble highway side slope retaining wall
CN206298869U (en) * 2016-12-12 2017-07-04 中国电建集团贵阳勘测设计研究院有限公司 A kind of concrete guard wall structure of free drainage
CN107012884A (en) * 2017-05-26 2017-08-04 中冶赛迪工程技术股份有限公司 Formula retaining structure is helped in a kind of storehouse
CN207295758U (en) * 2017-09-26 2018-05-01 福州市规划设计研究院 The prefabricated drainage system for facing upward inclined retaining wall

Patent Citations (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050104758A (en) * 2004-04-29 2005-11-03 주식회사 피아이에이 Retaining wall used waste concrete and method to construct it
RU2276230C1 (en) * 2004-12-08 2006-05-10 Открытое акционерное общество "Научно-исследовательский институт транспортного строительства" (ОАО ЦНИИС) Road embankment with retaining wall, method of retaining wall erection and reinforced concrete block for retaining wall erection
TWM276059U (en) * 2005-01-18 2005-09-21 Yu-Luen Peng Assembled box type retaining wall
CN1752354A (en) * 2005-10-31 2006-03-29 程卫国 Methd for building retaining wall and retaining block therefor
CN101100862A (en) * 2006-07-07 2008-01-09 贵阳铝镁设计研究院 Method for manufacturing road cutting type protecting wall and structure thereof
CN201158826Y (en) * 2008-02-25 2008-12-03 山东玮丰达建筑工程有限公司 Earth work grille reinforced retaining wall
CN101671985A (en) * 2009-07-29 2010-03-17 中铁二院工程集团有限责任公司 Quake-proof coverage-type reinforced fill structure
CN101787710A (en) * 2010-03-19 2010-07-28 黄靓 Integrally-assembled buttressed retaining wall and construction method thereof
KR20120021890A (en) * 2010-08-20 2012-03-09 민승기 Retaining wall block with tie
CN102277874A (en) * 2011-04-28 2011-12-14 中国科学院水利部成都山地灾害与环境研究所 Assembled retaining wall and construction method thereof
CN202416352U (en) * 2012-02-04 2012-09-05 朱维伟 Concrete retaining wall for artistic wall painting
CN203531007U (en) * 2013-07-10 2014-04-09 贵州省水利水电勘测设计研究院 Retaining wall structure
CN203625928U (en) * 2013-12-26 2014-06-04 中国水电顾问集团中南勘测设计研究院有限公司 Integrated cutting retaining wall
CN203834512U (en) * 2014-05-06 2014-09-17 昆明学院 Combined type gravity retaining wall
CN104652359A (en) * 2015-01-23 2015-05-27 安徽普氏生态环境工程有限公司 Multifunctional ecological concrete prefabricated retaining wall and manufacturing and constructing processes thereof
CN105104002A (en) * 2015-08-21 2015-12-02 中机中联工程有限公司 Concrete retaining wall drainage hole greening structure and method
CN205152982U (en) * 2015-11-23 2016-04-13 中冶赛迪工程技术股份有限公司 Barricade and structure of filling suitable for height is filled
CN105484286A (en) * 2015-12-15 2016-04-13 安徽理工大学 Green gravity type soil retaining structure
CN205205856U (en) * 2015-12-20 2016-05-04 刘刚 Hydraulic engineering retaining wall
CN205669211U (en) * 2016-04-11 2016-11-02 易朋莹 A kind of prefabricated Gravity Retaining Wall
CN105951875A (en) * 2016-06-27 2016-09-21 长沙学院 Adjustable assembly retaining wall with pressure reduction plate structures
CN205804401U (en) * 2016-06-28 2016-12-14 宇航交通建设集团有限公司 Retaining wall and the soil protection structure comprising this retaining wall
KR101684399B1 (en) * 2016-07-27 2016-12-08 이상현 Retaining Wall using Precast Panels and PHC Piles, and Constructing Method of such Retaining Wall
CN106049352A (en) * 2016-08-03 2016-10-26 宋斌 Retaining wall device used for water conservancy engineering and provided with inverse filtering mechanisms and construction method of retaining wall device
CN106351252A (en) * 2016-08-30 2017-01-25 中国冶集团有限公司 Rapid construction method for earth-retaining wall
CN206090612U (en) * 2016-10-13 2017-04-12 新疆维吾尔自治区交通规划勘察设计研究院 Quick assemble highway side slope retaining wall
CN206298869U (en) * 2016-12-12 2017-07-04 中国电建集团贵阳勘测设计研究院有限公司 A kind of concrete guard wall structure of free drainage
CN107012884A (en) * 2017-05-26 2017-08-04 中冶赛迪工程技术股份有限公司 Formula retaining structure is helped in a kind of storehouse
CN207295758U (en) * 2017-09-26 2018-05-01 福州市规划设计研究院 The prefabricated drainage system for facing upward inclined retaining wall

