CN102864789B - A kind of construction method of retaining wall drainage system - Google Patents

A kind of construction method of retaining wall drainage system Download PDF

Info

Publication number
CN102864789B
CN102864789B CN201210292856.1A CN201210292856A CN102864789B CN 102864789 B CN102864789 B CN 102864789B CN 201210292856 A CN201210292856 A CN 201210292856A CN 102864789 B CN102864789 B CN 102864789B
Authority
CN
China
Prior art keywords
retaining wall
gutter
header
loaded filter
drainage system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210292856.1A
Other languages
Chinese (zh)
Other versions
CN102864789A (en
Inventor
程贤红
付国才
白伟
鲍俊捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN201210292856.1A priority Critical patent/CN102864789B/en
Publication of CN102864789A publication Critical patent/CN102864789A/en
Application granted granted Critical
Publication of CN102864789B publication Critical patent/CN102864789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Retaining Walls (AREA)

Abstract

A kind of retaining wall drainage system and construction method thereof, comprise retaining wall and loaded filter, gutter is provided with in retaining wall, described retaining wall is provided with at least two layers, non-woven fabrics water barrier and header is provided with bottom retaining wall, header is close to the retaining wall back of the body and is longitudinally laid, and the bottom of header is inserted in gutter, between adjacent two gutters, arrange herringbone longitudinal gradient.Described construction technology step is as follows, builds the concrete base layer of loaded filter; To construct one section of retaining wall, pre-buried gutter; Fill sandy gravel stratum, lay non-woven fabrics water barrier, header is installed; Repeat above step, until to wall top; Build top platform or top backfill clay, block the surface water.Thus solve the problem that retaining wall gutter easily blocks inefficacy.Alleviate water percolating capacity larger time bottom gutter charge for remittance concentrate, draining not in time, the situation of the anhydrous row of top gutter, prevention ponding soaks foundation.Have the advantages that construction is simple, ensure that the unobstructed of retaining wall drainage system, after maintaining body of wall and wall, the soil body stablizes.

Description

A kind of construction method of retaining wall drainage system
Technical field
The present invention relates to a kind of construction method of retaining wall drainage system.
Background technology
Retaining wall can support Roadbed Soil or the hillside soil body, prevent from banketing or soil deformation unstability, is current most widely used support structure thing in the engineering such as highway, railway.Retaining wall structure is various informative, but " supporting+draining " is its main constitute and function.In use, the damage of drainage system is a common frequently-occurring disease, owing to designing unreasonable, lack of standardization, the reason such as material selection is improper of constructing, causes loaded filter to deposit to lose efficacy, gutter blocking, retaining wall forms water pocket or wall seam seepage behind, finally affects the stable of retaining wall structure.
Traditional loaded filter, seepage water is easy perpendicular flow in sandy gravel stratum, and the bottom in a large number to retaining wall is concentrated, top gutter loses the effect of draining, and seepage water collects to gutter point, and current are large, easily take away fine sand, erosion loaded filter, alluvial gutter end.
Summary of the invention
Its object of the present invention is just the construction method providing a kind of retaining wall drainage system, solves the problem that retaining wall gutter easily blocks inefficacy.Alleviate water percolating capacity larger time bottom gutter charge for remittance concentrate, draining not in time, the situation of the anhydrous row of top gutter, prevention ponding soaks foundation.Have the advantages that construction is simple, ensure that the unobstructed of retaining wall drainage system, after maintaining body of wall and wall, the soil body stablizes.
Realize above-mentioned purpose and the technical scheme taked, comprise retaining wall and loaded filter, gutter is provided with in retaining wall, described retaining wall is provided with at least two layers, non-woven fabrics water barrier and header is provided with bottom retaining wall, header is close to the retaining wall back of the body and is longitudinally laid, and the bottom of header is inserted in gutter, between adjacent two gutters, arrange herringbone longitudinal gradient.
Described construction method step is as follows:
I, the concrete base layer of loaded filter is built;
II, construction one section of retaining wall, pre-buried gutter;
III, fill sandy gravel stratum, lay non-woven fabrics water barrier, header is installed;
IV, the more than repeating the IIth, III step, until to wall top;
V, build top platform or top backfill clay, block the surface water.
Compared with prior art the present invention has the following advantages.
1, the difficult problem that retaining wall gutter easily blocks inefficacy is solved;
2, alleviate water percolating capacity larger time bottom gutter charge for remittance concentrate, draining not in time, the situation of the anhydrous row of top gutter, prevention ponding soaks foundation;
3, construct simple.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described.
Fig. 1 is structural representation front view of the present invention.
Fig. 2 is structural representation lateral view of the present invention.
Detailed description of the invention
The construction method of native system comprises retaining wall 1 and loaded filter 6, gutter is provided with in retaining wall 1, as shown in Figure 1, 2, described retaining wall 1 is provided with at least two layers, non-woven fabrics water barrier 5 and header 3 is provided with bottom retaining wall 1, header 3 is close to the retaining wall back of the body and is longitudinally laid, and the bottom of header 3 is inserted in gutter 4, between adjacent two gutters, arrange herringbone longitudinal gradient.
Described header 3 dense mesh type filter screen parcel 2 ~ 4 layers, interval 20cm hoop is fixed; Described gutter 4 caliber is greater than header caliber.
Described non-woven fabrics water barrier 5 stretches in loaded filter 6, and stretch into that the degree of depth is loaded filter 6 width 2/3.
Described retaining wall 1 top-rear side is concrete platform 2, is provided with Concrete Anti water layer 7 bottom loaded filter 6.
Described construction method step is as follows:
I, the concrete base layer of loaded filter is built;
II, construction one section of retaining wall, pre-buried gutter;
III, fill sandy gravel stratum, lay non-woven fabrics water barrier, header is installed;
IV, the more than repeating the IIth, III step, until to wall top;
V, build top platform or top backfill clay, block the surface water.
The drainage system of the present invention to loaded filter and gutter composition improves, and adopts the form of layering draining, reduces the flowing of underground water in loaded filter, arrange header, prevent gutter to block.The present invention is simple to operate, utilizes existing versatile material, improves, have very high practicality and using value to structure and construction method.
The present invention is provided with header, and along retaining wall, longitudinally arranging perforated plastic oozes (thoroughly) water pipe, is convenient to collect seepage water, improves water flow path.Header is provided with longitudinal gradient, can enter the silt of pipeline by Automatic clearance.Current flow rapidly into gutter from header, are conducive to silt to go out pipeline.
Take layering discharging mode, in loaded filter, be provided with waterproof non-woven fabrics water barrier, enhance the ability that header collects seepage water, slow down seepage water to the flowing bottom loaded filter, each layer collection gutter all can be played a role preferably.
The present invention includes
The selection of 1 material
Water proof material: waterproof geotextiles.
Filter screen: 400 order polyethylene filter screens.
Filtrate: prototype gradation gravel.
Header: perforated plastic oozes (thoroughly) water pipe.
Gutter: plastic pipe.Caliber is greater than header.
Concrete: C20, builds bottom loaded filter.
2 loaded filters fill
The thickness of loaded filter is relevant with execution conditions, and execution conditions better, single filled height is less than 1.0m, and loaded filter 30cm is thick to be advisable; The execution conditions of loaded filter are poor, and single filled height is greater than 1.0m, should increase the thickness of loaded filter, conveniently fills.
Graded gravel successively fills closely knit, when should not maybe tamping, answers layering to water closely knit.
3 collection gutters are installed
Header dense mesh type filter screen parcel 2 ~ 4 layers, interval 20cm hoop is fixed.Header is close to the wall back of the body and is longitudinally laid, between adjacent two gutters, arrange herringbone longitudinal gradient, lays fluid-tight geotextiles together in the sandy gravel stratum at the bottom of header.The bottom of header is inserted in gutter through walls.Drainpipe pre-buried, in retaining wall, arranges flowing water slope outside wall.Gutter is arranged on the lowest part that charge for remittance is concentrated, and for accelerating drainage effect, gutter extends 20cm and imbeds in sandy gravel stratum, and perforate, with dense mesh type filter screen parcel 2 ~ 4 layers (containing termination).
4 retaining wall constructions
Retaining wall or to build by laying bricks or stones or cast-in-place, needs firm closely knit, water-tight.Time cast-in-place, completed loaded filter lays barrier material, prevent cement paste from flowing into sandy gravel stratum, shutoff gravel space.
5 effect detection
1, filtrate and gutter up-to-standard, job specfication, filtrate fills closely knit, and gutter is laid by figure, and parcel is appropriate.
2, retaining wall body of wall is firm, protects completed drainage ditch in wall construction.
3, construct before wall roof panel, loaded filter is poured water inspection drainage effect.

Claims (4)

1. the construction method of a retaining wall drainage system, comprise retaining wall (1) and loaded filter (6), gutter (4) is provided with in retaining wall (1), it is characterized in that, described retaining wall (1) is provided with at least two layers, and retaining wall (1) bottom is provided with non-woven fabrics water barrier (5) and header (3), and header (3) is close to retaining wall (1) back of the body and is longitudinally laid, the bottom of header (3) is inserted in gutter (4), between adjacent two gutters, arrange herringbone longitudinal gradient;
Its construction method step is as follows:
I, the concrete base layer of loaded filter is built;
II, construction one section of retaining wall, pre-buried gutter;
III, fill sandy gravel stratum, lay non-woven fabrics water barrier, header is installed;
IV, the more than repeating the IIth, III step, until to wall top;
V, build top platform or top backfill clay, block the surface water.
2. the construction method of a kind of retaining wall drainage system according to claim 1, is characterized in that, described header (3) dense mesh type filter screen parcel 2 ~ 4 layers, and interval 20cm hoop is fixed; Described gutter (4) caliber is greater than header caliber.
3. the construction method of a kind of retaining wall drainage system according to claim 1, is characterized in that, described non-woven fabrics water barrier (5) is stretched in loaded filter (6), stretch into that the degree of depth is loaded filter (6) width 2/3.
4. the construction method of a kind of retaining wall drainage system according to claim 1, is characterized in that, described retaining wall (1) top-rear side is concrete platform (2), and loaded filter (6) bottom is provided with Concrete Anti water layer (7).
CN201210292856.1A 2012-08-17 2012-08-17 A kind of construction method of retaining wall drainage system Active CN102864789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210292856.1A CN102864789B (en) 2012-08-17 2012-08-17 A kind of construction method of retaining wall drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210292856.1A CN102864789B (en) 2012-08-17 2012-08-17 A kind of construction method of retaining wall drainage system

Publications (2)

Publication Number Publication Date
CN102864789A CN102864789A (en) 2013-01-09
CN102864789B true CN102864789B (en) 2015-09-30

Family

ID=47443900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210292856.1A Active CN102864789B (en) 2012-08-17 2012-08-17 A kind of construction method of retaining wall drainage system

Country Status (1)

Country Link
CN (1) CN102864789B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912097A (en) * 2015-06-08 2015-09-16 四川睿铁科技有限责任公司 Novel retaining wall reverse-filtering drainage system and construction method
CN105002927B (en) * 2015-06-15 2017-03-08 湖北工业大学 A kind of construction method of execavated rockmass barricade loaded filter
CN108005105B (en) * 2017-11-30 2020-05-05 中国一冶集团有限公司 Mountain land retaining wall based on sponge city and construction method thereof
CN109056785A (en) * 2018-08-13 2018-12-21 浙江科技学院 The drainage system and its construction method of retaining wall
CN109339095B (en) * 2018-11-26 2021-04-02 中国一冶集团有限公司 Retaining wall drainage system and wall back inverted filter layer construction method thereof
CN110042859B (en) * 2019-05-14 2023-12-29 中建五局土木工程有限公司 Retaining wall reverse filter body and construction method thereof
CN113235649A (en) * 2021-05-20 2021-08-10 武汉市汉阳市政建设集团有限公司 Retaining wall assembly type reverse filter bag construction method
CN114150572B (en) * 2021-12-30 2023-09-05 中国铁道科学研究院集团有限公司铁道建筑研究所 Railway road bridge transition section bench back assembled buffer structure and construction method thereof
CN116876465A (en) * 2023-09-07 2023-10-13 华能澜沧江水电股份有限公司 Integrated drain pipe, drain system and construction method of drain system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08120693A (en) * 1994-10-26 1996-05-14 Paritei Jipangu:Kk Retaining wall
CN2515247Y (en) * 2001-11-12 2002-10-09 黄瑞麟 Drainage structure for retaining wall
JP2007177586A (en) * 2005-12-28 2007-07-12 Takenaka Komuten Co Ltd Carbon dioxide fixing retaining wall
CN200992708Y (en) * 2006-12-19 2007-12-19 上海勘测设计研究院 Stereo drainage system in back fill behind retaining wall
CN101100862A (en) * 2006-07-07 2008-01-09 贵阳铝镁设计研究院 Method for manufacturing road cutting type protecting wall and structure thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08120693A (en) * 1994-10-26 1996-05-14 Paritei Jipangu:Kk Retaining wall
CN2515247Y (en) * 2001-11-12 2002-10-09 黄瑞麟 Drainage structure for retaining wall
JP2007177586A (en) * 2005-12-28 2007-07-12 Takenaka Komuten Co Ltd Carbon dioxide fixing retaining wall
CN101100862A (en) * 2006-07-07 2008-01-09 贵阳铝镁设计研究院 Method for manufacturing road cutting type protecting wall and structure thereof
CN200992708Y (en) * 2006-12-19 2007-12-19 上海勘测设计研究院 Stereo drainage system in back fill behind retaining wall

Also Published As

Publication number Publication date
CN102864789A (en) 2013-01-09

Similar Documents

Publication Publication Date Title
CN102864789B (en) A kind of construction method of retaining wall drainage system
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN109797769B (en) Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof
CN211772491U (en) Make things convenient for road surface to lay's roadbed structure
CN106368238A (en) Honeycomb geocell earth retaining wall with ecological restoration function and construction method thereof
CN113737772A (en) Anti-clogging drainage structure for high retaining wall and construction method thereof
CN104652181B (en) Light supporting structure for existing railway station roadbed on filling roadbed
CN103643689A (en) Pipe type underground water drainage blind ditch and construction technology and application thereof
CN202627166U (en) Novel water-discharging ecological zone for town road
CN205035768U (en) Enrockment concrete permeable dike
CN107700523B (en) Drainage system of prefabricated upward inclined retaining wall and construction method
CN212895900U (en) Gravity type U-shaped abutment rear drainage structure
CN113502836A (en) Drainage geogrid and supporting structure and method
CN219410355U (en) Flexible side-width structure of high-fill embankment of existing railway
CN110528347B (en) Permeable embankment structure applied to gully section and construction method thereof
CN210238543U (en) Inclined slope surface layered backfill dynamic compaction leveling structure
CN210439090U (en) Structure for building or widening high embankment
CN204491320U (en) Existing railway station roadbed light supporting structure on filled ground
CN101250864A (en) Drainage system in sluicing-siltation dam and uses thereof
CN203741852U (en) Tubular groundwater drainage and seepage blind ditch
CN110629732A (en) Prefabricated combined river bank protection and construction arrangement method thereof
CN203716273U (en) Multifunctional ecological draining gutter
CN107700500B (en) Slope retaining structure and slope supporting drain integral system
CN109339095A (en) Retaining wall drainage system and its wall carry on the back loaded filter construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant