CN110205921A - The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar - Google Patents
The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar Download PDFInfo
- Publication number
- CN110205921A CN110205921A CN201910643003.XA CN201910643003A CN110205921A CN 110205921 A CN110205921 A CN 110205921A CN 201910643003 A CN201910643003 A CN 201910643003A CN 110205921 A CN110205921 A CN 110205921A
- Authority
- CN
- China
- Prior art keywords
- pier stud
- bellows
- pier
- reinforcing bar
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 26
- 230000002787 reinforcement Effects 0.000 claims abstract description 28
- 239000004567 concrete Substances 0.000 claims abstract description 27
- 239000000463 material Substances 0.000 claims description 18
- 239000004570 mortar (masonry) Substances 0.000 claims description 18
- 238000013461 design Methods 0.000 claims description 7
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 239000011374 ultra-high-performance concrete Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 4
- 241001669679 Eleotris Species 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 claims description 3
- 238000012790 confirmation Methods 0.000 claims description 3
- 238000013016 damping Methods 0.000 claims description 3
- 238000009415 formwork Methods 0.000 claims description 3
- 239000004746 geotextile Substances 0.000 claims description 3
- 238000010438 heat treatment Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 239000002985 plastic film Substances 0.000 claims description 3
- 229920006255 plastic film Polymers 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 238000007711 solidification Methods 0.000 claims description 3
- 230000008023 solidification Effects 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 238000012546 transfer Methods 0.000 claims description 3
- 238000009423 ventilation Methods 0.000 claims description 3
- 238000009411 base construction Methods 0.000 claims 1
- 238000001514 detection method Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 6
- 239000007787 solid Substances 0.000 description 3
- 230000001427 coherent effect Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 206010054949 Metaplasia Diseases 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 230000015689 metaplastic ossification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Abstract
The present invention relates to a kind of precast assembly pier stud constructions that bellows connection is inserted by reinforcing bar, including cushion cap, cushion cap upper surface is equipped with groove, inside grooves are equipped with the support column to support pier stud bottom surface, inside grooves are embedded with several bellowss in support column surrounding vertically, several main reinforcements and bellows of pier stud bottom are corresponded and are inserted into bellows, and bellows interior is equipped with interior filled layer, and inside grooves have poured Concrete Filled layer.This is simple by the structure that the precast assembly pier stud that reinforcing bar is inserted into bellows connection constructs.
Description
Technical field
The present invention relates to a kind of precast assembly pier stud constructions and construction method that bellows connection is inserted by reinforcing bar, are related to
Field of civil engineering.
Background technique
With protection environment, universal, up-to-dateness requirement of the people for Urban Bridge Construction of energy saving consciousness
It is higher and higher, design, construction personnel from city dweller to bridge, to the construction of Urban Bridge exist fast and safely, energy conservation
Environmentally friendly, small to Coherent traffic noise, construction quality is excellent etc. to be required.Building assembled building technology is the pass for meeting the demand
Key, and the precast assembly technology of bridge superstructure is quite mature, sight is just gradually transferred to by construction with researcher
In the realization of the substructures precast assembly technology such as Bridge Pier, to realize that bridge is entirely prefabricated.
1971, Texas, USA was firstly introduced section assembling bridge pier, crossed over JFK for the city Corpus Christi
The construction of causeway highway bridge, with the introducing of Precast Concrete Segmental Bridges technology, section assembling bridge pier starts in the big rule in the U.S. or Europe
Mould application.For Precast Concrete Segmental Bridges construction technology, China is mainly used in the Superstructure Construction of bridge, section assembling coagulation
The engineer application of native bridge pier is less, and mainly using wet seam connection section assembling solid pier, only Donghai Bridge,
It is applied in the bridges such as Hangzhou Gulf Great Bridge, Beijing ponding pool bridge experimental project, Changjiang River Bridge Shanghai.
There are still many deficiencies, such as bridge pier to be spliced using cast-in-place seam for the connection type of existing assembled bridge pier, bridge pier master
Reinforcing bar Joining Technology is complicated, and quality of connection is not easy to guarantee;Such as using precast assembly structure frequently with grout sleeve connect, by
Small in the construction tolerance of muff joint, more demanding to construction precision, two reinforcing bars docked in sleeve are easy to make mistakes because of construction
Cause one it is too long, one is too short, and there are the risk that anchorage length not enough causes reinforcing bar to be extracted, the at present party for that too short root
Method is not suitable for the connection of antidetonation area fabricated construction.The safety of bridge substructure is particularly important, it is therefore necessary to send out
Bright one kind novel bridge pier seam interconnection technique overcomes disadvantages mentioned above.
Summary of the invention
In view of the deficiencies in the prior art, technical problem to be solved by the invention is to provide one kind to be inserted into ripple by reinforcing bar
The precast assembly pier stud construction and construction method of pipe connection, are not only simple in structure, and convenient and efficient.
In order to solve the above-mentioned technical problem, the technical scheme is that a kind of be inserted into bellows connection by reinforcing bar
Precast assembly pier stud construction, including cushion cap, cushion cap upper surface are equipped with groove, and inside grooves are equipped with the branch to support pier stud bottom surface
Dagger, inside grooves are embedded with several bellowss, several main reinforcements and bellows of pier stud bottom in support column surrounding vertically
It corresponds and is inserted into bellows, bellows interior is equipped with interior filled layer, and inside grooves have poured Concrete Filled layer.
Preferably, vertical main reinforcement and lateral stirrup are disposed with inside the pier stud, main reinforcement is along pier stud short transverse
Extend pier stud bottom surface.
Preferably, the length that main ribs are stretched out outside pier stud bottom surface needs to meet the anchorage length of main reinforcement insertion bellows,
Bellows Length is greater than the anchorage length of pier stud main reinforcement.
Preferably, the Concrete Filled layer uses expansive concrete or ultra-high performance concrete.
Preferably, the bottom of the bellows is embedded in groove slot bottom position below, and the top of the bellows is equal
Positioned at groove slot bottom or more than position but be not higher than groove notch.
Preferably, the interior filled layer uses high-strength mortar or grouting material.
Preferably, the support column top surface is flushed with cushion cap upper surface.
It is a kind of by reinforcing bar be inserted into bellows connection precast assembly pier stud construction construction method, according to the following steps into
Row: (1) Precast Pier Columns: production Pier Formwork binds pier stud main reinforcement and stirrup, carries out Precast Pier Columns concreting, poured
Cheng Houyong canvas covering, it is quiet stop a period of time after, start ventilation heating it is steam-cured, after reaching 90% or more design strength, Ji Keting
It only conserves, is ensuring that concrete will not occur due to demoulding and cause can form removal after damage;(2) pier stud transports existing
: construction site is transported to using rubber-tyred transportation in assembled state vehicle, damping is spread on compartment board and prevents the rubber pad of friction, in advance
It should be fixed after pier stud entrucking processed, and fixing situation is checked, meeting can dispatch a car after transporting requirement safely;(3) structure
The storage of part scene: spaciousness is answered in the stacking place of component, stack place answer it is smooth it is solid, draining is good, for prevent Precast Pier Columns by
Pollution, divides into sleeper as support pad;(4) pile foundation, bearing platform construction: progress pile foundation construction, excavation pit carry out cushion cap bed course first
Construction binds cushion cap reinforcing bar, and by the pre-buried bellows of design position, installation platform template pours cushion cap concrete and conserves, finally
Dabbing processing is carried out to cushion cap groove inner surface;(5) hoisting prefabricated pier stud;(6) loop wheel machine is slow to cushion cap top by pier stud lower end
Transfer makes suspension centre, pier stud bottom center, 3 points of cushion cap center in same vertical line, and the overhanging main reinforcement insertion of pier stud is pre-buried
In bellows, groove center support column top surface contacts support pier stud weight with pier stud bottom surface;(7) it is fixed temporarily and corrects: pier shaft
Surrounding is fixed using diagonal brace, and four foot of diagonal brace is withstood with screw jack, and the verticality of pillar is detected with theodolite or total station, if
The deviation filled and be worth perhaps is had more than, pier shaft verticality is adjusted by diagonal brace;(8) connecting node is constructed: confirmation pier stud position, verticality
After repetition measurement is errorless, high-strength mortar or grouting material are poured into bellows, the notch of groove applies one layer of steel mesh, pours in groove
Build expansive concrete or ultra-high performance concrete;(9) maintenance and temporary support are removed: after the completion of groove pours, being spilt in time
Water is conserved, and outside is conserved using geotextiles plastic film of wrapping, and keeps concrete surface wet, to concrete strength
Dismountable step (7) is fixed temporarily when reaching 90%.
Preferably, in step (8), micro- promotion pier stud exposes ripple before high-strength mortar or grouting material are poured into bellows
Nozzle, after high-strength mortar or grouting material are poured into bellows, pier stud main reinforcement should the insertion before high-strength mortar or grouting material solidification
Bellows, it is closely knit to guarantee to contact to fill up bellows gap for extruding high-strength mortar or grouting material when main reinforcement is inserted into.
Compared with prior art, the invention has the following advantages: structure is simple, bellows is pipe structure, passes through pipe
Wall forms the bonding of concaveconvex shape enhancing and interior filled layer, Concrete Filled layer, being connected firmly at assembly node;So that bridge
Substructure construction assembling, realize bridge pier factory industry metaplasia produce, scene it is directly assembled, have site operation fast and safely,
, wet construction few, short construction period, component quality guaranteed, economic and environment-friendly the advantages that small to Coherent traffic noise, has good engineering
Promotion prospect.
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Detailed description of the invention
Fig. 1 is the organigram of the embodiment of the present invention.
Fig. 2 is the local structure schematic diagram of Fig. 1.
Fig. 3 is the A-A cross-sectional view of Fig. 2.
Fig. 4 is the B-B cross-sectional view of Fig. 3.
Fig. 5 is the internal structure schematic diagram of pier stud.
Specific embodiment
To make the foregoing features and advantages of the present invention clearer and more comprehensible, special embodiment below, and cooperate attached drawing, make detailed
Carefully it is described as follows.
As shown in Fig. 1 ~ 5, a kind of precast assembly pier stud construction being inserted into bellows connection by reinforcing bar, including cushion cap 1, it holds
Platform upper surface is equipped with groove 6, and inside grooves are equipped with the support column 7 to support 2 bottom surface of pier stud, and inside grooves are in support column surrounding
It is embedded with several bellowss 4 vertically, several main reinforcements 5 and bellows of pier stud bottom are corresponded and are inserted into bellows,
Bellows interior is equipped with interior filled layer 8, and inside grooves have poured Concrete Filled layer 3.
In embodiments of the present invention, vertical main reinforcement and lateral stirrup 9 are disposed with inside the pier stud, main reinforcement is along pier
Column short transverse extends pier stud bottom surface.
In embodiments of the present invention, the length that main ribs are stretched out outside pier stud bottom surface needs to meet main reinforcement insertion bellows
Anchorage length, Bellows Length are greater than the anchorage length of pier stud main reinforcement.
In embodiments of the present invention, the Concrete Filled layer uses expansive concrete or ultra-high performance concrete,
It is preferably higher than cushion cap strength grade of concrete.
In embodiments of the present invention, the bottom of the bellows is embedded in groove slot bottom position below, the ripple
Be respectively positioned at the top of pipe groove slot bottom or more than position but be not higher than groove notch.
In embodiments of the present invention, the interior filled layer uses high-strength mortar or grouting material.
In embodiments of the present invention, the support column top surface is flushed with cushion cap upper surface.
It is a kind of by reinforcing bar be inserted into bellows connection precast assembly pier stud construction construction method, according to the following steps into
Row: (1) Precast Pier Columns: production Pier Formwork binds pier stud main reinforcement and stirrup, carries out Precast Pier Columns concreting, poured
Cheng Houyong canvas covering, it is quiet stop a period of time after, start ventilation heating it is steam-cured, after reaching 90% or more design strength, Ji Keting
It only conserves, is ensuring that concrete will not occur due to demoulding and cause can form removal after damage;(2) pier stud transports existing
: construction site is transported to using rubber-tyred transportation in assembled state vehicle, damping is spread on compartment board and prevents the rubber pad of friction, in advance
It should be fixed after pier stud entrucking processed, and fixing situation is checked, meeting can dispatch a car after transporting requirement safely;(3) structure
The storage of part scene: spaciousness is answered in the stacking place of component, stack place answer it is smooth it is solid, draining is good, for prevent Precast Pier Columns by
Pollution, divides into sleeper as support pad;(4) pile foundation, bearing platform construction: progress pile foundation construction, excavation pit carry out cushion cap bed course first
Construction binds cushion cap reinforcing bar, and by the pre-buried bellows of design position, installation platform template pours cushion cap concrete and conserves, finally
Dabbing processing is carried out to cushion cap groove inner surface;(5) hoisting prefabricated pier stud;(6) loop wheel machine is slow to cushion cap top by pier stud lower end
Transfer makes suspension centre, pier stud bottom center, 3 points of cushion cap center in same vertical line, and the overhanging main reinforcement insertion of pier stud is pre-buried
In bellows, groove center support column top surface contacts support pier stud weight with pier stud bottom surface;(7) it is fixed temporarily and corrects: pier shaft
Surrounding is fixed using diagonal brace, and four foot of diagonal brace is withstood with screw jack, and the verticality of pillar is detected with theodolite or total station, if
The deviation filled and be worth perhaps is had more than, pier shaft verticality is adjusted by diagonal brace;(8) connecting node is constructed: confirmation pier stud position, verticality
After repetition measurement is errorless, high-strength mortar or grouting material are poured into bellows, the notch of groove applies one layer of steel mesh, pours in groove
Build expansive concrete or ultra-high performance concrete;(9) maintenance and temporary support are removed: after the completion of groove pours, being spilt in time
Water is conserved, and outside is conserved using geotextiles plastic film of wrapping, and keeps concrete surface wet, to concrete strength
Dismountable step (7) is fixed temporarily when reaching 90%.
In embodiments of the present invention, in step (8), micro- promotion pier before high-strength mortar or grouting material is poured into bellows
Column exposes corrugated pipe orifice, and after high-strength mortar or grouting material are poured into bellows, pier stud main reinforcement should be in high-strength mortar or grouting material
Bellows is inserted into before solidification, it is closely knit to guarantee to contact to fill up bellows gap for extruding high-strength mortar or grouting material when main reinforcement is inserted into.
The present invention is not limited to above-mentioned preferred forms, anyone can show that other are each under the inspiration of the present invention
The precast assembly pier stud construction and construction method that bellows connection is inserted by reinforcing bar of kind form.It is all according to the present patent application patent
The equivalent changes and modifications that range is done, are all covered by the present invention.
Claims (9)
1. a kind of precast assembly pier stud for being inserted into bellows connection by reinforcing bar constructs, it is characterised in that: including cushion cap, on cushion cap
Surface is equipped with groove, and inside grooves are equipped with the support column to support pier stud bottom surface, and inside grooves are buried vertically in support column surrounding
Equipped with several bellowss, several main reinforcements and bellows of pier stud bottom are corresponded and are inserted into bellows, in bellows
Portion is equipped with interior filled layer, and inside grooves have poured Concrete Filled layer.
2. the precast assembly pier stud according to claim 1 for being inserted into bellows connection by reinforcing bar constructs, it is characterised in that:
Vertical main reinforcement and lateral stirrup are disposed with inside the pier stud, main reinforcement extends pier stud bottom surface along pier stud short transverse.
3. the precast assembly pier stud according to claim 1 for being inserted into bellows connection by reinforcing bar constructs, it is characterised in that:
The length that main ribs are stretched out outside pier stud bottom surface needs to meet the anchorage length of main reinforcement insertion bellows, and Bellows Length is greater than pier
The anchorage length of column main reinforcement.
4. the precast assembly pier stud according to claim 1 for being inserted into bellows connection by reinforcing bar constructs, it is characterised in that:
The Concrete Filled layer uses expansive concrete or ultra-high performance concrete.
5. the precast assembly pier stud according to claim 1 for being inserted into bellows connection by reinforcing bar constructs, it is characterised in that:
The bottom of the bellows is embedded in groove slot bottom position below, be respectively positioned at the top of the bellows groove slot bottom or with
On position but be not higher than groove notch.
6. the precast assembly pier stud according to claim 1 for being inserted into bellows connection by reinforcing bar constructs, it is characterised in that:
The interior filled layer uses high-strength mortar or grouting material.
7. the precast assembly pier stud according to claim 1 for being inserted into bellows connection by reinforcing bar constructs, it is characterised in that:
The support column top surface is flushed with cushion cap upper surface.
8. a kind of precast assembly pier stud construction as claimed in claim 1 for being inserted into bellows connection by reinforcing bar is applied
Work method, which is characterized in that sequentially include the following steps: (1) Precast Pier Columns: production Pier Formwork binds pier stud main reinforcement and stirrup,
Carry out Precast Pier Columns concreting, covered after the completion of pouring with canvas, it is quiet stop a period of time after, start ventilation heating it is steam-cured,
It after reaching 90% or more design strength, can stop conserving, ensure that concrete will not occur due to demoulding and after leading to damage
It can form removal;(2) pier stud is transported to scene: construction site is transported to using rubber-tyred transportation in assembled state vehicle, on compartment board
It spreads damping and prevents the rubber pad of friction, should be fixed, and fixing situation is checked, meet after Precast Pier Columns entrucking
It can dispatch a car after transporting requirement safely;(3) component scene stores: spaciousness is answered in the stacking place of component, is stacked place and is answered smooth heavily fortified point
Real, draining well, to prevent Precast Pier Columns contaminated, divides into sleeper as support pad;(4) pile foundation, bearing platform construction: progress stake first
Base construction, excavation pit carry out cushion cap cushion construction, cushion cap reinforcing bar are bound, by the pre-buried bellows of design position, installation platform mould
Plate pours cushion cap concrete and conserves, and finally carries out dabbing processing to cushion cap groove inner surface;(5) hoisting prefabricated pier stud;(6)
Pier stud lower end to slowly transfer at the top of cushion cap, is made suspension centre, pier stud bottom center, 3 points of cushion cap center in same vertical by loop wheel machine
On line, the overhanging main reinforcement of pier stud is inserted into pre-buried bellows, groove center support column top surface contacts support pier stud with pier stud bottom surface
Weight;(7) be fixed temporarily and correct: pier shaft surrounding is fixed using diagonal brace, and four foot of diagonal brace is withstood with screw jack, uses theodolite
Or the verticality of total station detection pillar adjusts pier shaft verticality by diagonal brace if having more than the deviation filled and be worth perhaps;(8) it connects
Node construction: after confirmation pier stud position, verticality repetition measurement are errorless, high-strength mortar or grouting material are poured into bellows, groove
Notch applies one layer of steel mesh, and expansive concrete or ultra-high performance concrete are poured in groove;(9) maintenance and interim branch
Support is removed: after the completion of groove pours, watering is conserved in time, and outside is conserved using geotextiles plastic film of wrapping, and is protected
It is wet to hold concrete surface, dismountable step (7) is fixed temporarily when concrete strength reaches 90%.
9. the construction method of the precast assembly pier stud construction according to claim 8 that bellows connection is inserted by reinforcing bar,
It is characterized by: micro- promotion pier stud exposes bellows before pouring into high-strength mortar or grouting material into bellows in step (8)
Mouthful, after high-strength mortar or grouting material are poured into bellows, pier stud main reinforcement should be inserted into wave before high-strength mortar or grouting material solidification
Line pipe, it is closely knit to guarantee to contact to fill up bellows gap for extruding high-strength mortar or grouting material when main reinforcement is inserted into.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910643003.XA CN110205921A (en) | 2019-07-17 | 2019-07-17 | The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910643003.XA CN110205921A (en) | 2019-07-17 | 2019-07-17 | The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110205921A true CN110205921A (en) | 2019-09-06 |
Family
ID=67797593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910643003.XA Pending CN110205921A (en) | 2019-07-17 | 2019-07-17 | The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110205921A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111042185A (en) * | 2020-01-13 | 2020-04-21 | 中冶建工集团有限公司 | Construction method of basement raft foundation with tower crane foundation |
CN112502030A (en) * | 2020-11-04 | 2021-03-16 | 安徽省交通规划设计研究总院股份有限公司 | Prefabricated assembled bridge substructure slot-in type and socket joint formula built-up connection structure |
CN113123220A (en) * | 2020-01-10 | 2021-07-16 | 中国国家铁路集团有限公司 | Rapid connecting structure between prefabricated pier stud and base and construction method |
CN113202017A (en) * | 2020-03-17 | 2021-08-03 | 中国铁路设计集团有限公司 | Connecting structure between prefabricated assembled pier stud and top cap and construction method |
CN114108687A (en) * | 2021-11-08 | 2022-03-01 | 中国一冶集团有限公司 | Accurate embedding method of embedded part |
CN116219902A (en) * | 2023-05-09 | 2023-06-06 | 中铁建设集团有限公司 | Construction method of filling blocks in thin-wall hollow high pier of cross-sea bridge |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106192729A (en) * | 2016-07-14 | 2016-12-07 | 东南大学 | Precast assembly bridge pier core shape joggle structure and construction method |
CN106869017A (en) * | 2017-04-05 | 2017-06-20 | 北京工业大学 | A kind of pier bottom sets the precast assembly bridge pier-cushion cap node connected mode and its practice of flexible layer |
CN108755392A (en) * | 2018-05-24 | 2018-11-06 | 威海市公路勘察设计院 | Precast assembly bridge pier grouting joint construction and construction method |
WO2018214477A1 (en) * | 2017-05-24 | 2018-11-29 | 华南理工大学 | Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor |
CN210482021U (en) * | 2019-07-17 | 2020-05-08 | 福州大学 | Prefabricated assembling pier column structure connected through steel bars inserted into corrugated pipe |
-
2019
- 2019-07-17 CN CN201910643003.XA patent/CN110205921A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106192729A (en) * | 2016-07-14 | 2016-12-07 | 东南大学 | Precast assembly bridge pier core shape joggle structure and construction method |
CN106869017A (en) * | 2017-04-05 | 2017-06-20 | 北京工业大学 | A kind of pier bottom sets the precast assembly bridge pier-cushion cap node connected mode and its practice of flexible layer |
WO2018214477A1 (en) * | 2017-05-24 | 2018-11-29 | 华南理工大学 | Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor |
CN108755392A (en) * | 2018-05-24 | 2018-11-06 | 威海市公路勘察设计院 | Precast assembly bridge pier grouting joint construction and construction method |
CN210482021U (en) * | 2019-07-17 | 2020-05-08 | 福州大学 | Prefabricated assembling pier column structure connected through steel bars inserted into corrugated pipe |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113123220A (en) * | 2020-01-10 | 2021-07-16 | 中国国家铁路集团有限公司 | Rapid connecting structure between prefabricated pier stud and base and construction method |
CN111042185A (en) * | 2020-01-13 | 2020-04-21 | 中冶建工集团有限公司 | Construction method of basement raft foundation with tower crane foundation |
CN111042185B (en) * | 2020-01-13 | 2021-05-11 | 中冶建工集团有限公司 | Construction method of basement raft foundation with tower crane foundation |
CN113202017A (en) * | 2020-03-17 | 2021-08-03 | 中国铁路设计集团有限公司 | Connecting structure between prefabricated assembled pier stud and top cap and construction method |
CN112502030A (en) * | 2020-11-04 | 2021-03-16 | 安徽省交通规划设计研究总院股份有限公司 | Prefabricated assembled bridge substructure slot-in type and socket joint formula built-up connection structure |
CN114108687A (en) * | 2021-11-08 | 2022-03-01 | 中国一冶集团有限公司 | Accurate embedding method of embedded part |
CN116219902A (en) * | 2023-05-09 | 2023-06-06 | 中铁建设集团有限公司 | Construction method of filling blocks in thin-wall hollow high pier of cross-sea bridge |
CN116219902B (en) * | 2023-05-09 | 2023-06-27 | 中铁建设集团有限公司 | Construction method of filling blocks in thin-wall hollow high pier of cross-sea bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110205921A (en) | The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar | |
CN103422672B (en) | A kind of reinforced concrete precast assembling housing construction construction method | |
CN106013172B (en) | Double-row pile combines Deep Foundation Pit Support for Soft Soil structure and construction method with diagonal brace | |
CN109235499B (en) | Open-cut underground building structure assembly type construction method | |
CN105178357A (en) | Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition | |
CN110219236B (en) | Prefabricated spliced pier column structure connected through slots and construction method thereof | |
CN109837831A (en) | A kind of centrifugation prefabricated assembled concrete bridge pier and construction method | |
CN106759439B (en) | Tower crane foundation for foundation pit and construction method thereof | |
CN106869548B (en) | A kind of newel frame assembled underground parking structural system and construction method | |
CN102839601A (en) | Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure | |
CN112575670B (en) | T-shaped rigid frame bridge suitable for tunnel to pass through giant karst cave and construction technology thereof | |
CN108035379B (en) | Comprehensive pipe gallery and construction method thereof | |
CN201567584U (en) | Prefabricated construction reinforced concrete cushion cap foundation | |
CN106193120B (en) | Basement is encorbelmented, and bottom plate is inverse to make structure and construction method | |
CN108708290A (en) | The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit | |
CN210482021U (en) | Prefabricated assembling pier column structure connected through steel bars inserted into corrugated pipe | |
CN210482022U (en) | Prefabricated pier stud structure of assembling of slot-in type connection | |
CN211547797U (en) | Tower crane foundation structure suitable for basement raft foundation | |
CN212926569U (en) | Connecting structure of prefabricated shear wall with window opening and superposed beam | |
CN211172070U (en) | Assembled type suspended wall retaining wall structure of reinforced concrete member | |
CN210163936U (en) | Pile culvert integrally-assembled steel bone concrete comprehensive pipe gallery | |
CN218712134U (en) | Groove body unit and groove body structure of assembled aqueduct | |
CN109235482B (en) | Tower crane foundation based on bonded prestressed concrete and construction method thereof | |
CN115506634B (en) | Assembled platform canopy and construction method thereof | |
CN215977872U (en) | Overlapped integral prefabricated shear wall edge component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |