CN107700361A - A kind of dumb-bell shape grout sleeve and the method that assembling construction is carried out with the grout sleeve - Google Patents
A kind of dumb-bell shape grout sleeve and the method that assembling construction is carried out with the grout sleeve Download PDFInfo
- Publication number
- CN107700361A CN107700361A CN201710903715.1A CN201710903715A CN107700361A CN 107700361 A CN107700361 A CN 107700361A CN 201710903715 A CN201710903715 A CN 201710903715A CN 107700361 A CN107700361 A CN 107700361A
- Authority
- CN
- China
- Prior art keywords
- grout sleeve
- dumb
- grouting
- grout
- bell shape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011440 grout Substances 0.000 title claims abstract description 103
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000000463 material Substances 0.000 claims abstract description 42
- 239000007788 liquid Substances 0.000 claims abstract description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 27
- 235000013336 milk Nutrition 0.000 claims description 13
- 239000008267 milk Substances 0.000 claims description 13
- 210000004080 milk Anatomy 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 238000007789 sealing Methods 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 238000002360 preparation method Methods 0.000 claims description 6
- 239000002002 slurry Substances 0.000 claims description 6
- 238000012360 testing method Methods 0.000 claims description 6
- 239000003822 epoxy resin Substances 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 4
- 239000004570 mortar (masonry) Substances 0.000 claims description 4
- 229920000647 polyepoxide Polymers 0.000 claims description 4
- 230000006835 compression Effects 0.000 claims description 3
- 238000007906 compression Methods 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000002156 mixing Methods 0.000 claims description 3
- 239000000284 extract Substances 0.000 claims description 2
- 150000001875 compounds Chemical class 0.000 claims 1
- 230000000717 retained effect Effects 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 9
- 239000004567 concrete Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 4
- 230000002787 reinforcement Effects 0.000 abstract 1
- 229920002472 Starch Polymers 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 235000019698 starch Nutrition 0.000 description 2
- 239000008107 starch Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 210000003195 fascia Anatomy 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000009955 starching Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B1/612—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A kind of method that assembling construction is carried out the invention discloses dumb-bell shape grout sleeve and with the grout sleeve,The dumb-bell shape grout sleeve,Including two longitudinal arrangements and highly concordant grout sleeve,And for connecting the rectangular enclosure of two grout sleeves,Communicated between the grout sleeve and the rectangular enclosure,One of them described grout sleeve outer upper is provided with a thick liquid discharge mouth,Bottom is provided with a stock inlet,Ribbed Bar is inserted into sleeve of the inner chamber with annular protrusion,Then pour into special high-strength,Contraction-free grouting concrete,Both sides grout sleeve works simultaneously,Make both sides upper and lower side bar connecting,So as to reach the connection effect for being higher than parent material of reinforcement rebar intensity in rapid construction,Efficiency of construction and building structure overall performance can be effectively improved,Simplify construction technology,And it is adapted in the area application that taken place frequently to construction environment requirement height and earthquake.
Description
Technical field
The present invention relates to a kind of precast assembly provisions for grouting and technical field of construction, especially a kind of dumb-bell shape grout sleeve
And the method that assembling construction is carried out with the grout sleeve.
Background technology
With the rapid development of communication, bridge, the quantities of road is also being continuously increased, and we apply for bridge
The requirement of work technology is more and more higher, simultaneously because science of bridge building, the particularly bridge on highway, railway, Suo Yougong
Journey requires that the time of site operation tries one's best short, so as to reduce the risk of site operation, ensures communications and transportation, reduces because applying
Work blocks inconvenience caused by traffic, avoids weather from having a strong impact on construction as far as possible, therefore have developed a series of applicable buildings
Industrialized technology.
Prefabricated concrete structure building is mostly built using industrialization technology at present, is by the structure of the primary structure of construction
Part uses prefabrication, the construction technology of on-site consolidation.Such construction technology has suitable technical advantage and construction characteristic,
Being smoothed out for bridge construction can be ensured, and can ensures the unobstructed of urban transportation.In bridge rapid construction, with prefabricated components
The concrete structure formed for main bearing member assembly connection is extremely important, and reinforced bar sleeve grouting connection is that assembled mixes
The important connected mode of Xtah Crude Clay structure, it is one of important directions of current architecture configuration development.