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王景;刘定涛;刘怀军;张群;赵钱欢;吴;: "震区受损道路的快速修复方法研究", 交通科技, no. 02 *
贾亚军;: "生态型公路挡土墙在西北地区水土保持工程中的特点分析", 中国建材科技, no. 05 *
马稳举;黄锡钢;桑培亮;: "水工大体积混凝土裂缝成因与防裂措施", 港口科技, no. 09 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208634A (en) * 2018-11-02 2019-01-15 佛山科学技术学院 A kind of soil polywater mud retaining wall
CN111456081A (en) * 2020-03-16 2020-07-28 中国电建集团华东勘测设计研究院有限公司 Pile foundation retaining wall structure and construction method
CN112832287A (en) * 2021-02-03 2021-05-25 江苏熙利建设有限公司 Inclined retaining wall

Also Published As

Publication number Publication date
CN107700523B (en) 2023-07-18

Similar Documents

Publication Publication Date Title
CN103032097B (en) Be applicable to tunnel drainage structure and the construction method thereof of bias voltage water rich strata
CN211057527U (en) Roadbed structure of soft foundation pavement
CN102864789B (en) A kind of construction method of retaining wall drainage system
CN107700523A (en) The prefabricated drainage system and construction method for facing upward inclined retaining wall
CN207295758U (en) The prefabricated drainage system for facing upward inclined retaining wall
CN101082216B (en) Soft soil foundation pipe-embedded vacuum drainage method
CN108060655A (en) A kind of construction and its construction method of the face coombe hydroenergy storage station upper storage reservoir that is ringed on three sides by mountains
CN210857096U (en) Ecological revetment structure of scour protection suitable for flood passage and navigation river course
CN103215945B (en) The three-dimensional assembly power drain consolidation system of heterogeneous body place soft soil foundation and method
CN105926579B (en) A kind of adding pressure type sleeve pipe impact drain consolidation system and method
CN101591906A (en) The method for processing foundation of intubate, multipass vacuum well-point dewatering dynamic consolidation
CN207646754U (en) A kind of pile body penetration type bankets body reinforcement bearing structure
CN203247575U (en) Stereoscopic combined type dynamic drainage consolidation system used for heterogeneous field soft foundation
CN202627002U (en) Tailing dam for river cutting type tailing pond water bursting section
CN110528540A (en) A kind of the draining anti-slide pile structure and its construction method of embedded pile
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN106049508B (en) A kind of swag type depression earth rock placement structure and construction method
CN206396830U (en) It is a kind of have fill put forward complex function be close to river water recharge system
CN100564702C (en) A kind of rectangle infitration galleries construction method of stabilizing water quantity
CN204982857U (en) Three -dimensional multichannel drainage combination tamping unit of low level negative pressure
CN113699965A (en) Combined reinforcement construction method for high-fill plain soil soft foundation
CN211228563U (en) Assembled groundwater drainage blind ditch drainage system that oozes
CN210238543U (en) Inclined slope surface layered backfill dynamic compaction leveling structure
CN208501613U (en) Nearby Structure depth riverbed quaywall supporting construction
CN202509446U (en) Tailings dam for river intercepting type tailings pond

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 350003 No.1, Gaoxin Avenue, high tech Zone, Minhou County, Fuzhou City, Fujian Province

Applicant after: Fuzhou planning and Design Institute Group Co.,Ltd.

Address before: 350003 No.1, Gaoxin Avenue, high tech Zone, Minhou County, Fuzhou City, Fujian Province

Applicant before: FUZHOU PLANNING DESIGN & Research Institute

GR01 Patent grant
GR01 Patent grant