CN109056785A
CN109056785A CN201810914270.1A CN201810914270A CN109056785A CN 109056785 A CN109056785 A CN 109056785A CN 201810914270 A CN201810914270 A CN 201810914270A CN 109056785 A CN109056785 A CN 109056785A
Authority
CN
China
Prior art keywords
retaining wall
layer
drainpipe
drainage system
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810914270.1A
Other languages
Chinese (zh)
Inventor
俞钦钦
王立峰
冯利坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Urban Rail Transit Investment And Construction Co Ltd
Zhejiang Lover Health Science and Technology Development Co Ltd
Zhejiang University of Science and Technology ZUST
Original Assignee
Jinhua Urban Rail Transit Investment And Construction Co Ltd
Zhejiang Lover Health Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Urban Rail Transit Investment And Construction Co Ltd, Zhejiang Lover Health Science and Technology Development Co Ltd filed Critical Jinhua Urban Rail Transit Investment And Construction Co Ltd
Priority to CN201810914270.1A priority Critical patent/CN109056785A/en
Publication of CN109056785A publication Critical patent/CN109056785A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Retaining Walls (AREA)

Abstract

The invention discloses a kind of drainage system of retaining wall and its construction methods, drainage system includes, retaining wall, it is the stickiness soil body after the wall of retaining wall, it is characterized in that, cavity is offered after retaining walls, the bottom casting concrete base of cavity, permeable or weak water penetration filler is filled out above concrete base layer, the stickiness soil body on rear side of water receiving or weak water penetration filler is since bottom every 1 ~ 1.5 meter of laying, one layer of gravel soil, the upper and lower level of every layer of gravel soil is laid with dense mesh type strainer, retaining wall is provided with multilayer, every layer is provided with outer low and inner high drainpipe, the inner end of drainpipe is connected to collector pipe, the collector pipe is located in permeable or weak water penetration filler.At least two layers of the gravel soil.The gradient of the drainpipe is the 4% ~ 6% of the gradient.The dense mesh type strainer is provided with 2 ~ 3 layers.The drainpipe is pvc pipe.The present invention has structure beneficial effect that is simple, at low cost, easy for construction, extending retaining wall service life.

Description

The drainage system and its construction method of retaining wall
Technical field
The present invention relates to a kind of drainage system of retaining wall and its construction methods, are more particularly, to retaining wall rolling earth behind retaining wall The drainage system of clay.
Background technique
Retaining wall is widely used in one of civil construction project structures, due to retaining wall inevitably by The effect of underground water in rolling earth behind retaining wall, this not only adds the increasings of the horizontal loading of retaining wall, and backfill water content to make Retaining wall shearing strength reduces, and soil pressure increases after wall.To prevent ponding after wall from forming hydrostatic pressure, draining should be arranged in retaining wall Measure.What retaining wall draining generallyd use is inorganization draining, i.e. setting drainpipe and drain hole spaced apart on the wall, Moisture is discharged via at drainpipe to drain hole along metope.Following problems can be generated using the draining of this inorganization:
In use, constructing due to lack of standardization, material selection is unreasonable etc., draining blockage, Jin Erzhi are easily caused Make impeded drainage.
In cold district, for retaining wall metope because moisture is in the presence of that can generate freeze thawing phenomenon, long term will be to retaining wall structure Generate serious damage.
Traditional retaining wall rolling earth behind retaining wall drainage system is inconvenient to construct, and causes part retaining wall drainage system not set, Directly affect the stabilization of retaining wall structure.
Summary of the invention
The present invention can prevent wall from carrying on the back ponding according to the above deficiency, provide a kind of drainage system of retaining wall, guarantee wall It carries on the back soil stabilization, extend retaining wall service life.
The object of the invention is that a kind of retaining wall drainage system and its construction method are provided, after solving retaining walls Drainage system is inconvenient to the problem of constructing.Alleviate it is not smooth from the farther away area sewerage of retaining wall, not in time the case where.Have The easy feature of construction is simple, ensure that the unobstructed of retaining wall drainage system, maintain the stabilization of the soil body after wall and wall.
The technical scheme is that
A kind of drainage system of retaining wall, including, retaining wall is the stickiness soil body after the wall of retaining wall, characterized in that in retaining wall Cavity is offered after wall, the bottom casting concrete base of cavity fills out permeable or weak water penetration above concrete base layer and fills out Expect, the stickiness soil body on rear side of permeable or weak water penetration filler is since bottom every 1 ~ 1.5 meter of laying, one layer of gravel soil, every layer of sand The upper and lower level of gravel soil is laid with dense mesh type strainer, and retaining wall is provided with multilayer, and every layer is provided with outer low and inner high drainpipe, drainpipe Inner end be connected to collector pipe, which is located in permeable or weak water penetration filler.
After gravel soil, major part flows to permeable or weak moisture in the stickiness soil body of the present invention along gravel soil lateral flow Water penetration filler, is discharged through drainpipe, and small a part of water can leak down through the stickiness soil body, leaks into next layer of gravel soil, Permeable or weak water penetration filler is flowed to through gravel soil lateral flow again, is discharged through drainpipe, gravel soil provides an infiltration Channel.
It should be noted that gravel soil loss can be effectively prevented in the setting of dense mesh type strainer.
Preferably, at least two layers of the gravel soil.
Preferably, the gradient of the drainpipe is the 4% ~ 6% of the gradient.
Preferably, the dense mesh type strainer is provided with 2 ~ 3 layers.
Preferably, the drainpipe is pvc pipe.
The effective dense mesh type strainer that catchments wraps up 3 ~ 5 layers, is spaced circumferential fixed.The setting of collector pipe can prevent permeable Or the loss of weak water penetration filler, and can ensure that water flow is unimpeded.
A kind of construction method of the drainage system of retaining wall, as follows:
S1 first pours the first layer of retaining wall, and the top surface of first layer is above the ground level;
S2 offers cavity after retaining walls, is poured concrete base layer in subaerial position;
Drainpipe and collector pipe is arranged in S3 on the first layer of retaining wall;
S4 pours the preceding half storey in the second layer of retaining wall;
S5 inserts permeable or weak water penetration filler in the cavity;
S6 cuts out the stickiness soil body after retaining walls and reserves the 0.5-0.75 meters of height that are above the ground level, and is laid with dense mesh type strainer, gravel Soil and dense mesh type strainer;
S7 is poured retaining wall after the rear half storey in the second layer, and drainpipe and collector pipe are arranged on the second layer;
S8 repeats step S5;
S9 backfills 1 ~ 1.5 meter of the stickiness soil body of height, is laid with dense mesh type strainer, gravel soil and dense mesh type strainer;S10 is poured third Layer retaining wall, is laid with drainpipe and collector pipe;
S11 repeats step S8, S9, and so on;
The retaining wall of S12 the last layer, permeable or weak water penetration filler and the stickiness soil body are contour.
One layer height of the retaining wall is identical as a layer height of the stickiness soil body, is 1 ~ 1.5 meter.
The present invention has the advantage that
1. of simple structure and low cost, construction is easily achieved, wall back product caused by due to sluicing hole plug fails can be prevented Water guarantees that wall carries on the back soil stabilization.
2. avoiding retaining wall metope caused by inorganization draining from washing away, pollute and freeze thawing, extend retaining wall service life.
3. effectively mediating the underground water after wall in the soil body, the stabilization of the soil body after wall and wall is maintained.
The present invention has structure beneficial effect that is simple, at low cost, easy for construction, extending retaining wall service life.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention.
Specific embodiment
Now in conjunction with attached drawing, the present invention is further illustrated:
As shown, a kind of drainage system of retaining wall, including, retaining wall 1 is the stickiness soil body 2 after the wall of retaining wall 1, special Sign is that cavity is offered after 1 wall of retaining wall, and the bottom casting concrete base 5 of cavity fills out above concrete base layer 5 The stickiness soil body 2 of permeable or weak water penetration filler 4, permeable or weak 4 rear side of water penetration filler is spread since bottom every 1 ~ 1.5 meter If one layer of gravel soil 3, the upper and lower level of every layer of gravel soil 3 is laid with dense mesh type strainer 9, and retaining wall 1 is provided with multilayer, and every layer is provided with Outer low and inner high drainpipe 7, the inner end of drainpipe 7 are connected to collector pipe 8, which is located at permeable or weak water penetration filler 4 It is interior.
At least two layers of gravel soil 3.
The gradient of drainpipe 7 is the 4% ~ 6% of the gradient.
Dense mesh type strainer 9 is provided with 2 ~ 3 layers.
Drainpipe 7 is pvc pipe.
Collector pipe 8 wraps up 3 ~ 5 layers with dense mesh type strainer, is spaced circumferential fixed.
A kind of construction method of the drainage system of retaining wall, as follows:
S1 first pours the first layer of retaining wall 1, and the top surface of first layer is above the ground level;
S2 offers cavity after 1 wall of retaining wall, is poured concrete base layer 5 in subaerial position;
Drainpipe 7 and collector pipe 8 is arranged in S3 on the first layer of retaining wall 1;
S4 pours the preceding half storey in the second layer of retaining wall 1;
S5 inserts permeable or weak water penetration filler 4 in the cavity;
S6 cuts out the stickiness soil body 2 after 1 wall of retaining wall and reserves the 0.5-0.75 meters of height that are above the ground level, and is laid with dense mesh type strainer 9, sand Gravel soil 3 and dense mesh type strainer 9;
S7 is poured retaining wall 1 after the rear half storey in the second layer, and drainpipe 7 and collector pipe 8 are arranged on the second layer;
S8 repeats step S5;
S9 backfills 21 ~ 1.5 meters of the stickiness soil body of height, is laid with dense mesh type strainer 9, gravel soil 3 and dense mesh type strainer 9;S10 casting Third layer retaining wall 1 is laid with drainpipe 7 and collector pipe 8;
S11 repeats step S8, S9, and so on;
The retaining wall 1 of S12 the last layer, permeable or weak water penetration filler 4 and the stickiness soil body 2 are contour.
One layer height of the retaining wall 1 is identical as a layer height of the stickiness soil body 2, is 1 ~ 1.5 meter.
The present invention uses the form to clay after retaining wall using layering draining, and stream of the underground water in clay is effectively relieved Dynamic, wall backwater is collected to collector pipe, is drained into earth's surface or gutter through drainpipe by drain hole.Functional in organized water drainage can prevent It causes wall to carry on the back ponding because sluicing hole plug failure individually, guarantees that wall carries on the back soil stabilization, moreover it is possible to caused by avoiding inorganization from draining Retaining wall metope washes away, pollutes and frost heave, extends retaining wall service life.
Using layering discharging mode, seepage water is avoided to concentrate on retaining wall bottom, so that each layer integrate draining Guan Junneng is preferable Play a role.Operation of the present invention is simple, using existing versatile material, is improved construction and construction method, is had non- Often high practicability and application value.