What is be widely used at present is single tube grout sleeve, and its interconnection technique principle is:, will be special after connecting reinforcing bar insertion sleeve
Pour into sleeve with grouting material, full of the gap between sleeve and reinforcing bar, after grouting material hardening with reinforcing bar cross rib and sleeve lining shape
Into tightly engaging, and the effective force between reinforcing bar and sleeve, by two bar connectings together.Conventional grout sleeve is shearing
It is isolated mutually in wall, so when arranging inner barrel mud jacking pulp pipeline, grouting mouth grout outlet pipeline occurs unavoidably
Too much, internal pipeline comes off, concrete spillage enter pipeline in cause the later stage block mud jacking pipeline the problem of.Moreover, utilize biography
Grout sleeve of uniting is constructed, unfavorable for the globality of thin-walled metope.When running into hollow section bridge pier, workmen is not easily accessible
Inside processing, site operation is difficult, and operating efficiency is relatively low, easily influences project progress.The wall face of other architectural engineering, construction
Personnel do not have scaffold to construct, not only bad for efficiency of construction, it could even be possible to engineering accident occurs.
The content of the invention
New efficiency of construction and building structure globality can be reliably and effectively improved it is an object of the invention to provide a kind of
Can, simplify construction technology, and be adapted to construction environment is required high and earthquake take place frequently area application reinforcing bar grout sleeve and its
Construction method.
To achieve these goals, a kind of dumb-bell shape grout sleeve provided by the invention, it is characterised in that vertical including two
To the grout sleeve of arrangement, and for connecting the cavity body structure of two grout sleeves, the grout sleeve and the chamber
Communicated between body structure;One of them described grout sleeve outer upper is provided with a thick liquid discharge mouth, and bottom is entered provided with one
Starch mouth.
Preferably, the grout sleeve is highly concordant, and inside middle portion is equipped with twice steel hoop back-up ring.
Preferably, the cavity body structure is rectangular enclosure, and intracavitary thickness is identical with the diameter of connected reinforcing bar, inwall light
It is sliding.
Preferably, the upper surface of the rectangular enclosure is less than the grout sleeve upper surface, and lower surface is higher than the grouting
Sleeve lower surface.
Preferably, the grout sleeve medial surface is provided with annular protrusion.
Preferably, the grout sleeve both ends carry sealing ring.
The length of the grout sleeve is at least 20 times of connection bar diameter.
The assembling constructing method of dumb-bell shape grout sleeve described in a kind of basis, it is characterised in that construction procedure is as follows:
1) Primary Location:First the difference grafting of connected reinforcing bar is arranged in two grout sleeves, and in the filling
The both ends of slurry sleeve are respectively mounted sealing ring;
2) preparation:Before grouting works are carried out, first determine unobstructed into thick liquid discharge mouth, check whether pollution, moistening is prefabricated
Component and grouting material contact surface, smear the levelling contact surface of epoxy resin mortar, and hoisting prefabricated component adjusts perpendicularity;
3) mixing grouting material:In strict accordance with proportions grouting material, filling is poured into after the grouting material matched is stirred
Starch in equipment, ensure the slump of grouting material;
4) it is in the milk:After upper member is vertically put into lower member, the grouting material mixed is imported into grouting pump, starts grouting
Pump, when the grouting material of grouting pump mouth outflow is in wire, using grouting method from bottom to top, grout pipe is inserted into entering for prefabricated components
Mouth is starched, after the grout sleeve thick liquid discharge mouth flows out grouting material, the thick liquid discharge mouth is blocked immediately, after holding pressure, it is same to extract grout pipe out
When quickly block stock inlet, other stock inlets of prefabricated components are equally in the milk successively;
5) test block indwelling:Construction quality inspection record should be carried out in time after completing to be in the milk, and retain image data, it is and described
The grouting material of dumb-bell shape grout sleeve matching takes test block group to carry out resistance to compression detection according to each construction section.
Preferably, the grouting material mixture should be finished after preparation in 0.5h, after mix is checked after completing
Grouting material fluidity, ensure that fluidity is not less than 300mm.
Preferably, after the thick liquid discharge mouth is blocked during grouting, a length of 60s during pressure is held.
It is provided by the invention, have the advantages that:
1. the grout sleeve can reliably and effectively improve efficiency of construction, strengthen the globality of thin-walled, lifting bridge is overall
Steadiness, can meet earthquake take place frequently the Special sections such as area to sleeve be in the milk interconnection technique requirement.Filled using the dumb-bell shape
When starching sleeve progress Construction Arrangement, it is only necessary to enter slurry in outer lateral irrigation, need not again open up into thick liquid discharge mouth on inner barrel, may be used also
To control adjacent sleeve spacing, greatly reduce into plasma discharge pipeline, avoid the occurrence of the mixed and disorderly uncontrollable problem of arrangement, build high exterior wall
When body and hollow section bridge pier, workmen uses the completion grouting process that the grout sleeve can be simple and convenient in outside,
Construction period can be shortened, improve the working environment of worker, moreover it is possible to reduce operating risk.
2. the twice steel hoop back-up ring set by the grout sleeve inside middle portion, the connection reinforcing bar with ribbing of both ends insertion enters
After entering the grout sleeve, the rib connected on reinforcing bar is stuck on the reinforcing bar back-up ring, is played limitation and is fixedly connected with reinforcing bar in the filling
The effect of bushing core position is starched, ensures secure and reliable connection.
3. the intracavitary thickness of the rectangular enclosure is identical with the diameter of connected reinforcing bar, inner wall smooth, it is ensured that smooth
Grouting, grouting material is quickly filled with the gap between sleeve and reinforcing bar, after grouting material hardening with reinforcing bar and the grout sleeve
Formation tightly engages, avoid the occurrence of grouting it is insufficient, there is shrinkage porosite etc., cause the low intensity of made wall.
4. the upper surface of the rectangular enclosure is less than the grout sleeve upper surface, lower surface is higher than under the grout sleeve
Surface, it is ensured that the glacing flatness of the grout sleeve upper and lower surface, be advantageous to ensure whole prefabricated components wall in follow-up assembling
The perpendicularity of body, avoids the occurrence of potential safety hazard, improves the anti-seismic performance of wall.
5. the grout sleeve medial surface is provided with equally distributed annular protrusion, it is ensured that the firm of bar connecting can
Lean on, strengthen the globality of wall, improve the anti-seismic performance of wall.
6. the grout sleeve both ends carry sealing ring, grouting material seepage can be effectively prevented, and effectively fill
The gap of reinforcing bar and the grout sleeve connecting portion is connected, avoids reinforcing bar from occurring loosening during grouting, tilt.
Brief description of the drawings
Fig. 1 is a kind of dumb-bell shape grout sleeve structural representation;
Fig. 2 is along the sectional drawing in B-B directions in Fig. 1;
Fig. 3 is sectional drawing of the rectangular enclosure along A-A directions in Fig. 1;
Fig. 4 is the grout sleeve layout drawing of shear wall cross section;
Fig. 5 is the vertical lifting figure of shear wall prefabricated components;
Fig. 6 is shear wall mud jacking figure;
Fig. 7 is the grout sleeve layout drawing of hollow section bridge pier;
Fig. 8 is the prefabricated components installation diagram of hollow section bridge pier;
In figure:
1. the reinforcing bar 7. of the first 5. stock inlet of grout sleeve 2. second grout sleeve, 3. rectangular enclosure, 4. thick liquid discharge mouth 6.
The annular protrusion of 12. sealing ring of grouting material 8. lower member, 9. upper member, 10. epoxy resin mortar, 11. steel hoop back-up ring 13..
Embodiment
As shown in Figure 1, Figure 2 and Figure 3, a kind of dumb-bell shape grout sleeve, including longitudinal arrangement and the highly concordant first filling
The grout sleeve 2 of sleeve 1 and second is starched, and for connecting the rectangular enclosure 3 of two grout sleeves, the first grouting set
Communicated between the 1, second grout sleeve 2 of cylinder and the rectangular enclosure 3.The physical dimension of two grout sleeves is identical,
Sleeve outer diameter is connection 3 times of the diameter of reinforcing bar 6, and length sleeve does not occur to bond length required for bond-slip for connection reinforcing bar 6
20 times of degree, at least connection bar diameter.The grout sleeve inside middle portion is provided with twice steel hoop back-up ring 11, and both ends are inserted
After the connection reinforcing bar 6 with ribbing entered enters the grout sleeve, the rib connected on reinforcing bar is stuck on the steel hoop back-up ring 11, is risen
Limitation is fixedly connected with effect of the reinforcing bar in the grout sleeve center, ensures that its surrounding has grouting gap about the same.
The grout sleeve medial surface is provided with equally distributed annular protrusion 13, is increased between the slurry of solidification by concavo-convex embedded structure
Strong curable grip, prevent rebar junction from departing from wall, strengthen the globality and anti-seismic performance of wall.For connecting described in two
Grout sleeve 1 and 2 plays the rectangular enclosure 3 of transmitting effect, and intracavitary thickness is the diameter of connection reinforcing bar 6, inner wall smooth.Institute
The upper surface for stating rectangular enclosure 3 is less than the grout sleeve upper surface, and lower surface is higher than the grout sleeve lower surface, Ke Yibao
Demonstrate,prove the glacing flatness of prefabricated components upper and lower end face.On the downside of the outer wall of the second grout sleeve 2 positioned at outside for stock inlet 5, on
Side is thick liquid discharge mouth 4, and inwall is got through, and is connected with cavity, and the both ends of 1 and second grout sleeve of the first grout sleeve 2 are with close
Seal 12 prevents slurry seepage, and grouting material 7 is injected into sleeve inner by the stock inlet 5 during work, it is empty to flow through the rectangle
Chamber 3, Self-leveling grouting material can guarantee that inner side first grout sleeve 1 is in the milk fully between two grout sleeves, reach on the inside of
Sleeve need not set the purpose into thick liquid discharge mouth.
The assembling constructing method of dumb-bell shape grout sleeve described in a kind of basis, it is characterised in that construction procedure is as follows:
1) Primary Location:Connected reinforcing bar 6 is first distinguished into grafting in two grout sleeves, and in the filling
The both ends of slurry sleeve are respectively mounted sealing ring 12;
2) preparation:Before grouting works are carried out, first determine that stock inlet 5, thick liquid discharge mouth 4 are unobstructed, check whether pollution.Such as
Shown in Fig. 5, moistening prefabricated components and grouting material contact surface, the 10 levelling contact surface of epoxy resin mortar that intensity is high, plasticity is good is smeared,
Hoisting prefabricated component adjusts perpendicularity;
3) mixing grouting material:In strict accordance with proportions grouting material 7, poured into after the grouting material 7 matched is stirred
In grouting equipment, grouting material 7 should be finished after preparation in 0.5h, the fluidity of grouting material 7 after mix is checked after completing,
Ensure that fluidity is not less than 300mm, ensure the slump of grouting material 7;
4) it is in the milk:As shown in fig. 6, after upper member 9 is vertically put into lower member 8, the grouting material 7 mixed is imported into filling
Stock pump, start grouting pump, when the grouting material 7 of grouting pump mouth outflow is in wire, using grouting method from bottom to top, grout pipe is inserted
Enter the stock inlet 5 of prefabricated components, after the grout sleeve thick liquid discharge mouth 4 flows out grouting material 7, block the thick liquid discharge mouth 4 immediately, hold
After pressing 60s, extract grout pipe out and quickly block stock inlet simultaneously.Other reserved grout holes of prefabricated components are equally in the milk successively, must not
Leakage fill, prefabricated components must once grouting terminate, gap must not be carried out and be repeatedly in the milk.Must not make in 24 hours after slip casting component and
Key stratum is given a shock, collided.
5) test block indwelling:Construction quality inspection record should be carried out in time after completing to be in the milk, and retain image data, it is and described
The grouting material of dumb-bell shape grout sleeve matching, test block group is taken to carry out resistance to compression detection according to each construction section.
Embodiment one:
In architectural engineering, shear wall is primarily subjected to horizontal loading caused by wind load or geological process and vertical load
Active force (gravity), thus shear wall earthquake take place frequently the Special sections such as area Anti-pull-press performance it is particularly important.Such as Fig. 4,5 and 6
Shown, dumb-bell shape grout sleeve is used for precast concrete shear wall, because wall thickness is fixed, it is possible to reduce the use of single sleeve,
It is easy to produce in batches.For the Side fascia of high level, constructed if wall is outer without scaffold worker inconvenience, the dumb-bell shape grouting set
Cylinder is being equally spaced inside and outside side grout sleeve within the walls, controls adjacent sleeve spacing, substantially increases operating efficiency, reduce cloth
Mixed and disorderly uncontrollable problem is put, has reached the purpose of enhancing globality, also more traditional grout sleeve is stronger for overall anti-seismic performance.
Embodiment two:
The dumb-bell shape grout sleeve and construction method are applicable not only to shear wall, are also applied for the steel of hollow section pier stud
Muscle connects, and hollow section pier stud can make full use of material, and application is more extensive.As shown in FIG. 7 and 8, in hollow section of precast assembly
Dumb-bell shape grout sleeve technology is used in the bar connecting construction of face bridge pier, worker is solved and is difficult into bridge pier interior construction
Problem, workmen need to only be in the milk on the outside of bridge pier, reduce potential safety hazard, can improve the working environment and work of worker
Industry risk, smaller to periphery traffic and the influence of environment, efficiency of construction is higher.
The dumb-bell shape sleeve applies also for the situation of the double muscle of solid section, such as square-section, and tensile region can match somebody with somebody
Double reinforcing bar.
Specific case used herein is elaborated to inventive concept, and the explanation of above example is only intended to
Help to understand core concept of the invention.It should be pointed out that for those skilled in the art, this is not being departed from
On the premise of inventive concept, any obvious modification, equivalent substitution or other improvement for being made, the present invention should be included in
Protection domain within.
Claims (9)
- A kind of 1. dumb-bell shape grout sleeve, it is characterised in that include the grout sleeve of two longitudinal arrangements, and for connecting two The cavity body structure of the individual grout sleeve, is communicated between the grout sleeve and the cavity body structure;Described in one of them Grout sleeve outer upper is provided with a thick liquid discharge mouth, and bottom is provided with a stock inlet.
- 2. dumb-bell shape grout sleeve according to claim 1, it is characterised in that the grout sleeve is highly concordant, and middle part Inner side is equipped with twice steel hoop back-up ring.
- 3. dumb-bell shape grout sleeve according to claim 1, it is characterised in that the cavity body structure is rectangular enclosure, intracavitary Thickness is identical with the diameter of connected reinforcing bar, inner wall smooth.
- 4. dumb-bell shape grout sleeve according to claim 1, it is characterised in that the upper surface of the rectangular enclosure is less than institute Grout sleeve upper surface is stated, lower surface is higher than the grout sleeve lower surface.
- 5. dumb-bell shape grout sleeve according to claim 1, it is characterised in that the grout sleeve medial surface is provided with annular It is raised.
- 6. dumb-bell shape grout sleeve according to claim 1, it is characterised in that the grout sleeve both ends are with sealing Circle.
- 7. a kind of assembling constructing method of dumb-bell shape grout sleeve according to claim 1 to 5 any one, its feature exist It is as follows in construction procedure:1) Primary Location:First the difference grafting of connected reinforcing bar is arranged in two grout sleeves, and in the grouting set The both ends of cylinder are respectively mounted sealing ring;2) preparation:Before grouting works are carried out, first determine unobstructed into thick liquid discharge mouth, check whether pollution, moisten prefabricated components With grouting material contact surface, the levelling contact surface of epoxy resin mortar is smeared, hoisting prefabricated component adjusts perpendicularity;3) mixing grouting material:In strict accordance with proportions grouting material, pour into grouting after the grouting material matched is stirred and set In standby, ensure the slump of grouting material;4) it is in the milk:After upper member is vertically put into lower member, the grouting material mixed is imported into grouting pump, starts grouting pump, When the grouting material of grouting pump mouth outflow is in wire, using grouting method from bottom to top, grout pipe insertion prefabricated components are entered into slurry Mouthful, after the grout sleeve thick liquid discharge mouth flows out grouting material, the thick liquid discharge mouth is blocked immediately, after holding pressure, extracts grout pipe out simultaneously Stock inlet quickly is blocked, other stock inlets of prefabricated components are equally in the milk successively;5) test block indwelling:Construction quality inspection record should be carried out in time after completing to be in the milk, image data is retained, with the dumbbell The grouting material of shape grout sleeve matching takes test block group to carry out resistance to compression detection according to each construction section.
- 8. the assembling constructing method of dumb-bell shape grout sleeve according to claim 7, it is characterised in that the grouting material is mixed Compound should be finished after preparation in 0.5h, the grouting material fluidity after mix is checked after completing, ensure that fluidity is not small In 300mm.
- 9. the assembling constructing method of dumb-bell shape grout sleeve according to claim 7, it is characterised in that institute is blocked during grouting After stating thick liquid discharge mouth, a length of 60s during pressure is held.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710903715.1A CN107700361B (en) | 2017-09-28 | 2017-09-28 | A kind of dumb-bell shape grout sleeve and the method for carrying out assembly construction with the grout sleeve |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710903715.1A CN107700361B (en) | 2017-09-28 | 2017-09-28 | A kind of dumb-bell shape grout sleeve and the method for carrying out assembly construction with the grout sleeve |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107700361A true CN107700361A (en) | 2018-02-16 |
CN107700361B CN107700361B (en) | 2019-06-04 |
Family
ID=61176207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710903715.1A Expired - Fee Related CN107700361B (en) | 2017-09-28 | 2017-09-28 | A kind of dumb-bell shape grout sleeve and the method for carrying out assembly construction with the grout sleeve |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107700361B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625477A (en) * | 2018-03-22 | 2018-10-09 | 武汉理工大学 | A kind of assembled beam-column node and its construction method |
CN109457596A (en) * | 2018-10-22 | 2019-03-12 | 北京工业大学 | Prefabricated assembled pier connection structure and construction method |
CN109853847A (en) * | 2019-02-01 | 2019-06-07 | 广州建筑产业研究院有限公司 | A kind of prefabricated column of non-interconnected grouting |
CN110185205A (en) * | 2019-05-07 | 2019-08-30 | 上海应用技术大学 | A kind of assembled architecture reinforcing bar connection bridging type grout sleeve |
CN110238963A (en) * | 2019-06-13 | 2019-09-17 | 天津城建大学 | Double-tube type steel bar connecting structure and its construction method between precast concrete |
CN110318498A (en) * | 2019-06-24 | 2019-10-11 | 天元建设集团有限公司 | A kind of assembled architecture combined type connection system and its construction method |
CN111622429A (en) * | 2020-06-17 | 2020-09-04 | 陈建全 | Method for improving connection safety of grouting sleeve and grouting sleeve |
CN112282120A (en) * | 2020-11-06 | 2021-01-29 | 湖南泽坤建筑设计有限公司 | Shear wall plate fast bin sealing device |
CN112853946A (en) * | 2021-03-18 | 2021-05-28 | 长安大学 | Grouting sleeve, grouting sleeve connected assembled pier and construction method thereof |
CN113417465A (en) * | 2021-07-30 | 2021-09-21 | 中国建筑第二工程局有限公司 | Assembled building grout sleeve grout system |
CN114753636A (en) * | 2022-04-27 | 2022-07-15 | 河南迅隆实业有限公司 | Assembled building combined type connecting method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1167515A (en) * | 1995-11-10 | 1997-12-10 | 东京铁钢株式会社 | Mortar filling type steel bar joint |
CN1723324A (en) * | 2003-01-08 | 2006-01-18 | 金龙根 | Reinforcing bar coupler |
US20140060721A1 (en) * | 2012-09-06 | 2014-03-06 | Splice Sleeve Japan, Ltd. | Joint method for reinforcing bar |
KR20170040037A (en) * | 2015-10-02 | 2017-04-12 | (주)백암이노베이션 | A reinforcing rod coupler having a clamp |
CN106968381A (en) * | 2017-04-28 | 2017-07-21 | 广东省建科建筑设计院有限公司 | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection |
CN107044193A (en) * | 2017-04-26 | 2017-08-15 | 上海核工程研究设计院 | A kind of pair of sleeve steel concrete supporting device |
-
2017
- 2017-09-28 CN CN201710903715.1A patent/CN107700361B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1167515A (en) * | 1995-11-10 | 1997-12-10 | 东京铁钢株式会社 | Mortar filling type steel bar joint |
CN1723324A (en) * | 2003-01-08 | 2006-01-18 | 金龙根 | Reinforcing bar coupler |
CN100363576C (en) * | 2003-01-08 | 2008-01-23 | 金龙根 | Reinforcing bar coupler |
US20140060721A1 (en) * | 2012-09-06 | 2014-03-06 | Splice Sleeve Japan, Ltd. | Joint method for reinforcing bar |
KR20170040037A (en) * | 2015-10-02 | 2017-04-12 | (주)백암이노베이션 | A reinforcing rod coupler having a clamp |
CN107044193A (en) * | 2017-04-26 | 2017-08-15 | 上海核工程研究设计院 | A kind of pair of sleeve steel concrete supporting device |
CN106968381A (en) * | 2017-04-28 | 2017-07-21 | 广东省建科建筑设计院有限公司 | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625477A (en) * | 2018-03-22 | 2018-10-09 | 武汉理工大学 | A kind of assembled beam-column node and its construction method |
CN109457596A (en) * | 2018-10-22 | 2019-03-12 | 北京工业大学 | Prefabricated assembled pier connection structure and construction method |
CN109853847A (en) * | 2019-02-01 | 2019-06-07 | 广州建筑产业研究院有限公司 | A kind of prefabricated column of non-interconnected grouting |
CN110185205A (en) * | 2019-05-07 | 2019-08-30 | 上海应用技术大学 | A kind of assembled architecture reinforcing bar connection bridging type grout sleeve |
CN110238963A (en) * | 2019-06-13 | 2019-09-17 | 天津城建大学 | Double-tube type steel bar connecting structure and its construction method between precast concrete |
CN110318498B (en) * | 2019-06-24 | 2023-08-15 | 天元建设集团有限公司 | Assembled building combined type connecting system and construction method thereof |
CN110318498A (en) * | 2019-06-24 | 2019-10-11 | 天元建设集团有限公司 | A kind of assembled architecture combined type connection system and its construction method |
CN111622429A (en) * | 2020-06-17 | 2020-09-04 | 陈建全 | Method for improving connection safety of grouting sleeve and grouting sleeve |
CN112282120B (en) * | 2020-11-06 | 2021-11-02 | 湖南泽坤建筑设计有限公司 | Shear wall plate fast bin sealing device |
CN112282120A (en) * | 2020-11-06 | 2021-01-29 | 湖南泽坤建筑设计有限公司 | Shear wall plate fast bin sealing device |
CN112853946A (en) * | 2021-03-18 | 2021-05-28 | 长安大学 | Grouting sleeve, grouting sleeve connected assembled pier and construction method thereof |
CN113417465A (en) * | 2021-07-30 | 2021-09-21 | 中国建筑第二工程局有限公司 | Assembled building grout sleeve grout system |
CN114753636A (en) * | 2022-04-27 | 2022-07-15 | 河南迅隆实业有限公司 | Assembled building combined type connecting method |
Also Published As
Publication number | Publication date |
---|---|
CN107700361B (en) | 2019-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107700361B (en) | A kind of dumb-bell shape grout sleeve and the method for carrying out assembly construction with the grout sleeve | |
CN103334422A (en) | Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof | |
CN111042185B (en) | Construction method of basement raft foundation with tower crane foundation | |
CN103510540B (en) | Mortar flag stone retaining wall reinforcement construction method and structure thereof | |
CN110205921A (en) | The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar | |
CN107338801B (en) | Prestressing force assembled Complex retaining wall structure and construction method | |
CN208763204U (en) | A kind of vertical connecting structure of low layer assembled architecture prefabricated panel | |
US20220098819A1 (en) | Method for strengthening and lifting high-rise building having raft foundation | |
CN109024651A (en) | A kind of concrete filled steel tube mixing pile foundation and construction method | |
CN208844417U (en) | A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column | |
CN106869548A (en) | A kind of newel framework assembled underground parking structural system and construction method | |
CN114215090B (en) | Construction method of raft and pile pressing in closed space | |
CN105986621B (en) | Prefabrication beam column built from concrete shaped steel combination connecting node constructs and method | |
CN110552706A (en) | Permanent-temporary combined shield hoisting hole sealing structure and method | |
CN104074197A (en) | Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof | |
CN102041806A (en) | Construction method for inserting steel column in bored pile | |
CN210369031U (en) | Slurry anchor lap joint type prefabricated retaining wall unit and prefabricated retaining wall | |
CN104594343A (en) | Fabricated pile and construction method thereof | |
KR100444838B1 (en) | A fiber reinforced earth retaining wall, a constructing method thereof, and a composite underground wall structure using thereof | |
CN101545255B (en) | Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting | |
CN114197526B (en) | Formwork system with vertical structure by reverse construction method and construction method | |
CN114922172A (en) | Anchor rod pile device capable of eliminating negative frictional resistance of collapsible loess and construction method | |
CN211900603U (en) | Face combination shield structure hole of hoist enclosed construction forever | |
CN107059884A (en) | A kind of construction method of building foundation pit grouting support stake | |
CN114134896A (en) | Grouting device and post-grouting process for post-grouting of PHC (prestressed high-strength concrete) tubular pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190604 |