Claims (8)

1. a kind of drainage system of retaining wall, including, retaining wall (1) is the stickiness soil body (2), feature after the wall of retaining wall (1) It is that cavity is offered after retaining wall (1) wall, the bottom casting concrete base (5) of cavity, above concrete base layer (5) Permeable or weak water penetration filler (4) is filled out, the stickiness soil body (2) on rear side of permeable or weak water penetration filler (4) is every since bottom Dense mesh type strainer (9) are laid with every the upper and lower level of 1 ~ 1.5 meter of laying, one layer of gravel soil (3), every layer of gravel soil (3), retaining wall (1) is set It is equipped with multilayer, every layer is provided with outer low and inner high drainpipe (7), and the inner end of drainpipe (7) is connected to collector pipe (8), the collector pipe (8) it is located in permeable or weak water penetration filler (4).
2. a kind of drainage system of retaining wall as described in claim 1, characterized in that at least two layers of the gravel soil (3).
3. a kind of drainage system of retaining wall as described in claim 1, characterized in that the gradient of the drainpipe (7) is The 4% ~ 6% of the gradient.
4. a kind of drainage system of retaining wall as described in claim 1, characterized in that the dense mesh type strainer (9) is provided with 2 ~ 3 layers.
5. a kind of drainage system of retaining wall as described in claim 1, characterized in that the drainpipe (7) is pvc pipe.
6. a kind of drainage system of retaining wall as described in claim 1, characterized in that the collector pipe (8) is filtered with dense mesh type 3 ~ 5 layers of net package is spaced circumferential fixed.
7. a kind of construction method of the drainage system of retaining wall, characterized in that as follows:
S1 first pours the first layer of retaining wall (1), and the top surface of first layer is above the ground level;
S2 offers cavity after retaining wall (1) wall, is poured concrete base layer (5) in subaerial position;
Drainpipe (7) and collector pipe (8) is arranged in S3 on the first layer of retaining wall (1);
S4 pours the preceding half storey in the second layer of retaining wall (1);
S5 inserts permeable or weak water penetration filler (4) in the cavity;
S6 cuts out the stickiness soil body (2) after retaining wall (1) wall and reserves the 0.5-0.75 meters of height that are above the ground level, and is laid with dense mesh type strainer (9), gravel soil (3) and dense mesh type strainer (9);
S7 is poured retaining wall (1) after the rear half storey in the second layer, and drainpipe (7) and collector pipe (8) are arranged on the second layer;
S8 repeats step S5;
S9 backfills (2) 1 ~ 1.5 meters of the stickiness soil body of height, is laid with dense mesh type strainer (9), gravel soil (3) and dense mesh type strainer (9);S10 is poured third layer retaining wall (1), is laid with drainpipe (7) and collector pipe (8);
S11 repeats step S8, S9, and so on;
The retaining wall (1) of S12 the last layer, permeable or weak water penetration filler (4) and the stickiness soil body (2) are contour.
8. a kind of construction method of the drainage system of retaining wall as claimed in claim 7, characterized in that the retaining wall (1) A layer height it is identical as a layer height of the stickiness soil body (2), be 1 ~ 1.5 meter.
CN201810914270.1A 2018-08-13 2018-08-13 The drainage system and its construction method of retaining wall Pending CN109056785A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810914270.1A CN109056785A (en) 2018-08-13 2018-08-13 The drainage system and its construction method of retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810914270.1A CN109056785A (en) 2018-08-13 2018-08-13 The drainage system and its construction method of retaining wall

Publications (1)

Publication Number Publication Date
CN109056785A true CN109056785A (en) 2018-12-21

Family

ID=64683721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810914270.1A Pending CN109056785A (en) 2018-08-13 2018-08-13 The drainage system and its construction method of retaining wall

Country Status (1)

Country Link
CN (1) CN109056785A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003105746A (en) * 2001-09-28 2003-04-09 Haipaa:Kk Design method for in-soil drainage layer and in-soil drainage structure
CN102864789A (en) * 2012-08-17 2013-01-09 中铁四局集团第五工程有限公司 Retaining wall drainage system and construction method thereof
CN103669398A (en) * 2013-12-26 2014-03-26 中国水电顾问集团中南勘测设计研究院有限公司 Integrated type road cutting retaining wall
RU2588152C1 (en) * 2015-01-15 2016-06-27 Евгений Александрович Суриков Method of increasing shear stability of retaining wall
CN208777333U (en) * 2018-08-13 2019-04-23 浙江科技学院 The drainage system of retaining wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003105746A (en) * 2001-09-28 2003-04-09 Haipaa:Kk Design method for in-soil drainage layer and in-soil drainage structure
CN102864789A (en) * 2012-08-17 2013-01-09 中铁四局集团第五工程有限公司 Retaining wall drainage system and construction method thereof
CN103669398A (en) * 2013-12-26 2014-03-26 中国水电顾问集团中南勘测设计研究院有限公司 Integrated type road cutting retaining wall
RU2588152C1 (en) * 2015-01-15 2016-06-27 Евгений Александрович Суриков Method of increasing shear stability of retaining wall
CN208777333U (en) * 2018-08-13 2019-04-23 浙江科技学院 The drainage system of retaining wall

Similar Documents

Publication Publication Date Title
CN105927272B (en) Bottom plate anchors restricted type tunnel lining structure
CN107237650B (en) Drilling siphon negative pressure drainage system and method for treating water seepage of tunnel wall
WO2021109537A1 (en) Ultra-long tunnel sewage disposing and separation drainage structure suitable for cold regions
CN103510528B (en) For the blind drainage structure of underground structure anti-floating
CN206530363U (en) One kind can the outer drainage system of maintenance type railway tunnel bottom structure
CN201835198U (en) Drainage roadbed for high underground water level
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN102635402A (en) Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole
CN208055802U (en) A kind of row oozes mating type road structure
CN107245989A (en) Bear the tunnel structure and its construction technology of external water pressure in height
CN208702024U (en) Inverted roof light and shade combination dual-drainage structure
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN209652669U (en) A kind of subgrade drainage structure
CN208982109U (en) A kind of tunnel structure with antiseepage drain function
CN107740708B (en) Construction structure and construction method for preventing leakage of tunnel arch wall foot
CN207228292U (en) One kind omits water system in printing slowly after first catchmenting
CN207093138U (en) A kind of Tunnel Second Lining water pressure control structure
CN208777333U (en) The drainage system of retaining wall
CN110725717A (en) Water plugging structure for ore body roadway
CN103114605B (en) Anti-seepage drainage layer structure and construction method
CN206298869U (en) A kind of concrete guard wall structure of free drainage
CN109056785A (en) The drainage system and its construction method of retaining wall
CN207211173U (en) CFRD reverse drainage system
CN214363925U (en) Cut water seepage ditch system
CN211395743U (en) Water accumulation preventing and draining structure of retaining wall of mountain road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination